Page 1: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Northwest ConnectorA Project by Knox County Engineering and Public Works

Presenter: Jim Snowden, P.E.

Page 2: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

About EPWCodes Enforcement

Fire Prevention Bureau

Highway Maintenance

Solid Waste and Recycling

Stormwater Management2

About Presenter:- Senior Director- Serve at the county for more than 20 years- Oversees following departments:

• Codes Enforcement• Fire Prevention Bureau• Highway Maintenance• Solid Waste and Recycling• Stormwater Management

Page 3: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Topics of Discussion

3

General Overview• Why is Knox County proposing the Project• Scope of the Project• Other improvements included in Project• Construction impacts to residents

Completed Projects• Callahan Drive Phase 1, 2, & 3• Schaad Road Phase 1• Lovell Road (TDOT) Phase 1, 2, & 3

Upcoming Projects• Schaad Road Extension Phase 2 & 3• Lovell Road Phase 4

Page 4: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Completed Projects

4

Callahan DrivePhase 1 – Pleasant Ridge Rd to Clinton Hwy

• Notice to Proceed – Spring 1999• Completed – Summer 2000• 31 tracts impacted• 17,240 ADT (2017 data)• $2.3M cost• 0.43 miles• Improve linkage between

Pleasant Ridge Rd to Clinton Hwy• 2 traffic signals• 4-lane median divided• Sidewalks

Prev

ious

ly C

ompl

eted

Page 5: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

2016 Aerial

Callahan Drive – Pleasant Ridge Rd to Clinton Hwy

5

Prev

ious

ly C

ompl

eted

1996 Aerial 1998 Aerial

Page 6: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Completed Projects

6

Callahan DrivePhase 2 – Clinton Hwy to Keck Rd

• Notice to Proceed – Spring 1999• Completed – Summer 2001• 27 tracts impacted• 24,418 ADT (2017 data)• $1.4M cost• 1.08 miles• New alignment construction

• 1 traffic signal• 4-lane median divided• Sidewalk

Prev

ious

ly C

ompl

eted

Page 7: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Callahan Drive – Clinton Hwy to Keck Rd

7

Prev

ious

ly C

ompl

eted

1996 Aerial

2003 Aerial

Page 8: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Completed Projects

8

Callahan DrivePhase 3 – Keck Rd to I-75

• Notice to Proceed – Spring 2002• Completed – Fall 2003• 53 tracts impacted• 26,644 ADT (2017 data)• $2.0M cost• 0.78 miles• Final phase connecting to the

Interstate• 4-lane median divided• Sidewalk• Improved access for UPS

Prev

ious

ly C

ompl

eted

Page 9: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Callahan Drive – Keck Rd to I-75

9

Prev

ious

ly C

ompl

eted

1998 Aerial

2003 Aerial

Page 10: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Completed Project

10

Schaad Road -Western Ave to Glenlake S/D

• Notice to Proceed – Fall 2006• Completed – Winter 2008• 42 tracts impacted• 1,433 ADT (2017 data)• $10.0M cost• 1.61 miles• Re-alignment of Ball Camp Pike

and Schaad Road• 1 traffic signal• 4-lane median divided• Sidewalk

Prev

ious

ly C

ompl

eted

Page 11: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Schaad Road – Western Ave to Glenlake S/D

11

Prev

ious

ly C

ompl

eted

2018 Aerial

AmherstElementary

AmherstElementary

Page 12: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Completed Project

12

Lovell Road (TDOT)

Phase 1 – I-40 to Gilbert Ln• Notice to Proceed – Summer 2000• Completed – Summer 2002• 33 tracts impacted• 18,840 ADT (2017 data)• $3.3M cost• 0.54 miles• Improved intersection of

Lexington Dr w/ Signalization

Page 13: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Lovell Road (TDOT) – I-40 to Gilbert Ln

13

Prev

ious

ly C

ompl

eted

1998 Aerial 2017 Aerial

Page 14: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Completed Project

14

Lovell Road (TDOT)

