Asset: P.S. 65 - BROOKLYN, 158 RICHMOND STREET, New York, 11208 Inspection Id Inspection Type Time In Last Edited SA : K065 Architectural - Senior 2020-01-28 10:56 AM 2020-02-05 3:17 PM AA : K065 Architectural - Associate 2020-01-28 12:15 PM 2020-02-04 2:04 PM Asset Data Question Answer Was the building fully accessible for inspection Yes Principal(s) Information Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal? No Did this Principal provide feedback? Yes Summary of Principal's Feedback Director of School Operations Ernesto Soto, commented on behalf of the Principal as follows: 1. The gutters and leaders occasionally overflow and need to be cleaned periodically. Custodian Was not present Fireman Alphonso Price Building Square Footage 23000 Comments on the Area None Comments on the Stories (Floors) plus Basements 2+B+Attic+Tower Comments on the Number of Classrooms 9 Comments on the Year Built 1873 Student Population 247 Staff Population 35 Weather Fair Facade Photo Richmond Street - Northwest View NYC Department of Education Architectural Inspection Building Condition Assessment Survey 2019 - 2020 K065 PB/A&W Print Date: 9/13/2020 Page 1 of 32

Upload: others

Post on 28-May-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Asset: P.S. 65 - BROOKLYN, 158 RICHMOND STREET, New York, 11208

Inspection Id Inspection Type Time In Last Edited

SA : K065 Architectural - Senior 2020-01-28 10:56 AM 2020-02-05 3:17 PM

AA : K065 Architectural - Associate 2020-01-28 12:15 PM 2020-02-04 2:04 PM

Asset Data

Question Answer

Was the building fully accessible for inspection Yes

Principal(s) Information

Principal Name Max Milligan

Organization Achievement First East New York Middle School - Brooklyn

Did you meet with this Principal? No

Did this Principal provide feedback? Yes

Summary of Principal's Feedback Director of School Operations Ernesto Soto, commented on behalf ofthe Principal as follows: 1. The gutters and leaders occasionallyoverflow and need to be cleaned periodically.

Custodian Was not present

Fireman Alphonso Price

Building Square Footage 23000

Comments on the Area None

Comments on the Stories (Floors) plus Basements 2+B+Attic+Tower

Comments on the Number of Classrooms 9

Comments on the Year Built 1873

Student Population 247

Staff Population 35

Weather Fair

Facade Photo

Richmond Street - Northwest View

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 1 of 32

Page 2: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Main Entrance Photo

Facade A - Richmond Street

Roof Photo

Roof 3 - West View

Have any Systems/Major Building Components been upgraded? Yes

Systems: Gutters and leaders repairs.

Year: 2019

Systems: Partial Roofing repairs.

Year: 2014

Systems: Exterior Walls, Chimney and Parapets repointing; Leadersand Gutters replacement; Student and Staff Toilet Roomsupgrade; Basement Student Toilet Rooms upgrade to HCcompliance.

Year: 2013

Systems: Partial Roofing repairs.

Year: 2011

Systems: Schoolyard replacement.

Year: 2009

Systems: Perimeter Site Gates installation.

Year: 2007

Systems: Exterior Modernization Program including Roofing andFlashing replacement; Roof Hatch Doors replacement;Window and Window Guards replacement; Exterior Wallsrepointing and repairs.

Year: 2003

Have there been any New Building Additions? No

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 2 of 32

Page 3: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Tandem Schools? No

Leased Space? No

Priority Condition

PriorityCondition ExistLast Year?

PriorityCategory

ConditionDescription

ComponentAffected

LocationDescription

Person(s)Notified

Person(s) Title PhotoImage

No condition recorded

Structural Engineer Required

StructuralCondition Type

ConditionDescription

ComponentAffected

LocationDescription

Person(s)Notified

Person(s) Title PhotoImage

No condition recorded

Accessibility

Accessibility Status Question Response

Is the primary or secondary entrance on an accessible route? Yes

Is the building a multi-story building? Yes

Are all floors of the building accessible through compliant means? No

Are SOME floors other than the 1st floor and basement accessible through compliantmeans?

