Oil & Gas Pipelines
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
2/21
Project Experience Oil & Gas Pipelines
S. No. Project Name Client PLE Scope Region
1Sabah Sarawak Gas Pipeline
522 Kms 36 Gas PipelinePetronas Carigali
Review & Validation of Basic Engineering
Detail Design and Engineering
Basic & Detail Engineering for cold flare blow down
using Transient simulators, Vent Dispersion & Flare
Radiation
Engineering Support for Procurement & Construction
Malaysia
2 Engineering services for Gas pipeline Petrofac Detailed Engineering
Engineering Support for Procurement & Construction
Confidential
3Engineering services for Fuel Gas and Gas oil
pipelinePetrofac
Detailed Engineering
Engineering Support for Procurement & Construction
Confidential
4
Agip Kashagan Export Pipelines
25 Km 12 Fuel Gas pipeline
24 Oil export Pipeline - 52 Km
24 Gas export pipeline - 90 Km
Agip KCO
Review of Basic Engineering
Detail Design and Engineering
Residual Engineering
Kazakhstan
5Dhabol Panvel Pipeline Project , Phase 1
150 Kms 30 Gas PipelineGail
Detail Engineering
Engineering Support for Procurement & Construction
India
6Darod Jafrabad Pipeline
111 Kms 24 Gas Pipeline
Gujarat State
Petronet Ltd.
Detail Design and Engineering
Engineering Support for Procurement & Construction
India
7 IOCL South Jetty Multiple Pipelines IOCL Detail Design and Engineering
Engineering Support for Procurement & Construction
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
3/21
Project Experience Oil & Gas Pipelines
S. No. Project Name Client PLE Scope Region
8Viramgam Salaya Crude oil pipeline
56 kms 24 heated crude oil pipeline
Cairn Energy
India Ltd.
Detail Design and Engineering
Engineering Support for Procurement & Construction
India
9
Uran Trombay Jawahardeep oil pipeline
32 Kms 36" Oil Pipeline
8 Kms 30"- Oil Pipeline
ONGC India Detailed Design & Engineering
Engineering Support for Procurement & Construction
India
10CEIL- Reliance Spur Line
8 Kms 24 Crude Oil spur line
Cairn Energy
India Ltd. Basic Engineering India
11Uran Trombay Gas Pipeline
24 Kms 20 Gas PipelineONGC
Detail Design and Engineering
Engineering Support for Procurement & ConstructionIndia
12CEIL- Reliance Spur Line
8 Kms 24 Crude Oil spur line
Cairn Energy
India Ltd.
Detailed Design & Engineering
Engineering Support for Procurement & Construction
India
13
Mehsana-Bhatinda and Mallavaram - Vijaipur
Gas Pipeline4000 Kms
IOCL Detailed Feasibility Report
Basis for Detailed engineering and Cost estimatesIndia
14Radhanpur Pipeline
10 22 Kms Heated crude oil pipeline
Cairn Energy
India Ltd.
Detail Design and Engineering
Engineering Support for Procurement & Construction
India
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
4/21
Project Experience Oil & Gas Pipelines
S. No. Project Name Client PLE Scope Region
15CEIL-EOL Spur Line
4 Kms 24 Heated crude Oil spurline
Cairn Energy India
Ltd.
