EC ObligationsEC Obligations
Fisheries and Oceans (Fisheries Act,, etc)Fisheries and Oceans (Fisheries Act,, etc) Environment Canada (Canadian Environment Canada (Canadian
Environmental Protection Act, Species at Environmental Protection Act, Species at Risk Act, Canada Wildlife Act, etc.)Risk Act, Canada Wildlife Act, etc.)
Nunavut Water BoardNunavut Water Board INACINAC OthersOthers
Nunavut Water BoardNunavut Water Board
NWB licenseNWB license Annual report on activitiesAnnual report on activities
Oil Pollution Emergency Plan: Spill contingency plan Oil Pollution Emergency Plan: Spill contingency plan Reporting/cleanup of unauthorized dischargesReporting/cleanup of unauthorized discharges Abandonment & restoration planAbandonment & restoration plan Results of monitoring programResults of monitoring program Operations and Maintenance Procedures for Sewage, Solid Operations and Maintenance Procedures for Sewage, Solid
Waste Disposal and Waste Treatment Facilities: Waste Waste Disposal and Waste Treatment Facilities: Waste disposal activities and sewage management and solid and disposal activities and sewage management and solid and hazardous waste management hazardous waste management
Quality and Assurance Plan: Water use and methods of Quality and Assurance Plan: Water use and methods of obtaining waterobtaining water
Modifications and Construction: Notification to NWB in Modifications and Construction: Notification to NWB in writing before initiation of workwriting before initiation of work
Eureka FacilitiesEureka Facilities
• Transient Quarters• Water & Sewer• Power
• Drum Handling• Landfill• Runway
Current Users EurekaCurrent Users Eureka
Environment CanadaEnvironment Canada CANDACCANDAC DNDDND NRCANNRCAN PCSPPCSP NAVCANADANAVCANADA U of New BrunswickU of New Brunswick OGDOGD
NOAANOAA Ken Borek AirlinesKen Borek Airlines TourismTourism Other (NGO)Other (NGO) ARQXARQX Inland WatersInland Waters Other (EC)Other (EC)
Facilities IssuesFacilities Issues
Limited transient quartersLimited transient quarters WaterWater Sewage treatmentSewage treatment Drum crushing and disposalDrum crushing and disposal LandfillLandfill RunwayRunway
EC Current ProjectsEC Current ProjectsProjectProject YearYear CostCost
GeneratorsGenerators 2007/082007/08 $2.7M$2.7M
Runway LightsRunway Lights 2007/082007/08 $1.5M$1.5M
Warehouse RoofWarehouse Roof 2007/082007/08 $400K$400K
IncineratorIncinerator 2007/082007/08 $372K$372K
Water TanksWater Tanks 2008/092008/09 $1.1M$1.1M
Bldg RepairsBldg Repairs 2008/092008/09 ~$500K~$500K
Contaminated Site Contaminated Site Clean upClean up
OngoingOngoing UnknownUnknown
EC Future ProjectsEC Future ProjectsProjectProject YearYear CostCost
Fuel Tank Farm Fuel Tank Farm InspectionInspection
20092009 ~$300K~$300K
Fuel Tank Farm Fuel Tank Farm RepaintingRepainting
20102010 ~$450K~$450K
Fuel Tank Farm Fuel Tank Farm ExpansionExpansion
2011/122011/12 UnknownUnknown
Sewage TreatmentSewage Treatment ~2011/12~2011/12 ~$2M~$2M
DecommissioningDecommissioning ~2012/13~2012/13 ~$1.0M~$1.0M
Runway SurfaceRunway Surface ~2011/12~2011/12 ~$3.5M~$3.5M
Contaminated Site Contaminated Site Clean upClean up
OngoingOngoing UnknownUnknown
ConclusionConclusion
Facility in high demandFacility in high demand Obligations to regulatory bodiesObligations to regulatory bodies EC requirements are smallEC requirements are small Use exceeds capacityUse exceeds capacity Minor increases have big impactsMinor increases have big impacts Many upgrades neededMany upgrades needed EC investing a lot of resourcesEC investing a lot of resources
Requirements for AgenciesRequirements for Agencies
MOU: Needs to be reviewed. Last one MOU: Needs to be reviewed. Last one was 1986.was 1986. DND/DOT/Energy Mines and ResourcesDND/DOT/Energy Mines and Resources
Exchange of services of general nature and in field Exchange of services of general nature and in field of telecommunications and utilities.of telecommunications and utilities.
Use of Eureka Facilities/LandUse of Eureka Facilities/Land
Fuel StorageFuel Storage Drum Receipt at SiteDrum Receipt at Site Drum handlingDrum handling Drum StorageDrum Storage List of approved drum usersList of approved drum users SpillsSpills Fuel tank farmFuel tank farm Gasoline tank and pump Gasoline tank and pump
Potable Water Lagoon and Potable Water Lagoon and TanksTanks StorageStorage Use Use
RunwayRunway Landings/Take-offsLandings/Take-offs
Storage/LandfillStorage/Landfill List of areasList of areas Hazardous MaterialsHazardous Materials
SewageSewage UseUse
PowerPower UseUse
Opportunities for Cost SharingOpportunities for Cost Sharing
EC needs help from parties on site to EC needs help from parties on site to provide funding related to common issues provide funding related to common issues such as:such as: ProjectsProjects Contaminated sitesContaminated sites Etc.Etc.
Operation and MaintenanceOperation and Maintenance
Generator Maintenance contract: $1.3M over 4 Generator Maintenance contract: $1.3M over 4 yearsyears
General Maintenance Contract: $350K /yearGeneral Maintenance Contract: $350K /year Drum Crushing: $23K/yearDrum Crushing: $23K/year Portable Fire Extinguishers: $12k/yearPortable Fire Extinguishers: $12k/year Yearly Facilities Maintenance Contract: Yearly Facilities Maintenance Contract:
$75K/year$75K/year Fuel: $1M/year @ 700,000L. Next year need Fuel: $1M/year @ 700,000L. Next year need
900,000L900,000L Fire Alarm System Contract: UnknownFire Alarm System Contract: Unknown