Page 1: Numerical Modelling of Soil Structure Interaction Problem

Oasys User Group ForumNumerical Modelling of

Soil-structure Interaction Problems

Hoe Yeow

Page 2: Numerical Modelling of Soil Structure Interaction Problem

SoftwareIn-house Oasys SAFE for 2D problems

Propped excavation Berm excavation Tunnel & tunnelling

-20.00 20.00 60.00 100.0

X [m]Scale x 1:500 y 1:500

-5.000

.0

5.000

10.00

15.00

20.00

25.00

Y [m

]

Façade model Embankment and slope

Page 3: Numerical Modelling of Soil Structure Interaction Problem

SoftwareBP00.1

In-house Oasys LS-Dyna for 3D problems (PC based)

Car crash Air bag

Gravity foundation Tunnelling Piled raft

Page 4: Numerical Modelling of Soil Structure Interaction Problem

BRICK soil modelState of the art non-linear, small strain fine grain soil model(Simpson 92)

London ClaySingapore Marine ClayFlorence claysBangkok clays Hong Kong CDG (back analyses only)

Page 5: Numerical Modelling of Soil Structure Interaction Problem

Why Numerical Modelling? HP000.1

• Design requirements

• Economic design

• Justifying critical design

• Complex problems, evaluating risks

• Investigate failures

• Ground movement damage assessments

• Client’s requirements

Page 6: Numerical Modelling of Soil Structure Interaction Problem

Design Requirements (Potts and Zdravkovic, 1999)

Page 7: Numerical Modelling of Soil Structure Interaction Problem

Economic DesignBP00.1

2m

HomogeneousIsotropicclay

1m

= 20kN/m3

d

1m c5kPa25 = 0.67sw = 0

8m

1

3

5

7

9 8.7m

7.3m

6.0m

LE PseudoFE FE/FD

Wa

ll E

mb

ed

me

nt

d (

m)

500

1000

1152

837734

LE PseudoFE FE/FD

Cal

cula

ted

Max

imum

ULS

Wal

l BM

(kN

m/m

)

Page 8: Numerical Modelling of Soil Structure Interaction Problem

• minimum saving of £860,000• reduction of excavation programme

from 15 months to 6 months

page 145 …..

… combined numerical modelling and observation methodValue for money - Batheaston Bypass BP00.1

(1998)

Page 9: Numerical Modelling of Soil Structure Interaction Problem

Value for money – Canary Wharf Piled Raft BP00.1

• Base grouted bored pile (capacity m)• Raft action to increase mean effective stress• Savings of 30% in piling cost• Complex soil-structure interaction

Page 10: Numerical Modelling of Soil Structure Interaction Problem

Justifying critical design and approval BP00.1

Metsovitikos Bridge (original design)

Tunnelling operation

- complex ground conditions- highly 3D- slope stability- ubiquitous joint model

- complex SCL sequence(previously known as NATM)

- large excavation next to existing tunnels

Gravity anchor foundation

Page 11: Numerical Modelling of Soil Structure Interaction Problem

Ashford Box Design (1.8km cut and cover, 15m deep)BP00.1

• Non-symmetrical• Interaction btw. walls• Permanent under slab

drainage system• Permeability, kh > kv• Observation method

Page 12: Numerical Modelling of Soil Structure Interaction Problem

Complex problem, evaluate construction risks and approval

RC bored pile, 1.8m diameter

Steel tunnel 3.68m diameter, 0.508m segment width, 124mm flange thickness

Each elementis 0.508m wide,to represent a segment

Horizontal displacement

Deformed shape

200x magnified

Page 13: Numerical Modelling of Soil Structure Interaction Problem

Investigate failure BP00.1

Hull tunnel

Heathrow Express Tunnel Collapse

Page 14: Numerical Modelling of Soil Structure Interaction Problem

Ground Movement & Damage Assessments BP00.1

Excavation

Computedtunnel’sdistortion

Effects on existing tunnels

Britannic House

Page 15: Numerical Modelling of Soil Structure Interaction Problem

Client’s requirements (Florence TAV Station, Italy)

Tension piles

Pseudo-FEFREW

Railway loading

• Non linear, small strain soil model

• Coupled consolidation• Compare with pseudo-FE

computation

Non-linear soil model

Wall

28m

SAFE

Prop 1

Prop 2