Page 1: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

Qualification StatementQualification Statement

Oil & Gas Water ElectricityGeneration

Wintara, Inc . 6710 Oxon Hill Road . National Harbor, MD 20745 . USATel: (301) 686-1637 . Fax: (301)749-1519 . www.wintara.com

Page 2: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

DOCUMENT OVERVIEW

• CORPORATE BACKROUND……………………………………………………………………………......3

• OPERATING LOCATIONS………………………………………………………………………………......4

• TEAM PROFILE……………………………………………………………………………………………....5

• PROGRAM VERVIEW ………...…………………………………………………………………………….6

• OIL REFINERY SOLUTIONS…………...…………………………………………………………………..9

FUEL ADDITIVES 12• FUEL ADDITIVES ………………………………….………………..………………………………….......12

• BENEFITS ……..………………..……………………………………………......………………………......13

• STRATEGIC ALLIANCES ...…………………………………………………………………………….…14

• RELEVANT EXPERIENCE…………………………………………………………………………….…..17

• EXECUTIVE ADVISORY GROUP………………………………………………………………….……..28

Page 3: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

CORPORATE BACKGROUNDWintara, Inc. World Headquarters is housed in a modern 5story office building located at 6710 Oxon Hill Roadstory office building, located at 6710 Oxon Hill Road,National Harbor, Maryland, USA. Wintara occupies 25,000square feet on the 5th Floor. The office is in close proximity tothe Capitol and the Pentagon, as well as the World ClassNational Harbor Complex featuring Meeting & ConventionNational Harbor Complex featuring Meeting & ConventionCenters, Hotels, and Restaurants for all tastes and a variety ofshops.

Wintara offices are security controlled and certified at TOP SECRET level for classifiedprocessing, storage and meetings.

The Wintara offices are fully equipped to provide a pleasant and highly productive environment.Features include an Executive Meeting Room equipped for Worldwide Audio and VideoConferencing, a High Security Meeting Room, and three Multi-Purpose Meeting Rooms. Thirty(30) private offices are provided for Executive and Management personnel and for visiting clientsand friends.

3

Wintara maintains state-of-the-art communications, reproduction and computer equipment, and thelatest in productivity software.

Page 4: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

TEAM OPERATING LOCATIONS

4

Page 5: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

TEAM PROFILE

• Drilling Equipmentg q p

• Steel Pipeline

• Field Instruments

• Blowout Preventers

• Wellhead Equipment

• Fishing Tools• Fishing Tools

• Power Plant Engineering and Construction

• Heavy Equipment Acquisition and Installation

• Information Systems Engineering

• Large Team Customer Base

5

• Worldwide Service Capability

Page 6: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

PROGRAM OVERVIEWWintara’s Team brings exceptional capabilities and experience in the water, energy,

oil and gas industries. Wintara offers a unique package of services to the U.S. Army

Corps of Engineers, Republic of Iraq and other Middle East Nations.

Power is critical:

Infrastructure is the core of any nation, and Power is a critical component. Wintara

plays a Major and Key role in this most important sector in the Middle East.

Wintara provides a highly mobile, engineering Rapid Response Force that repairs and

overhauls utility systems, theatre wide. The team consists of approximately 500 self

ffi i l hi l d i bl f i d d i isufficient personnel, vehicles and equipment capable of independent operations in

remote, high threat environments.

6

Page 7: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

PROGRAM OVERVIEW cont’d

The unit is structured with the following packages:• Commissioning Piping Works for Oil Refineries Chemical Plants are areas• Commissioning, Piping Works for Oil Refineries, Chemical Plants are areas

our team is capable of providing• Turn Key Power Stations • Equipment Erection, Testing• Engineering Design• Engineering Design • Overall Plant Design

System DesignMechanical DesignElectrical DesignElectrical DesignControls Systems AutomationCivil Works DesignField Engineering (erection & commissioning)

• Installation and Dismantling• Installation and Dismantling• Operation Maintenance• OEM Services, GE Frame 5, 6, 7, 9 LM6000, TM2500• Equipment, State of the Art Technology, Critical Spare Parts acquisition –new

and refurbished

7

and refurbished• Transportation – harden vehicles equipment, refuelling, maintenance