No

Do any of the following spaces exist on the First floor? Classroom, Art Room,Auditorium, Cafeteria, Computer, Gymnasiums, Library, Multipurpose Room, ScienceLabs

No

Do any of the following spaces exist in the Basement? Classroom, Art Room,Auditorium, Cafeteria, Computer, Gymnasiums, Library, Multipurpose Room, ScienceLabs

Yes

For the rooms that do exist, are SOME of them accessible in the Basement? Yes

Boys and Girls or Unisex accessible toilets exist in the Basement? Yes

Physical Breakdown Structure Exists Required Complies Deficiency AudioInductionSystem

FireAlarmStrobe

FUNCTIONAL ACCESSIBILITY

Exterior Routes

Exterior Entrances & Exits Yes

Exterior H/C Lifts No No

Exterior Ramps and Railings Yes Yes

Interior Routes

Corridor and Lobby H/C Lifts No No

Interior Corridor Doors and Hardware Yes Yes

Interior Corridors and Lobbies Yes

Interior Elevators No

Interior Lobby Doors and Hardware Yes

Interior Ramps No

Rooms & Spaces

Art Rooms No

Auditorium No

Cafeteria Basement Yes Yes Yes Yes

Classrooms None on Accessible Route Yes No Not on Accessible Route

Computer Rooms No

Gymnasium No

Library Room 209 Yes No Not on Accessible Route

Main Office Room 102 Yes No Not on Accessible Route

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 3 of 32

Page 4: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Physical Breakdown Structure Exists Required Complies Deficiency AudioInductionSystem

FireAlarmStrobe

Rooms & Spaces

Multi-purpose Room No

Nurse's Room Basement Yes Yes

Pool No

Science Lab No

Toilet Rooms (Boys) Basement Yes Yes

Toilet Rooms (Girls) Basement Yes Yes

Toilet Rooms (Staff) Basement Yes No Accessory ArrangementClear opening < 32"Sink ArrangementTurning RadiusUrinal ArrangementWater ClosetArrangement

Building Template

Inspection

Question Response

Architectural

EXTERIOR Inspected

AREAWAY Does not Exist

AWNINGS AND CANOPIES Does not Exist

CHIMNEY Inspected

Material Type(s) Masonry

Condition 3 - Fair

Deficiency BRICK: OPEN JOINTS

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 4 of 32

Page 5: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

EXTERIOR

CHIMNEY

Roof Plan reference

Deficiency Quantity 40

Quantity Uom S.F.

Potential Action REPOINT

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Roof 1 - Chimney 2

Violations No violations recorded.

COPING Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

CORNICE Inspected

Condition 2 - Between Good and Fair

Deficiency WOOD: DETERIORATED

Roof Plan reference

Deficiency Quantity 100

Quantity Uom S.F.

Potential Action REPAIR

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 5 of 32

Page 6: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

EXTERIOR

CORNICE

Deficiency Photo1

Facade D

Violations No violations recorded.

DOORS Inspected

DOORS AND FRAMES Inspected

Condition 4 - Between Fair and Poor

Deficiency WOOD: DETERIORATED DOOR AND FRAME - MAJORDETERIORATION

Roof Plan reference

Deficiency Quantity 2

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 4

Purpose of Action LEVEL 2

Deficiency Photo1

Facade A

Violations No violations recorded.

DOOR HARDWARE Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

LINTELS Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 6 of 32

Page 7: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

EXTERIOR

DOORS Inspected

TRANSOM/SIDE LIGHT Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

EXTERIOR WALLS Inspected

Material Type(s) Masonry

Replacement Quantity 19,000

Replacement Uom S.F.

InspectedInstance on All Facades

Instance Condition 3 - Fair

Instance Quantity 19,000

Instance Quantity Uom S.F.

