E-Mail-eernb5bbsr@gmail,com Tel :- (06741-2392424 oFFICE OF THE EXECUTTVE ENGTNEER BHUBANESWA& (R&B)DIVTSTON-V, BH U BAN ESWAR 562? Dtd t7.//./y No GOVERNMENT OF ODISHA NOTTCE TNVTTTNG QUOTATTON CALL NOTICE In pursuance of decision to revise the Schedule of Rates - 2074, Sealed budgetary Quotation are invited from the registered contractors and other Stakeholdeis in their letter head as applicable and authorized for respective items having valid Registration, GSTIN for Miscellaneous items(Part XXV) of SoR (available in the office of the Executive Engineer, Bhubaneswar (R&B) Division No- V,Bhubaneswaras well as in the website of Works Depaftment) confirming to relevant specifications for inclusion in the revised Scheduled of Rates of Government of Odisha to be used in different Civil construction / infrastructure works and repair works.The interested party i.e. the registered contractor shall quote his price in the following format, RATE OF MISCELLANEOUS ITEMS FOR 2018 sl. No. Description of items Unit Finished Rate excluding GST in Rs. 1 I z 3 The list of description of items and the unit for which rate to be quoted will be available in the Offlcial website of Works Depaftment, Government of Odisha w.e.f. 28.11.2018. The sealed quotations with all supporting documents complete in all respects will be received from 10.00 AM of dt.28.11.2018 to 5.00 PM of dt.2O,L2.2O18in the quotation box available in the office of the Executive Engineer, Bhubaneswar (R&B) Division No-V, Bhubaneswarand will be opened on Dt2L.L2.2018 at 12.30 P.M. in presence of the quotationers or their authorized representatives who desire to be present. This quotation is invited to ascertain and assess the Rate of Miscellaneous items at par with lowest market rate for revision of Schedule of Rates 2014. The quotation shall be considered only if applied in Letter Head of the registered contractormentioning GSTIN No, Registration No, failing which quotation shall be rejected. The undersigned reserves the right to accept or assigning any reason thereoT. reject / cancel any or all quotations without

Upload: others

Post on 27-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • E-Mail-eernb5bbsr@gmail,com

    Tel :- (06741-2392424

    oFFICE OF THE EXECUTTVE ENGTNEER BHUBANESWA&

    (R&B)DIVTSTON-V, BH U BAN ESWAR562? Dtd t7.//./yNo

    GOVERNMENT OF ODISHANOTTCE TNVTTTNG QUOTATTON CALL NOTICE

    In pursuance of decision to revise the Schedule of Rates - 2074, Sealed budgetary Quotation areinvited from the registered contractors and other Stakeholdeis in their letter head as applicable andauthorized for respective items having valid Registration, GSTIN for Miscellaneous items(Part XXV) ofSoR (available in the office of the Executive Engineer, Bhubaneswar (R&B) Division No-V,Bhubaneswaras well as in the website of Works Depaftment) confirming to relevantspecifications for inclusion in the revised Scheduled of Rates of Government of Odisha to be used indifferent Civil construction / infrastructure works and repair works.The interested party i.e. the registeredcontractor shall quote his price in the following format,

    RATE OF MISCELLANEOUS ITEMS FOR 2018

    sl.No. Description of items Unit

    Finished Rate excluding GST inRs.

    1I z 3

    The list of description of items and the unit for which rate to be quoted will be available in theOfflcial website of Works Depaftment, Government of Odisha w.e.f. 28.11.2018.

    The sealed quotations with all supporting documents complete in all respects will be receivedfrom 10.00 AM of dt.28.11.2018 to 5.00 PM of dt.2O,L2.2O18in the quotation box available in theoffice of the Executive Engineer, Bhubaneswar (R&B) Division No-V, Bhubaneswarand will be opened on

    Dt2L.L2.2018 at 12.30 P.M. in presence of the quotationers or their authorized representatives whodesire to be present. This quotation is invited to ascertain and assess the Rate of Miscellaneous items atpar with lowest market rate for revision of Schedule of Rates 2014. The quotation shall be considered only

    if applied in Letter Head of the registered contractormentioning GSTIN No, Registration No, failing which

    quotation shall be rejected.

