no-stretch assembly of triple gems
DESCRIPTION
No-stretch assembly of triple GEMs . Andrey Marinov On behalf of GEM Collaboration GEMs for CMS. Talk Outline. Technologies used for all the CMS prototypes NS1 Prototype – 10x10cm NS2 Prototype – 30x30cm Future Plans. Assembly technologies used in CMS prototypes. Thermo stretching method - PowerPoint PPT PresentationTRANSCRIPT
Andrey MarinovOn behalf of
GEM Collaboration GEMs for CMS
No-stretch assembly of triple GEMs
2L. Franconi - A. Marinov - M. Zientek
Technologies used for all the CMS prototypesNS1 Prototype – 10x10cmNS2 Prototype – 30x30cmFuture Plans
Talk Outline
RD51 Miniweek - Nov. 2011
3L. Franconi - A. Marinov - M. Zientek
Thermo stretching methodAll CMS prototype s where build based on this
method
Assembly technologies used in CMS prototypes
RD51 Miniweek - Nov. 2011
4
“Honeycomb” GEM
Insert honeycomb spacers between GEM foils to avoid foil stretching
Similar performance level observed as for standard GEMs, but local efficiency losses due to spacers.
RD51 Miniweek - Nov. 2011L. Franconi - A. Marinov - M. Zientek
5L. Franconi - A. Marinov - M. Zientek
NS1 10x10cm
RD51 Miniweek - Nov. 2011
Holes for the Stretching pins
Protection resistors 10MohmsContact areas
L. Franconi - A. Marinov - M. Zientek 6
10x10 [NS2] prototype: New mechanics
GEM foil with the protection resistors
Read-Out board, bottom plane
Read-Out board, top plane, connector
Frame for stretching
Placing the foil Mounting the frame and stretching
Stretched GEM foil Placing the Read-Out
Assembled in 1 hour!
RD51 Miniweek - Nov. 2011
GEM foil tests in CO2 have been done by applying HV to each GEM and measuring the current.
Nothing suspicious has been found.
The drift was also tested up to 3.5kV, measured current was constant 0.3nA.
L. Franconi - A. Marinov - M. Zientek RD51 Miniweek - Nov. 2011 8
NS1 – 10x10cm
Small prototype in the setup, connected to the gas.
9L. Franconi - A. Marinov - M. Zientek RD51 Miniweek - Nov. 2011
10L. Franconi - A. Marinov - M. Zientek
NS2 30x30cm
RD51 Miniweek - Nov. 2011
RD51 Miniweek - Nov. 2011 L. Franconi - A. Marinov - M. Zientek 11
GEM foil
Holes for the stretching
RD51 Miniweek - Nov. 2011 L. Franconi - A. Marinov - M. Zientek 12
Drift plane
Pins for the HV connections
13L. Franconi - A. Marinov - M. Zientek
NS2 30x30cm
RD51 Miniweek - Nov. 2011
Drift electrodeand the external frame
14L. Franconi - A. Marinov - M. Zientek
NS2 30x30cm
RD51 Miniweek - Nov. 2011
Triple GEM frameReady for stretching
15L. Franconi - A. Marinov - M. Zientek RD51 Miniweek - Nov. 2011
NS2 30x30cm
Stretching the GEMs
16L. Franconi - A. Marinov - M. Zientek
NS2 30x30cm
RD51 Miniweek - Nov. 2011
Stretched GEMs
Waiting the readoutPCB to be mounted
17L. Franconi - A. Marinov - M. Zientek
It is under testGain calibrationGain stabilityUniformity
NS2 30x30cm Status
RD51 Miniweek - Nov. 2011
18L. Franconi - A. Marinov - M. Zientek
After validating NS2 we would like to go for NS3 with full GE1/1 size.
We need to see the possibility the build such a detectorMechanicsHVReadoutGas….
Future Plan
RD51 Miniweek - Nov. 2011
19L. Franconi - A. Marinov - M. Zientek
Thanks toLeszek Ropelewski
Rui De OliveiraThe RD51 Team
Thank you
11/21/2011