Page 1: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

ODOT DISTRICT 1 2020 CONSTRUCTION PROGRAM

MIKE DEWINE, OHIO GOVERNOR | JACK MARCHBANKS, PH.D., ODOT DIRECTOR | CHRIS HUGHES, P.E., DISTRICT DEPUTY DIRECTOR

SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT, AND WYANDOT COUNTIES

Page 2: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

Chris Hughes District Deputy Director 419-999-6804 [email protected]

Rob White Capital Programs Administrator 419-999-6901 [email protected]

Rhonda Pees Regional Public Information Officer 419-373-7121 [email protected]

Cheri Newton District Public Information Officer 419-999-6803 [email protected]

Scott Mullins District Construction Engineer 419-999-6903 [email protected]

Luke Johansen District Area Construction Engineer 419-999-6956 [email protected]

Bashar Kanouh District Area Construction Engineer 419-999-6909 [email protected]

District One Contacts

1

Page 3: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

COUNTYNO. OF

PROJECTSESTIMATED COST

NO. OF

PROJECTSESTIMATED COST

NO. OF

PROJECTSESTIMATED COST

DISTRICT WIDE 8 $9,037,673 0 $0 8 $9,037,673

ALLEN 6 $28,338,494 5 $3,640,907 11 $31,979,401

DEFIANCE 3 $5,577,515 1 $103,991 4 $5,681,506

HANCOCK 8 $5,146,214 7 $9,371,088 15 $14,517,302

HARDIN 3 $4,190,286 1 $2,172,000 4 $6,362,286

PAULDING 1 $1,387,892 0 $0 1 $1,387,892

PUTNAM 3 $3,569,608 1 $115,000 4 $3,684,608

VAN WERT 3 $4,353,754 0 $0 3 $4,353,754

WYANDOT 3 $2,327,411 1 $408,281 4 $2,735,692

TOTALS 38 $63,928,847 16 $15,811,267 54 $79,740,114

MILES

RESURFACED

/ REPAIRED

---

---

---

123.73

7.05

8.12

---

---

DISTRICT ONE STATS (ODOT PROJECTS)

NO. OF

STRUCTURES

ADDRESSED

11

11

---

---

OTHER

RECONSTRUCTION

RESURFACE

PAVEMENT MARKINGS

CULVERTS

COSTNO. OF PROJECTSPROJECT TYPE

$9,693,674

9 $9,518,364

$1,500,000

$40,571,669

$1,109,158

8

3

10

2

2 $1,535,982

DISTRICT ONE SUMMARYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2020

ODOT AND LOCAL GOVERNMENT PROJECTS

BRIDGE MAINTENANCE &

REPLACEMENT

ODOT PROJECTS LOCAL GOV’T. PROJECTS GRAND TOTALS

2

Page 4: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

County-Route-

SectionDescription Location

Length

(Miles)

99451 D01-Sign-FY20

Replace existing roadway signs

(extrusheets). Traffic will be

maintained.

On various routes throughout

District OneNA SOLD

Spring/Summer

2020927,850$

103426 D01-HS-FY20

On-Road and guardrail herbicidal

spraying for 4-lane and 2-lane sections

in the district. Traffic will be

maintained.

Various routes and sections

throughout District OneVarious SOLD

Spring/Summer/

Fall 2020211,001$

98554 D01-CPR-FY20Repair concrete pavements and ramps.

Traffic will be maintained.

Various routes and sections

throughout District One8.12 SOLD

Spring/Summer

20202,833,625$

98530 D01-PM-FY20

Upgrade existing painted pavement

markings on rural state highway routes.

Traffic will be maintained.

Various routes and sections

throughout District OneVarious SOLD

Spring/Summer/

Fall 20201,205,880$

103435 D01-GR-FY20District wide guardrail repair / upgrade

project. Traffic will be maintained.

Various routes and sections

throughout District OneVarious 3/26/2020 Summer 2020 1,495,329$

107844 D01-CR-FY20

Perform miscellaneous culvert

maintenance activities. Traffic will be

maintained.

Various routes in Hancock and

Wyandot counties.Various 5/07/2020 Summer 2020 533,886$

101006 D01-RPM-FY21

Replace raised pavement marker casting

and/or lenses as needed on various

routes. Traffic will be maintained.

