norah’s vintage afghan - · pdf file 3 [email protected] berroco -...
TRANSCRIPT
Berroco, Inc., 1 Tupperware Dr, Suite 4, N. Smithfield, RI 02896-6815 Copyright 2015 in USA and Canada
Love Berroco patterns? Sign up for our KnitBits® newsletter.
1
Norah’s Vintage AfghanDesigned by Norah Gaughan
Berroco - Norah’s Vintage Afghan version 5
skill level: Intermediate One size
finished measurementsApproximately 48" wide x 60" long
materials4 Hanks each BERROCO VINTAGE (100 grs), #5104 Mushroom (A), #5192 Chana Dal (B), #5107 Cracked Pepper (C), #5105 Oats (D) and #5177 Douglas Fir (E)Or 4 balls each BERROCO COMFORT (100 grs), #9703 Barley (A), #9785 Falseberry Heather (B), #9713 Dusk (C), #9720 Hummus (D) and #9792 Hackberry Heather (E)Straight knitting needles, size 7 (4.50 mm) OR SIZE TO OBTAIN GAUGECable needle (cn)Crochet hook, size 4.50 mm (G)Tapestry needle
gauge20 sts and 27 rows = 4" in St stTO SAVE TIME, TAKE TIME TO CHECK GAUGE Vintage®
Berroco Comfort ®
www.berroco.com
NOTEThis afghan is made up of 20 different squares. They are all made individually, then sewn together following diagram in the direction shown by arrows. Cast on for all squares using long-tail method.
SQUARE 1With A, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): K1, M1, (k2, M1) 27 times, k1, M1, k1 – 86 sts. Beg on WS, work Rows 1 – 16 of Chart 1 four times, then work Rows 1 – 5, end with a WS row (69 rows total).Dec Row (RS): K2tog, (k1, k2tog) 28 times – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 2With B, cast on 59 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): (K1, M1) 3 times, (k1, M1, k2, M1) 17 times, (k1, M1) 3 times, k2 – 99 sts.Beg on WS, work Rows 1 – 12 of Chart 2 five times, then work Rows 1 – 11, end with a WS row (71 rows total).Dec Row (RS): K1, (k2tog) 3 times, (k1, k2tog, k2tog) 17 times, (k2tog) 3 times, k1 – 59 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 3With C, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.Inc Row (RS): (K2, M1) 27 times, k3 – 84 sts.Beg on WS, work 69 rows of Chart 3, end with a WS row.Dec Row (RS): (K1, k2tog) 27 times, k3 – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 4With D, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): (K1, M1) twice, (k2, M1) 26 times, (k1, M1) twice, k1 – 87 sts.Beg on WS, work Rows 1 – 16 of Chart 4 four times, then work Rows 1 – 7, end with a WS row (71 rows total).Dec Row (RS): (K2tog) twice, (k1, k2tog) 27 times, k2tog – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
NOTE: We recommend using yarns called for in our instructions. Every effort has been made to ensure that directions contained in this book are accurate and complete, however errors do occur. We cannot be responsible for variance of individual knitters, human or typographical errors.
All pattern PDFs are updated when corrections are made. In the event of finding an error, please make sure you've downloaded the most recent version.
Berroco - Norah’s Vintage Afghan
www.berroco.com
Berroco - Norah’s Vintage Afghan
SQUARE 5With D, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): K1, M1, (k2, M1) 27 times, k1, M1, k1 – 86 sts.Beg on WS, work Rows 1 – 8 of Chart 5 eight times, then work Rows 1 – 5, end with a WS row (69 rows total).Dec Row (RS): K2tog, (k1, k2tog) 28 times – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 6With E, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): (K1, M1) twice, (k2, M1) 26 times, (k1, M1) twice, k1 – 87 sts.Beg on WS, work Rows 1 – 11 of Chart 6 once, then work Rows 12 – 21 six times, end with a WS row (71 rows total). Dec Row (RS): (K2tog) twice, (k1, k2tog) 27 times, k2tog – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 7With B, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): K1, M1, (k2, M1) 27 times, k1, M1, k1 – 86 sts.Beg on WS, work Rows 1 – 12 of Chart 7 five times, then work Rows 1 – 9, end with a WS row (69 rows total). Dec Row (RS): K2tog, (k1, k2tog) 28 times – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 8With A, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): (K1, M1) twice, (k2, M1) 26 times, (k1,
M1) twice, k1 – 87 sts.Beg on WS, work Rows 1 – 6 of Chart 8 eleven times, then work Rows 1 – 3, end with a WS row (69 rows total).Dec Row (RS): (K2tog) twice, (k1, k2tog) 27 times, k2tog – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 9With B, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): (K1, M1) twice, (k2, M1) 26 times, (k1, M1) twice, k1 – 87 sts.Beg on WS, work Rows 1 – 16 of Chart 9 four times, then work Rows 1 – 7, end with a WS row (71 rows total).Dec Row (RS): (K2tog) twice, (k1, k2tog) 27 times, k2tog – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 10With C, cast on 59 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): K1, M1, (k2, M1) 28 times, k2 – 88 sts.Beg on WS, work Rows 1 – 4 of Chart 10 seventeen times, then work Row 1 once more, end with a WS row (69 rows total).Dec Row (RS): K1, (k1, k2tog) 29 times – 59 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 11With D, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): (K1, M1) twice, (k2, M1) 26 times, (k1, M1) twice, k1 – 87 sts.Beg on WS, work Rows 1 – 24 of Chart 11 twice, then work Rows 1 – 21 once, end with a WS row (69 rows total).Dec Row (RS): (K2tog) twice, (k1, k2tog) 27 times, k2tog – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
www.berroco.com
Berroco - Norah’s Vintage Afghan
