NORTH STREET RECONSTRUCTION PROJECT
Department of Public Works - Public Information Meeting
Tuesday, March 6, 2012 (City Hall, Hearing Room, 7pm)
Presentation Available: www.northamptonma.gov/dpw/Engineering
-
7/31/2019 North St Meeting 03-06-2012
2/20
Recent History
2007 North Street becomes a priority for repaving
2008 DPW survey completed for repaving in 2009
2009 Bay State Gas replaces gas lines, delaying repaving June 2010 DPW Public Information Meeting (27 people)
Began process for neighborhood input: Discussed traffic calming
.
October 2010 Website Neighborhood Survey for Traffic Calming
(74 responders ranked 22 possible improvements)
This survey showed that responders ranked pedestrian safety and
accessibility as their highest priority, with drainage, reducing truck
traffic, and planting more trees running a close second. The next tier
of ranking were bike lanes, and improvements to curbing and
pavement markings.
-
7/31/2019 North St Meeting 03-06-2012
3/20
Early 2011 Further confirmation that utility improvements need
to be included on North Street causing higher project costs.Budget constraints push North Street to 2012, and Conz Street
Reconstruction takes priority.
Recent History (continued)
reconstruction including utility replacement (water, sewer and
drainage), traffic calming, sidewalks, curbing, crosswalks,
accessibility, pavement markings, and signage.
Summer 2012 North Street Reconstruction Expected to Begin!(Warning: Probably will get worse before it gets better.)
Tonight: Present Improvements and 3 Conceptual Designs.
Gather feedback from residents.
-
7/31/2019 North St Meeting 03-06-2012
4/20
IMPROVEMENT: Replace Water, Sewer & Drainage Infrastructure
-
7/31/2019 North St Meeting 03-06-2012
5/20
IMPROVEMENT: Pavement Markings
DOUBLE YELLOW CENTER LINE W/ SHOULDER LINES
~3,000 FT LENGTH:
BATES ST. TO INTERSECTION
OF MARKET ST/WALNUT ST.
11 FT TRAVEL LANES:NARROWER LANES TO
REDUCE SPEEDS
-
7/31/2019 North St Meeting 03-06-2012
6/20
IMPROVEMENT: Install Curbing to Define Roadway
Multiple types of existing curbing
Bituminous runs with granite radii
Remove and reset granite curb from
Market St. to Highland Ave
Propose narrowing Lincoln Ave throat
-
7/31/2019 North St Meeting 03-06-2012
7/20
IMPROVEMENT: Install Curbing to Define Roadway (continued)
Propose narrowing Market Street throat.
-
7/31/2019 North St Meeting 03-06-2012
8/20
DRAINAGE IMPROVEMENT: Crown & Grade Road & Add Catch Basins
-
7/31/2019 North St Meeting 03-06-2012
9/20
-
7/31/2019 North St Meeting 03-06-2012
10/20
TREE CONCERNS:
Provide Tree Protection Stump Removal
-
7/31/2019 North St Meeting 03-06-2012
11/20
PROPOSE: New Sidewalk Along Cemetery
TREE PLANTINGS:
DPW will consider treeplantings on private property.
Care of these trees is owners
responsibility.
-
7/31/2019 North St Meeting 03-06-2012
12/20
SIDEWALK CONCERNS
Private property sidewalk transitions for several feet provided for in contract.
Discussion with owner may be required on a case by case basis.
-
7/31/2019 North St Meeting 03-06-2012
13/20
SIDEWALK CONCERNS
Responsibility of owner to trim vegetation on private property or
remove plants before construction begins.
-
7/31/2019 North St Meeting 03-06-2012
14/20
IMPROVEMENT: Crosswalks/Signage
Provide up to 7 crosswalks along North Street meeting current DPW standards
(16) Crosswalks at all side streets
MUTCD Approved Signage
(on BOTH sides of posts)
-
7/31/2019 North St Meeting 03-06-2012
15/20
OTHER SIGNAGE
LARGER STOP SIGNS, INTERSECTION AHEAD WARNING, 30 MPH,
NO PARKING, CURVES (WITH ADVISORY SPEED LIMIT)
-
7/31/2019 North St Meeting 03-06-2012
16/20
IMPROVEMENT: Two Raised Crosswalks Under Consideration
JACKSON STREET SCHOOL
-
7/31/2019 North St Meeting 03-06-2012
17/20
IMPROVEMENT: Two Raised Crosswalks Under Consideration
JACKSON STREET SCHOOL
-
7/31/2019 North St Meeting 03-06-2012
18/20
CITY EMERGENCY ROUTE MAP
Primary Route for Police-Fire Vehicles
*Need to discuss raised feature plans for approval.
NORTH ST: 30 MPH
SPEED REGULATION #7346
ISSUED ON January 14, 1986
-
7/31/2019 North St Meeting 03-06-2012
19/20
PARKING: (D.A. Sullivan and Market/North Intersection
-
7/31/2019 North St Meeting 03-06-2012
20/20
Concept Plans
Concept 1 Replacement in kind Concept 2 Layout, sidewalks and green
space improvements
Concept 3 Bike Lane