Deficiency BRICK: OPEN JOINTS

Roof Plan reference

Elevation

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPOINT

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Facade E

Violations No violations recorded.

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 7 of 32

Page 8: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

EXTERIOR

EXTERIOR WALLS Inspected

Deficiency BRICK: CRACKS/DISPLACED/SPALLED BRICK AT BUILDINGCORNERS

Roof Plan reference

Elevation

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REMOVE AND REBUILD

Urgency of Action PRIORITY 4

Purpose of Action LEVEL 2

Deficiency Photo1

Facade B

Violations No violations recorded.

Deficiency BRICK: DETERIORATED MASONRY SILLS

Roof Plan reference

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 8 of 32

Page 9: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

EXTERIOR

EXTERIOR WALLS

Elevation

Deficiency Quantity 30

Quantity Uom L.F.

Potential Action REPAIR

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Facade B

Violations No violations recorded.

Deficiency BRICK: MAJOR / THRU CRACKS

Roof Plan reference

Elevation

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REMOVE AND REBUILD

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 9 of 32

Page 10: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

EXTERIOR

EXTERIOR WALLS

Urgency of Action PRIORITY 4

Purpose of Action LEVEL 2

Deficiency Photo1

Facade A

Violations No violations recorded.

Deficiency BRICK: EFFLORESCENCE

Roof Plan reference

Elevation

Deficiency Quantity 200

Quantity Uom S.F.

Potential Action MAINTENANCE

Urgency of Action PRIORITY 1

Purpose of Action LEVEL 1

Deficiency Photo1 No photo recorded

Violations No violations recorded.

Deficiency BRICK: MINOR CRACKS AND SPALLING

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 10 of 32

Page 11: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

EXTERIOR

EXTERIOR WALLS

Roof Plan reference

Elevation

Deficiency Quantity 50

Quantity Uom S.F.

Potential Action RESTITCH

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Facade A

Violations No violations recorded.

EXTERIOR SOFFITS Does not Exist

LOADING DOCK Does not Exist

LOUVER Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

PARAPETS Inspected

Material Type(s) Masonry

Replacement Quantity 500

Replacement Uom C.F.

InspectedInstance on Facades C, K

Instance Condition 2 - Between Good and Fair

Instance Quantity 500

Instance Quantity Uom C.F.

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 11 of 32

Page 12: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

EXTERIOR

PARAPETS Inspected

Deficiency No deficiencies recorded

PLAZA DECK Does not Exist

ROOF Inspected

Roofing Inspected

Replacement Quantity 8,500

Replacement Uom S.F.

ROOF HATCH/SMOKE HATCH Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

LEADERS, GUTTERS, DOWNSPOUTS, SCUPPERS Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

ROOF BARRIER Does not Exist

ROOF CAGE Does not Exist

ROOF FENCE Does not Exist

ROOFING Inspected

InspectedInstance on Metal: Roofs 1, 3, 4, 5, 6

Instance Condition 1 - Good

Instance Quantity 8,000

Instance Quantity Uom S.F.

Does the roof have major mechanical equipment sitting onDunnage Steel less than 18" above the Roofing?

No

Installation Year 2003

Source of Installation Custodial Staff

Deficiency No deficiencies recorded

InspectedInstance on Modified Bitumen: Roof 2

Instance Condition 3 - Fair

Instance Quantity 500

Instance Quantity Uom S.F.

Does the roof have major mechanical equipment sitting onDunnage Steel less than 18" above the Roofing?

No

Installation Year 2003

Source of Installation Custodial Staff

Deficiency No deficiencies recorded

ROOFING DRAINS Does not Exist

Specialties Inspected

BULKHEAD/PENTHOUSE Does not Exist

CUPOLA/ SPIRES/ TOWERS Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

DORMER Does not Exist

DUNNAGE STEEL Does not Exist

SKYLIGHT/ROOF VENT Does not Exist

ROOF/GRAVITY TANK Does not Exist

STAIRS/RAMPS: EXTERIOR Inspected

BUILDING CHEEK/FLANK WALLS Inspected

Condition 4 - Between Fair and Poor

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 12 of 32

Page 13: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

EXTERIOR

STAIRS/RAMPS: EXTERIOR

BUILDING CHEEK/FLANK WALLS

Deficiency CAST IN PLACE CONCRETE: CRACKS/SPALLING - MAJOR

Roof Plan reference

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 4

Purpose of Action LEVEL 2

Deficiency Photo1

Facade H

Violations No violations recorded.