    The undersigned reserves the right to accept orassigning any reason thereoT.

    reject / cancel any or all quotations without

  • 1112412018advtg-rePort

    FORMl

    ' GOVERNMENT OF ODISHAINFORMATION & PUBLIC RELATIONS DEPARTMENT

    NO.ADVT 34Og0IPR,Bhubaneswar, on daLe 22-71-2018

    To,The Advertlsement Manager

    Subject:-Publication of Advertisement Others : 0031

    Dear Sir,Inenclosingtheaboveadvertisementlamdesiredtorequestyoutokindty

    advertisement to the Departrnent for payment'

    Youarealsorequiredtosendacomplementarycopyofnewspapercontainingthe advertasemenE to the advertiser lmmediately after

    its publi'cation'

    Receiptoftheadvertisementmaykindlyeacknow]edgedandtheprobabledate of insertion of the same in the newspaper m y aLso be

    intimated to this

    dePartrnent Yours faithful rY

    Jt. Dir,/Dy. Dir. of I&PR (Advt ' ) and Dy ' Secy to Government

    17-Nov-18 ?R'3;3i fiE rooRO No : 34090/II/003I/IBL9

    AD TyPe: CLASSIfTED

    B.W/COL: B & W

    CATEGORY: Others

    Sl.NO NP CODE NAME1 32OOO4 PRAGATIVAD]2 32087r Manthan

    REF. & DATE

    DESIG.:

    Address:

    Caption No. :

    PUB CITY

    BHUBANESWAR

    Bhubaneswar

    : 5650 -E.ER&B Division, BBSRNo.VOdi sha

    B 60-Il

    INS DATE LASII I)ATE INS24 /7r/rB 21 /rr/rB 124/rr/1821/71/18 1

    INS'I' ADVT SPACE COSTINNER 100 SquCm 8400INNtIR 1OO SquCm i000

    Copy forward towith reference

    the E.E , R&B Division, BBSRto his Letter/Memo No : 5650

    Jt. Dir/DY ' Dir

    Memo. no 5650Copy to Guard file

    Report generated bY NIC as on

    No.V , Odisha , nul1 f or inf ormatlonDated : 1-i - NOV 1B .

    . of r &PR (AdvL. ) and Dy. Secy to Governmel)L

    lll24 12018 at 12222232 PM

  • T

    :rN\]t l ScELLl-\E(f,s lTElCs

    i Provldlng and tlxlng pre-cast K.L.t. lL'L:'t)B kilometre stone as per l.R.C. design including

    15ocm long ordinitsT;i

    N.fl., S.tl. and vrllage

    posts of cement concrete (L:2:4) with hard granite chips I f acninnlrrriino rncf nf r'll rcinfnrccment-

    Unit

    F ' < l.a St r--'-Fg l'<

    Rate rnfigures

    cm thick and fixing in cement nlortar in position aftercutting the grooves, etc. complete including cost of all

    materials.

    Providing and fixing in posrtion 50mm, thick precastcement concerejally (1,:2:4) hard granite chips includingroughening, cleaning, fixing and finishing in cementmortar (1:3) etc., comPlete

    5 c.m. thick R.C C tftuW.t [1:2:4) with hard granite chipsfinished smooth12mm size fitted and fixed in position

    complete with all materials.

    g5cm long ordinary Km. Stone forroads.

    B cm thick R.C.C. fins *t11t i12'+; witfr Uiit t.t"ra ore rr tf cchips 12mm size using 3.0 kg to 3.50 Kg ol steel

    reinforcement per Sq.M. including shuttelirl g, fr rlish i ng

    complete.

    1Sq.M

    1Sq.M

    1Sq.M

    R.C.C. boundary s-tones 1f Z+1 w-itn witncashingles or hard stone chips 10cm x 10cm and Each

    using 75Kgs oFsteel reinforcement per Cu.M. includingcost of all materials and labour fitting and fixing inposition etc.

    Srpply"tg ""d

    f*-gTsfi an "n-a

    f-oO rr,4. f o"gg'iia

    T

    Each

    Frscttliv€ En$rcerBhubarresrrar (R&B) Drvn. No.V

    Rhrrhsnpqrrar

    (c)

    Page 1

    .l so r-t.l. _'1"_

  • Finished Rate Excluding GSTin Rs.

    slNo.

    Description of ltems

    @B cm thick gocm high with hard1_0 granite chips 6mm to 2Omm size complete as

    per

    approved design.

    UnitRate infigures

    Rate inwords

    \r_. &ilJfireEnglrnerdnuDaleswar (R&B) Divn. N+.V

    Bhubanesvyar

    I-RI. tt""d".d R.C.C' railing(1'"2:q using black hardgranite chips 12mm size including cost of centering and

    ihuttering and cost and conveyance of all materials and

    labour etc. comPlete.