Various routes and sections

throughout District OneVarious 7/2/2020

Summer/Fall

2020 $ 330,102

107806D01-Erosion

Repair-FY20

Repair drainage and erosion issues by

constructing curb & gutter, catch basins

and/or regrade shoulders. Traffic will be

maintained.

Various routes and sections

throughout District OneVarious 7/2/2020

Summer/Fall

2020 $ 1,500,000

9,037,673$ DISTRICT WIDE TOTAL

DISTRICT WIDE PROJECTS (No Map)

CONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2020

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

3

Page 5: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

County-Route-

SectionDescription Location

Length

(Miles)

88306 ALL-SR 65/CR 509 Replace bridge decks. Traffic will be detoured.Elm Street (SR 65) and Pine Street over the

Ottawa River in the City of LimaNA SOLD

Spring/Summer/

Fall 2020$3,907,465

101189 ALL-81-21.51 Replace bridge deck. Traffic will be detoured.On SR 81 over the Ottawa River, located

approximately 2.5 miles east of IR 75NA SOLD

Spring/Summer/

Fall 2020$787,332

94214ALL/HAN-75-

15.80/0.00

Resurface with asphalt from the Napoleon Road

interchange to just south of the SR 235

interchange. Reconstruct about 1 mile of IR 75

pavement at the SR 696 interchange. Replace the

IR 75 bridge deck over TR 33 just north of

Bluffton. Traffic will be maintained.

On IR 75 from Napoleon Road in Allen

County to SR 235 in Hancock County.7.35 SOLD

Spring/Summer/

Fall 2020$20,993,821

105527 ALL-65/81/117-VarResurface with asphalt. Traffic will be

maintained.

On Elm Street (SR 117 and SR 65) from

Woodlawn Avenue to Union Street in the

City of Lima. On SR 81 from SR 66 to

Wapak Road.

9.7 SOLDSpring/Summer

2020$1,851,340

98522 ALL-117-13.85

Overlay bridge deck with a new concrete surface.

Paint structural steel at each abutment. Upgrade

bridge railing and guardrail off structure. Traffic

will be detoured.

SR 117 over the RJ Corman railroad in

Lima.NA SOLD

Summer/Fall

2020$798,536

98469PUT/HAN/ALL-

224/103-Var.

Resurface with asphalt. Traffic will be

maintained.

On US 224 from the CSX railroad crossing

on the east side of Ottawa to SR 235 in

Hancock County; and, on SR 103 in the

Village of Bluffton from Huber Street to

the Hancock county line.

0.27 6/4/2020Summer/Fall

2020

See

Putnam County

$28,338,494ALLEN COUNTY-ODOT LET TOTAL

ALLEN COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2020

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

4

Page 6: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

County-Route-

SectionDescription Location

Length

(Miles)

80441All- Lima RR Grade

Separation

Construct a railroad grade separation of the

Indiana & Ohio railway at Elm Street.

Reconstruct 0.70 miles of pavement along Elm St.

and construct a roundabout at it's intersection of

with Bellefontaine Avenue. Construct a storm

sewer system outletting to the Ottawa River.

On Elm Street from North St. to

Belfontaine AvenueSpot SOLD

Spring 2018 to

Summer 2020Sold in 2018

90949

ALL-Lima

Wayne/High

Streets

Resurface with asphalt, upgrade curb and gutter,

replace some sidewalk and upgrade ADA curb

ramps, upgrade signals and improve drainage.

Traffic will be maintained.

On Wayne Street from Jameson

Avenue to Central Avenue; and,

on High Street from Metcalf

Street to Jackson Street

2.23 SOLDSpring/Summer/

Fall 2020$3,337,965

88306 ALL-SR 65/CR 509 Replace bridge decks. Traffic will be detoured.

Elm Street (SR 65) and Pine Street

over the Ottawa River in the City

of Lima

NA SOLDSpring/Summer/

Fall 2020See ODOT Let

110216ALL-Lafayette

Sidewalks

Construct sidewalks, ADA curb ramps and

crosswalks. Traffic will be maintained.

Along portions of Main Street in

the Village of Lafayette.NA 5/21/2020 Summer 2020

Included with

PID 110217

below

110217ALL-Beaverdam

Sidewalks

Construct sidewalks, ADA curb ramps and

crosswalks. Traffic will be maintained.

