ODOT DISTRICT 1 2020 CONSTRUCTION PROGRAM
MIKE DEWINE, OHIO GOVERNOR | JACK MARCHBANKS, PH.D., ODOT DIRECTOR | CHRIS HUGHES, P.E., DISTRICT DEPUTY DIRECTOR
SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT, AND WYANDOT COUNTIES
Chris Hughes District Deputy Director 419-999-6804 [email protected]
Rob White Capital Programs Administrator 419-999-6901 [email protected]
Rhonda Pees Regional Public Information Officer 419-373-7121 [email protected]
Cheri Newton District Public Information Officer 419-999-6803 [email protected]
Scott Mullins District Construction Engineer 419-999-6903 [email protected]
Luke Johansen District Area Construction Engineer 419-999-6956 [email protected]
Bashar Kanouh District Area Construction Engineer 419-999-6909 [email protected]
District One Contacts
1
COUNTYNO. OF
PROJECTSESTIMATED COST
NO. OF
PROJECTSESTIMATED COST
NO. OF
PROJECTSESTIMATED COST
DISTRICT WIDE 8 $9,037,673 0 $0 8 $9,037,673
ALLEN 6 $28,338,494 5 $3,640,907 11 $31,979,401
DEFIANCE 3 $5,577,515 1 $103,991 4 $5,681,506
HANCOCK 8 $5,146,214 7 $9,371,088 15 $14,517,302
HARDIN 3 $4,190,286 1 $2,172,000 4 $6,362,286
PAULDING 1 $1,387,892 0 $0 1 $1,387,892
PUTNAM 3 $3,569,608 1 $115,000 4 $3,684,608
VAN WERT 3 $4,353,754 0 $0 3 $4,353,754
WYANDOT 3 $2,327,411 1 $408,281 4 $2,735,692
TOTALS 38 $63,928,847 16 $15,811,267 54 $79,740,114
MILES
RESURFACED
/ REPAIRED
---
---
---
123.73
7.05
8.12
---
---
DISTRICT ONE STATS (ODOT PROJECTS)
NO. OF
STRUCTURES
ADDRESSED
11
11
---
---
OTHER
RECONSTRUCTION
RESURFACE
PAVEMENT MARKINGS
CULVERTS
COSTNO. OF PROJECTSPROJECT TYPE
$9,693,674
9 $9,518,364
$1,500,000
$40,571,669
$1,109,158
8
3
10
2
2 $1,535,982
DISTRICT ONE SUMMARYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2020
ODOT AND LOCAL GOVERNMENT PROJECTS
BRIDGE MAINTENANCE &
REPLACEMENT
ODOT PROJECTS LOCAL GOV’T. PROJECTS GRAND TOTALS
2
County-Route-
SectionDescription Location
Length
(Miles)
99451 D01-Sign-FY20
Replace existing roadway signs
(extrusheets). Traffic will be
maintained.
On various routes throughout
District OneNA SOLD
Spring/Summer
2020927,850$
103426 D01-HS-FY20
On-Road and guardrail herbicidal
spraying for 4-lane and 2-lane sections
in the district. Traffic will be
maintained.
Various routes and sections
throughout District OneVarious SOLD
Spring/Summer/
Fall 2020211,001$
98554 D01-CPR-FY20Repair concrete pavements and ramps.
Traffic will be maintained.
Various routes and sections
throughout District One8.12 SOLD
Spring/Summer
20202,833,625$
98530 D01-PM-FY20
Upgrade existing painted pavement
markings on rural state highway routes.
Traffic will be maintained.
Various routes and sections
throughout District OneVarious SOLD
Spring/Summer/
Fall 20201,205,880$
103435 D01-GR-FY20District wide guardrail repair / upgrade
project. Traffic will be maintained.
Various routes and sections
throughout District OneVarious 3/26/2020 Summer 2020 1,495,329$
107844 D01-CR-FY20
Perform miscellaneous culvert
maintenance activities. Traffic will be
maintained.
Various routes in Hancock and
Wyandot counties.Various 5/07/2020 Summer 2020 533,886$
101006 D01-RPM-FY21
Replace raised pavement marker casting
and/or lenses as needed on various
routes. Traffic will be maintained.