SQUARE 12With E, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): K1, M1, (k2, M1) 27 times, k2 – 85 sts.Beg on WS, work Rows 1 – 16 of Chart 12 four times, then work Rows 1 – 7, end with a WS row (71 rows total).Dec Row (RS): K1, (k1, k2tog) 28 times – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 13With C, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): (K1, M1) twice, (k2, M1) 26 times, (k1, M1) twice, k1 – 87 sts.Beg on WS, work Rows 1 – 8 of Chart 13 eight times, then work Rows 1 – 7, end with a WS row (71 rows total).Dec Row (RS): (K2tog) twice, (k1, k2tog) 27 times, k2tog – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 14With A, cast on 59 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): K1, M1, (k2, M1) 28 times, k2 – 88 sts.Beg on WS, work Rows 1 – 24 of Chart 14 twice, then work Rows 1 – 23, end with a WS row (71 rows total).Dec Row (RS): K1, (k1, k2tog) 29 times – 59 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 15With E, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): K1, M1, (k2, M1) 27 times, k1, M1, k1 – 86 sts.Beg on WS, work Rows 9 – 16 of Chart 15 once,
work Rows 1 – 16 three times, then work Rows 1 – 15, end with a WS row (71 rows total).Dec Row (RS): K2tog, (k1, k2tog) 28 times – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 16With B, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 1 – 9: Knit.Inc Row (RS): K1, M1, (k2, M1) 27 times, k2 – 85 sts.Beg on WS, work Rows 1 – 69 of Chart 16, end with a WS row (69 rows total).Dec Row (RS): K1, (k1, k2tog) 28 times – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 17With E, cast on 59 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): (K1, M1) 3 times, (k1, M1, k2, M1) 17 times, (k1, M1) 3 times, k2 – 99 sts.Beg on WS, work Rows 1 – 12 of Chart 17 six times, then work Row 1 once, end with a WS row (73 rows total).Dec Row (RS): K1, (k2tog) 3 times, (k1, k2tog, k2tog) 17 times, (k2tog) 3 times, k1 – 59 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 18With D, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): (K2, M1) 27 times, k3 – 84 sts.Beg on WS, work Rows 1 – 71 of Chart 18, end with a WS row (71 rows total).Dec Row (RS): (K1, k2tog) 27 times, k3 – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
www.berroco.com
SQUARE 19With A, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): K1, M1, (k2, M1) 27 times, k1, M1, k1 – 86 sts.Beg on WS, work Rows 1 – 38 of Chart 19, then work Rows 1 – 35, end with a WS row (73 rows total).Dec Row (RS): K2tog, (k1, k2tog) 28 times – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
SQUARE 20With C, cast on 57 sts.Rows 1 – 4: Knit.Row 5 (WS): K1, * p1, k1, rep from * across.Rows 6 – 9: Knit.Inc Row (RS): K1, M1, (k2, M1) 28 times – 86 sts.Beg on WS, work Rows 1 – 20 of Chart 20 three times, then work Rows 1 – 9, end with a WS row (69 rows total).Dec Row (RS): K2tog, (k1, k2tog) 28 times – 57 sts. Rep Rows 1 – 9 as for beginning of square, end with a WS row. Bind off knitwise.
FINISHINGUsing tapestry needle and left-over yarn and whip st, sew squares together following diagram. Turn squares as you work so that they go in the direction shown by arrows (bound-off edge should be at point of arrow).Edging: With RS facing, using crochet hook, join D with a sl st in any corner of afghan. Work in sc around entire afghan, working 3 sc’s in each corner, join with a sl st in first sc. Working from left to right, work in reverse sc around entire edge, join with a sl st in first sc. Fasten off. Weave in all ends and block as desired.
Berroco - Norah’s Vintage Afghan
BERROCO SCHEMATICS FOR STYLE: NORAH’S AFGHAN DIAGRAM DATE: 12/8/15
1
A
2 3 4
5 6 7 8
9 10 11 12
13 14 15 16
17 18 19 20
B C D
ED B A
B C D E
C A E B
E D A C
NORAH’S AFGHAN DIAGRAM
www.berroco.com
Sl 2 sts on cn and hold in BACK, k2, p2 from cn
Sl 2 sts to cn and hold in FRONT, p2, k2 from cn. ..
...
.
. ...
. .
.
15
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
CHART 1
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
KEY TO CHART 1
CHART 1 NOTESOn RS, beg at A, work to C, rep betweenB and C, end at DOn WS, beg at D, work to B, rep betweenC and B, end at A
Sl 2 sts on cn and hold in BACK, k2, p2 from cn
Sl 2 sts to cn and hold in FRONT, p2, k2 from cn. ..
...
.
. ...
. .
.
15
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
CHART 1
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
KEY TO CHART 1
CHART 1 NOTESOn RS, beg at A, work to C, rep betweenB and C, end at DOn WS, beg at D, work to B, rep betweenC and B, end at A
CHART 1
Berroco - Norah’s Vintage Afghan
www.berroco.com
CHART 2KEY TO CHART 2
CHART 2 NOTESOn RS, beg at A, work to C, repbetween B and C, end at DOn WS, beg at D, work to B, repbetween C and B, end at A
..
..
.. .......
.....
..
.....
..........
.....
..........
11
9
7
5
3
1
12
10
8
6
4
2
CHART 2knit on RS; purl on WS
purl on RS; knit on WS
..
..
..
..
..
Sl 1 st to cn and hold in BACK, p1, k1, p1, p1 from cn
Sl 3 sts to cn and hold in FRONT, p1, k3 from cn
Sl 4 sts to cn and hold in BACK, p1, k1, p1,sl last st from cn to LH needle and purl it,then k3 from cn
Sl 4 sts to cn and hold in FRONT, p1, k1,p1, sl last st to LH needle and purl it,then k3 from cn
ABCD
KEY TO CHART 2
CHART 2 NOTESOn RS, beg at A, work to C, repbetween B and C, end at DOn WS, beg at D, work to B, repbetween C and B, end at A
..
..
.. .......
.....
..
.....
..........
.....
..........
11
9
7
5
3
1
12
10
8
6
4
2
CHART 2knit on RS; purl on WS
purl on RS; knit on WS
..
..
..
..
..
Sl 1 st to cn and hold in BACK, p1, k1, p1, p1 from cn
Sl 3 sts to cn and hold in FRONT, p1, k3 from cn
Sl 4 sts to cn and hold in BACK, p1, k1, p1,sl last st from cn to LH needle and purl it,then k3 from cn
Sl 4 sts to cn and hold in FRONT, p1, k1,p1, sl last st to LH needle and purl it,then k3 from cn
ABCD
Berroco - Norah’s Vintage Afghan
www.berroco.com
CHART 3
.
.
..
.
. .
..
.
..
.
.
..
..
..
..
.
..
.
.
.
.
.
.
.
.
.
..
....
..
..
..
..
..
..
....
..
..