Page 8: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

PROGRAM OVERVIEW cont’d

Energy Service Package• Turnkey Construction and Facilities Additions• Turbine/Generator Removal and Installation • Preventative Maintenance, Operational Maintenance, Major Inspections • Turbine Services for all OEM’s - GE Steam & Heavy Industrial and Aero

Gas Turbines Siemens/Westinghouse, Alstom/ABB, Pratt-Whitney • Critical Spare Parts Acquisition - New and Refurbished• Remote Monitoring Systems

Training – Two Schools on site/off site El i l G i T i i d Di ib i S• Electrical Generation, Transmission, and Distribution Systems

Operations and Maintenance (O&M)Additional critical course as requiredT i th T i

8

Train the Trainer

Page 9: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

Wintara employs Oil Industry experts with many years of

Oil Refinery Solutions

extensive experience in the exploration, production and

refining/processing fields.

We provide our customers the best of class equipment on timeWe provide our customers the best of class equipment, on time

and at competitive prices to meet their needs.

Wintara offers a wide variety of Oil Sector Equipment and Services

•Drilling Equipment

•Steel Pipeline

•Field Instruments

•Blowout Preventers - including manual, hydraulic ram, hydraulic

annular and closing units.

9

Page 10: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

•Wellhead Equipment - including Adapters for Casingheads and Tubingheads,

Oil Refinery Solutions cont’d

Back Pressure Valves, Ball Valves (Full Opening), Bails (Elevator), Baskets, Bell

Nipples, Bull Plugs, Casingheads, Casing Spools, Chokes (Positive, Manual

Adjustable, and Hydraulic), Collars (Rotary Drill), Drifts (Casing and Tubing),

Drilling Bits, Elevators, Flanges (Companion and Weldneck), Flow Tees, Gauges,

Gate Valves (Manual and Dual), Gate Valve Actuators, Hoses (Rotary), Landing

Bases, Mud Mixers, Muleshoe (Joints), Nipples, Plugs (Bull, Lift and

BOP),Primary Seals, Pup Joints (Drill Pipe, Tubing, Collar), Racks (Pipe), Ring

Gaskets, Scrapers (Casing), Secondary Seals, Slips (Rotary), Slip Assemblies,

Spiders (Rotary), Spools (Rotary), Stripper Heads, Stripper Rubbers, Studs &

Nuts, Subs (Lift and Rotary), Swabs (Casing and Tubing), Swab Equipment,

Tanks (Mud), Tees and Crosses, Tongs (Hydraulic Rod, Manual & Hydraulic

Tubing), Tubing Hangers, Tubingheads, Unions, Valves (Ball, Check, Gate,

10

Inside BOP & Safety), Wear Bushings, Wraparounds, Wrenches (Sucker Rod and

Hammer)

Page 11: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

•Fishing Tools - including Bailer (Bulldog and Hydrostatic), Baskets

Oil Refinery Solutions cont’d

(Junk), Bits, Blocks (Impression), Broach (Tubing), Bushings, Cutters

(Internal & External), Depthometer, Die Collars and Nipples, Grabs

(Wireline) Hot Tap (Gate and Ball Valve) Jacks (Hydraulic and(Wireline), Hot Tap (Gate and Ball Valve), Jacks (Hydraulic and

Casing), Jars (Hydraulic, Bumper Sub, Rod or Wireline), Joints

(Safety), Knife (Paraffin), Lubricator (Back Pressure Valve), Magnet

(Ditch and Fishing), Mills, Overshoots, Pipe (Washout), Pump (Sand),

Shoes (Rotary and Washout), Socket (Clulow, Bull Dog Oversocket),

Spears (Packer Retrieving, Rotary Releasing), Stabilizer (Welded

Blade), Subs (Cut Lip, Screw In, Drain, Jet, Circulating Pump Out),

Swages (Casing Roller), Swivels (Circulating), Taps (Box Die), Traps

(Mouse) Wiper (Key Set)

11

(Mouse), Wiper (Key Set)

Page 12: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

There is the world-wide critical, economic need to utilize under-processed or unprocessed petroleum fuels. The major challenge has been to make them compliant with engine OEM requirements. One prime example is fuel additives used successfully to allow powering of Gas Turbine Engines with crude oil

FUEL ADDITIVES

additives used successfully to allow powering of Gas Turbine Engines with crude oil.