Detail Design and Engineering
Engineering Support for Procurement & Construction
India
16Dahej Uran Gas Pipeline
130 Kms 30 Gas PipelineGail
Residual Engineering
Procurement & Construction Support
India
17Dabhol Panvel Pipeline Project , Phase 2
48 Kms 30 Gas PipelineGail
Detail Design and Engineering
Engineering Support for Procurement & Construction
India
18
MDPL Project-(Salaya Bhogat pipeline)
75 Kms 24 Crude Oil Pipeline
75 Kms 8 Gas Pipeline
Cairn Energy India
Ltd. Basic Engineering India
19Khartoum Medani Product Pipeline
250 Kms 12 Product PipelineSPPHC
Detailed Design & Engineering
Engineering Support for Procurement & ConstructionSudan
20
Strategic Gas Transmission Project
210 Kms 36 Gas pipeline project Qatar Petroleum
Engineering Management
Client interface and Documents approval
Factory and Site Acceptance Tests
Qatar
21Multi product Pipeline Project
46 Kms 18 Multi product pipelineQatar Petroleum
Engineering Management
Client interface and Documents approval
Factory and Site Acceptance Tests
Qatar
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
5/21
S. No. Project Name Client PLE Scope Region
22 OGC gas pipeline project252 Kms 32 Gas pipeline
Oman GasCompany
Engineering Management
Client interface and Documents approval
Factory and Site Acceptance Tests
Oman
23RGPPL LNG Revival Project
0.7 Kms 24 High pressure Natural Gas PipelineGail
Detail Design and Engineering
Engineering Support for Procurement &
Construction
India
24Vent Dispersion Study
4 Kms 24 Heated crude Oil spurline
Cairn Energy
India Ltd
Vent dispersion Study India
25 Engineering support servicesStantec
Consulting Create As-Built drawings for Enbridge Canada
26EPIC of Sweet Fuel Gas Supply to
Dukhan Consumers
Black Cat
Engineering &Construction
Drafting support Qatar
27
Karachaganak-Uralsk Gas Pipeline
152 Kms 20 Gas Pipeline KazStroy
Stress Analysis of complete underground &
above ground system including all branches Kazakhstan
Project Experience Oil & Gas Pipelines
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
6/21
Facilities / Major Equipments
36" Gas Pipeline - 522Km passing through mountains /
swampy regions
Three Compressor Stations with Block Valve and Regional
Office
Two Metering Stations, 19 Block Valve Stations, Two
Scrapper Stations with Block Valves
Terrain ranging from 0 m to 1027 m above sea level
Pipeline passing high rainfall areas and virgin rain forests
Overhead power lines
PL Engineering Scope
Review & Validation of Basic Engineering
Detailed Engineering
Basic & Detail Engineering for cold flare blow down
Engineering Support for Procurement & Construction
Sabah Sarawak Gas Pipeline Project
Client: Petronas Carigali SDN. BHD
Project Location : Malaysia
EPC Contractor: Punj Lloyd
Engineering : PL Engineering
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
7/21
Engineering Services for Gas Pipeline Project
Facilities / Major Equipments
140 Kms 40 Gas
Slug CatcherMetering skid
Contol Room
All pipelines in close proximity to the wellheads in the field
PL Engineering Scope
Detailed Engineering
Engineering Support for Procurement & Construction
Client: Confidential
Project Location : ConfidentialEPC Contractor : Petrofac
Engineering : PL Engineering
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
8/21
Facilities / Major Equipments
Metering skid
Contol Room
24 Oil export Pipeline - 52 Km
24 Gas export pipeline - 90 Km
12 Fuel Gas export pipeline 25 Km
Major river (Ural) crossing of 700 m done using Horizontal
directional drilling method without affecting the fisheries of
the areas
PL Engineering Scope
Review of Basic Engineering
Detailed Engineering
Engineering Support for Procurement & Construction
AGIP KCO Kashagan Pipelines Project
Client: AGIP KCO
Project Location :Atyrau, Kazakhstan
EPC Contractor: Punj Lloyd
Engineering : PL Engineering
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
9/21
Facilities / Major Equipments
30 Gas Pipeline - 150 Km (Savitri to Panvel )
Three launcher/ receiver stations
Five Block valve stations
PL Engineering Scope
Detail Engineering
Engineering Support for Procurement & Construction
Dabhol Panvel Gas Pipeline Project, Phase - 1
Client: GAIL India
Project Location : Maharashtra, India
EPC Contractor: Punj Lloyd
Engineering : PL Engineering
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
10/21
Darod Jaffrabad Pipeline Project
Client: Gujarat State Petronet Ltd.
Project Location : Gujarat, India
EPC Contractor : Punj Lloyd
Engineering : PL Engineering
Facilities / Major Equipments
24 100 kms Gas pipeline
Block Valve station
IP Station
Metering Skid
Flow control Skid
Pressure Reducing Skid
SCADA
PL Engineering ScopeDetailed Design & Engineering
Engineering Support for Procurement & Construction
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
11/21
Viramgam Salaya Pipeline Project
Client: Cairn Energy India Ltd.
Project Location : Gujarat, India
EPC Contractor : Punj Lloyd
Engineering : PL Engineering
Facilities / Major Equipments
24 56 Kms Heated crude oil pipeline
Block Valve station
Pipeline using Skin Effect Heat Management System
(SEHMS)
8 river crossings ,including a 300 m crossing at Sasoi river
PL Engineering Scope
Detailed Design & Engineering
Engineering Support for Procurement & Construction
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
12/21
Facilities / Major Equipments
36 Oil Pipeline - 32 Km Onshore, Marshy & Offshore
regions
30"- Oil Pipeline - 8 Km Offshore
Loading/ Unloading & Metering facilities
PL Engineering Scope
Detailed Engineering
Engineering Support for Procurement & Construction
Uran Trombay Jawahardeep Oil Pipeline Project
Client: ONGC India
Project Location : Maharashtra, India
EPC Contractor: Punj Lloyd
Engineering : PL Engineering
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
13/21
CIL-Reliance Spur line Project
Client: Cairn Energy India Ltd.