    Boxing with cement concrete (1:3:6) with wire nettlngand w"ashed pit singles or hard stone chips including

    cement plasier 6mm, thick finished smooth complete'

    nff,ng Ut,,rnen and cement and jute fibre in expanslonjoints inclusive of cost of materials, bitumen andcement proportion [3:1J including cleaning before

    pouring 12mm to 25mm and 15cm depth'

    Ditto extra forof 15cm

    ."ct "dd,t,onal

    2'5cm depth over the depth

    Inserting Premoulded expansion joint including cleaning

    (labour onlY)

    (b) Doors and Window

    1 Sqm

    1 Sqm

    L"b"r. "f

    .eptacing glass- panes including cutting to size

    with cost of nails and PuttY.

    Ct*ninggluss-panes with spirit including cost of spirit

    Frcstlng glasLpanes including cost of all labour and

    materialsrs in Position in wooden,

    steel window frames including cutting grooves'

    Renewing putty in fixing glass-panesp*ttU ofa gf'ot. panes with wooden beading includingcost of nails and beadings

    P.*iding, fitting and fixing with sal wood battens, 7.5cmor expanded metall.2cmwith 6mm mesh wire netting,

    including Panting comPlete

    F*-g wire netting or welded mesh including screw andnails (Labour onlY)

    1- Sqm

    Pr""td*g, fltttt"g;nd-xing 25mm thick sal wood batten'

    iaffry, door shutters fitted and fixed in position

    including cost of iron fitting and hinged cleats etc'

    complete.

    Page 2

  • I

    20

    IJ

    /

    I

    SI

    No'DescriPtion of ltems

    [a) Doors

    etc. comPlete

    i 15

    ilupprnng unJii-i"g fi;den btocks to walls

    1B

    oartme tal shutters

    excluding cost of fixing and fitting :,l"lli*

    but including

    mending size of gtoou?' in chaukaths and size of shutters'

    Finished Rate LxcruqlrrB \rJ r

    in Rs'

    Rate inRate infigures

    rsordsUnit

    bacn

    Sqm

    lrach

    r ^..^ ^^'-l .n,indorruS

    bacn

    b.acn

    BaCn

    l'.ach

    1,7 iron rings or brass rings to doors andwindows

    sand blocks 1-3cm

    st of screws'

    il"ine .urcll hooks of different

    x 1Ocm x

    size to doors anoSupplYing4cm thick

    Labour forwindows.

    ^"d f**g htn-gta tf"'tt B cm to 10crtl long

    and hacn

    including cost of scrytNt

    Bhubaneswar (F{eB) Divn' li; VBhu*aneswsi'

    I

    [h) Windows

    z1

    Easing,windows

    Page 3

    l.acn

  • slNo.

    R

    n

    DescriPtion of Items

    -I in Rs.

    Unitffit^.!i Rate rn i wordsI figures !

    2ffi,ding making good to the

    3 41

    Each23

    I

    I

    1 Cum1ALA

    Labour for making chauKatns ano oul Bd5

    worksrrrpd

    arLJ1sqm.

    F,ACN

    26

    ;LI

    silliIVIAKIIIB LEIIICTTL UVITLT LLV \

    L Sqm2B

    Providing and fixing in posttton zumm LIITLI( Lrurru Lvr L

    tvpe]sitaboardorequivalentapprovedqualityflush.'ft*i". double Ieaf (treated with liquidil;;;if;;ldehvde svnthetic resin) with

    and including

    [oo. a.opp.., cleats, both side commercial shutterand superior hinges, etc' complete'

  • )

    J\Finished Rate Ercluding GST

    in Rs"

    r Rate in words| figrr."t

    slNo,

    DescriPtion of ltemsr Unit

    3

    1

    Adtsln

    IaJ

    tblAd

    _$lfaritb

    Sqm39

    I

    Sqm ISqm

    Sqm40

    Sqm

    g

    1RM

    l

    I

    I

    41.

    ete using OPC 43 Grade

    of 5'5 mm to 6'0 mm dia

    ges, Iocks' W l' clamPs' etc'

    IEx-factorY)

    -ln

    A11L Each

    Each

    Each

    Each

    \- -_

    Each

    1RM

    +5

    1

    me or cement grouting to

    cra

    aL

    100 nos'

    5 ll?x ;1',:" :ff "ll:ft::}lil ;; p

    "' "' aro u nd the

    A.+

    G.l. sheet gutter uPttr

    .t"rnPt ""4 making connection with rat

    \-l

    refixing the same tn t'

    d"*" P'-1re.-

    -'--Each

    [ --] I tttt'tl_-

    5

    6

    tl

    Page 5

  • DescriPtion of ltems

    Finished Ratein

    UnitRate infigures

    !CLs

    3 4

    down PiPe with necessaryuding cost of clamPs and 1RM

    7

    EachB

    Each9

    of length and

    size including repairs to damages'crni tilp roofins

    1 sqm

    1RM

    Each

    l

    ---- )IIL

    I

    -)

    i

    l

    10

    11

    1)