Sl 1 st to cn and hold in BACK,k3, k1 from ch
Sl 3 sts to cn and hold in FRONT,k1, k3 from cn
Sl 2 sts to cn and hold inBACK, k3, k2 from cn
Sl 3 sts to cn and hold inFRONT, k2, k3 from cn
Sl 2 sts to cn and hold inBACK, k3, p2 from cn
Sl 3 sts to cn and hold inFRONT, p2, k3 from cn
Sl 3 sts to cn and hold inBACK, k3, k3 from cn
Sl 3 sts to cn and hold inFRONT, k3, k3 from cn
Sl 3 sts to cn and hold inBACK, k3, p3 from cn
Sl 3 sts to cn and hold inFRONT, p3, k3 from cn
CHART 3 NOTESOn WS, work from left to right.On RS, work from right to left.
..
69
67
65
63
61
59
57
55
53
51
49
47
45
43
41
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
68
66
64
62
60
58
56
54
52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
CHART 3
knit on RS; purl on WS
work these 4 sts 3 times work these 4 sts 3 times
purl on RS; knit on WS
KEY TO CHART 3
Sl 1 st to cn and hold in BACK,k3, p1 from cn
Sl 3 sts to cn and hold in FRONT,p1, k3 from cn
.
.
..
.
. .
..
.
..
.
.
..
..
..
..
.
..
.
.
.
.
.
.
.
.
.
..
....
..
..
..
..
..
..
....
..
..
Sl 1 st to cn and hold in BACK,k3, k1 from ch
Sl 3 sts to cn and hold in FRONT,k1, k3 from cn
Sl 2 sts to cn and hold inBACK, k3, k2 from cn
Sl 3 sts to cn and hold inFRONT, k2, k3 from cn
Sl 2 sts to cn and hold inBACK, k3, p2 from cn
Sl 3 sts to cn and hold inFRONT, p2, k3 from cn
Sl 3 sts to cn and hold inBACK, k3, k3 from cn
Sl 3 sts to cn and hold inFRONT, k3, k3 from cn
Sl 3 sts to cn and hold inBACK, k3, p3 from cn
Sl 3 sts to cn and hold inFRONT, p3, k3 from cn
CHART 3 NOTESOn WS, work from left to right.On RS, work from right to left.
..
69
67
65
63
61
59
57
55
53
51
49
47
45
43
41
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
68
66
64
62
60
58
56
54
52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
CHART 3
knit on RS; purl on WS
work these 4 sts 3 times work these 4 sts 3 times
purl on RS; knit on WS
KEY TO CHART 3
Sl 1 st to cn and hold in BACK,k3, p1 from cn
Sl 3 sts to cn and hold in FRONT,p1, k3 from cn
.
.
..
.
. .
..
.
..
.
.
..
..
..
..
.
..
.
.
.
.
.
.
.
.
.
..
....
..
..
..
..
..
..
....
..
..
Sl 1 st to cn and hold in BACK,k3, k1 from ch
Sl 3 sts to cn and hold in FRONT,k1, k3 from cn
Sl 2 sts to cn and hold inBACK, k3, k2 from cn
Sl 3 sts to cn and hold inFRONT, k2, k3 from cn
Sl 2 sts to cn and hold inBACK, k3, p2 from cn
Sl 3 sts to cn and hold inFRONT, p2, k3 from cn
Sl 3 sts to cn and hold inBACK, k3, k3 from cn
Sl 3 sts to cn and hold inFRONT, k3, k3 from cn
Sl 3 sts to cn and hold inBACK, k3, p3 from cn
Sl 3 sts to cn and hold inFRONT, p3, k3 from cn
CHART 3 NOTESOn WS, work from left to right.On RS, work from right to left.
..
69
67
65
63
61
59
57
55
53
51
49
47
45
43
41
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
68
66
64
62
60
58
56
54
52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
CHART 3
knit on RS; purl on WS
work these 4 sts 3 times work these 4 sts 3 times
purl on RS; knit on WS
KEY TO CHART 3
Sl 1 st to cn and hold in BACK,k3, p1 from cn
Sl 3 sts to cn and hold in FRONT,p1, k3 from cn
.
.
..
.
. .
..
.
..
.
.
..
..
..
..
.
..
.
.
.
.
.
.
.
.
.
..
....
..
..
..
..
..
..
....
..
..
Sl 1 st to cn and hold in BACK,k3, k1 from ch
Sl 3 sts to cn and hold in FRONT,k1, k3 from cn
Sl 2 sts to cn and hold inBACK, k3, k2 from cn
Sl 3 sts to cn and hold inFRONT, k2, k3 from cn
Sl 2 sts to cn and hold inBACK, k3, p2 from cn
Sl 3 sts to cn and hold inFRONT, p2, k3 from cn
Sl 3 sts to cn and hold inBACK, k3, k3 from cn
Sl 3 sts to cn and hold inFRONT, k3, k3 from cn
Sl 3 sts to cn and hold inBACK, k3, p3 from cn
Sl 3 sts to cn and hold inFRONT, p3, k3 from cn
CHART 3 NOTESOn WS, work from left to right.On RS, work from right to left.
..
69
67
65
63
61
59
57
55
53
51
49
47
45
43
41
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
68
66
64
62
60
58
56
54
52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
CHART 3
knit on RS; purl on WS
work these 4 sts 3 times work these 4 sts 3 times
purl on RS; knit on WS
KEY TO CHART 3
Sl 1 st to cn and hold in BACK,k3, p1 from cn
Sl 3 sts to cn and hold in FRONT,p1, k3 from cn
Berroco - Norah’s Vintage Afghan
www.berroco.com
CHART 4
..
..
Sl 4 sts to cn and hold in FRONT, p2, k4 from cn
Sl 4 sts to cn and hold in FRONT,k1, p1, k4 from cn
..
..
.
.
Sl 4 sts to cn and hold in FRONT,p1, k1, k4 from cn.. ..Sl 2 sts to cn and hold in BACK,k4, p2 from cn. .Sl 2 sts to cn and hold in BACK,k4, p1, k1, from cn.
.Sl 2 sts to cn and hold in BACK,k4, k1, p1 from cn
. .. .
. . Sl 2 sts to cn and hold in BACK,p1, RT, p1, k2 from cn
RT - k2tog, leaving sts on LH needle, thenk the �rst st again, slipping sts o� LH needle
..
....
Sl 4 sts to cn and hold in FRONT,k2, then p1, RT, p1 from cn.. . .
.. . .
Sl 2 sts to cn and hold in BACK,p1, RT, p1, then p2 from cn....
....
Sl 4 sts to cn and hold in FRONT,p2, then p1, RT, p1 from cn
KEY TO CHART 4
CHART 4 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
CHART 4
ABCD
15
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
..