Various routes and sections
throughout District OneVarious 7/2/2020
Summer/Fall
2020 $ 330,102
107806D01-Erosion
Repair-FY20
Repair drainage and erosion issues by
constructing curb & gutter, catch basins
and/or regrade shoulders. Traffic will be
maintained.
Various routes and sections
throughout District OneVarious 7/2/2020
Summer/Fall
2020 $ 1,500,000
9,037,673$ DISTRICT WIDE TOTAL
DISTRICT WIDE PROJECTS (No Map)
CONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2020
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
3
County-Route-
SectionDescription Location
Length
(Miles)
88306 ALL-SR 65/CR 509 Replace bridge decks. Traffic will be detoured.Elm Street (SR 65) and Pine Street over the
Ottawa River in the City of LimaNA SOLD
Spring/Summer/
Fall 2020$3,907,465
101189 ALL-81-21.51 Replace bridge deck. Traffic will be detoured.On SR 81 over the Ottawa River, located
approximately 2.5 miles east of IR 75NA SOLD
Spring/Summer/
Fall 2020$787,332
94214ALL/HAN-75-
15.80/0.00
Resurface with asphalt from the Napoleon Road
interchange to just south of the SR 235
interchange. Reconstruct about 1 mile of IR 75
pavement at the SR 696 interchange. Replace the
IR 75 bridge deck over TR 33 just north of
Bluffton. Traffic will be maintained.
On IR 75 from Napoleon Road in Allen
County to SR 235 in Hancock County.7.35 SOLD
Spring/Summer/
Fall 2020$20,993,821
105527 ALL-65/81/117-VarResurface with asphalt. Traffic will be
maintained.
On Elm Street (SR 117 and SR 65) from
Woodlawn Avenue to Union Street in the
City of Lima. On SR 81 from SR 66 to
Wapak Road.
9.7 SOLDSpring/Summer
2020$1,851,340
98522 ALL-117-13.85
Overlay bridge deck with a new concrete surface.
Paint structural steel at each abutment. Upgrade
bridge railing and guardrail off structure. Traffic
will be detoured.
SR 117 over the RJ Corman railroad in
Lima.NA SOLD
Summer/Fall
2020$798,536
98469PUT/HAN/ALL-
224/103-Var.
Resurface with asphalt. Traffic will be
maintained.
On US 224 from the CSX railroad crossing
on the east side of Ottawa to SR 235 in
Hancock County; and, on SR 103 in the
Village of Bluffton from Huber Street to
the Hancock county line.
0.27 6/4/2020Summer/Fall
2020
See
Putnam County
$28,338,494ALLEN COUNTY-ODOT LET TOTAL
ALLEN COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2020
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
4
County-Route-
SectionDescription Location
Length
(Miles)
80441All- Lima RR Grade
Separation
Construct a railroad grade separation of the
Indiana & Ohio railway at Elm Street.
Reconstruct 0.70 miles of pavement along Elm St.
and construct a roundabout at it's intersection of
with Bellefontaine Avenue. Construct a storm
sewer system outletting to the Ottawa River.
On Elm Street from North St. to
Belfontaine AvenueSpot SOLD
Spring 2018 to
Summer 2020Sold in 2018
90949
ALL-Lima
Wayne/High
Streets
Resurface with asphalt, upgrade curb and gutter,
replace some sidewalk and upgrade ADA curb
ramps, upgrade signals and improve drainage.
Traffic will be maintained.
On Wayne Street from Jameson
Avenue to Central Avenue; and,
on High Street from Metcalf
Street to Jackson Street
2.23 SOLDSpring/Summer/
Fall 2020$3,337,965
88306 ALL-SR 65/CR 509 Replace bridge decks. Traffic will be detoured.
Elm Street (SR 65) and Pine Street
over the Ottawa River in the City
of Lima
NA SOLDSpring/Summer/
Fall 2020See ODOT Let
110216ALL-Lafayette
Sidewalks
Construct sidewalks, ADA curb ramps and
crosswalks. Traffic will be maintained.
Along portions of Main Street in
the Village of Lafayette.NA 5/21/2020 Summer 2020
Included with
PID 110217
below
110217ALL-Beaverdam
Sidewalks
Construct sidewalks, ADA curb ramps and
crosswalks. Traffic will be maintained.