    L Sqm13 La0our I0l' IdylllE, ruuqr t\srrrbs ng __-

    L,-in tilo rnnfinq

    Dqtl-1 sqm

    1AI.t

    1-t:)l- Cum

    IOlncluulll6 LvJL vr

    1 Sqm1,7

    Labour for removal of old bamooo II.aIllc rlrLruurrrb

    stacking the useful materials for reuse'

    t,- lrrEach

    1BLabour for fixing 'J' 'L' or

    'U' nooKS rol I elrd

    battens including all aterials' etc' complete

    iluin *"t *iring tttetched on old framesincluding all materials etc'

    1 Sqm

    1 sqm

    I

    1,

    Z

    I sqm3

    Bamboo celiling with new Sal lranle rtILruLrrrrE

    materials etc. comPletell

    l sqm+

    Bamboo celiling with old 5al lrame rtruruurrt6'

    materials etc' comPlete

    1 sqm1 I lwr\rrrb

    PTotisning tne floor surface with

    turpentine

    red oxide, bees wax ano

    tile flooring and

    dadosskirtingincludingwaxpolishingtogtveeranolithic finish'

    1 sqmL

    L sqmJ

    [f) Iron works/4.th6u,>t

    Bhubarnsunr (R&B) Divn. Nc.VBhubaneswar

    Page 6

  • SI

    No,DescriPtion of ltems

    Fini$ed Ratein

    Unit, Rate in

    i ngures

    Idls.

    udi4GSr

    Rate inwords

    ---l

    t

    including drilling holes and supplying bolts and nuts'

    (l

    3 4

    L qtl1

    21 qtl

    Faorlcateu ll urt v

    Labour for fixingcement, ::;

    L sqm3

    P.. la.tttPer iointPer jointPer jointPer toint

    +

    Welding of rods to proper speclllcatluIl dttu rLr srrblrr

    including cutting and shaping the ends to receive the

    welding materials and cutting to proper slzes as

    required for the work comPlete'

    1 Sqm5

    Labour for fitting and ttxtng oI tvl'r' wtrruuvv ts'

    including cost of screws comPlete

    L Sqm6

    Labour for fitting and ttxtng oI lvl'J' udLcr crr Psr

    "pp.ou.a design including cost of all materials

    completeEach

    7Labour for fixing holdtng down oorLs ttr L

    EachB

    Labour for fixing fan hooks ln exlstlng' K'L' Ltrrrrrr6

    (g)whitewashing , , , : :_Each

    1,

    Wftita washing and refiguring kllometer slulrcs ut rrl

    stones or boundarY Pillars: : ; ;: ^-.^^-rnnw

    EachI

    I

    White washing andpost

    reftgurtng IurllIrB Pt'L

    1- sqm3

    Chellr rnreshing One COat tO fecelve u15LsrtrPsr r116

    il"rning t-o .ottt to receive distemperingll

    1 sqmAa

    100 sqm5

    Labour for rubbing out heavy moss rr ur

    L00 sqm6

    Washing the plastered surlace wlLrr rudP qrru rvus

    water

    ze upto 120mm

    -p"intiru

    ftgrres and letters "bout 1re

    Each1

    1RM2

    PageT

    Bhubanes";ar

  • Finisttd nre rrrr-GSIin Rs

    SI

    No.DescriPtion of Items

    Unit

    ]. RM

    Rate infigures

    Rate inr-ords

    10cm

    -"inting

    and *.iting road signs of all kinds as per I.R.C.

    stan dard includin g par nlr ng !glq!j-

    [Labour onlY)

    S.*pirrg tld p"int witkr scrapers' sand papering

    ""J*"ii"g with soap water or soda including

    scaffolding charges upto 5M height

    flr"ping old p"int *itr, ,.*p.tt, t'n[n,1p::tlg "nd*rrtting- with soap water or soda rncluding

    scaffolding charges above 5M high and upto BM height

    plastic Paint/cementincluding cost of Painting 100 sqm

    Washing and cleaningpaint/distemPered walls

    sponge

    fil Pile Driviand fixing in Position

    llcmto 15cm, diaupto 1'50M depth including

    sharpening the end'

    ilitto- ottto+.vona r.50m depth - Do - Do

    t iauPto l'50Mdepth

    ffi,50M dePth-Do-DoZ}cmdiauPto l'50M

    Ditto-Ditto above 25 Cm and uPto 20cm diauPto 1'50M

    e-*b* jrrree on toP of Piles100 Sqm

    cm aPart to be driven

    denth of 90Cm with 60Cm jafree on top'

    VBhubaneswai (R&5) Divn. i!c.tr

    Ehrib,anes,Yat

    10

    Page B

    1RM

  • /

    I

    SI

    No.