RAILINGS Inspected

Condition 3 - Fair

Deficiency RUST - MINOR

Roof Plan reference

Deficiency Quantity 15

Quantity Uom L.F.

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1 No photo recorded

Violations No violations recorded.

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 13 of 32

Page 14: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

EXTERIOR

STAIRS/RAMPS: EXTERIOR

STAIRS/RAMPS Inspected

Condition 2 - Between Good and Fair

Deficiency CONCRETE: CRACKS/SPALLING - MINOR

Roof Plan reference

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPAIR

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Facade H

Violations No violations recorded.

WINDOWS Inspected

Replacement Quantity 3,000

Replacement Uom S.F.

EXTERIOR GUARDS Inspected

Condition 3 - Fair

Deficiency RUST - MINOR

Roof Plan reference

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 14 of 32

Page 15: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

EXTERIOR

WINDOWS

EXTERIOR GUARDS

Elevation

Deficiency Quantity 500

Quantity Uom S.F.

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1 No photo recorded

Violations No violations recorded.

LINTELS Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

WINDOWS Inspected

Material Type(s) Solid Wood

InspectedInstance on Wood: All Facades

Instance Condition 2 - Between Good and Fair

Instance Quantity 3,000

Instance Quantity Uom S.F.

Installation Year 2010

Source of Installation Custodial Staff

Deficiency No deficiencies recorded

INTERIOR Inspected

POOLS Does not Exist

STRUCTURAL Inspected

COLUMNS/BEAMS/BEARING WALLS Inspected

Condition 3 - Fair

Deficiency WOOD COLUMNS/BEAMS: DETERIORATED

Deficiency Location/Instance Attic

Deficiency Quantity 20

Quantity Uom L.F.

Potential Action REPLACE

Urgency of Action PRIORITY 4

Purpose of Action LEVEL 5

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 15 of 32

Page 16: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

INTERIOR

STRUCTURAL

COLUMNS/BEAMS/BEARING WALLS

Deficiency Photo1

Attic

Violations No violations recorded.

Deficiency MASONRY BEARING WALL: CRACKED/SPALLED

Deficiency Location/Instance Basement - Pump Room, Cafeteria, Corridor

Deficiency Quantity 30

Quantity Uom S.F.

Potential Action RESTITCH

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 5

Deficiency Photo1

Basement - Pump Room

Violations No violations recorded.

FLOOR STRUCTURE Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

FOUNDATION WALLS Inspected

Material Type(s) Masonry

Condition 3 - Fair

Deficiency BRICK: OPEN JOINTS

Deficiency Location/Instance Basement - Pump Room

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPOINT

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 5

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 16 of 32

Page 17: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

INTERIOR

STRUCTURAL

FOUNDATION WALLS

Deficiency Photo1

Basement - Pump Room

Violations No violations recorded.

Deficiency BRICK: CRACKED/SPALLED

Deficiency Location/Instance Basement - Pump Room, Corridor

Deficiency Quantity 30

Quantity Uom S.F.

Potential Action RESTITCH

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 5

Deficiency Photo1

Basement - Corridor

Violations No violations recorded.

ROOF STRUCTURE Inspected

Condition 3 - Fair

Deficiency WOOD COLUMNS AND BEAMS: DETERIORATED

Deficiency Location/Instance Attic

Deficiency Quantity 30

Quantity Uom S.F.

Potential Action REPAIR

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 5

Deficiency Photo1

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 17 of 32

Page 18: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

INTERIOR

STRUCTURAL Inspected

ROOF STRUCTURE Inspected

Attic

Violations No violations recorded.