..
Sl 4 sts to cn and hold in FRONT, p2, k4 from cn
Sl 4 sts to cn and hold in FRONT,k1, p1, k4 from cn
..
..
.
.
Sl 4 sts to cn and hold in FRONT,p1, k1, k4 from cn.. ..Sl 2 sts to cn and hold in BACK,k4, p2 from cn. .Sl 2 sts to cn and hold in BACK,k4, p1, k1, from cn.
.Sl 2 sts to cn and hold in BACK,k4, k1, p1 from cn
. .. .
. . Sl 2 sts to cn and hold in BACK,p1, RT, p1, k2 from cn
RT - k2tog, leaving sts on LH needle, thenk the �rst st again, slipping sts o� LH needle
..
....
Sl 4 sts to cn and hold in FRONT,k2, then p1, RT, p1 from cn.. . .
.. . .
Sl 2 sts to cn and hold in BACK,p1, RT, p1, then p2 from cn....
....
Sl 4 sts to cn and hold in FRONT,p2, then p1, RT, p1 from cn
KEY TO CHART 4
CHART 4 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
CHART 4
ABCD
15
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
..
..
Sl 4 sts to cn and hold in FRONT, p2, k4 from cn
Sl 4 sts to cn and hold in FRONT,k1, p1, k4 from cn
..
..
.
.
Sl 4 sts to cn and hold in FRONT,p1, k1, k4 from cn.. ..Sl 2 sts to cn and hold in BACK,k4, p2 from cn. .Sl 2 sts to cn and hold in BACK,k4, p1, k1, from cn.
.Sl 2 sts to cn and hold in BACK,k4, k1, p1 from cn
. .. .
. . Sl 2 sts to cn and hold in BACK,p1, RT, p1, k2 from cn
RT - k2tog, leaving sts on LH needle, thenk the �rst st again, slipping sts o� LH needle
..
....
Sl 4 sts to cn and hold in FRONT,k2, then p1, RT, p1 from cn.. . .
.. . .
Sl 2 sts to cn and hold in BACK,p1, RT, p1, then p2 from cn....
....
Sl 4 sts to cn and hold in FRONT,p2, then p1, RT, p1 from cn
KEY TO CHART 4
CHART 4 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
CHART 4
ABCD
15
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
Berroco - Norah’s Vintage Afghan
www.berroco.com
CHART 5
7
5
3
1
8
6
4
2
CHART 5
knit on RS; purl on WS
purl on RS; knit on WS
k1tbl
Make Knot - k in front, back, then frontof next st (3 sts made in 1), sl these 3 stsback to LH needle and knit them, thensl second and �rst st over third st
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
Sl 2 sts to cn and hold in BACK,k2, k2 from cn
Sl 1 st to cn and hold in FRONT, k1,k1 from cn
Sl 1 st to cn and hold in BACK, k1,k1 from cn
KEY TO CHART 5
CHART 5 NOTESOn RS, beg at A, work to C, rep between Band C, end at D.On WS, beg at D, work to B, rep between Cand B, end at A.
ABCD
7
5
3
1
8
6
4
2
CHART 5
knit on RS; purl on WS
purl on RS; knit on WS
k1tbl
Make Knot - k in front, back, then frontof next st (3 sts made in 1), sl these 3 stsback to LH needle and knit them, thensl second and �rst st over third st
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
Sl 2 sts to cn and hold in BACK,k2, k2 from cn
Sl 1 st to cn and hold in FRONT, k1,k1 from cn
Sl 1 st to cn and hold in BACK, k1,k1 from cn
KEY TO CHART 5
CHART 5 NOTESOn RS, beg at A, work to C, rep between Band C, end at D.On WS, beg at D, work to B, rep between Cand B, end at A.
ABCD
7
5
3
1
8
6
4
2
CHART 5
knit on RS; purl on WS
purl on RS; knit on WS
k1tbl
Make Knot - k in front, back, then frontof next st (3 sts made in 1), sl these 3 stsback to LH needle and knit them, thensl second and �rst st over third st
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
Sl 2 sts to cn and hold in BACK,k2, k2 from cn
Sl 1 st to cn and hold in FRONT, k1,k1 from cn
Sl 1 st to cn and hold in BACK, k1,k1 from cn
KEY TO CHART 5
CHART 5 NOTESOn RS, beg at A, work to C, rep between Band C, end at D.On WS, beg at D, work to B, rep between Cand B, end at A.
ABCD
CHART 6CHART 6
21
19
17
15
13
11
9
7
5
3
1
20
18
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
k1tbl on RS; p1tbl on WS
Sl 2 sts to cn and hold in BACK,k2, k2 from cn
Sl 2 sts to cn and hold in FRONT, k2, k2 from cn
KEY TO CHART 6
CHART 6 NOTESOn WS, work from left to right.On RS, work from right to left.Work Rows 1 - 11, then rep Rows12 - 21 six times.
CHART 6
21
19
17
15
13
11
9
7
5
3
1
20
18
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
k1tbl on RS; p1tbl on WS
Sl 2 sts to cn and hold in BACK,k2, k2 from cn
Sl 2 sts to cn and hold in FRONT, k2, k2 from cn
KEY TO CHART 6
CHART 6 NOTESOn WS, work from left to right.On RS, work from right to left.Work Rows 1 - 11, then rep Rows12 - 21 six times.
CHART 6
21
19
17
15
13
11
9
7
5
3
1
20
18
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
k1tbl on RS; p1tbl on WS
Sl 2 sts to cn and hold in BACK,k2, k2 from cn
Sl 2 sts to cn and hold in FRONT, k2, k2 from cn
KEY TO CHART 6
CHART 6 NOTESOn WS, work from left to right.On RS, work from right to left.Work Rows 1 - 11, then rep Rows12 - 21 six times.