    , Finished Rate ErcludingGST

    DescriPtion of Items

    L 2 3 4

    11

    Bamboo piling 2.00M long 30cm apart to be driven to adepth of 1,0M with 90Cm jafree on top. 1RM

    1.2

    Bamboo piling 3.7M long 3Ocm apart to be driven to adepth of 2M with 1.50M jafree on top. 1RM

    I

    13Half bullah tying pieces fitted and fixed with nails

    flabour only)1RM

    1.4For driving piles in water add extra to the respectiverate of pile driving item.

    1RM

    (i) String course and cornice

    1

    6 cm to Bcm projection plinth moudling with brick incement mortar [1:3J 6 cm to B cm depth includingcement plaster L:4 comPlete

    1RM

    2

    9 cm projection 6 cm deep cornice with brick in cementmortar [1:3) and cement mortar [1:4) complete 1RM

    5

    15cm projection and 15cm deep cornice with brick incement [1:3) including drip course and cement plaster(1:4J complete.

    1RM

    4

    23cm projection and 23cm deep cornice with brick in

    cement mortar [1:3) including drip course and cementplaster (1:4) including plaster [1:4J complete'

    1, RM

    5

    25 Cm deep brick coping on compound wallincluding cement plaster [1:4) complete for 35cm to

    3Bcm thick walls including plastering [1:4) complete1RM

    61-5 Cm deep brick coping 23cm to 25cm thick walls

    including plastering [1-:4) complete.lRM

    715 cm deep brick coping for 11cm to 1'2cm thick walls 1RM

    B

    7.Scm deep brick coping on compound wall of 23cm to

    25cm thick including cement plaster [1-:4J complete'

    compound wall and plasiering with cement plaster

    [1:4J complete.

    1RMI

    II

    9 1RM

    1RM106 cm projection for 23cm to 25cm wall string coursewith brick in cement mortar [1:3) and cement plaster

    (1:4) complete

    Page 9

  • SI

    No,Description of Items

    in Rs.

    Rate in rt-ordsUnit

    I -t."tn

    -l(k) Drain _ -_ I15cm. x 15cm con..et" dt"in with cement concrete [1:3:6) ]and cement plaster (1:3) including pu nning over hard base'

    11

    1

    concrete

    [1:3:6) and cement plaster [1:3) including punning over

    hard base.

    "t."*t"t" (13 6)--

    h with 10crn thick

    concrete over hard base'

    1RM

    1RM

    2

    3

    '111RM

    1RM

    4

    q

    Shallow brick drain in courtyard bcm oeep wlln cerrrc

    ''re-Le (1'Z'+)

    finished smooth

    A 10.r " 15cm d.ains finished srttoolh

    7

    15cm thick cement concrete [1:'3:6) draln /5cm wloe anu

    3Ocm depth including 1ZMM cemenl plastering [1:3) finished

    smooth.

    1RM

    Ditto 60cm wide and 3Ocm depth

    9

    10

    Ditto 30cm wide and 3Ocm dePtlr

    waste water outlet in cement including cost oI gratrngsI KIVI

    J -,--

    Each

    11 Waste water outlet in cement without gratlngs Each

    100 m

    100 m

    1AO m

    Labour for fitting and iixingtop line of barbed wire to thand straining hooks.

    1.50M high bamboo fencrngand strong bamboo frame work including all

    materials comPlete'

    1

    L

    4Each

    Supplying fitting and fixing R.C'U' It:l:+J Iencrrlg' pusLs

    *rift ,ftipt 1.68M long 13cm " 13cm atbottom and Bcmx B cm rttop and 3Ocm x 3Ocm x B cm base finishedsmooth

    Finished Rate E\cluding GST

    Page10

  • -I

    /,SI

    No.Description of ltems

    Finished Rate IinI

    I UnitRate infigures

    hcluding GSTts.

