november 23, 2009 m1 briefing
TRANSCRIPT
-
8/14/2019 November 23, 2009 M1 Briefing
1/25
-
8/14/2019 November 23, 2009 M1 Briefing
2/25
Greenfield District
Prime location located at the heart of town has frontages and is
accessible via two majorthoroughfares, EDSA andShaw Blvd.
Master planned community more green open spaces interconnected buildings via
overhead walkways interconnected basement
parking network
Countrys first ever SmartConnected District
*Artists Rendition
Only
-
8/14/2019 November 23, 2009 M1 Briefing
3/25
GreenfieldDis
trict
VicinityMap
Subject to change without prior notice
-
8/14/2019 November 23, 2009 M1 Briefing
4/25
Live in the Heart of Town
5-minute drive from ImportantPlaces
Private Schools- Xavier School, Poveda, UA&P, La Salle
Greenhills, ICA, OB Montessori, St. Paul
Pasig, Lourdes School of Mandaluyong Churches
- EDSA Shrine, Christ the King, Mary theQueen, Kapitolyo Holy Family Parish, St.Francis Church, Lourdes Church
Hospitals- Cardinal Santos Hospital and Medical City
Golf Courses & Country Clubs
- WackWackGolf & Country Club, ValleVerde, Green Valley and Club Filipino
Banks- BPI Shaw/Sheridan, RCBC - Pavilion,
Security Bank - United Street, and BDO -Pioneer
Mandaluyong Police & Fire Stations
J ust a stroll away fromfavorite spots Malls
- Shangri-La Plaza, The Podium, SMMegamall, Greenfield CommercialCenter, Robinsons Galleria
Hotels- Shangri-La Hotel, Holiday Inn,
Discovery Suites
Terminals- MRT Station, Bus & Cab Stops, Shuttle
Lines
Greenfield District Park
-
8/14/2019 November 23, 2009 M1 Briefing
5/25
Greenfield DistrictLarge Open Spaces!
*Artists Rendition Only
-
8/14/2019 November 23, 2009 M1 Briefing
6/25
Twin Oaks Place (TOP) isGDCs first mixed usebuilding in Greenfield District
Situated on a 2,599 sqm lotalong Shaw Blvd. beside SOHOCentral and across Shangri-LaMall
Total of 43 floors plus 5basement levels
1st to 3rd floors will be forcommercial retail
4th and 5th floors will be foramenities
6th to 43rd floors will house 760residential condominium units
First ever Future ReadyBuilding inthe country
The Tower
*Artists Rendition Only
-
8/14/2019 November 23, 2009 M1 Briefing
7/25
TOP Smart Home System
GDC shall only provide the fiber optic backbone to make the building high tech ready. The features aboveare merely optional are necessarily standard features of the condominium units. All items needed to
connect to the fiber optic backbone of the building to the unit shall be for the account of the buyer.
-
8/14/2019 November 23, 2009 M1 Briefing
8/25
Saleable Units (6TH - 25TH Flrs)
Standard Units
Premium Units
Shaw Boulevard
Makati/GreenfieldDistrictViews
Wack Wack/Ortigas Views
FortBonifacioViews
Rizal AreaViews
N
-
8/14/2019 November 23, 2009 M1 Briefing
9/25
Studio Units
3 Types of Studio Units31 to 36 square meters
*Artists R endition Only
-
8/14/2019 November 23, 2009 M1 Briefing
10/25
Standard Studio Type A31.52 sqmUnits C, F, G, H,M, N, O, P and QUnit B same layout but premium finish
Premium Studio Type C35.55 sqmUnits S, T, J and K
Standard Studio Type B31.01 sqmUnits D and E
Studio Units
-
8/14/2019 November 23, 2009 M1 Briefing
11/25
One Bedroom Units
2 Types of One Bedroom Units40 to 48 square meters
*Artists Rendition Only
-
8/14/2019 November 23, 2009 M1 Briefing
12/25
One Bedroom Flats
Premium 1 BR Type A47.32 sqm
Units I, L and R
Premium 1 BR Type B39.52 sqm
Unit A
-
8/14/2019 November 23, 2009 M1 Briefing
13/25
Premium Finish Standard Finish
Residential UnitsLiving/ Dining floor finish 400mm x 400mm Polished Homogenous Floor Tiles 400mm x 400mm Ceramic Floor Tiles