Along portions of Main Street (SR
696) and West Street in the
Village of Beaverdam.
NA 5/21/2020 Summer 2020 $302,942
$3,640,907
$31,979,401TOTAL ESTIMATED COST FOR ALLEN COUNTY:
(Continued)
ALLEN COUNTY
ALLEN COUNTY-LOCAL GOVERNMENTS TOTAL
CITY OF LIMA
Local Governments
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
Village of Beaverdam
5
ELIDA
SPENCERVILLE
BEAVERDAMCAIRO
HARROD
LAFAYETTE
LIMA
DELPHOS
BLUFFTON
75
7530
3030
696
117
501
196
198
81
117
65
65
66
117
309 115
12
81
103
66
309
105527
110217
94214
101189
98522
10552790949
94214
98469
88306
80441
110216
M
ap Pr
oduc
ed by
Cod
y Lap
e
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotCulvertBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
63/31/2020
Allen County 2020 Construction Projects
PID Name PID Name80441 ALL Lima RR Grade Separation 98522 ALL SR 117 13.8588306 ALL SR 65 (Elm)/CR 509 (Pine) 101189 ALL SR 81 21.5190949 ALL Lima Wayne/High Streets 105527 ALL SR 65/81/117 Var.94214 ALL/HAN-75-15.80/0.00 110217 ALL Beaverdam Sidewalks98469 PUT/HAN/ALL US 224/SR 103 Var. 110216 ALL Lafayette Sidewalks
County-Route-
SectionDescription Location
Length
(Miles)
96605 DEF-15-14.77Replace Clinton Street (SR15/18/66) bridge over the
Maumee River. Traffic will be detoured.
Approximately 0.2 miles north of
Second Street in the City of DefianceSpot SOLD
Spring 2019 to Spring
2020Sold in 2019
112045DEF-24-
3.05/3.25/6.15
Repair slopes adjacent to the roadway. Traffic will be
maintained.
Along the exit ramps at the US 24
interchange ramps with SR 15/18
and Baltimore Street
Spot 5/21/2020 Summer/Fall 2020 $474,000
94231 DEF-24-3.47 Resurface with asphalt. Traffic will be maintained.From the Baltimore Street
interchange to the Henry county line11.32 7/2/2020
Summer 2020 to
Spring 2021$5,103,515
$5,577,515
County-Route-
SectionDescription Location
Length
(Miles)
99208DEF-CR VAR PM-
FY20
Upgrade existing pavement markings. Traffic will be
maintained.
Various county routes throughout
Defiance CountyVarious SOLD Summer/Fall 2020 $103,991
$103,991
DEFIANCE COUNTY-ODOT LET TOTAL
DEFIANCE COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2020
ODOT Projects
PID No.
Project
Sale Date Approximate Duration Estimated Cost
DEFIANCE COUNTY-LOCAL GOVERNMENTS TOTAL
TOTAL ESTIMATED COST FOR DEFIANCE COUNTY: $5,681,506
Local Governments
PID No.
Project
Sale Date Approximate Duration Estimated Cost
7
SHERWOOD
NEY
HICKSVILLEDEFIANCE
127
127
24
24
18
66
49
249
281
2
2
249
2
18
15
111
15
15
49
18
1899208
99208
99208 99208
99208
99208
9920
8
9920
8
99208
9920
8
94231112045
112045
96605
M
ap Pr
oduc
ed by
Cod
y Lap
e
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotCulvertBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
83/31/2020
Defiance County 2020 Construction Projects
PID Name94231 DEF US 24 3.4796605 DEF SR 15 14.7799208 DEF CR VAR PM FY20112045 DEF US 24 3.05/3.25/6.15
County-Route-
SectionDescription Location
Length
(Miles)
87005 HAN-75-14.39
Major reconstruction and widening of IR 75 through the
City of Findlay. Reconstruct the IR 75/US 68 system
interchange and replace all mainline structures. Traffic
will be maintained during construction.
On IR 75 from approximately 0.8 miles
south of the US68 interchange to just
south of the CR 99 interchange
6.85 SOLDSpring 2017 -
Summer 2020Sold in 2017
94214ALL/HAN-75-
15.80/0.00
Resurface with asphalt from the Napoleon Road
interchange to just south of the SR 235 interchange.