    Rate inwords

    L 2 3 4

    (J

    Labour for fixing barbed wire fencing and post bymeans of staples and straining hooks by means of tyingwith G.l. wire and including cost of staples, hooks andtying wires

    Each lineEachmetre

    [m] Bridee work and other Hydraulic structureWell Sinking:

    1

    Labour for sinking wells in all ki rds of soil other than rock, to

    lines,levels and plumb by scooping out from inside andbelow the staining including cost of necessary tools and plant

    supplying and working of pumps bailing out of water ordredging, removal of all materials and obstacles from insidethe well by divers, hire and labour for cantiledge jetting, ifnecessary and sinking to a depth of 10M taking precaution

    against shifting and tilting disposal of the spoil with all leadsand lifts, etc comPlete(a) 3.00 M dia outside circular or octagonal single wall upto10.00 M deoth

    1RM

    [a1) 3.00 M dia every successive additiona] metre depth

    beyond 10,00M dePthDitto

    [b) 3.25M dia outside ctrcular or octagonal single wall,upro 10.9!Y "d{_@f) :.ZS M dia outside circular or octagonal single wellfor every successive additional metre depth beyond10,00M depth add,

    Dirto

    Ditto

    (c) 3.50M dia outside circular or octagonal single wellupto 10.00M depth

    Ditto

    [c1) 3.50M dia for every successive additional metredepth beyond 10.00M add

    1RM

    [d) 4,00 M dia outside circular or octagonal single well

    upto 10.00M dePthDitto

    [d1) 4.00 M dia for every successive additional metredeoth bevond 10, depth add

    Ditto

    te) 4.25 M dia outside circular or octagonal single well I Difto

    [e1J a.25M dia for every successive additional meterdepth beyond 10.00 M dePth add'

    (0 4.50M dia outside circular or octagonal single well Ditto

    [f1) 4,5M dia for every successive additional metredeoth bevond 10.00 M dePth add.

    Ditro

    [g) 4,75M dia outside circula or octagonal single well Ditto

    Pagetl

  • A slNo.

    DescriPtion of ltems Unit

    Fini$ed Rzte EinR

    Rate infigures

    rdrdi4 GSTS

    Rate inwords

    3 4

    j

    Icessive additional metredd. Ditto

    Dittoth) 5.00 M dia outside circular or octagonar stIrE'Itr

    Ditto[h1) 5.50M dia for every successlve aclclltlonar IIreLc

    ipnth hevond 10.00M dePth add'

    I

    _o.I1Ditto

    [i) 5.50 M dia outside circular or octagonar srIIBre vvsrr

    Dittoij) 5.75M dia outside circular or octagonal slnS're werr

    _lil_Ditto

    Ditto[k1) 6.00 M dia for every successlve aocllflolrar rrrtrL

    a.pitr beyond 10'0M dePth add'l

    ctagonal single well

    additionald

    Ditto

    Ditto

    -.1

    -l

    _?'1"Ditto

    [m) 6.75M dia outside circular or octagonar srrtB'|rc vvtrrr

    Ditto(n) 7,00M dia outside circular to octagonar slrtE'Itr

    Ditto[n1J 7.00M dia for every successlve aLrurLrurrclr rrreL

    Ditto

    Ditto[o1) 7.25M dia for every successlve aourLrur

    a.pift beyond 10'00M dePth addll

    ry'9__

    l)itto

    lg vv Lrl

    -l motrodl lll! Lr e

    Ditto2

    [a) 3,30M dia outside circular or octagonar LWttr

    upto 10.00U A.Pm

    Paget2

  • I

    t

    Page13

    -aSI

    No.DescriPtion of ltems Unit

    Finished Rate EinR

    Rate infigures

    xcluding GSTs.

    Rate inwords

    3 41

    ssive additional metre+l^ ^rlrl

    DittodePtn oeYortu ru.u'"'

    3

    Earth work in excavation of lounoatlon lll alr KrrruJ ur

    ,oit *i,tt all leads and lifts includings shoring'shuttering, propping bullahs, piling dewatering

    from

    i"""at,iJ",^ tupptying and working pumps and

    stacking the excavatld materials away form working

    area as-ordered by the Engineer-in-charge upto 60M

    0 M. DePth

    trd wtrk tr -granite rock with all leads and liits' includi CIrom foundation supplying shoring pump.s

    pumps and stacking the excavatecl materla

    working areas as ".1?::-oPjl*"':::,11:-'harge upto 60M

    1 cum

    Di fro

    _Ditto _

    +

    100 Cum

    Ditto

    withall]eadsandlifts,includingshortingshuttering;;;;;i;; buttrhr, piling dewatering from foundation'lioiiyi"? and working f "pt

    and staking the excavated

    *ii".irrJt*ay from riorl

  • SI

    lo,Description of ltems Unit

    Finished Rate EinR

    Rate infigures

    xcluding GSTs.