Berroco - Norah’s Vintage Afghan
www.berroco.com
CHART 7
11
9
7
5
3
1
12
10
8
6
4
2
CHART 7
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
Sl 4 sts to cn and holdin FRONT, k4, k4 from cn
Sl 4 sts to cn and holdin BACK, k4, k4 from cn
KEY TO CHART 7
CHART 7 NOTESOn RS, beg at A, work to C, rep between B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
11
9
7
5
3
1
12
10
8
6
4
2
CHART 7
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
Sl 4 sts to cn and holdin FRONT, k4, k4 from cn
Sl 4 sts to cn and holdin BACK, k4, k4 from cn
KEY TO CHART 7
CHART 7 NOTESOn RS, beg at A, work to C, rep between B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
11
9
7
5
3
1
12
10
8
6
4
2
CHART 7
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
Sl 4 sts to cn and holdin FRONT, k4, k4 from cn
Sl 4 sts to cn and holdin BACK, k4, k4 from cn
KEY TO CHART 7
CHART 7 NOTESOn RS, beg at A, work to C, rep between B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
CHART 8
5
3
1
6
4
2
CHART 8
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
RT - k2tog, leaving sts on LH needle,then k the �rst st again, slipping stso� LH needle
Sl 2 sts to cn and hold in BACK,k2, k2 from cn
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
KEY TO CHART 8
CHART 8 NOTESOn RS, beg at A, work to C, rep betweenB and C, end at D.On WS, beg at D, work to B, rep betweenC and B, end at A.
5
3
1
6
4
2
CHART 8
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
RT - k2tog, leaving sts on LH needle,then k the �rst st again, slipping stso� LH needle
Sl 2 sts to cn and hold in BACK,k2, k2 from cn
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
KEY TO CHART 8
CHART 8 NOTESOn RS, beg at A, work to C, rep betweenB and C, end at D.On WS, beg at D, work to B, rep betweenC and B, end at A.
5
3
1
6
4
2
CHART 8
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
RT - k2tog, leaving sts on LH needle,then k the �rst st again, slipping stso� LH needle
Sl 2 sts to cn and hold in BACK,k2, k2 from cn
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
KEY TO CHART 8
CHART 8 NOTESOn RS, beg at A, work to C, rep betweenB and C, end at D.On WS, beg at D, work to B, rep betweenC and B, end at A.
Berroco - Norah’s Vintage Afghan
www.berroco.com
CHART 9CHART 9
ABCD
... ...15
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
Sl 3 sts to cn and hold inBACK, p1, k1, p1, k3 from cn
Sl 3 sts to cn and hold inBACK, p1, k1, p1, p3 from cn
. . .. . . . . .
..
.. ....
.. ..
Sl 3 sts to cn and hold inBACK, k3, then p1, k1, p1 from cn... Sl 3 sts to cn and hold inBACK, k3, p3 from cn
CHART 9 NOTESOn RS, beg at A, work to C, repbetween B to C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
KEY TO CHART 9
CHART 9
ABCD
... ...15
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
Sl 3 sts to cn and hold inBACK, p1, k1, p1, k3 from cn
Sl 3 sts to cn and hold inBACK, p1, k1, p1, p3 from cn
. . .. . . . . .
..
.. ....
.. ..
Sl 3 sts to cn and hold inBACK, k3, then p1, k1, p1 from cn... Sl 3 sts to cn and hold inBACK, k3, p3 from cn
CHART 9 NOTESOn RS, beg at A, work to C, repbetween B to C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
KEY TO CHART 9
CHART 9
ABCD
... ...15
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
Sl 3 sts to cn and hold inBACK, p1, k1, p1, k3 from cn
Sl 3 sts to cn and hold inBACK, p1, k1, p1, p3 from cn
. . .. . . . . .
..
.. ....
.. ..
Sl 3 sts to cn and hold inBACK, k3, then p1, k1, p1 from cn... Sl 3 sts to cn and hold inBACK, k3, p3 from cn
CHART 9 NOTESOn RS, beg at A, work to C, repbetween B to C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
KEY TO CHART 9
Berroco - Norah’s Vintage Afghan
CHART 10CHART 10
3
1
4
2
knit on RS; purl on WS
purl on RS; knit on WS
Sl 2 sts to cn and hold in BACK,k2, k2 from cn
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
KEY TO CHART 10
CHART 10 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
ABCD
CHART 10
3
1
4
2
knit on RS; purl on WS
purl on RS; knit on WS
Sl 2 sts to cn and hold in BACK,k2, k2 from cn
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
KEY TO CHART 10
CHART 10 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
ABCD
CHART 10
3
1
4
2
knit on RS; purl on WS
purl on RS; knit on WS
Sl 2 sts to cn and hold in BACK,k2, k2 from cn
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
KEY TO CHART 10
CHART 10 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
ABCD
CHART 11
www.berroco.com
23
21
19
17
15
13
11
9
7
5
3
1
24
22
20
18
16
14
12
10
8
6
4
2
CHART 11
knit on RS; purl on WS
purl on RS; knit on WS
Sl 6 sts to cn and hold in BACK,k3, sl last 3 sts from cn to LH needleand purl them, then k3 from cn
Sl 6 sts to cn and hold in FRONT,k3, sl last 3 sts from cn to LH needleand purl them, then k3 from cn
CHART 11 NOTESOn RS, beg at A, work to C, rep between B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
KEY TO CHART 11
ABCD
23
21
19
17
15
13
11
9
7
5
3
1
24
22
20
18
16
14
12
10
8
6
4
2
CHART 11
knit on RS; purl on WS
purl on RS; knit on WS
Sl 6 sts to cn and hold in BACK,k3, sl last 3 sts from cn to LH needleand purl them, then k3 from cn
Sl 6 sts to cn and hold in FRONT,k3, sl last 3 sts from cn to LH needleand purl them, then k3 from cn
CHART 11 NOTESOn RS, beg at A, work to C, rep between B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
KEY TO CHART 11
ABCD
Berroco - Norah’s Vintage Afghan
CHART 12
www.berroco.com
15
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
CHART 12
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
k1tbl on RS; p1tbl on WS
.
.
. .
..
.
. .
.
Sl 2 sts to cn and hold inBACK, k2, p2 from cn
Sl 2 sts to cn and hold inFRONT, p2, k2 from cn
Sl 3 sts to cn and hold inBACK, k2, sl last st on cn toLH needle and k1tbl, k2 from cn
Sl 3 sts to cn and hold inFRONT, k2, sl last st on cn toLH needle and k1tbl, k2from cn
KEY TO CHART 12
CHART 12 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
15
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
CHART 12
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
k1tbl on RS; p1tbl on WS
.
.
. .
..
.
. .
.