Reconstruct about 1 mile of IR 75 pavement at the SR 696
interchange. Replace the IR 75 bridge deck over TR 33 just
north of Bluffton. Traffice will be maintained.
On IR 75 from Napoleon Road in Allen
County to SR 235 in Hancock County.3.22 SOLD
Spring/Summer/
Fall 2020See Allen County
98515 HAN-37-17.58Replace bridge with a new structure. Traffic will be
detoured.
On SR 37 over Lynn Creek, located
approximately 1.9 miles north of US 30Spot SOLD
Spring / Summer
2020$358,455
105573 HAN-12-20.83Replace culvert with a new structure. Traffic will be
detoured.
On SR 12 over an intermittant waterway,
located approximately 0.1 mile south/west
of CR 248
Spot SOLDSpring / Summer
2020$320,233
107652HAN/HAR-68-
0.00/10.61Resurface with micro surfacing. Traffic will be maintained.
On US 68 from Kenton to SR 15 in Hancock
County, excluding portions in the villages
of Dunkirk and Arlington
11.11 SOLDSpring / Summer
2020$1,199,270
98499 HAN-68-12.03 Replace bridge deck. Traffic will be detoured. On US 68 over SR 15 in Hancock County Spot SOLDSpring / Summer
2020$1,775,449
98588 HAN-568-5.57Replace bridge with a new structure. Traffic will be
detoured.
On SR 568 over Outlet Ditch, located
approximately 0.1 miles east of CR 7Spot 3/12/2020
Summer/Fall
2020$1,127,807
111236 HAN-75-18.47 Construct a noise wall. Traffic will be maintained.Along IR 75 on the west side of the
roadway, just south of CR 95Spot 4/23/2020
Summer/Fall
2020$365,000
98469PUT/HAN/ALL-
224/103-Var.Resurface with asphalt. Traffic will be maintained.
On US 224 from the CSX railroad crossing
on the east side of Ottawa to SR 235 in
Hancock County; and, on SR 103 in the
Village of Bluffton from Huber Street to
the Hancock county line.
5.25 6/4/2020Summer/Fall
2020See Putnam County
$5,146,214HANCOCK COUNTY-ODOT LET TOTAL
HANCOCK COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2020
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
9
County-Route-
SectionDescription Location
Length
(Miles)
100184 HAN-CR 236-0.00Resurface with asphalt. Includes minor widening and some
drainage and bike path work. Traffic will be maintained.On CR 236 from SR 568 to US 224 1.27 5/8/2020
Summer/Fall
2020$2,240,595
107829 HAN-CR 313-0.00 Resurface with asphalt. Traffic will be maintained.On CR 313 from the Allen County line to
the south corp limit of Findlay13.29 3/26/2020
Summer/Fall
2020$1,848,067
106715HAN-Greenway Trail
ExtensionConstruct a multi-use trail along the Blanchard River
Along the Blanchard River, starting at the
existing trail and ending at Eastpoint Park
in the City of Findlay
0.05 SOLD Spring/Summer 2020 $707,110
104247HAN-Lincoln/
Blanchard Paths
Construct a multi-use path in place of existing sidewalks
along portions of Lincoln Street. Construct shared lanes on
northbound and southbound curb lanes on portions of
Blanchard Street. Traffic will be maintained.
In the City of Findlay on Lincoln Street
from Cory Street to Blanchard Street;
and, on Blanchard Street from 6th Street
to Tiffin Avenue
1.72 5/8/2020Summer/Fall
2020$2,220,784
104001 HAN-68-4.70
Reconstruct US 68 including new pavement, curb and
gutter, drainage and storm sewers. Traffic will be
detoured.
On US 68 from the south corp limit to
Liberty Street in the Village of Arlingtion0.4 SOLD
Spring/Summer/Fall
2020$1,334,035
104002 HAN-68-5.37
Reconstruct US 68 including new pavement, curb and
gutter, drainage and storm sewers. Traffic will be
detoured.