Along portions of Main Street (SR

696) and West Street in the

Village of Beaverdam.

NA 5/21/2020 Summer 2020 $302,942

$3,640,907

$31,979,401TOTAL ESTIMATED COST FOR ALLEN COUNTY:

(Continued)

ALLEN COUNTY

ALLEN COUNTY-LOCAL GOVERNMENTS TOTAL

CITY OF LIMA

Local Governments

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

Village of Beaverdam

5

Page 7: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

ELIDA

SPENCERVILLE

BEAVERDAMCAIRO

HARROD

LAFAYETTE

LIMA

DELPHOS

BLUFFTON

75

7530

3030

696

117

501

196

198

81

117

65

65

66

117

309 115

12

81

103

66

309

105527

110217

94214

101189

98522

10552790949

94214

98469

88306

80441

110216

M

ap Pr

oduc

ed by

Cod

y Lap

e

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotCulvertBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

63/31/2020

Allen County 2020 Construction Projects

PID Name PID Name80441 ALL Lima RR Grade Separation 98522 ALL SR 117 13.8588306 ALL SR 65 (Elm)/CR 509 (Pine) 101189 ALL SR 81 21.5190949 ALL Lima Wayne/High Streets 105527 ALL SR 65/81/117 Var.94214 ALL/HAN-75-15.80/0.00 110217 ALL Beaverdam Sidewalks98469 PUT/HAN/ALL US 224/SR 103 Var. 110216 ALL Lafayette Sidewalks

Page 8: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

County-Route-

SectionDescription Location

Length

(Miles)

96605 DEF-15-14.77Replace Clinton Street (SR15/18/66) bridge over the

Maumee River. Traffic will be detoured.

Approximately 0.2 miles north of

Second Street in the City of DefianceSpot SOLD

Spring 2019 to Spring

2020Sold in 2019

112045DEF-24-

3.05/3.25/6.15

Repair slopes adjacent to the roadway. Traffic will be

maintained.

Along the exit ramps at the US 24

interchange ramps with SR 15/18

and Baltimore Street

Spot 5/21/2020 Summer/Fall 2020 $474,000

94231 DEF-24-3.47 Resurface with asphalt. Traffic will be maintained.From the Baltimore Street

interchange to the Henry county line11.32 7/2/2020

Summer 2020 to

Spring 2021$5,103,515

$5,577,515

County-Route-

SectionDescription Location

Length

(Miles)

99208DEF-CR VAR PM-

FY20

Upgrade existing pavement markings. Traffic will be

maintained.

Various county routes throughout

Defiance CountyVarious SOLD Summer/Fall 2020 $103,991

$103,991

DEFIANCE COUNTY-ODOT LET TOTAL

DEFIANCE COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2020

ODOT Projects

PID No.

Project

Sale Date Approximate Duration Estimated Cost

DEFIANCE COUNTY-LOCAL GOVERNMENTS TOTAL

TOTAL ESTIMATED COST FOR DEFIANCE COUNTY: $5,681,506

Local Governments

PID No.

Project

Sale Date Approximate Duration Estimated Cost

7

Page 9: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

SHERWOOD

NEY

HICKSVILLEDEFIANCE

127

127

24

24

18

66

49

249

281

2

2

249

2

18

15

111

15

15

49

18

1899208

99208

99208 99208

99208

99208

9920

8

9920

8

99208

9920

8

94231112045

112045

96605

M

ap Pr

oduc

ed by

Cod

y Lap

e

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotCulvertBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

83/31/2020

Defiance County 2020 Construction Projects

PID Name94231 DEF US 24 3.4796605 DEF SR 15 14.7799208 DEF CR VAR PM FY20112045 DEF US 24 3.05/3.25/6.15

Page 10: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

County-Route-

SectionDescription Location

Length

(Miles)

87005 HAN-75-14.39

Major reconstruction and widening of IR 75 through the

City of Findlay. Reconstruct the IR 75/US 68 system

interchange and replace all mainline structures. Traffic

will be maintained during construction.

On IR 75 from approximately 0.8 miles

south of the US68 interchange to just

south of the CR 99 interchange

6.85 SOLDSpring 2017 -

Summer 2020Sold in 2017

94214ALL/HAN-75-

15.80/0.00

Resurface with asphalt from the Napoleon Road

interchange to just south of the SR 235 interchange.