Sl 2 sts to cn and hold inBACK, k2, p2 from cn
Sl 2 sts to cn and hold inFRONT, p2, k2 from cn
Sl 3 sts to cn and hold inBACK, k2, sl last st on cn toLH needle and k1tbl, k2 from cn
Sl 3 sts to cn and hold inFRONT, k2, sl last st on cn toLH needle and k1tbl, k2from cn
KEY TO CHART 12
CHART 12 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
Berroco - Norah’s Vintage Afghan
CHART 13
CHART 13
7
5
3
1
8
6
4
2
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
Sl 4 sts to cn and hold in FRONT, k4, k4 from cn
KEY TO CHART 13
CHART 13 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
CHART 13
7
5
3
1
8
6
4
2
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
Sl 4 sts to cn and hold in FRONT, k4, k4 from cn
KEY TO CHART 13
CHART 13 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
www.berroco.com
Berroco - Norah’s Vintage Afghan
CHART 14
www.berroco.com
CHART 14
23
21
19
17
15
13
11
9
7
5
3
1
24
22
20
18
16
14
12
10
8
6
4
2
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
.
. .....
......
......
....
..
....
....
Sl 1 st to cn and hold inBACK, k2, k1 from cn
Sl 2 sts to cn and hold inFRONT, k1, k2 from cn
Sl 1 st to cn and hold inBACK, k2, p1 from cn
Sl 2 sts to cn and hold inFRONT, p1, k2 from cn
Sl 2 sts to cn and hold inFRONT, k2, k2 from cn
KEY TO CHART 14
CHART 14 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
CHART 14
23
21
19
17
15
13
11
9
7
5
3
1
24
22
20
18
16
14
12
10
8
6
4
2
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
.
. .....
......
......
....
..
....
....
Sl 1 st to cn and hold inBACK, k2, k1 from cn
Sl 2 sts to cn and hold inFRONT, k1, k2 from cn
Sl 1 st to cn and hold inBACK, k2, p1 from cn
Sl 2 sts to cn and hold inFRONT, p1, k2 from cn
Sl 2 sts to cn and hold inFRONT, k2, k2 from cn
KEY TO CHART 14
CHART 14 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
CHART 14
23
21
19
17
15
13
11
9
7
5
3
1
24
22
20
18
16
14
12
10
8
6
4
2
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
.
. .....
......
......
....
..
....
....
Sl 1 st to cn and hold inBACK, k2, k1 from cn
Sl 2 sts to cn and hold inFRONT, k1, k2 from cn
Sl 1 st to cn and hold inBACK, k2, p1 from cn
Sl 2 sts to cn and hold inFRONT, p1, k2 from cn
Sl 2 sts to cn and hold inFRONT, k2, k2 from cn
KEY TO CHART 14
CHART 14 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
Berroco - Norah’s Vintage Afghan
CHART 15
www.berroco.com
15
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
Sl 2 sts to cn and hold inBACK, k2, k2 from cn
Sl 2 sts to cn and hold inFRONT, k2, k2 from cn
KEY TO CHART 15
CHART 15 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
CHART 15
15
13
11
9
7
5
3
1
16
14
12
10
8
6
4
2
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
Sl 2 sts to cn and hold inBACK, k2, k2 from cn
Sl 2 sts to cn and hold inFRONT, k2, k2 from cn
KEY TO CHART 15
CHART 15 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
CHART 15
Berroco - Norah’s Vintage Afghan
CHART 16
www.berroco.com
ABCDEF
CHART 16
69
67
65
63
61
59
57
55
53
51
49
47
45
43
41
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
68
66
64
62
60
58
56
54
52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
.
. ..
..
.
.
. ..
.
.
..
.. .
..
..
..
.
..
.... ......
..
....
..
....
..
....
....
.. ......
..
....
..
....
Bobble - knit in front and back of nextst twice (5 sts made in 1); * sl these 5 stsback to LH needle and knit them. Rep from * once more. Slip sts 4, 3, 2 and 1over 5th st - 1 st remains
Sl 2 sts to cn and hold inBACK, k2, k2 from cn
Sl 2 sts to cn and hold inFRONT, k2, k2 from cn
Sl 2 sts to cn and hold inBACK, k2, p2 from cn
Sl 2 sts to cn and hold inFRONT, p2, k2 from cn
KEY TO CHART 16
CHART 16 NOTESOn RS, beg at A, work to C, rep fromB to C once more; work to E, rep from D toE once, end at F.On WS, beg at F, work to D, rep fromE to D once more; work to B, rep from C toB once, end at A.
ABCDEF
CHART 16
69
67
65
63
61
59
57
55
53
51
49
47
45
43
41
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
68
66
64
62
60
58
56
54
52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
.
. ..
..
.
.
. ..
.
.
..
.. .
..
..
..
.
..
.... ......
..
....
..
....
..
....
....
.. ......
..
....
..
....
Bobble - knit in front and back of nextst twice (5 sts made in 1); * sl these 5 stsback to LH needle and knit them. Rep from * once more. Slip sts 4, 3, 2 and 1over 5th st - 1 st remains
Sl 2 sts to cn and hold inBACK, k2, k2 from cn
Sl 2 sts to cn and hold inFRONT, k2, k2 from cn
Sl 2 sts to cn and hold inBACK, k2, p2 from cn
Sl 2 sts to cn and hold inFRONT, p2, k2 from cn
KEY TO CHART 16
CHART 16 NOTESOn RS, beg at A, work to C, rep fromB to C once more; work to E, rep from D toE once, end at F.On WS, beg at F, work to D, rep fromE to D once more; work to B, rep from C toB once, end at A.
ABCDEF
CHART 16
69
67
65
63
61
59
57
55
53
51
49
47
45
43
41
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
68
66
64
62
60
58
56
54
52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
.
. ..
..
.
.
. ..
.
.
..
.. .
..
..
..
.
..
.... ......
..
....
..
....
..
....
....
.. ......
..
....
..
....
Bobble - knit in front and back of nextst twice (5 sts made in 1); * sl these 5 stsback to LH needle and knit them. Rep from * once more. Slip sts 4, 3, 2 and 1over 5th st - 1 st remains
Sl 2 sts to cn and hold inBACK, k2, k2 from cn
Sl 2 sts to cn and hold inFRONT, k2, k2 from cn
Sl 2 sts to cn and hold inBACK, k2, p2 from cn
Sl 2 sts to cn and hold inFRONT, p2, k2 from cn
KEY TO CHART 16
CHART 16 NOTESOn RS, beg at A, work to C, rep fromB to C once more; work to E, rep from D toE once, end at F.On WS, beg at F, work to D, rep fromE to D once more; work to B, rep from C toB once, end at A.
ABCDEF
CHART 16
69
67
65
63
61
59
57
55
53
51
49
47
45
43
41
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
68
66
64
62
60
58
56
54
52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
.
. ..
..