On US 68 from the bridge over Buck Run
to Wardwell Street in the Village of
Arlingtion
0.22 SOLDSpring/Summer/Fall
2020$857,299
103696 HAN-SRTS-McComb
Construct sidewalks and detectable warning signs. Improve
pedestrian signals and upgrade signing around the school.
Traffic will be maintained.
At various locations near the school in
the Village of McCombSpot SOLD Summer 2020 $163,198
$9,371,088
Hancock County Engineer
City of Findlay
HANCOCK COUNTY-LOCAL GOVERNMENTS TOTAL
TOTAL ESTIMATED COST FOR HANCOCK COUNTY: $14,517,302
Village of Arlington
Village of McComb
HANCOCK COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2020
Local Governments
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
10
ARLINGTON
ARCADIA
RAWSON VANLUE
JENERA
MOUNTCORY
BENTON RIDGE
MOUNT BLANCHARD
VAN BUREN
FINDLAY
FOSTORIA
BLUFFTON
MCCOMB
75
75
30
68
224224
30
68
568
37
698
15
186
330
613
103
18
37
103
235
12
235
103
12
235
235
37
613
18
12
613
98469
87005
94214
98499
111236
98515
107829
87005
104247 98588
105573103696
106715
100184
104002104001
1076
5210
7652
M
ap Pr
oduc
ed by
Cod
y Lap
e
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotCulvertBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
113/31/2020
Hancock County 2020 Construction Projects
PID Name87005 HAN IR 75 14.3994214 ALL/HAN-75-15.80/0.0098469 PUT/HAN/ALL US 224/SR 103 Var.98499 HAN US 68 12.0398515 HAN SR 37 17.5898588 HAN SR 568 5.57100184 HAN CR 236 0.00103696 HAN SRTS McComb104001 HAN US 68 4.70 Arlington Phase 2104002 HAN US 68 5.37 Arlington Phase 3104247 HAN Lincoln/Blanchard Paths105573 HAN SR 12 20.83106715 HAN Greenway Trail Extension107652 HAN/HAR US 68 0.00/10.61107829 HAN CR 313 0.00111236 HAN IR 75 18.47 Noise Wall
County-Route-
SectionDescription Location
Length
(Miles)
107652HAN/HAR-68-
0.00/10.61
Resurface with micro surfacing. Traffic will be
maintained.
On US 68 from Kenton to SR 15 in
Hancock County, excluding portions in
the villages of Dunkirk and Arlington
10.51 SOLDSpring / Summer
2020
See Hancock
County
107656 HAR-67-1.59Resurface with asphalt. Traffic will be
maintained.
On SR 67 from SR 117 to the west corp
limit of Kenton13.48 SOLD Summer 2020 $1,395,452
107667HAR/WYA-68/
37/Var.
Resurface with asphalt. Traffic will be
maintained.
On US 68 from the south corp of
Kenton to Espy Street; On SR 37 from
SR 67 to the south corp limit of
Marseilles; On SR 67 from Hardin
County to High Street in Upper
Sandusky; On SR 103 from US 23 to SR
199 in Carey; On SR 293 from the
south corp limit of Kirby to Usion
Street; and, On SR 293 in Wharton
from Franklin Street to Cass Street
0.41 SOLD Summer 2020 $2,794,834
$4,190,286
County-Route-
SectionDescription Location
Length
(Miles)
106438HAR-Ada Lincoln
St. Phase 3
Reconstruct and widen, construct curb and
gutter, install drainage improvements and
portions of sidewalk. Traffic will be detoured.
On Lincoln Street in the Village of Ada
from Union Street to Klingler Road0.86 SOLD
Spring/Summer/
Fall 2020$2,172,000
$2,172,000
TOTAL ESTIMATED COST FOR HARDIN COUNTY: $6,362,286HARDIN COUNTY-LOCAL GOVERNMENTS TOTAL
Local Governments
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
Village of Ada
HARDIN COUNTY-ODOT LET TOTAL
HARDIN COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2020
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
12
FOREST
DUNKIRK
RIDGEWAY
MOUNT VICTORY
ALGER
MCGUFFEY
PATTERSON
KENTON
ADA
68
68
68
67
309
292
235
701
31
385
309
309
195
8181
117
273
117
67
53
235
37
107652
106438
107656107667
107652
Map
Prod
uced
by C
ody L
ape
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotCulvertBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
133/10/2020
Hardin County 2020 Construction Projects
PID Name106438 HAR Ada Lincoln St. Phase 3107652 HAN/HAR US 68 0.00/10.61107656 HAR SR 67 1.59107667 HAR/WYA US 68/SR 37/VAR
County-Route-
SectionDescription Location
Length
(Miles)
107124 PAU-24-5.42/11.52Reconstruct slopes adjacent to the highway, add curb and gutter
and rebuild guardrail. Traffic will be maintained.
