objective · garthreyer 448 e utopia rd phoenix az. 85024 home phone (623) 322-4147 cell (602)...

2
Garth Reyer 448 E Utopia Rd Phoenix Az. 85024 Home Phone (623) 322-4147 Cell (602) 717-2042 Objective Looking forward in my career with an exciting company that will challenge me and broaden my skills so I can utilize my potential and contribute to the overall culture of the project(s) and company. Applying my 20 years of commercial building experience with electrical, plumbing and mechanical systems, in daily operation, installation, predictive/preventative maintenance and repair. WORK HISTORY Chief Engineer - Transwestem HF Lakeside II / The Centre 250,000 sf Phoenix AZ. 7Ill-Present Preventive Maintenance on building Systems HVAC: 2 Evapco cooling towers 750 Tons, VFD's, VA V,s Closed loop pumps and motors, water source heat pumps. Ems: Alerton Backtalk system Elevators: Kone Geared Elevators Fire alarm: EST 3 system Roof: Single ply Membrane Tenant work order Tenant improvements !build outs Coordinating repair work with outside contractors After-hours and on-call emergencies. Purchasing and inventory of building supplies. Invoice routing, bidding processes, budgeting, accounts payable approvals, and monthly reporting. Supervise and train Utility Engineers Chief Engineer - Transwestem - Missouri Falls/ The Centre 250,000 sf Phoenix AZ. liB-Present Preventive Maintenance on building Systems VFD's HV AC: 4 Baltimore air coil (BAC) cooling towers 158 Tons each, VFD's, Closed loop pumps and motors, water source heat pumps and split system heat pumps. Ems: Alerton Backtalk system Elevators: Montgomery traction elevators De power and 2 Reliable hydraulic elevators Fire alarm: Simplex panel Roof: elastomeric coating on rolled roof Tenant work order Tenant improvements /build outs Coordinating repair work with outside contractors After-hours and on-call emergencies. Purchasing and inventory of building supplies. Invoice routing, bidding processes, budgeting, accounts payable approvals, and monthly reporting. Supervise and train Utility Engineers Lead Engineer - Transwestem - Freeport McMoRan Center (FMC) 500,000 sf. Phoenix AZ 5/10-1/11 Preventive Maintenance on building Systems VFD's HVAC: 2 Evapco cooling towers 1096 tons each, Trane DX Intellipacs 100 tons, V.A.V., Fan Power Boxes, Water source heat pumps, closed loop pumps and motors Ems: Johnson Controls Metasys BacNet Elevators: 15 Otis Jen 2 elevators Fire alarm: Siemens Fire Finder Fire booster pump Domestic Water booster pump: Tiger Flow Roof Tenant work order Tenant improvements!build outs Coordinating repair work with outside contractors After-hours and on-call emergencies. Purchasing and inventory of building supplies. Invoice routing, bidding processes, budgeting, accounts payable approvals, and monthly reporting. Supervise and train Utility Engineers

Upload: others

Post on 24-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Objective · GarthReyer 448 E Utopia Rd Phoenix Az. 85024 Home Phone (623) 322-4147 Cell (602) 717-2042 Objective Looking forward in my career with an exciting company that will challenge

Garth Reyer448 E Utopia Rd

Phoenix Az. 85024Home Phone (623) 322-4147

Cell (602) 717-2042

Objective

Looking forward in my career with an exciting company that will challenge me and broaden my skills so I can utilize my potential and contribute tothe overall culture of the project(s) and company. Applying my 20 years of commercial building experience with electrical, plumbing and mechanicalsystems, in daily operation, installation, predictive/preventative maintenance and repair.

WORK HISTORY

Chief Engineer - Transwestem HF Lakeside II / The Centre 250,000 sf Phoenix AZ. 7Ill-Present

• Preventive Maintenance on building SystemsHVAC: 2 Evapco cooling towers 750 Tons, VFD's, VA V,s Closed loop pumps and motors, water source heat pumps.Ems: Alerton Backtalk systemElevators: Kone Geared ElevatorsFire alarm: EST 3 system

• Roof: Single ply Membrane• Tenant work order• Tenant improvements !build outs• Coordinating repair work with outside contractors• After-hours and on-call emergencies.• Purchasing and inventory of building supplies.• Invoice routing, bidding processes, budgeting, accounts payable approvals, and monthly reporting.• Supervise and train Utility Engineers

