no-stretch assembly of triple gems

19
Andrey Marinov On behalf of GEM Collaboration GEMs for CMS No-stretch assembly of triple GEMs

Upload: sora

Post on 23-Feb-2016

45 views

Category:

Documents


0 download

DESCRIPTION

No-stretch assembly of triple GEMs . Andrey Marinov On behalf of GEM Collaboration GEMs for CMS. Talk Outline. Technologies used for all the CMS prototypes NS1 Prototype – 10x10cm NS2 Prototype – 30x30cm Future Plans. Assembly technologies used in CMS prototypes. Thermo stretching method - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: No-stretch assembly of triple GEMs

Andrey MarinovOn behalf of

GEM Collaboration GEMs for CMS

No-stretch assembly of triple GEMs

Page 2: No-stretch assembly of triple GEMs

2L. Franconi - A. Marinov - M. Zientek

Technologies used for all the CMS prototypesNS1 Prototype – 10x10cmNS2 Prototype – 30x30cmFuture Plans

Talk Outline

RD51 Miniweek - Nov. 2011

Page 3: No-stretch assembly of triple GEMs

3L. Franconi - A. Marinov - M. Zientek

Thermo stretching methodAll CMS prototype s where build based on this

method

Assembly technologies used in CMS prototypes

RD51 Miniweek - Nov. 2011

Page 4: No-stretch assembly of triple GEMs

4

“Honeycomb” GEM

Insert honeycomb spacers between GEM foils to avoid foil stretching

Similar performance level observed as for standard GEMs, but local efficiency losses due to spacers.

RD51 Miniweek - Nov. 2011L. Franconi - A. Marinov - M. Zientek

Page 5: No-stretch assembly of triple GEMs

5L. Franconi - A. Marinov - M. Zientek

NS1 10x10cm

RD51 Miniweek - Nov. 2011

Holes for the Stretching pins

Protection resistors 10MohmsContact areas

Page 6: No-stretch assembly of triple GEMs

L. Franconi - A. Marinov - M. Zientek 6

10x10 [NS2] prototype: New mechanics

GEM foil with the protection resistors

Read-Out board, bottom plane

Read-Out board, top plane, connector

Frame for stretching

Placing the foil Mounting the frame and stretching

Stretched GEM foil Placing the Read-Out

Assembled in 1 hour!

RD51 Miniweek - Nov. 2011

Page 7: No-stretch assembly of triple GEMs

GEM foil tests in CO2 have been done by applying HV to each GEM and measuring the current.

Nothing suspicious has been found.

The drift was also tested up to 3.5kV, measured current was constant 0.3nA.

Page 8: No-stretch assembly of triple GEMs

L. Franconi - A. Marinov - M. Zientek RD51 Miniweek - Nov. 2011 8

NS1 – 10x10cm

Small prototype in the setup, connected to the gas.

Page 9: No-stretch assembly of triple GEMs

9L. Franconi - A. Marinov - M. Zientek RD51 Miniweek - Nov. 2011

Page 10: No-stretch assembly of triple GEMs

10L. Franconi - A. Marinov - M. Zientek

NS2 30x30cm

RD51 Miniweek - Nov. 2011

Page 11: No-stretch assembly of triple GEMs

RD51 Miniweek - Nov. 2011 L. Franconi - A. Marinov - M. Zientek 11

GEM foil

Holes for the stretching

Page 12: No-stretch assembly of triple GEMs

RD51 Miniweek - Nov. 2011 L. Franconi - A. Marinov - M. Zientek 12

Drift plane

Pins for the HV connections

Page 13: No-stretch assembly of triple GEMs

13L. Franconi - A. Marinov - M. Zientek

NS2 30x30cm

RD51 Miniweek - Nov. 2011

Drift electrodeand the external frame

Page 14: No-stretch assembly of triple GEMs

14L. Franconi - A. Marinov - M. Zientek

NS2 30x30cm

RD51 Miniweek - Nov. 2011

Triple GEM frameReady for stretching

Page 15: No-stretch assembly of triple GEMs

15L. Franconi - A. Marinov - M. Zientek RD51 Miniweek - Nov. 2011

NS2 30x30cm

Stretching the GEMs

Page 16: No-stretch assembly of triple GEMs

16L. Franconi - A. Marinov - M. Zientek

NS2 30x30cm

RD51 Miniweek - Nov. 2011

Stretched GEMs

Waiting the readoutPCB to be mounted

Page 17: No-stretch assembly of triple GEMs

17L. Franconi - A. Marinov - M. Zientek

It is under testGain calibrationGain stabilityUniformity

NS2 30x30cm Status

RD51 Miniweek - Nov. 2011

Page 18: No-stretch assembly of triple GEMs

18L. Franconi - A. Marinov - M. Zientek

After validating NS2 we would like to go for NS3 with full GE1/1 size.

We need to see the possibility the build such a detectorMechanicsHVReadoutGas….

Future Plan

RD51 Miniweek - Nov. 2011

Page 19: No-stretch assembly of triple GEMs

19L. Franconi - A. Marinov - M. Zientek

Thanks toLeszek Ropelewski

Rui De OliveiraThe RD51 Team

Thank you

11/21/2011