Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO2 stored CCS workshop at ISO/TC 265 plenary meeting – September 10th 2015 Sveinung Hagen and colleagues – Statoil
![Page 2: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/2.jpg)
Sleipner
Snøhvit
Brevik
TCM
![Page 3: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/3.jpg)
• Gas/condensate field in the North Sea (1996)
• Discovered 1974
• Statoil (operator), ExxonMobil and Total
• High CO2 content (4-9%) - export quality
specification allows (2,5%)
• Almost 16 Million ton CO2 stored
Snøhvit
• Gas/condensate field in the Barents Sea (2007)
• Discovered 1984
• Statoil (operator), Petoro, Total, GDF Suez, DEA
• All subsea installation, - gas processing (LNG) at
Melkøya
• About 150 km gas (and CO2) transport pipe
• Approaching 4 million ton CO2 stored
Decision to store geologically the captured CO2 was based on willingness to try out
new technology, CO2 tax incentive and state requirements
Sleipner
![Page 4: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/4.jpg)
Sleipner
Snøhvit
~150 km offshore CO2 pipeline
Brevik
TCM
![Page 5: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/5.jpg)
• CO2 from the Sleipner field is stored in the Utsira
Formation, North Sea
• Reservoir unit at 800-1100 m depth
• One CO2 injector - 36 meter perforation at
~1012 meter (TVD)
• Injected gas is ~98% CO2
Outline Sleipner CO2 injection project
![Page 6: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/6.jpg)
• Plume distribution controlled by gravity (buoyancy)
and top Utsira/ base sealing formation topography
• About 4500 meter long (2013)
• No pressure increase detected/measured at
wellhead
• No observation of CO2 leakage above the Utsira Fm.
Accumulated seismic amplitude difference
2001 2006 2004 2008 2010 2013
Chadwick et al (2005)
CO2 plume monitoring and permanence
![Page 7: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/7.jpg)
Operational Performance
• Stable wellhead pressure ~65bar
• Wellhead temperature held at 25oC
Monitoring Data
• Wellhead pressure and flow rate is monitored continuously
• Gas composition samples are taken intermittently
• Seven time-lapse (4D) seismic surveys
• Three repeat gravimetric surveys
• Electromagnetic survey
• Sea bottom surveys - Side scan sonar and multi beam echo-sounding 2006 & Synthetic Aperture sonar 2011
Subsurface questions
• Role of internal Utsira shale layers, plume propagation
• Reservoir and wellbore processes
• Maximum injection capacity/rate (large volume beyond Sleipner)
Condensate
CO2
Operating the Sleipner CO2 project
![Page 8: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/8.jpg)
Snøhvit
![Page 9: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/9.jpg)
• CO2 from the LNG processing facility at Melkøya stored
in the Tubåen and Stø Formation, Barents sea
• Reservoir unit at 2000 - 2500 m depth
• CO2 stored initially in the Tubåen Fm. (2008-11) and
then in the Stø Fm. (2011-)
• Stable injection of ~1800 ton/day
Main segment with gas producers
CO2 Injector
Tubåen
Stø
x
GWC
North South
Melkøya
Snøhvit
Outline Snøhvit CO2 injection project
![Page 10: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/10.jpg)
high
Perf
Perm k
Stø
Vsh
Tubåen - Densely stacked fluvial channels - Poor lateral and vertical communication
Stø - Shallow-marine environment - Good lateral and vertical communication
Well F-2H Seismic survey - 2003
Structural depth map – top reservoir
Snøhvit - subsurface setting
![Page 11: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/11.jpg)
4D
Tubåen injection Stø injection
4D 4D
CO2 pressure development - Snøhvit
![Page 12: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/12.jpg)
Base-2011 2 months, 121kton Base
Base-2012 13 months, 550kton
high
low
Snøhvit CO2 4D seismic (2011 & 2012)
Amplitude change maps
![Page 13: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/13.jpg)
Concluding remarks
• Both Snøhvit and Sleipner inject CO2 as planned and predicted
• No leakage are observed
• Geophysical, non-invasive monitoring has proven essential for site management and used to
address most of the operational questions
• Sharing experience is important for building confidence in CCS
• Need/require international regulation, political courage and public acceptance to move
forward!
![Page 14: Offshore CCS-projects in Norway - standard.no · 2015. 9. 16. · Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO 2 stored CCS workshop at ISO/TC 265](https://reader035.vdocument.in/reader035/viewer/2022071103/6113e38d025adf77c5748ad4/html5/thumbnails/14.jpg)
Offshore CCS-projects in Norway 20 years of experience and 20 million tonnes CO2 stored
Sveinung Hagen [email protected] Tel: +4741513706 www.statoil.com