Project Location : Rajasthan, India
Engineering : PL Engineering
Facilities / Major Equipments
24 heated crude oil spur line
Pipeline using Skin Effect Heat Management System
(SEHMS)
PL Engineering Scope
Basic Engineering including
Finalization of route
Development of basic process Engineering documents
Development of all specifications
Development of alignment sheets and other necessary
pipeline drawings
Detail Engineering
Engineering Support for Procurement & Construction
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
14/21
Facilities / Major Equipments
24 Km, 20 Gas Pipeline Onshore, Marshy and Offshore
regions
Metering Skid
PL Engineering Scope
Detailed Engineering
Engineering Support for Procurement & Construction
Uran Trombay Gas Pipeline Project
Client: ONGC India
Project Location : Maharashtra, India
EPC Contractor: Punj Lloyd
Engineering : PL Engineering
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
15/21
Client: Indian Oil Corporation Ltd.
Project Location : India
Detailed Feasibility Report- PL Engineering
Mehsana-Bhatinda and Mallavaram & Vijaipur Gas Pipeline Project
Facilities / Major Equipments
3200 Kms Gas Pipeline
800 Kms of spur lines
SCADA & Telecom Package
150 + river crossings
PL Engineering Scope
Detailed Feasibility Report
Basis for Detailed engineering and Cost estimates
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
16/21
Radhanpur Pipeline Project
Client: Cairn Energy India Ltd.
Project Location : Gujarat, India
EPC Contractor: Punj Lloyd
Engineering : PL Engineering
Facilities / Major Equipments
10 28 Kms Heated crude oil pipeline
Skin Effect Heat Management System (SEHMS)
PL Engineering Scope
Detailed Design & Engineering
Engineering Support for Procurement & Construction
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
17/21
Facilities / Major Equipments
30 Gas Pipeline 130 Km (Dahej to Hajira )
Two launcher/ receiver stations with Metering facilities,
Five Block valve stations
PL Engineering Scope
Residual Engineering
Engineering Support for Procurement & Construction
Dahej Uran Gas Pipeline Project
Client: GAIL India
Project Location : Gujarat & Maharashtra
EPC Contractor: Punj LloydEngineering : PL Engineering
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
18/21
Facilities / Major Equipments
30 Gas Pipeline - 48 Km (Ambewadi to Ussar ) includingrespective branch spur-lines to consumers
Metering stations
PL Engineering Scope
Detailed Engineering
Engineering Support for Procurement & Construction
Dabhol Panvel Gas Pipeline Project, Phase - 2
Client: GAIL India
Project Location : Maharashtra ,India
EPC Contractor: Punj Lloyd
Engineering : PL Engineering
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
19/21
CIL- EOL Spur line Project
Client: Cairn Energy India Ltd.
Project Location : Rajasthan
Engineering : PL Engineering
Facilities / Major Equipments
24 Crude Oil spur line 4 Km (Salaya to Essar refinery )
Pipeline using Skin Effect Heat Management System
(SEHMS)
Control and communication system
PL Engineering Scope
Detailed Design & Engineering
Engineering Support for Procurement & Construction
Strategic Gas Transmission Project
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
20/21
Facilities / Major Equipments
2 x 211 Kms 36 Gas pipeline project
Continuous rocky terrain, 440 various crossings executed
by trenchless method
PL Engineering Scope
Engineering Management
Client interface and Documents approval
Factory and Site Acceptance Tests
Client: Qatar Petroleum
Project Location : Qatar
EPC Contractor: Punj Lloyd
Engineering Support: PL Engineering
Strategic Gas Transmission Project
-
8/12/2019 Oil & Gas Pipeline_1 (1).pdf
21/21
Facilities / Major Equipments
32 dia x 252 kms and 24 x 40 kms Gas pipelines and
associated station works
Pipeline passing though Continuous Rock and Desert
Locations
56 pipeline crossings and 18 Block valve stations
PL Engineering Scope
Engineering Management
Client interface and Documents approval
Factory and Site Acceptance Tests
Client: Oman Gas Company
Project Location : Oman
EPC Contractor: Punj Lloyd
Engineering : PL Engineering
OGC Gas Pipeline Project