Phase 2 – Gilbert Ln to Bob Gray Rd• Notice to Proceed – N/A• Completed – Summer 2011• 52 tracts impacted• 21,530 ADT (2017 data)• $7.2M cost• 1.28 miles• Re-aligned intersections at

Almeda & Snyder Rd and Bob Gray & Yarnell Rd w/signalization

Page 15: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Lovell Road (TDOT) – Gilbert Ln to Bob Gray Rd

15

Prev

ious

ly C

ompl

eted

2010 Aerial 2017 Aerial

Page 16: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Completed Project

16

Lovell Road (TDOT)

Phase 3 – Bob Gray Rd to Cedardale Ln• Notice to Proceed – N/A• Completed – Fall 2012• 28 tracts impacted• 21,530 ADT (2017 data)• $3.8M cost• 0.68 miles• Improved interchange w/

northbound Pellissippi Pkwy& Schaeffer Rd including signalization

Page 17: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Lovell Road (TDOT) – Bob Gray Rd to Cedardale Ln

17

Prev

ious

ly C

ompl

eted

2010 Aerial 2017 Aerial

Page 18: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Upcoming Project

18

Lovell Road (TDOT)

Phase 4 – Cedardale Ln to Middlebrook Pk• Currently in NEPA Permitting phase• Notice to Proceed – TBD• Completed – TBD• 97 tracts impacted• 1.41 miles• 5-lane w/ center turn lane

& sidewalks

Page 19: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Lovell Road (TDOT) – Cedardale Ln to Middlebrook Pk

19

Page 20: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Upcoming Project

20

Schaad Rd Extension

Phase 2 – Middlebrook Pk to Ball Rd• Notice to Proceed – Summer 2019• Completed – TBD• 101 tracts impacted• $15.3M cost• 1.6 miles• New alignment construction

• 4-lane median divided• Sidewalks• Andes Rd re-align w/ 100 ‘ bridge

to eliminate at-grade RR crossing

Page 21: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Schaad Rd Extension

21

Page 22: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Upcoming Project

22

Schaad Rd Extension

Phase 3 – Ball Rd to Glenlake S/D• Notice to Proceed – Summer 2019• Completed – TBD• 50 tracts impacted• $17.7M cost• 1.79 miles• New alignment construction

• 4-lane median divided• Sidewalks• Twin 447’-6” bridges to eliminate

at-grade RR crossing

Page 23: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Schaad Rd Extension

23

Page 24: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Upcoming Project

24

Schaad Rd Extension

Phase 4 – Oak Ridge Hwy to Pleasant Ridge Rd

• Currently in final design phase• 4-lane w/ median & sidewalks• Intersection modifications at

Pleasant Ridge Rd• 59 tracts impacted• Cost = $11.9M• 1.5 miles

Page 25: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Timeline

25

1999 NTPCallahan Dr – Phase 1 & 2(Pleasant Ridge Rd to Keck Rd)

2002 CompletedLovell Rd – Phase 1(I-40 to Gilbert Ln)

2006 NTPSchaad Rd (Western Ave to Glenlake S/D)

2011 CompletedLovell Rd – Phase 2(Gilbert Ln to Bob Gray Rd)

2021 NTPSchaad Rd Extension – Phase 1&4(Oak Ridge Hwy to Pleasant Ridge Rd)

2003 CompletedCallahan Dr – Phase 3(Keck Rd to I-75)

2012 CompletedLovell Rd – Phase 3(Bob Gray Rd to Cedardale Ln)

2019 NTPSchaad Rd Extension – Phase 2&3(Middlebrook Pk to Glenlake S/D)

2008 CompletedSchaad Rd (Western Ave to Glenlake S/D)

Page 26: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

• Total Tracts = 476

• Total Mileage = 13 miles

• Total Cost = $74.9M

Project TOTALS

26

Page 27: Northwest Connector A Project by Knox County Engineering ......Schaad Road - Western Ave to Glenlake S/D • Notice to Proceed – Fall 2006 • Completed –Winter 2008 • 42 tracts

Thank YouJim Snowden

Jim.Snowden/knoxcounty.orgknoxcounty.org/epw

215-5800