Adjacent to the overpass
structures On US 127 over CR 176
and on US 127 over CR 105 near
Cecil
Spot SOLDSpring/Summer
2020$1,387,892
$1,387,892
County-Route-
SectionDescription Location
Length
(Miles)
$0
TOTAL ESTIMATED COST FOR PAULDING COUNTY: $1,387,892PAULDING COUNTY-LOCAL GOVERNMENTS TOTAL
Local Governments
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
PAULDING COUNTY-ODOT LET TOTAL
PAULDING COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2020
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
14
CECIL
ANTWERP
PAYNE MELROSE
OAKWOOD
LATTY
HAVILAND
GROVER HILL
BROUGHTON
PAULDING
SCOTT
24
127
127
30
127
24
114
111
500
637
49
114
66
637
500
613
111
613
114
613
637
613
66
49
107124
107124
Map
Prod
uced
by C
ody L
ape
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotCulvertBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects 15
3/10/2020
Paulding County 2020 Construction Projects
PID Name107124 PAU US 24 5.42/11.52
County-Route-
SectionDescription Location
Length
(Miles)
105161 PUT-30-0.21Repair drainage structures and condiuts.
Traffic will be maintained.
On US 30 between the Van Wert
and Allen county linesSpot 3/12/2020
Spring/Summer
2020$323,667
98469PUT/HAN/ALL-
224/103-Var.
Resurface with asphalt. Traffic will be
maintained.
On US 224 from the CSX railroad
crossing on the east side of
Ottawa to SR 235 in Hancock
County; and, on SR 103 in the
Village of Bluffton from Huber
Street to the Hancock county line.
8.21 6/4/2020Summer/Fall
2020$2,307,311
98516 PUT-108-1.68
Overlay the deck surface with concrete,
replace the deck edges and repair the
abutments. Rebuild the roadway slopes
adjacent to the bridge. Traffic will be
detoured.
On SR 108 over the Miller Cutoff,
located approximately 0.4 miles
south of SR 613
Spot 7/16/2020Summer/Fall
2020$938,630
$3,569,608
PID No. Project Sale DateApproximate
DurationEstimated Cost
County-Route-
SectionDescription Location
Length
(Miles)
101974PUT-CR VAR PM
FY21
Upgrade existing pavement markings.
Traffic will be maintained.
On various county routes in
Putnam CountyVarious 7/1/2020
Summer/Fall
2020$115,000
$115,000
PUTNAM COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2020
ODOT Projects
PID No.
Project
Sale DateApproximate
Duration
Estimated
Cost
TOTAL ESTIMATED COST FOR PUTNAM COUNTY: $3,684,608
PUTNAM COUNTY-ODOT LET TOTAL
Local Governments
Putnam County Engineer
PUTNAM COUNTY-LOCAL GOVERNMENTS TOTAL
16
LEIPSIC
KALIDA
GLANDORF
PANDORA
DUPONT
OTTOVILLE
CONTINENTAL
COLUMBUS GROVE
BELMORE
CLOVERDALE
FORTJENNINGS
MILLER CITY
WEST LEIPSIC
GILBOAOTTAWA224
224
224
224
613
115
694
109
65
12
108
190
634
634
114
634
63465
189
11515
190
66
613
189
613
114
12
15
15 65
696
30
98516
105161
98469
Map
Prod
uced
by C
ody L
ape
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotCulvertBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
173/10/2020
Putnam County 2020 Construction Projects
PID Name98469 PUT/HAN/ALL US 224/SR 103 Var.98516 PUT SR 108 1.68105161 PUT US 30 0.21
County-Route-
SectionDescription Location
Length
(Miles)
105160 VAN-81-20.65Replace culvert with a new structure. Traffic
will be detoured.