Reconstruct about 1 mile of IR 75 pavement at the SR 696

interchange. Replace the IR 75 bridge deck over TR 33 just

north of Bluffton. Traffice will be maintained.

On IR 75 from Napoleon Road in Allen

County to SR 235 in Hancock County.3.22 SOLD

Spring/Summer/

Fall 2020See Allen County

98515 HAN-37-17.58Replace bridge with a new structure. Traffic will be

detoured.

On SR 37 over Lynn Creek, located

approximately 1.9 miles north of US 30Spot SOLD

Spring / Summer

2020$358,455

105573 HAN-12-20.83Replace culvert with a new structure. Traffic will be

detoured.

On SR 12 over an intermittant waterway,

located approximately 0.1 mile south/west

of CR 248

Spot SOLDSpring / Summer

2020$320,233

107652HAN/HAR-68-

0.00/10.61Resurface with micro surfacing. Traffic will be maintained.

On US 68 from Kenton to SR 15 in Hancock

County, excluding portions in the villages

of Dunkirk and Arlington

11.11 SOLDSpring / Summer

2020$1,199,270

98499 HAN-68-12.03 Replace bridge deck. Traffic will be detoured. On US 68 over SR 15 in Hancock County Spot SOLDSpring / Summer

2020$1,775,449

98588 HAN-568-5.57Replace bridge with a new structure. Traffic will be

detoured.

On SR 568 over Outlet Ditch, located

approximately 0.1 miles east of CR 7Spot 3/12/2020

Summer/Fall

2020$1,127,807

111236 HAN-75-18.47 Construct a noise wall. Traffic will be maintained.Along IR 75 on the west side of the

roadway, just south of CR 95Spot 4/23/2020

Summer/Fall

2020$365,000

98469PUT/HAN/ALL-

224/103-Var.Resurface with asphalt. Traffic will be maintained.

On US 224 from the CSX railroad crossing

on the east side of Ottawa to SR 235 in

Hancock County; and, on SR 103 in the

Village of Bluffton from Huber Street to

the Hancock county line.

5.25 6/4/2020Summer/Fall

2020See Putnam County

$5,146,214HANCOCK COUNTY-ODOT LET TOTAL

HANCOCK COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2020

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

9

Page 11: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

County-Route-

SectionDescription Location

Length

(Miles)

100184 HAN-CR 236-0.00Resurface with asphalt. Includes minor widening and some

drainage and bike path work. Traffic will be maintained.On CR 236 from SR 568 to US 224 1.27 5/8/2020

Summer/Fall

2020$2,240,595

107829 HAN-CR 313-0.00 Resurface with asphalt. Traffic will be maintained.On CR 313 from the Allen County line to

the south corp limit of Findlay13.29 3/26/2020

Summer/Fall

2020$1,848,067

106715HAN-Greenway Trail

ExtensionConstruct a multi-use trail along the Blanchard River

Along the Blanchard River, starting at the

existing trail and ending at Eastpoint Park

in the City of Findlay

0.05 SOLD Spring/Summer 2020 $707,110

104247HAN-Lincoln/

Blanchard Paths

Construct a multi-use path in place of existing sidewalks

along portions of Lincoln Street. Construct shared lanes on

northbound and southbound curb lanes on portions of

Blanchard Street. Traffic will be maintained.

In the City of Findlay on Lincoln Street

from Cory Street to Blanchard Street;

and, on Blanchard Street from 6th Street

to Tiffin Avenue

1.72 5/8/2020Summer/Fall

2020$2,220,784

104001 HAN-68-4.70

Reconstruct US 68 including new pavement, curb and

gutter, drainage and storm sewers. Traffic will be

detoured.

On US 68 from the south corp limit to

Liberty Street in the Village of Arlingtion0.4 SOLD

Spring/Summer/Fall

2020$1,334,035

104002 HAN-68-5.37

Reconstruct US 68 including new pavement, curb and

gutter, drainage and storm sewers. Traffic will be

detoured.

On US 68 from the bridge over Buck Run

to Wardwell Street in the Village of

Arlingtion

0.22 SOLDSpring/Summer/Fall

2020$857,299

103696 HAN-SRTS-McComb

Construct sidewalks and detectable warning signs. Improve

pedestrian signals and upgrade signing around the school.