Through our strong partnerships with manufactures of oil-soluble metal components and developers of proprietary manufacturing processes and combustion catalyst technology, Wintara has the unique capability to provide a wide range of Petroleum Fuel Additives to the Power Generation Industry and other volume fossil fuel consumers. These additives :• Prevent deposits and hot corrosion on hot path metal parts in various kinds of engines caused by oil-

soluble metals and water-soluble alkali metals and alkaline earth salts • Catalyze combustion, reduce particulate emissions and improve fuel efficiency• Neutralize sulfuric acid in exhaust gases to reduce acid rain• Neutralize sulfuric acid in exhaust gases to reduce acid rain

Wintara offers new improved products based on newly patented Combustion Catalyst Technology using a unique combination of iron and magnesium. The catalyst results in more efficient combustion of fuels.

• Reduce carbon emissions up to 90% in engine exhausts compared with 50% reduction reported in the literature

• Yield fuel savings in Diesel engines commensurate with the level of particulate emissions in the exhaust.

The technology supporting the product line is a result of years of study and application of scientific

12

The technology supporting the product line is a result of years of study and application of scientific principles to products and their use as fuel additives.

Page 13: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

BENEFITSBENEFITS

A Rapid Response Team with a unique range of capabilities that allows the p p q g p

Government to meet engineering and optimization needs through a single

source.

• Rapid Response to overhaul, design, bill, repair, logistics and

maintenance services.

• Reduced Cost of Operations & Maintenance (O&M)

• Cost Effective Security Solution

• Maximize reconstruction contract revenue flow to the region

Economy

13

Page 14: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

WOOD GROUP

Wood Group has world-leading positions in engineering for deepwater topsides and subsea

STRATEGIC ALLIANCES

pipelines, mature field production support and enhancement, and the provision of

electric submersible pumps, surface wellheads and valves.

EDAC Engineering Limited (EDAC)EDAC Engineering Limited (EDAC)

EDAC has executed several prestigious projects in India and abroad in Oil & Gas,

Power, Petrochemical and Chemical sectors. EDAC has extended its construction business

in overseas by executing projects in U.A.E, Oman, Saudi Arabia, Jordan, Algeria, Yemen,y g p j g

Singapore, Malaysia, Curacao (the Netherlands Antilles). EDAC is also an ISO 9001: 2000

certified company accredited under RvA scheme by DET NORSKE VERITAS (DNV),

The Netherlands.

SIEMENS

Siemens has many years experience in power generation - combined cycle, simple cycle, IGCC

or steam power plants Siemens offer advanced compression solutions for the oil and gas industry

14

or steam power plants. Siemens offer advanced compression solutions - for the oil and gas industry

as well as for applications in air separation plants, metal making and in the chemical industry.

Page 15: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

STRATEGIC ALLIANCES cont’dDEMAR, LTD.Demar qualified staff of project managers, estimators, and field superintendentsq p j g , , prepresents a vast range of experience in many types of projects. Their backgroundincludes structural steel, pre-cast, tilt-wall, poured-in-place concrete, pre-engineeredmetal, masonry, metal stud, wood framed, and much more. Demar will promptly, y, , , p p yrespond to meet the challenge whether interior renovation, an exterior expansion, or abrand new multipurpose facility. In addition to meeting the construction needs, DemarConstructors can also work with their other operating divisions to complete the entireturnkey project.

Power EngineersPower Engineers has experience on the ground in Iraq with projects completed forthe US Government in support of rehabilitation of the Power Sector.

15

Page 16: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

GENERAL ELECTRIC(GE)id d d d d h l k i d h

STRATEGIC ALLIANCES cont’d

GE provides advanced power systems and around-the-clock energy services around theworld. GE installed the first steam turbine in 1901, our installed base of steam andheavy-duty gas turbines has grown to over 10,000 units, representing over a millionM tt (MW) f i t ll d it i th 120 t i With 5 500Megawatts (MW) of installed capacity in more than 120 countries. With over 5,500wind and 3,600 hydro turbines, the installed capacity of renewable energy exceeds160,000 MW.