Chief Engineer - Transwestem - Missouri Falls/ The Centre 250,000 sf Phoenix AZ. liB-Present

• Preventive Maintenance on building SystemsVFD'sHV AC: 4 Baltimore air coil (BAC) cooling towers 158 Tons each, VFD's, Closed loop pumps and motors, water source heat pumpsand split system heat pumps.Ems: Alerton Backtalk systemElevators: Montgomery traction elevators De power and 2 Reliable hydraulic elevatorsFire alarm: Simplex panel

• Roof: elastomeric coating on rolled roof• Tenant work order• Tenant improvements /build outs• Coordinating repair work with outside contractors• After-hours and on-call emergencies.• Purchasing and inventory of building supplies.• Invoice routing, bidding processes, budgeting, accounts payable approvals, and monthly reporting.• Supervise and train Utility Engineers

Lead Engineer - Transwestem - Freeport McMoRan Center (FMC) 500,000 sf. Phoenix AZ 5/10-1/11• Preventive Maintenance on building Systems

VFD'sHVAC: 2 Evapco cooling towers 1096 tons each, Trane DX Intellipacs 100 tons, V.A.V., Fan Power Boxes, Water source heatpumps, closed loop pumps and motorsEms: Johnson Controls Metasys BacNetElevators: 15 Otis Jen 2 elevatorsFire alarm: Siemens Fire FinderFire booster pumpDomestic Water booster pump: Tiger FlowRoof

• Tenant work order• Tenant improvements!build outs• Coordinating repair work with outside contractors• After-hours and on-call emergencies.

• Purchasing and inventory of building supplies.• Invoice routing, bidding processes, budgeting, accounts payable approvals, and monthly reporting.• Supervise and train Utility Engineers

Page 2: Objective · GarthReyer 448 E Utopia Rd Phoenix Az. 85024 Home Phone (623) 322-4147 Cell (602) 717-2042 Objective Looking forward in my career with an exciting company that will challenge

Lead Engineer - Transwestem - 5090 N 40th st. (5090) 178,000 sf. 7/08-5/10

• Preventive Maintenance on building SystemsVFD'sHV AC: 2 Baltimore air coil (BAC) cooling towers 248 tons, closed loop pumps and motors, water source heat pumps, 7 ton splitsystemEms: CSI systemElevators: Dover Traction Elevator De powerFire alarm: Coordinated and oversaw the complete retrofit of building fire alarm system. (From old Simplex to a new Notifier system.

• Roof• Tenant work order• Tenant improvements Ibuild outs• Coordinating repair work with outside contractors• After-hours and on-call emergencies.• Purchasing and inventory of building supplies.• Invoice routing, bidding processes, budgeting, accounts payable approvals, and monthly reporting.• Supervise and train Utility Engineers

Engineer - Transwestem-Biltrnore Financial Center (BFC) 650,000 sf 10/06-7/08

• Preventive Maintenance on building SystemsVFD'sHV AC: 7 Baltimore air coil (BAC) cooling towers from 125 to 450 Tons, closed loop pumps and motors, water source heat pumpsEms: Alerton BacTalk systemElevators: US Traction elevators De powerFire alarm: NotifierRoof: EPDM Ballasted roof system (helped oversee and coordinate replacement of roof)

• Tenant work order• Tenant improvements Ibuild outs• Coordinating repair work with outside contractors• After-hours and on-call emergencies.• Purchasing and inventory of building supplies.• Invoice routing, bidding processes, budgeting, accounts payable approvals, and monthly reporting.• Supervise and train Utility Engineers

Forman - Commercial Air Inc.-2329 W. Mascal #307 Phoenix Az. 12/5-10/6

• Responsibilities were running a crew of 10 workers• Coordinating work with other trades• Readl interpret blue prints• Lay outlInstalIation and maintenance air-conditioning units, air handling equipment and duct work

Split systems unitsPackage unitsWall unitsOutside air fansMetal, fiberglass and flex ductMuchmore

• Installation make up /exhaust air for grease hood• Designing welding and installing grease duct• Measuring lordering of duct work and required materials.

Education

McQuay Rooftop Ac factory trainedG.E.D Phoenix Az.Metro Tech Phoenix Az.

1 Year of Mechanical DraftingDeVry Phoenix Az,

1.5 years AlC D/C power