Traffic will be maintained.

At various locations near the school in

the Village of McCombSpot SOLD Summer 2020 $163,198

$9,371,088

Hancock County Engineer

City of Findlay

HANCOCK COUNTY-LOCAL GOVERNMENTS TOTAL

TOTAL ESTIMATED COST FOR HANCOCK COUNTY: $14,517,302

Village of Arlington

Village of McComb

HANCOCK COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2020

Local Governments

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

10

Page 12: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

ARLINGTON

ARCADIA

RAWSON VANLUE

JENERA

MOUNTCORY

BENTON RIDGE

MOUNT BLANCHARD

VAN BUREN

FINDLAY

FOSTORIA

BLUFFTON

MCCOMB

75

75

30

68

224224

30

68

568

37

698

15

186

330

613

103

18

37

103

235

12

235

103

12

235

235

37

613

18

12

613

98469

87005

94214

98499

111236

98515

107829

87005

104247 98588

105573103696

106715

100184

104002104001

1076

5210

7652

M

ap Pr

oduc

ed by

Cod

y Lap

e

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotCulvertBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

113/31/2020

Hancock County 2020 Construction Projects

PID Name87005 HAN IR 75 14.3994214 ALL/HAN-75-15.80/0.0098469 PUT/HAN/ALL US 224/SR 103 Var.98499 HAN US 68 12.0398515 HAN SR 37 17.5898588 HAN SR 568 5.57100184 HAN CR 236 0.00103696 HAN SRTS McComb104001 HAN US 68 4.70 Arlington Phase 2104002 HAN US 68 5.37 Arlington Phase 3104247 HAN Lincoln/Blanchard Paths105573 HAN SR 12 20.83106715 HAN Greenway Trail Extension107652 HAN/HAR US 68 0.00/10.61107829 HAN CR 313 0.00111236 HAN IR 75 18.47 Noise Wall

Page 13: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

County-Route-

SectionDescription Location

Length

(Miles)

107652HAN/HAR-68-

0.00/10.61

Resurface with micro surfacing. Traffic will be

maintained.

On US 68 from Kenton to SR 15 in

Hancock County, excluding portions in

the villages of Dunkirk and Arlington

10.51 SOLDSpring / Summer

2020

See Hancock

County

107656 HAR-67-1.59Resurface with asphalt. Traffic will be

maintained.

On SR 67 from SR 117 to the west corp

limit of Kenton13.48 SOLD Summer 2020 $1,395,452

107667HAR/WYA-68/

37/Var.

Resurface with asphalt. Traffic will be

maintained.

On US 68 from the south corp of

Kenton to Espy Street; On SR 37 from

SR 67 to the south corp limit of

Marseilles; On SR 67 from Hardin

County to High Street in Upper

Sandusky; On SR 103 from US 23 to SR

199 in Carey; On SR 293 from the

south corp limit of Kirby to Usion

Street; and, On SR 293 in Wharton

from Franklin Street to Cass Street

0.41 SOLD Summer 2020 $2,794,834

$4,190,286

County-Route-

SectionDescription Location

Length

(Miles)

106438HAR-Ada Lincoln

St. Phase 3

Reconstruct and widen, construct curb and

gutter, install drainage improvements and

portions of sidewalk. Traffic will be detoured.

On Lincoln Street in the Village of Ada

from Union Street to Klingler Road0.86 SOLD

Spring/Summer/

Fall 2020$2,172,000

$2,172,000

TOTAL ESTIMATED COST FOR HARDIN COUNTY: $6,362,286HARDIN COUNTY-LOCAL GOVERNMENTS TOTAL

Local Governments

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

Village of Ada

HARDIN COUNTY-ODOT LET TOTAL

HARDIN COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2020

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

12

Page 14: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

FOREST

DUNKIRK

RIDGEWAY

MOUNT VICTORY

ALGER

MCGUFFEY

PATTERSON

KENTON

ADA

68

68

68

67

309

292

235

701

31

385

309

309

195

8181

117

273

117

67

53

235

37

107652

106438

107656107667

107652

Map

Prod

uced

by C

ody L

ape

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotCulvertBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

133/10/2020

Hardin County 2020 Construction Projects

PID Name106438 HAR Ada Lincoln St. Phase 3107652 HAN/HAR US 68 0.00/10.61107656 HAR SR 67 1.59107667 HAR/WYA US 68/SR 37/VAR

Page 15: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

County-Route-

SectionDescription Location

Length

(Miles)

107124 PAU-24-5.42/11.52Reconstruct slopes adjacent to the highway, add curb and gutter

and rebuild guardrail. Traffic will be maintained.