VAULTS-BUNKERS Does not Exist

AUDITORIUM Does not Exist

CAFETERIA Inspected

InspectedInstance on Basement

Ceiling

InspectedInstance on Basement

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Door(s)

Not RequiredInstance on Basement

Fixed Equipment

Does not ExistInstance on Basement

Floor Finish

InspectedInstance on Basement

Condition 1 - Good

Deficiency No deficiencies recorded

Sliding-folding Partition

Does not ExistInstance on Basement

Stage

Does not ExistInstance on Basement

Walls

InspectedInstance on Basement

Condition 2 - Between Good and Fair

Deficiency BRICK: CRACKS/SPALLING

Deficiency Location/Instance Near Entrance, Near windows

Deficiency Quantity 30

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near windows

Violations No violations recorded.

Window Curtains/Shades/Blinds

Does not ExistInstance on Basement

CLASSROOMS/CORRIDORS/ADMIN SPACES Inspected

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 18 of 32

Page 19: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Ceiling Inspected

Condition 2 - Between Good and Fair

Deficiency METAL PAN: DAMAGED/MISSING

Deficiency Location/Instance Room 202, Principal Office

Deficiency Quantity 15

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Principal Office

Violations No violations recorded.

Door(s) Inspected

Condition 5 - Poor

Deficiency WOOD: DETERIORATED DOOR AND FRAME

Deficiency Location/Instance Basement Nurse Office

Deficiency Quantity 1

Quantity Uom EACH

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Basement Nurse Office

Violations No violations recorded.

Deficiency METAL CLAD WOOD: DETERIORATED DOOR

Deficiency Location/Instance Rooms 200, 100

Deficiency Quantity 2

Quantity Uom EACH

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 19 of 32

Page 20: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Door(s)

Deficiency Photo1

Room 200

Violations No violations recorded.

Floor Finish Inspected

Condition 5 - Poor

Deficiency VINYL TILES: DETERIORATED SUBSTRATE

Deficiency Location/Instance Rooms 207, 205, 200, 103, 101 and others

Deficiency Quantity 1,000

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Room 200

Violations No violations recorded.

Deficiency VINYL TILES: BROKEN/DETERIORATED/MISSING TILES

Deficiency Location/Instance Room 205, 204, 202

Deficiency Quantity 30

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 20 of 32

Page 21: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Floor Finish Inspected

Room 202

Violations No violations recorded.

Walls Inspected

Condition 2 - Between Good and Fair

Deficiency PLASTER: CRACKS/SPALLING

Deficiency Location/Instance Principal Office, Near Principal Office, Main Entrance

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Principal Office

Violations No violations recorded.

Specialties Does not Exist

GYMNASIUM Does not Exist

INTERIOR DOOR HARDWARE Inspected

Condition 3 - Fair

Deficiency No deficiencies recorded

INTERIOR GUARDS Inspected

Condition 2 - Between Good and Fair

Deficiency DETERIORATED/TORN-OUT/MISSING

Deficiency Location/Instance Stair B/1

Deficiency Quantity 20

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Stair B/1

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 21 of 32

Page 22: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

INTERIOR

INTERIOR GUARDS Inspected

Violations No violations recorded.

KITCHEN Inspected

InspectedInstance on Basement (300 SF)

Ceiling

InspectedInstance on Basement (300 SF)

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Door(s)

InspectedInstance on Basement (300 SF)

Condition 1 - Good

Deficiency No deficiencies recorded

Floor Finish

InspectedInstance on Basement (300 SF)

Condition 5 - Poor

Deficiency VINYL TILES: DETERIORATED SUBSTRATE

Deficiency Location/Instance Center, Servery, Near Entrance

Deficiency Quantity 80

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near Entrance

Violations No violations recorded.