Bharat Heavy Electricals Ltd. (BHEL)BHEL is a world leader in the engineering and production of power generation/transmission equipment and services Employing over 42 600 highly skilledgeneration/transmission equipment and services. Employing over 42,600 highly skilled personnel, BHEL is a certified ISO 9001 and ISO 14001 TQM contractor and also Occupational Health and Safety (OSHA) 18001 compliant. BHEL's market leadership and presence in Iraq enhances our offer substantially.

16

p q y

Page 17: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

RELEVANT EXPERIENCE

Client: M/s Gas Authority of India Limited, New DelhiEDACProject Title: Mechanical Erection works for Gail Pata Gas Cracker & ProcessingScope of Work: Fabrication & Erection of Piping & related Civil works. Erection of Equipments, Stack, Structural and Centrifugal Compressors.Date of Completion: December 1997

Client: M/s. Technip, ChennaiEDACProject Title: Civil works for Niko Dew Point Control unit project

i il k f b i d i il f d i fScope of Work: Civil Woks for Substation, DG Room and Civil foundation for Equipments Date of Completion: June 2004

17

Page 18: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

RELEVANT EXPERIENCE cont’d

Client: M/s. L&T Ltd, MumbaiEDACProject Title: Mechanical Erection works for IOCL Expansion Project. S f W k F b i ti & E ti f H t Oil Fi d C b tiScope of Work: Fabrication & Erection of Hot Oil, Fired Combustion & Xylene Heaters. Date of Completion: June 2005

Client: M/s. IOCL, GujaratEDACP j t Titl Ci il & S l k f IOCL FCC Sh dProject Title: Civil & Structural works for IOCL FCC Shutdown at Gujarat Refinery.Scope of Work: Replacement of Column, Civil & Structural works.Date of Completion: October 2007

18

Date of Completion: October 2007

Page 19: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

RELEVANT EXPERIENCE cont’dClient: M/s. Clough Engineering Limited, AustraliaEDACEDACProject Title: Electrical and Instrumentation installation works for ONGC G1 & GS15 Fields Development Project at Amalapuram, AP. Scope of Work: Installation of Swithchgear Cables Cable TraysScope of Work: Installation of Swithchgear, Cables, Cable Trays,Termination, Electrical Equipments, Panels, Instruments Installation, and Instrument cable, Field Instruments & Instrument loop checking. Date of Completion: March 2008Date of Completion: March 2008

Client: M/s. Reliance Refinery Limited, JamnagarEDACEDACProject Title: Mechanical works for Sulphur Recovery Unit (SRU) 3 Trains at Reliance Jamnagar Refinery Expansion project.Scope of Work: Erection of Piping and Structural works.

19

Scope of Work: Erection of Piping and Structural works. Date of Completion: March 2008

Page 20: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

RELEVANT EXPERIENCE cont’d

Client: U.S. Army Corps of Engineers, Gulf RegionDivisionProject Title: GE Frame 9E Combustion Inspectiont Kh Al Z bh iat Khor Al-Zubhair

Scope: Combustion inspection of two (2) GeneralElectric Frame 9E gas turbines, including inspectionand repair of the generators, auxiliaries and BOP.P ided e i ee i e i e t t e iProvided engineering, equipment, parts, repairs,labor, life support, security, start-up andcommissioning.Equipment: Two (2) General Electric Frame 9ECombustion Turbines Generators and Auxiliaries

GE Frame 9E Combustion Turbine

Combustion Turbines, Generators and AuxiliariesFuel: Natural GasRating: 123 MW

20

Page 21: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

RELEVANT EXPERIENCE cont’d

Client: U.S. Army Corps of EngineersProject Title: Siemens V64.3A & V94.3ACombustion Inspection at Taza Power PlantScope: Combustion inspection of 1 SiemensScope: Combustion inspection of 1 SiemensV64.3.A and 1 Siemens V94.31 gas turbines,including inspection and repair of the generators,auxiliaries and BOP. Provided engineering,equipment, parts, repairs, labor, life support,