Adjacent to the overpass

structures On US 127 over CR 176

and on US 127 over CR 105 near

Cecil

Spot SOLDSpring/Summer

2020$1,387,892

$1,387,892

County-Route-

SectionDescription Location

Length

(Miles)

$0

TOTAL ESTIMATED COST FOR PAULDING COUNTY: $1,387,892PAULDING COUNTY-LOCAL GOVERNMENTS TOTAL

Local Governments

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

PAULDING COUNTY-ODOT LET TOTAL

PAULDING COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2020

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

14

Page 16: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

CECIL

ANTWERP

PAYNE MELROSE

OAKWOOD

LATTY

HAVILAND

GROVER HILL

BROUGHTON

PAULDING

SCOTT

24

127

127

30

127

24

114

111

500

637

49

114

66

637

500

613

111

613

114

613

637

613

66

49

107124

107124

Map

Prod

uced

by C

ody L

ape

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotCulvertBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects 15

3/10/2020

Paulding County 2020 Construction Projects

PID Name107124 PAU US 24 5.42/11.52

Page 17: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

County-Route-

SectionDescription Location

Length

(Miles)

105161 PUT-30-0.21Repair drainage structures and condiuts.

Traffic will be maintained.

On US 30 between the Van Wert

and Allen county linesSpot 3/12/2020

Spring/Summer

2020$323,667

98469PUT/HAN/ALL-

224/103-Var.

Resurface with asphalt. Traffic will be

maintained.

On US 224 from the CSX railroad

crossing on the east side of

Ottawa to SR 235 in Hancock

County; and, on SR 103 in the

Village of Bluffton from Huber

Street to the Hancock county line.

8.21 6/4/2020Summer/Fall

2020$2,307,311

98516 PUT-108-1.68

Overlay the deck surface with concrete,

replace the deck edges and repair the

abutments. Rebuild the roadway slopes

adjacent to the bridge. Traffic will be

detoured.

On SR 108 over the Miller Cutoff,

located approximately 0.4 miles

south of SR 613

Spot 7/16/2020Summer/Fall

2020$938,630

$3,569,608

PID No. Project Sale DateApproximate

DurationEstimated Cost

County-Route-

SectionDescription Location

Length

(Miles)

101974PUT-CR VAR PM

FY21

Upgrade existing pavement markings.

Traffic will be maintained.

On various county routes in

Putnam CountyVarious 7/1/2020

Summer/Fall

2020$115,000

$115,000

PUTNAM COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2020

ODOT Projects

PID No.

Project

Sale DateApproximate

Duration

Estimated

Cost

TOTAL ESTIMATED COST FOR PUTNAM COUNTY: $3,684,608

PUTNAM COUNTY-ODOT LET TOTAL

Local Governments

Putnam County Engineer

PUTNAM COUNTY-LOCAL GOVERNMENTS TOTAL

16

Page 18: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

LEIPSIC

KALIDA

GLANDORF

PANDORA

DUPONT

OTTOVILLE

CONTINENTAL

COLUMBUS GROVE

BELMORE

CLOVERDALE

FORTJENNINGS

MILLER CITY

WEST LEIPSIC

GILBOAOTTAWA224

224

224

224

613

115

694

109

65

12

108

190

634

634

114

634

63465

189

11515

190

66

613

189

613

114

12

15

15 65

696

30

98516

105161

98469

Map

Prod

uced

by C

ody L

ape

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotCulvertBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

173/10/2020

Putnam County 2020 Construction Projects

PID Name98469 PUT/HAN/ALL US 224/SR 103 Var.98516 PUT SR 108 1.68105161 PUT US 30 0.21

Page 19: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

County-Route-

SectionDescription Location

Length

(Miles)

105160 VAN-81-20.65Replace culvert with a new structure. Traffic

will be detoured.

On SR 81 over an intermittant

waterway, located approximately 0.3

miles east of SR 116

Spot SOLDSpring/Summer

2020$255,039

107661VAN-127/224/118/

709-Var.