    Rate inwords

    3 4Ito 15cm dia for eachI materials'

    ffi n a"ti o n irrctu a i n g-a.*a t. ri ru r a an.zrrn rn tho rpcncctirre rate of cement ConCrete

    Each10

    1 Cum11

    1 Cumt2

    cement concrete in substructure IncIuoIIlB

    fshutt"ring and hoisting) add extra to the respective items of

    work.

    1 CurnIJ

    Masonry work in foundation below bed level aou exLr d LU

    l.tp.lrrv. rates of foundatjon for dewatering and ioweringof materials.

    sheet oiies excluding cost of wood (Labour only)1 Sqm

    1+

    15Shuttering in foundation excludlng cost oI woou I

    only)

    IOTrial boring in river-bed 3Bmm to 5urnm olaupLo v

    donthI

    1 Cumr7

    Removing and refixing old wood worK savlrrg LU Lrrc I sL1u

    sizes where n"..rr".y including cost of new nails but.*Juaing cost of bolts complete for bridge work [labouronly).

    1 Cum1B

    Fixing wooden planks and scantltng Ior orluBc ucLnrrrs;-^r,,rina nnct nF ner,v nails f Labour onlyl

    @joint as Per MORT&Hspecification.

    (bl Comprers,on s",l "xpansion ioint as perMORT&H

    o fZ-ar. P.nuttion'l

    L9

    nails spikes for bridge work, etc' inclusive of cost of all

    materials comPlete

    Refixing old wood including cost of new nails etc'

    Dismanting old wood work of bridges and stacking at site

    l-rlriCum

    LUm

    Cum

    1

    2

    aJ

    1 CumAa

    "^ed inclrrdins cost of nails1 Sqm

    5

    LuUou. for fixing old salbuilah including cost of naiis after

    culting to required sizes'lRM

    6

    Page14

  • Labour for fillingposition includin

    /

    Finished Rate Ercluding GSTin Rs'

    SI

    No,Description of ltems

    per direction of En gineer-l n-cna rge

    or sandy soil

    Second class K'B. bricks on dental brick edging

    Unit Rate inlvords

    +

    00 Nos.

    ,i#iJ'i:'ii::1 i

    Clearing heavy jungle including uprooting stumps oI trees

    and tre"es above 1M girth and thick bushes including bamboo

    l sqtr

    1RM

    100 sqm

    100 sqm

    Ilach

    Ea ch

    Each

    -bacn

    Each

    iL

    emeasurement.

    Cutting and uprooting trees including '"toYl:^1d-T*'tt igood to tbq 9gnr3€9{o glgylfq q.erfup to L5rJ rvr grrtn

    i

    Cutting and uProoting trees inc

    good to the damages to ground

    Washin-g newer coi it-tcludit'giefi"t''g "'it-t tot

    t.ffiert"g ,^d -*'"*tg *uutsrt '"d iltt

    disinfecting wells uPto 1.5M dia

    and

    d silt and disinfectingwelis above 1.50M and upto 2'50M dia

    Page15

    ,,E

    tlg.'v

    Labour for filling empty cement bags sewing and layrng 100 Nosunder water in Position.

    wilh sand in boat within 300m

    (o) Road work

    Caulking boats, lock gates, "ti'*ILgk"'

    Other Miscellaneous items

    Ea ch

  • Ir SINo. Description of ltems UnitFinished Rate Excluding GST

    in Rs.

    t Rate inRate in I wordsfigures

    I

    I 2 3 4

    9

    Supplying fitting and fixing [eak wood hand rails Bcm to

    10cm wide and Scm to Bcm depth complete in all respects

    polished.1RM

    10

    Supplying fitting and fixing teak wood picture rail B cm totOim wide and 12cm tick including polishng, etc' complete 1RM

    11Bamboo gabions 60cm dia 1'50 M high inctuding coaltaring 2

    coats to 30 cm bottom fitted and fixed completeEach

    1,2Bamboo gabions 1m dia 1.50 M high includingcoaltaring 2 coats to 30 cm bottom fitted and fixed complete

    Each

    13Recanning arm of dining chair with nylon cane(Back)

    Each

    L4R"c*

    "g at*

    "f dining chair with country cane (Back) Each

    15 Recaning arm of dining chair with nylon cane (seatJ Each

    t6Recaning arm of dining chair with country cane [seat) Each

    l/ Recanning easy chair with nylon cane

    Recannins easv chair with country ca ne

    Each

    Each1B

    L9Construction of brick gabions with dry brick and cementmortar in honey comb joints and two layers solid masonry in

    cement mortar [1:6Jin all joints.