Walls

InspectedInstance on Basement (300 SF)

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

LIBRARY Inspected

InspectedInstance on Room 209

Built-in Furnishing

Does not ExistInstance on Room 209

Ceiling

InspectedInstance on Room 209

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Door(s)

InspectedInstance on Room 209

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 22 of 32

Page 23: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

INTERIOR

LIBRARY

Floor Finish

InspectedInstance on Room 209

Condition 3 - Fair

Deficiency VINYL TILES: DETERIORATED SUBSTRATE

Deficiency Location/Instance Near Entrance

Deficiency Quantity 50

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near Entrance

Violations No violations recorded.

Walls

InspectedInstance on Room 209

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

LOCKER ROOM Does not Exist

MULTI-PURPOSE ROOM Does not Exist

SCIENCE DEMO ROOM Does not Exist

SCIENCE LAB Does not Exist

SCIENCE PREP ROOM Does not Exist

SHOWER ROOM Does not Exist

STAIRS/RAMPS: INTERIOR Inspected

Do Letter Stair Signs Exist? Yes

Ceiling Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Door(s) Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Partition Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Railings Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Stairs and Landings Inspected

Condition 2 - Between Good and Fair

Deficiency WOOD: BROKEN/DETERIORATED

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 23 of 32

Page 24: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

INTERIOR

STAIRS/RAMPS: INTERIOR

Stairs and Landings

Deficiency Location/Instance Near Principal Office

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Near Principal Office

Violations No violations recorded.

Deficiency CONCRETE: CRACKS/SPALLING - MAJOR

Deficiency Location/Instance Stair D/1

Deficiency Quantity 10

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Stair D/1

Violations No violations recorded.

Walls Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

TOILET ROOMS - STAFF Inspected

Ceiling Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Door(s) Inspected

Condition 5 - Poor

Deficiency WOOD: DETERIORATED DOOR

Deficiency Location/Instance 2nd Floor, Inside Room 200

Deficiency Quantity 1

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 24 of 32

Page 25: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

INTERIOR

TOILET ROOMS - STAFF

Door(s)

Quantity Uom EACH

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

2nd Floor

Violations No violations recorded.

Floor Finish Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Stalls Does not Exist

Walls Inspected

Condition 2 - Between Good and Fair

Deficiency PLASTER: CRACKS/SPALLING

Deficiency Location/Instance 2nd Floor, Inside Room 200

Deficiency Quantity 15

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

2nd Floor

Violations No violations recorded.

TOILET ROOMS - STUDENTS Inspected

Ceiling Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Door(s) Inspected

Condition 5 - Poor

Deficiency WOOD: DETERIORATED DOOR

Deficiency Location/Instance Basement - Girls

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 25 of 32

Page 26: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

INTERIOR

TOILET ROOMS - STUDENTS

Door(s)

Deficiency Quantity 1

Quantity Uom EACH

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Basement - Girls

Violations No violations recorded.

Deficiency WOOD: DAMAGED LOUVER

Deficiency Location/Instance Basement - Boys

Deficiency Quantity 1

Quantity Uom EACH

Potential Action MAINTENANCE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Basement - Boys

Violations No violations recorded.

Floor Finish Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Stalls Inspected

Condition 5 - Poor

Deficiency RUST - MAJOR

Deficiency Location/Instance Basement - Boys

Deficiency Quantity 4

Quantity Uom EACH

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 26 of 32

Page 27: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

INTERIOR

TOILET ROOMS - STUDENTS

Stalls

Deficiency Photo1

Basement - Boys

Violations No violations recorded.

Walls Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

LIFE SAFETY Inspected

F.D. HOLDING AREA Does not Exist

STEEL STAIRS Does not Exist

SITE Inspected

CONTAINERIZATION Does not Exist

Drainage System for Asphalt Inspected

Catch Basins/Manhole - Surrounded by asphalt Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Culverts - Asphalt Covering Does not Exist

Drainage System for Concrete Inspected

Catch Basins/Manhole - Surrounded by concrete Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Culverts - Concrete Covering Does not Exist

Drainage System for Soil Does not Exist

DRINKING FOUNTAINS Does not Exist

FENCES Inspected

Condition 3 - Fair

Deficiency WROUGHT IRON: MISSING SECTIONS

Deficiency Location/Instance Ridgewood Avenue

Deficiency Quantity 120

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 27 of 32

Page 28: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

SITE

FENCES

Deficiency Photo1

Ridgewood Avenue

Violations No violations recorded.