.
.
. ..
.
.
..
.. .
..
..
..
.
..
.... ......
..
....
..
....
..
....
....
.. ......
..
....
..
....
Bobble - knit in front and back of nextst twice (5 sts made in 1); * sl these 5 stsback to LH needle and knit them. Rep from * once more. Slip sts 4, 3, 2 and 1over 5th st - 1 st remains
Sl 2 sts to cn and hold inBACK, k2, k2 from cn
Sl 2 sts to cn and hold inFRONT, k2, k2 from cn
Sl 2 sts to cn and hold inBACK, k2, p2 from cn
Sl 2 sts to cn and hold inFRONT, p2, k2 from cn
KEY TO CHART 16
CHART 16 NOTESOn RS, beg at A, work to C, rep fromB to C once more; work to E, rep from D toE once, end at F.On WS, beg at F, work to D, rep fromE to D once more; work to B, rep from C toB once, end at A.
Berroco - Norah’s Vintage Afghan
CHART 17
www.berroco.com
11
9
7
5
3
1
12
10
8
6
4
2
CHART 17
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
Sl 6 sts to cn and hold in BACK, k3,slip left-most 3 sts from cn back toLH needle and purl them, then k3from cn
Sl 6 sts to cn and hold in FRONT, k3,slip left-most 3 sts from cn back toLH needle and purl them, then k3from cn
KEY TO CHART 17
CHART 17 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
11
9
7
5
3
1
12
10
8
6
4
2
CHART 17
ABCD
knit on RS; purl on WS
purl on RS; knit on WS
Sl 6 sts to cn and hold in BACK, k3,slip left-most 3 sts from cn back toLH needle and purl them, then k3from cn
Sl 6 sts to cn and hold in FRONT, k3,slip left-most 3 sts from cn back toLH needle and purl them, then k3from cn
KEY TO CHART 17
CHART 17 NOTESOn RS, beg at A, work to C, repbetween B and C, end at D.On WS, beg at D, work to B, repbetween C and B, end at A.
Berroco - Norah’s Vintage Afghan
www.berroco.com
CHART 18CHART 18
71
69
67
65
63
61
59
57
55
53
51
49
47
45
43
41
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
70
68
66
64
62
60
58
56
54
52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
..
..
..
. . .. . .
.. .
..
. . .. .
. ..
.. . .
. .. .
..
. . ..
.. .
. .. .
. .
.
.
..
..
.. .
. .. .
..
....
.. ....
....
..
.... .. ..
.. .... ..
....
.. .. .... ....
.. .. ..
....
.. ....
.... .. ....
..
....
....
.. .. ....
..
.... ..
..
...... ..
.. .... ..
.. ....
Sl 2 sts to cn and hold in BACK, k2, k2 from cn
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
Sl 2 sts to cn and hold in BACK,k2, p2 from cn
Sl 2 sts to cn and hold in FRONT,p2, k2 from cn
Sl 4 sts to cn and hold in FRONT,k2, slip left-most 2 sts from cn toLH needle and purl them, thenk2 from cn
KEY TO CHART 18
CHART 18 NOTESOn WS, work from left to right.On RS, work from right to left.
CHART 18
71
69
67
65
63
61
59
57
55
53
51
49
47
45
43
41
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
70
68
66
64
62
60
58
56
54
52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
..
..
..
. . .. . .
.. .
..
. . .. .
. ..
.. . .
. .. .
..
. . ..
.. .
. .. .
. .
.
.
..
..
.. .
. .. .
..
....
.. ....
....
..
.... .. ..
.. .... ..
....
.. .. .... ....
.. .. ..
....
.. ....
.... .. ....
..
....
....
.. .. ....
..
.... ..
..
...... ..
.. .... ..
.. ....
Sl 2 sts to cn and hold in BACK, k2, k2 from cn
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
Sl 2 sts to cn and hold in BACK,k2, p2 from cn
Sl 2 sts to cn and hold in FRONT,p2, k2 from cn
Sl 4 sts to cn and hold in FRONT,k2, slip left-most 2 sts from cn toLH needle and purl them, thenk2 from cn
KEY TO CHART 18
CHART 18 NOTESOn WS, work from left to right.On RS, work from right to left.
CHART 18
71
69
67
65
63
61
59
57
55
53
51
49
47
45
43
41
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
70
68
66
64
62
60
58
56
54
52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
knit on RS; purl on WS
purl on RS; knit on WS
..
..
..
. . .. . .
.. .
..
. . .. .
. ..
.. . .
. .. .
..
. . ..
.. .
. .. .
. .
.
.
..
..
.. .
. .. .
..
....
.. ....
....
..
.... .. ..
.. .... ..
....
.. .. .... ....
.. .. ..
....
.. ....
.... .. ....
..
....
....
.. .. ....
..
.... ..
..
...... ..
.. .... ..
.. ....
Sl 2 sts to cn and hold in BACK, k2, k2 from cn
Sl 2 sts to cn and hold in FRONT,k2, k2 from cn
Sl 2 sts to cn and hold in BACK,k2, p2 from cn
Sl 2 sts to cn and hold in FRONT,p2, k2 from cn
Sl 4 sts to cn and hold in FRONT,k2, slip left-most 2 sts from cn toLH needle and purl them, thenk2 from cn
KEY TO CHART 18
CHART 18 NOTESOn WS, work from left to right.On RS, work from right to left.
Berroco - Norah’s Vintage Afghan
www.berroco.com
CHART 19
CHART 19
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
knit on RS; purl on WS
purl on RS; knit on WS
. . .
. . .. . .
. . .. . .
. . . . . .. . .
. . .
. . .. . .
. . .
. . .
...
......
......
...
......
......
......
......
...
......
......
......
......
...
...
.. .
.. ... .
.. ....
......
...
RT - k2tog, leaving sts on LH needle,then k the �rst st again, slipping sts o� LH needle
Sl 2 sts to cn and hold inBACK, p1, RT, p1, thenp2 from cn
Sl 4 sts to cn and hold inFRONT, p2, then p1, RT,p1 from cn
Sl 4 sts to cn and hold inFRONT, k1, p1, then p1,RT, p1 from cn
Sl 4 st to cn and hold in FRONT, p1, k1, then p1,RT, p1 from cn
KEY TO CHART 19
CHART 19 NOTESOn RS, beg at A, work to C, repbetween B and C once, end at D.On WS, beg at D, work to B, repbetween C and B once, end at A.