    (a) 1.25M dia and 1.50M high

    (b) 1.00M dia and 1.50M high

    Each

    Each

    20L"yt"g

    ""d f**g * position R.C.C. spun pipes with collars

    jointe"d with cement mortar 1:3 complete excluding cost of

    spun pipes and collars

    (a) 100mm dia R.C.C. PiPe

    150mm dia R.C.C. PiPe

    250mm dia R.C.C. PiPe

    300mm dia R.C.C. PiPe

    450mm dia R.C.C, PiPe

    60Omm dia R.C.C. PiPe

    900mm dia R.C.C. PiPe

    barricading purPose'

    1RM

    (b) 1RM

    Ic]1 KVI

    lRM(d)

    Ie)lRM

    t01RM

    (e) 1RM

    (h) 1RM

    Each21,

    22Z:..nto EO.m dia Sal bullah fitted and fixedcomplete

    1 Cum

    1m23

    1Ocm to 13cm dia Non-Sal bullah fitted and fixed complete

    Page \E

  • /SI

    No.

    Finished Rate Excluding GSTin Rs.

    Description of ltems Unit i Rate inwordsRate in

    figures

    1 2 3 4

    24Non-salbullah 13cm to 15cm dia fitted and fixed complete 1m

    25Non-salbullah l8cm to 2Ocm dia fitted and fixed complete 1m

    zo25mm thick sal plank fitted and fixed cornplete for Shelves

    1 Sqm

    27

    Fitting and fixing unitex board after cutting rebate andgrooves and fixing with necessary beads, nails or screws etc.(Labour) nails or screws etc [labour)

    1 Sqm

    2B

    Renewing bases of lightening conductors terminals withpillar 2Scm x 25cm andl2mm cement plaster [1:6) complete Each

    29

    Making empty coalter drum gabions with thick coat of colatarto exposed surface (drums to be supplied departmentally)' Each

    30

    Cutting chase or grooves upto 15cm x 15cm in old wallsincluding fixing C.l, sheet in cement mortar (1:3) 1RM

    31

    1Zcm thick honey comb brick works in cementmorlar (1:4) including cement plaster (1:6)comolete.

    1 Sqm

    32Labour for cutting the empty coalter drums and flatteringthe same

    Each

    33

    Providing 12cm thick and 3Ocm high ornamental brickparapet as per design with (1:6) cement mortarandcement plaster (L:6) finished smoolh complete'

    1RM

    3+Labour for fitting and fixing masonite sheet lining to wallfaces etc. complete.

    1 Sqm,

    35Crack repair to walls Bcm x 2Scm with cementmortar [1:31

    1RM

    36Clearing of water hyacinth from canal and drainage channels

    (a) Thickely grown 1 Sqm

    [b) Moderately grown 1 Sqm

    J/ Dug belling 23cm x 1Scm 100 M

    3B Drilling hole 25cm to 37mm dia in granite rock 1RM

    39Drilling hole 2Scm to 37mm dia in rock other than granite 1RM

    +0Sawing charges of wood by machine as persoecified size

    1Cu.M

    +1

    Sewing charges by hand including cost of the thread handneedless per R.M.

    1RM

    Page.1 1 \\w

  • Finished Rate Excluding GSTin Rs.

    SI

    No.Description of Items Unit

    inclusive oi labour and costmentioned in the descriPtion

    Rate infigures

    Rate inwords

    Note:

    Rates under this sub-heads are

    royalty excePt where otherwise

    (r) EPOXY COATING

    of materials, conveYance and

    of items.

    GtAtt weattrer Road Repairing Compound'

    Hire and RunniTrailer with machine

    Per dayDug out boat with f bo"!.91

    Per day

    Per day

    Per day

    Per day

    Per day

    Boat excluding boat man

    (i) Smail upto 1M width

    (ii) Big above 1M w4l!i1

    Plough man with 2 bulp!\l9l!!ftu19!Bullock or buffalo cart with driver

    Description of item

    Providing fusion bonded epoxy coatlng not

    less than 175 micron thickness and upto

    300 micron to reinforcement of all

    diameters as Per I.S 13620-1993including testing of coating at plant

    Dia of Barin mm

    Finished Rate Excluding GST inRs.

    Rate in ng"t" - | nate in(Rs./ M.T.) | wordsI fns. / M,T.

    Sl No.

    32 mm28 mm25 mm20 mm16 mm12 mm10 mm0B mm

    Rate (Rs.)DescriPtion of item

    ffi road repairingcompound of approved make including

    monsoon having comPosition oFAggregates having sieve sizes of B mm

    & down, Bitumen having less of wax

    content-Anti stripping compound, White

    spirit, PolYmer and Cement

    \rExecu

    Page

    Bhubaneswar (R&B) Division