In July of 2011, a denitrifying bioreactor was installed in the North Fork Maquoketa Headwaters watershed in northeast Iowa. A denitrifying bioreactor is installed to reduce nitrate delivery from agriculture fields.TRANSCRIPT
![Page 1: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/1.jpg)
The bioreactor was designed by ISU Extension and
installed by Schlietz Construction and Ernie Goebel
With funding from the:
Iowa Watershed Improvement Review Board
![Page 2: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/2.jpg)
Nitrate in
tile-drainageDenitrifying
bioreactorwith by-pass flow
Reduced nitrate
loading to surface waters
nitrate
+ organic fill
bacteria nitrogen
gas
Tile-drained field
![Page 3: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/3.jpg)
![Page 4: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/4.jpg)
The site for the
Denitrifying Bioreactor
was chosen because it
was in an out-of-the-
way area beside a
grassed waterway
along Clear Creek Rd.
Tile location --
outlets under
the road
![Page 5: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/5.jpg)
Starting the carbon biomass (woodchip) bed. This will
be a 15’ wide, 100’ long, and about 3.5’ to 4’ deep
with a 1.25 % grade from the inlet to the outlet.
![Page 6: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/6.jpg)
Bypass tile line --
Due to location
of existing tile a
non-perforated
bypass
line was placed
within the
bioreactor.
![Page 7: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/7.jpg)
Inlet control structure with two sets of baffles.
To Bioreactor inlet tile
Water from
drainage
tile
Bypass
Leave 1.5 to 2 ft at bottom Remove all baffles
![Page 8: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/8.jpg)
Outlet structure
plumbed with a
perforated tile at
lower end of
bioreactor.
Water will exit the
bioreactor through
perforated tile.
![Page 9: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/9.jpg)
Outlet control structure to allow water
samples to be taken and, if desired, reduce
the rate of flow from bioreactor.
Outlet From bioreactor
![Page 10: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/10.jpg)
Non-perforated by-pass line tied in below outlet structure.
Outlet control
structure used to
allow water samples
to be collected or
to slow the rate of
flow out of
bioreactor.
![Page 11: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/11.jpg)
Biomass ‘bed’ was filled
using a skid loader and
spread with backhoe to
prevent wheel traffic and compaction on the
wood chips.
![Page 12: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/12.jpg)
Inlet perforated tile–
where water will
enter evenly across
the bioreactor.
Inlet control structure – Tile water allowed
to freely flow from drainage tile into bioreactor. Internal baffles used to
create 1.5’ to 2’ head pressure before
releasing into bypass non-perforated tile.
![Page 13: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/13.jpg)
Permeable geotextile fabric used to
keep soil from leaching down into the
wood chips and slowing the system.
Outlet
Inlet
![Page 14: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/14.jpg)
Soil placed
back over
wood chips with
care not to put
too much
wheel traffic on
chip bed.
![Page 15: North Fork Maquoketa Denitrifying Bioreactor Installation](https://reader034.vdocument.in/reader034/viewer/2022042816/55999c5f1a28ab870d8b47bd/html5/thumbnails/15.jpg)
Bioreactor mounded to reduce chances of
washout. Waterway will be shaped and
reseeded. The goal is to have 1 to 1.5 Ft of
soil covering wood chips.