Baseboards wooden baseboards none
Living/Dining Wall Finish
Living/Dining Ceiling Finish
Bed Rooms floor finish Premium Laminated Flooring 400mm x 400mm Ceramic Floor Tiles
Bedroom Ceiling
Bed Room Closet MDF Board on Laminated Finish none
Interior Partition
Toilet and Baths
Powder room floor finish
300mm x 300mm Premium non-skid homogenous
ceramic tiles 300mm x 300mm non-skid homogenous Ceramic tiles
Powder room wall finish
Full 2-tone 300x300mm Premium polished homogenous
ceramic tiles Full 2-tone 300x300mm ceramic tiles
Shower enclosure Glass Enclosure Shower curtain rod
Plastered Semi-gloss paint finish
Ficem board cladding for exposed pipes, smooth underslab painted finish
Ficem board cladding for exposed pipes, smooth underslab painted finish
Double wall gypsum board on metal studs in paint finish
Unit
Specifications
Subject to change without prior notice
-
8/14/2019 November 23, 2009 M1 Briefing
14/25
Premium Finish Standard Finish
Kitchen
Finishes/accessories
Kitchen Floor Finish 400mm x 400mm Polished Homogenous Floor Tiles 400mm x 400mm Ceramic Floor Tiles
Kitchen Wall Finish
Kitchen (Ceiling)
Grease trap
Kitchen sink
Kitchen counter Premium Granite Granite
Kitchen cabinet Premium Laminated MDF board / marine plywood Laminated MDF board / marine plywood
Interior Partition Double wall gypsum board on metal studs on paint finish none
Rangehood ducted range hood ducts only
Stainless Steel
Plastered Semi-gloss paint finish
Ficem board cladding for exposed pipes, smooth underslab painted finish
Stainless Grease trap
Subject to change without prior notice
Unit
Specifications
-
8/14/2019 November 23, 2009 M1 Briefing
15/25
Premium Finish Standard Finish
Door Panels
Main Vicudoor with 1hr fire rating Vicudoor with 1hr fire rating
solid core on metal Jamb Wood Veneer Finish solid core on metal Jamb Wood Veneer Finish
Interior MFD (Molded Fiber Door) MFD (Molded Fiber Door)
hollow core on metal Jamb Wood Stain Finish hollow core on metal Jamb Wood Stain Finish
with door casing without door casing
T& B 2 Sided Marine Plywood hollow core door 2 Sided Marine Plywood hollow core door
on metal Jamb Wood Stain Finish on metal Jamb Wood Stain Finish
Plumbing fixtures
Watercloset Premium Ceramic Ceramic
Lavatory Premium Ceramic Ceramic
Shower Head Premium Telephone Type Telephone TypeLavatory Faucet Premium Stainless Steel Stainless Steel
Soap Holder Premium Ceramic Ceramic
Towel Holder Premium Stainless Steel Stainless Steel
Tissue Holder Premium Ceramic Stainless Steel
Towel Bar Premium Stainless Steel Stainless Steel
Aircon Provisions Split type for corner units only Window type for all studio units
Subject to change without prior notice
Unit
Specifications
-
8/14/2019 November 23, 2009 M1 Briefing
16/25
The Grand Lobby
*Artists Rendition Only
-
8/14/2019 November 23, 2009 M1 Briefing
17/25
TheGroun
d
Floor
Subject to change without prior notice
Approximate Areas:
Residential Lobby
(including elevators) 1,188 sqm
Caf 159 sqm
-
8/14/2019 November 23, 2009 M1 Briefing
18/25
The AmenitiesGet away from it all
2 Levels of Amenities
*Artists Rendition Only
Function Room
Gym & Fitness Room
The Cafe Area
-
8/14/2019 November 23, 2009 M1 Briefing
19/25
Two
Levels
of
Amenitie
s
4
thFloor
Approximate Areas:
Pool - 200 sqm
Function Room 154 sqm Subject to change without prior notice
-
8/14/2019 November 23, 2009 M1 Briefing
20/25
Two
Levels
of
Amenities
5
thFloor
Subject to change without prior notice
Approximate Areas:
Gym - 245 sqm
-
8/14/2019 November 23, 2009 M1 Briefing