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
ABCD
CHART 19
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
knit on RS; purl on WS
purl on RS; knit on WS
. . .
. . .. . .
. . .. . .
. . . . . .. . .
. . .
. . .. . .
. . .
. . .
...
......
......
...
......
......
......
......
...
......
......
......
......
...
...
.. .
.. ... .
.. ....
......
...
RT - k2tog, leaving sts on LH needle,then k the �rst st again, slipping sts o� LH needle
Sl 2 sts to cn and hold inBACK, p1, RT, p1, thenp2 from cn
Sl 4 sts to cn and hold inFRONT, p2, then p1, RT,p1 from cn
Sl 4 sts to cn and hold inFRONT, k1, p1, then p1,RT, p1 from cn
Sl 4 st to cn and hold in FRONT, p1, k1, then p1,RT, p1 from cn
KEY TO CHART 19
CHART 19 NOTESOn RS, beg at A, work to C, repbetween B and C once, end at D.On WS, beg at D, work to B, repbetween C and B once, end at A.
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
ABCD
CHART 19
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
knit on RS; purl on WS
purl on RS; knit on WS
. . .
. . .. . .
. . .. . .
. . . . . .. . .
. . .
. . .. . .
. . .
. . .
...
......
......
...
......
......
......
......
...
......
......
......
......
...
...
.. .
.. ... .
.. ....
......
...
RT - k2tog, leaving sts on LH needle,then k the �rst st again, slipping sts o� LH needle
Sl 2 sts to cn and hold inBACK, p1, RT, p1, thenp2 from cn
Sl 4 sts to cn and hold inFRONT, p2, then p1, RT,p1 from cn
Sl 4 sts to cn and hold inFRONT, k1, p1, then p1,RT, p1 from cn
Sl 4 st to cn and hold in FRONT, p1, k1, then p1,RT, p1 from cn
KEY TO CHART 19
CHART 19 NOTESOn RS, beg at A, work to C, repbetween B and C once, end at D.On WS, beg at D, work to B, repbetween C and B once, end at A.
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
ABCD
Berroco - Norah’s Vintage Afghan
www.berroco.com
CHART 20
..
..
..
..
.
..
..
....
....
....
..
KEY TO CHART 20
Sl 2 sts to cn and hold inBACK, k2, k2 from cn
Sl 2 sts to cn and hold inFRONT, k2, k2 from cn
Sl 2 sts to cn and hold inBACK, p2, k2 from cn
Sl 2 sts to cn and hold inFRONT, p2, k2 from cn
CHART 20 NOTESOn RS, beg at A, work to C, rep between B and C once, end at D.On WS, beg at D, work to B, repbetween C and B once, end at A. ABCD
19
17
15
13
11
9
7
5
3
1
20
18
16
14
12
10
8
6
4
2
CHART 20
knit on RS; purl on WS
purl on RS; knit on WS
..
..
..
..
.
..
..
....
....
....
..
KEY TO CHART 20
Sl 2 sts to cn and hold inBACK, k2, k2 from cn
Sl 2 sts to cn and hold inFRONT, k2, k2 from cn
Sl 2 sts to cn and hold inBACK, p2, k2 from cn
Sl 2 sts to cn and hold inFRONT, p2, k2 from cn
CHART 20 NOTESOn RS, beg at A, work to C, rep between B and C once, end at D.On WS, beg at D, work to B, repbetween C and B once, end at A. ABCD
19
17
15
13
11
9
7
5
3
1
20
18
16
14
12
10
8
6
4
2
CHART 20
knit on RS; purl on WS
purl on RS; knit on WS
Berroco - Norah’s Vintage Afghan
www.berroco.com
ABBREVIATIONS & TERMS
beg: beginningCC: contrasting colorcdd (centered double decrease): Slip 2 together (as if to k2tog), knit 1, pass the 2 slipped stitches over.cn: cable needlecont: continuedec: decreasedpn: double pointed needles est: established inc: increaseK: knitk tbl: knit through the back loop(s)k2tog: Knit 2 stitches togetherk3tog: Knit 3 stitches togetherLH: left handMC: main colorM1: Pick up horizontal strand between stitch just worked and next stitch from front to back, place on left hand needle, knit this stitch through the back (1 stitch increased).M1L: Work as for M1.M1p: Pick up horizontal strand between stitch just worked and next stitch from front to back, place on left hand needle, purl this stitch through the back (1 stitch increased).M1pL: Work as for M1p.M1pR: Pick up horizontal strand between stitch just worked and next stitch from back to front, place on left hand needle, purl this stitch through the front (1 stitch increased).M1R: Pick up horizontal strand between stitch just worked and next stitch from back to front, place on left hand needle, knit this stitch through the front (1 stitch increased).p: purlp tbl: purl through the back loop(s)pat(s): pattern(s)pm: place marker psso: pass slip stitch over knit stitchp2tog: purl 2 stitches togetherp2sso: pass 2 slip stitches over knit stitchp3tog: purl 3 stitches togetherrem: remaining rep: repeatRH: right handrnd(s): round(s)RS: right sidesc: single crochet
sl: slipsm: slip markerSSK: Slip 2 stitches knitwise, insert point of left hand needle through fronts of these 2 stitches and knit 2 together.SSP: Slip 2 stitches knitwise, transfer these 2 stitches back to left hand needle, purl 2 together through the back loops.st(s): stitch(es)TBL: through back loop(s)tog: togetherw&t: wrap and turn, a method of concealing a hole created in short row shaping. With yarn held in back, slip stitch to be wrapped purlwise, then bring yarn between needles to the front. Slip that same stitch back to the left needle, then bring the yarn to the back again. Turn your work. Unless otherwise indicated, each time you come to a wrapped stitch when working subsequent rows, slip the wrap back over stitch and onto needle, then work the wrap together with its accompanying stitch.WS: wrong sidewyib: with yarn in backwyif: with yarn in frontyo: yarn overend on WS: end having just completed a Wrong Side row.end on RS: end having just completed a Right Side rowStockinette stitch (St st): Knit 1 row, purl 1 row alternately when working on straight needles. The knit side is the right side of work. Knit EVERY round when working in the round on a circular needle. Reverse St st (Rev St st): Purl 1 row, knit 1 row alternately when working on straight needles. The purl side is the right side of the work. Purl EVERY round when working in the round on a circular needle.GARTER ST: Knit EVERY row when working on straight needles. Knit 1 round, purl 1 round when working on a circular needle.
23
Berroco - Norah’s Vintage Afghan