Deficiency CHAIN LINK: DAMAGED/DETERIORATED

Deficiency Location/Instance Schoolyard North

Deficiency Quantity 200

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Schoolyard North

Violations No violations recorded.

Deficiency CONCRETE CURB: DAMAGED/DETERIORATED

Deficiency Location/Instance Schoolyard

Deficiency Quantity 35

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Schoolyard North

Violations No violations recorded.

Deficiency CHAIN LINK: DAMAGED POST/RAIL

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 28 of 32

Page 29: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

SITE

FENCES

Deficiency Location/Instance Schoolyard, Behind Building

Deficiency Quantity 40

Quantity Uom L.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Behind Building

Violations No violations recorded.

Deficiency WROUGHT IRON: DAMAGED/DETERIORATED

Deficiency Location/Instance Richmond Avenue

Deficiency Quantity 40

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Richmond Avenue

Violations No violations recorded.

IRRIGATION SYSTEM Does not Exist

PAVING Inspected

Student Non-Use Inspected

Gravel Exists? No

Asphalt Does not Exist

Concrete Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Pavers Does not Exist

Student Use Inspected

Gravel Exists? No

Asphalt Inspected

Condition 3 - Fair

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 29 of 32

Page 30: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

SITE

PAVING

Student Use

Asphalt

Deficiency CRACKS - MAJOR

Deficiency Location/Instance Schoolyard

Deficiency Quantity 120

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Schoolyard

Violations No violations recorded.

Concrete Does not Exist

Pavers Does not Exist

Site Sidewalks & Walkways Inspected

Asphalt Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Concrete Does not Exist

Pavers Does not Exist

DOT Sidewalk Inspected

Asphalt Does not Exist

Concrete Inspected

Condition 3 - Fair

Deficiency HEAVING

Deficiency Location/Instance Ridgewood Avenue

Deficiency Quantity 50

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 30 of 32

Page 31: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

SITE

PAVING

DOT Sidewalk

Concrete

Ridgewood Avenue

Violations No violations recorded.

Deficiency DAMAGED/DETERIORATED/MISSING SECTIONS

Deficiency Location/Instance Ridgewood Avenue

Deficiency Quantity 300

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Ridgewood Avenue

Violations No violations recorded.

Pavers Does not Exist

PLAYGROUNDS Does not Exist

PLAYING SURFACE Does not Exist

RETAINING WALLS Inspected

Are there any Retaining Walls 6' OR higher facing publicstreet/sidewalk?

No

Condition 3 - Fair

Deficiency CAST IN PLACE CONCRETE: CRACKS/SPALLING - MAJOR

Deficiency Location/Instance Schoolyard South

Deficiency Quantity 40

Quantity Uom S.F.

Potential Action REPLACE

Urgency of Action PRIORITY 3

Purpose of Action LEVEL 2

Deficiency Photo1

Schoolyard South

Violations No violations recorded.

SEATING Inspected

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 31 of 32

Page 32: NYC Department of Education · 2020. 9. 13. · Principal Name Max Milligan Organization Achievement First East New York Middle School - Brooklyn Did you meet with this Principal?

Question Response

SITE

SEATING

Benches Inspected

Concrete Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Metal/Wood/Plastic Inspected

Condition 2 - Between Good and Fair

Deficiency No deficiencies recorded

Bleachers Does not Exist

SITE WALLS (NOT RETAINING WALLS) Does not Exist

STAIRS/RAMPS: EXTERIOR Does not Exist

NYC Department of Education

Architectural Inspection

Building Condition Assessment Survey 2019 - 2020

K065

PB/A&W Print Date: 9/13/2020Page 32 of 32