21/25
Front Desk Service / Concierge
24/7 Security Services
Fire and Sprinkler System
Provision for CCTV Monitors
Four (4) High Speed Elevators
One (1) Service Elevator
Laundry Services Area
Stand-by Power Supply
(Generator sets supplying 2,000 KVA for the retail areas
and 1,000 KVA for the residential tower)
Water Storage Facilities
80 cu.m overhead tank and 380 cu.m. cistern
The Facilities: Peace of Mind
-
8/14/2019 November 23, 2009 M1 Briefing
22/25
Building
Specifications
Subject to change without prior notice
ARCHITECTURAL FINISHES
LobbyFloor Granite floor Tiles
Wall Wood and Aluminum cladding
Ceiling Fiber cement board painted finish
FaadeGeneral facade 25mm Granite Stone cladding
Semigloss paint finish
Louvres Wall Cladding System
Windows 6mm Tempered Glass
Window FramesAluminum Window Frames with Powder Coated Paint Finish
Railings Paint Finish
Aircon Louvres Aluminum Louvres in Metallic Powder Coat Paint Finish
Typical Elavator LobbiesFloor 600mm x 600mm Homogenous Floor Tiles
Wall Painted Finish
Ceiling Painted Finish w/ Gypsum drop ceiling
Hallways/Corridors
Hallway Floor finish 600mm x 600mm Homogenous Floor Tiles
Wall Painted Finish
Ceiling Painted Finish w/ Gypsum drop ceiling
-
8/14/2019 November 23, 2009 M1 Briefing
23/25
Building
Specifications
Subject to change without prior notice
ELECTRICAL SPECIFICATIONS
Gensets
2 units 1,000KVA, 460V(for retail) and 1 unit 1,000KVA, 400/230V
(for residential)
Transformer
1 unit 2,000 KVA (for retail) and 2 units 1,000 KVA ( for residential,
pad mounted)
ATS ATS with synchronizing panel for 2 generators (for retail gensets)
LVSG with LVSG
Main Feeder Line Busduct (Copper)
Electric meter Individual per unit, located at meter center per floor
Submeter by admin for the retail locators
Cables
Power cables in IMC conduits for the elevator and pressurization
panels
Telephone & CATV 2 telephone and CATV providers (provision only)
Intercom System Voice system
Guest Annunciator
PA/BGM system at the retail and parking areas, residential system
(in case of emergency)
CCTV
CCTV with camera surveillance and magnetic door contacts. One
camera per elevator car
-
8/14/2019 November 23, 2009 M1 Briefing
24/25
Building
Specifications
Subject to change without prior notice
STRUCTURAL SPECIFICATIONS
Floor- Floor height 3.2 meters B5 to B2
4.6 meters for B1
5 meters for podium floors
3.2 meters for typical levels
Substructure Matt foundation; Diaphragm wall
MECHANICAL SPECIFICATIONSPressurization Pressurized elevator and fire exit stairs
Basement Ventilation system Provided
SANITARY SPECIFICATIONS
Elevated water tank
2 Stainless steel Water Tank (80 Cu m Residential +
20 cum for Retail)
Underground Cistern 380 cum for Residential + 80 cum for Retail
FIRE PROTECTION SPECIFICATIONS
Fire Hose Double- jacket
Fire Detectors
Heat detectors at kitchen, smoke detectors at rooms
and smoke detectors along common hallways (9mintervals)
Sprinkler Head Type Pendent, Side Throw
Fire Detection Alarm System Addressable
Fire Pumps
Low Zone (1 run, 1 standby b5 to 17th) and
High Zone ( 1 run, 1 standby 18th and up)
TRANSPORTATION SYSTEMS
Average Waiting time (secs) 72
Number of units
4 units for residential use, 1 unit for freight and 1 unit
for podium
-
8/14/2019 November 23, 2009 M1 Briefing
25/25
Consultants
Twin OaksBuilding Architect: Rchitects IncStructural: Aromin and Sy + Associates
Mechanical: IM Martinez ConsultingEngineer
Electrical: R.G. Taguines and Associates
Greenfield District :Master Planner: Kajiwara Gallagher and Paine
Design Studio
TLS # ENCRFO-09 -08 -016