On SR 81 over an intermittant
waterway, located approximately 0.3
miles east of SR 116
Spot SOLDSpring/Summer
2020$255,039
107661VAN-127/224/118/
709-Var.
Resurface with asphalt. Traffic will be
maintained.
On US 127 from the CSX railroad to
Marsh Rd.; On US 224 from the Indiana
state line to TR 77; On SR 118 in the
City of Van Wert from Shannon Street
to Washington Street; and, On SR 709
from SR 118 to TR 58 in Ohio City
12.9 6/18/2020Summer/Fall
2020$2,598,715
109818 VAN-30-10.60Reconstruct and lower pavement under the
overpass. Traffic will be maintained.
On US 30 under the US 224 overpass
west of the City of Van Wert0.2 6/18/2020
Summer/Fall
2020$1,500,000
$4,353,754
County-Route-
SectionDescription Location
Length
(Miles)
$0
Local Governments
VAN WERT COUNTY-ODOT LET TOTAL
VAN WERT COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2020
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
TOTAL ESTIMATED COST FOR VAN WERT COUNTY: $4,353,754
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
VAN WERT COUNTY-LOCAL GOVERNMENTS TOTAL
18
SCOTT
CONVOY
WREN
OHIO CITY
MIDDLE POINT
ELGIN
WILLSHIRE
VENEDOCIA
VAN WERT
DELPHOS
30
33
224
224
127
224
127
81
709
697
116
118
116
116
117
49
49
81
49
118
66
637
30
105160
107661
107661
109818 107661
Map
Prod
uced
by C
ody L
ape
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotCulvertBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
193/10/2020
Van Wert County 2020 Construction Projects
PID Name105160 VAN SR 81 20.65107661 VAN US 127/224/SR 118/709 9.94109818 VAN US 30 10.60
County-Route-
SectionDescription Location
Length
(Miles)
107667HAR/WYA-68/
37/Var.
Resurface with asphalt. Traffic will be
maintained.
On US 68 from the south corp of
Kenton to Espy Street; On SR 37
from SR 67 to the south corp limit of
Marseilles; On SR 67 from Hardin
County to High Street in Upper
Sandusky; On SR 103 from US 23 to
SR 199 in Carey; On SR 293 from the
south corp limit of Kirby to Usion
Street; and, On SR 293 in Wharton
from Franklin Street to Cass Street
16.29 SOLD Summer 2020 See Hardin County
107669 WYA-199-7.35Resurface with micro resurfacing.
Traffic will be maintained.
On SR 199 from Upper Sandusky to
SR 1036.86 SOLD
Spring/Summer
2020$358,434
94220 WYA-23-6.65Resurface with asphalt. Traffic will be
maintained.
On US 23 from CR 62 to the Conrail
railroad overpass just north of US 303.63 5/7/2020
Summer/Fall
2020$1,968,977
$2,327,411
County-Route-
SectionDescription Location
Length
(Miles)
106290WYA-Ogg Street
Bridge
Replace bridge with a new structure.
Traffic will be detoured.
On Ogg Street in the Village of Carey
over Spring RunSpot SOLD
Spring/Summer
2020$408,281
$408,281
WYANDOT COUNTY-ODOT LET TOTAL
WYANDOT COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2020
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
WYANDOT COUNTY-LOCAL GOVERNMENTS TOTAL
TOTAL ESTIMATED COST FOR WYANDOT COUNTY: $2,735,692
Local Governments
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
Village of Carey
20
HARPSTER
NEVADA
WHARTON
SYCAMORE
KIRBY
MARSEILLES
UPPER SANDUSKY
CAREY
FOREST
23
30
23
23
30
231
294
53
103
199
293
231
103
67
53
15
568
231
231
53
67
67
37
67
53
103
294
94220
107667
107669
107667
106290
107667
107667
107667
Map
Prod
uced
by C
ody L
ape
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotCulvertBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
213/10/2020
Wyandot County 2020 Construction Projects
PID Name94220 WYA US 23 6.65106290 WYA Ogg Street Bridge107667 HAR/WYA US 68/SR 37/VAR107669 WYA SR 199-7.35