Resurface with asphalt. Traffic will be

maintained.

On US 127 from the CSX railroad to

Marsh Rd.; On US 224 from the Indiana

state line to TR 77; On SR 118 in the

City of Van Wert from Shannon Street

to Washington Street; and, On SR 709

from SR 118 to TR 58 in Ohio City

12.9 6/18/2020Summer/Fall

2020$2,598,715

109818 VAN-30-10.60Reconstruct and lower pavement under the

overpass. Traffic will be maintained.

On US 30 under the US 224 overpass

west of the City of Van Wert0.2 6/18/2020

Summer/Fall

2020$1,500,000

$4,353,754

County-Route-

SectionDescription Location

Length

(Miles)

$0

Local Governments

VAN WERT COUNTY-ODOT LET TOTAL

VAN WERT COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2020

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

TOTAL ESTIMATED COST FOR VAN WERT COUNTY: $4,353,754

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

VAN WERT COUNTY-LOCAL GOVERNMENTS TOTAL

18

Page 20: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

SCOTT

CONVOY

WREN

OHIO CITY

MIDDLE POINT

ELGIN

WILLSHIRE

VENEDOCIA

VAN WERT

DELPHOS

30

33

224

224

127

224

127

81

709

697

116

118

116

116

117

49

49

81

49

118

66

637

30

105160

107661

107661

109818 107661

Map

Prod

uced

by C

ody L

ape

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotCulvertBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

193/10/2020

Van Wert County 2020 Construction Projects

PID Name105160 VAN SR 81 20.65107661 VAN US 127/224/SR 118/709 9.94109818 VAN US 30 10.60

Page 21: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

County-Route-

SectionDescription Location

Length

(Miles)

107667HAR/WYA-68/

37/Var.

Resurface with asphalt. Traffic will be

maintained.

On US 68 from the south corp of

Kenton to Espy Street; On SR 37

from SR 67 to the south corp limit of

Marseilles; On SR 67 from Hardin

County to High Street in Upper

Sandusky; On SR 103 from US 23 to

SR 199 in Carey; On SR 293 from the

south corp limit of Kirby to Usion

Street; and, On SR 293 in Wharton

from Franklin Street to Cass Street

16.29 SOLD Summer 2020 See Hardin County

107669 WYA-199-7.35Resurface with micro resurfacing.

Traffic will be maintained.

On SR 199 from Upper Sandusky to

SR 1036.86 SOLD

Spring/Summer

2020$358,434

94220 WYA-23-6.65Resurface with asphalt. Traffic will be

maintained.

On US 23 from CR 62 to the Conrail

railroad overpass just north of US 303.63 5/7/2020

Summer/Fall

2020$1,968,977

$2,327,411

County-Route-

SectionDescription Location

Length

(Miles)

106290WYA-Ogg Street

Bridge

Replace bridge with a new structure.

Traffic will be detoured.

On Ogg Street in the Village of Carey

over Spring RunSpot SOLD

Spring/Summer

2020$408,281

$408,281

WYANDOT COUNTY-ODOT LET TOTAL

WYANDOT COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2020

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

WYANDOT COUNTY-LOCAL GOVERNMENTS TOTAL

TOTAL ESTIMATED COST FOR WYANDOT COUNTY: $2,735,692

Local Governments

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

Village of Carey

20

Page 22: ODOT DISTRICT 1 · p P r o d u c e d b y C o d y L a p e. Ohio Department of Transportation District One - Lima Office of Capital Program 1885 N. McCullough L ima, Oh o 45801. Legend

HARPSTER

NEVADA

WHARTON

SYCAMORE

KIRBY

MARSEILLES

UPPER SANDUSKY

CAREY

FOREST

23

30

23

23

30

231

294

53

103

199

293

231

103

67

53

15

568

231

231

53

67

67

37

67

53

103

294

94220

107667

107669

107667

106290

107667

107667

107667

Map

Prod

uced

by C

ody L

ape

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotCulvertBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

213/10/2020

Wyandot County 2020 Construction Projects

PID Name94220 WYA US 23 6.65106290 WYA Ogg Street Bridge107667 HAR/WYA US 68/SR 37/VAR107669 WYA SR 199-7.35