Siemens V64.3A Gas Turbineequipment, parts, repairs, labor, life support,security, start-up and commissioning.Equipment: 1 Siemens V64.3A and 1 SiemensV94.3A Gas Turbine and 2 Sets of Generators,Auxiliaries and BOP.Auxiliaries and BOP.Fuel: Natural GasRating: 65 MW and 260 MW

Siemens V94 3A Gas Turbine

21

Siemens V94.3A Gas Turbine

Page 22: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

Project Name: Operation and Management, Mussayib P Pl I

RELEVANT EXPERIENCE cont’d

Power Plant, IraqClient: U.S. Army Corps of Engineers, Gulf Region DivisionScope: Provide facility engineering improvements, f ili i i dfacility operations, maintenance, and management to include Life Support, PSD Security, Force ProtectionEquipment: Ten (10) each, General Electric LM6000 Combustion Turbine, Generator, Auxiliaries and BOPF l Di l tl h d l d f i t d lFuel: Diesel currently; scheduled for conversion to dual fuel (diesel and natural gas)Rating: 50 MW each – 500 MW total

22

Page 23: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

RELEVANT EXPERIENCE cont’d

23

Page 24: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

RELEVANT EXPERIENCE cont’d

24

Page 25: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

RELEVANT EXPERIENCE cont’d

25

Page 26: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

RELEVANT EXPERIENCE cont’d

26

Page 27: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

RELEVANT EXPERIENCE cont’d

Client: Large US Contractor Persian GulfClient: Large US Contractor, Persian Gulf

DEMAR LTD.

Project Description: Marine Terminals Upgrades - Demar provided an

assessment, plan and improvements to living conditions for personnel on 2

marine terminals. Upgrades included conex style berthing units, RO unit,

power generation, and storage containers for dry storage, drinking water and

MRE’s; improvements to the base camp for existing loads and the addition of

ballistic shielding for gun positions, new berthing, kitchen and other service

containers; new fender systems ladders and stairways and 4 000 Lb capacitycontainers; new fender systems, ladders and stairways and 4,000 Lb capacity

deck cranes to off load supplies; support features were added including

communication towers and related equipment

27

Page 28: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

Isaac (Ike) Gibson, Veteran, USAF. CEO. A highly successful Systems Engineering Executive withextensive experience in domestic and international security and utility industry. He is knowledgeable in allfacets of military and government markets Mr Gibson is the founder and owner of Wintara Inc a

EXECUTIVE ADVISORY GROUPEXECUTIVE ADVISORY GROUP

facets of military and government markets. Mr. Gibson is the founder and owner of Wintara, Inc. aprivately held systems integration, veteran owned business established in 2001.

Tom Arnsmeyer, Vice President & Chief Operating Officer. Mr. Arnsmeyer brings his over 20 years experience in the global engineering sector. He has Extensive senior level experience in running large operating nits and management of major programs in the p blic and pri ate sector He joins Wintaraoperating units and management of major programs, in the public and private sector. He joins Wintara after his most recent role as Vice President of the Homeland Security Solutions Business Unit at Raytheon Technical Services Company.

Daniel James III, Lieutenant General USAF (Ret.) He is a seasoned military officer with a career spanning over 30 years as a military officer. General James III rose up through the military ranks beginning his career as a Second Lieutenant in 1968 until his retirement in 2006 as Lt. General of the United States Air Force Director of the Air National Guard. Gen. James III has had a distinguished military career having been the recipient of numerous military and civilian awards. He has over 4,000 hours of flight hours in a variety of aircraft including the F-16 The general is responsible forhours of flight hours in a variety of aircraft including the F-16. The general is responsible for formulating, developing and coordinating policies, procedures and programs of over 168,000 National Guardsmen in more than 88 flying units and 200 geographically separated units from the United States to the Pacific and the Caribbean. He holds a Bachelors degree in Psychology from the University of Arizona, Tucson and degrees from the Air Command and Staff College and National Security Course.

28

Page 29: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

Dr. C. Robert Kline Jr. professional activities span over 25 years with extensive experience in the fields of Modeling and Optimizing Energy Distribution Networks including the installation of Control Systems in power plants He has had important roles in Fortune 100 companies and including US government

EXECUTIVE ADVISORY GROUP cont’d

in power plants. He has had important roles in Fortune 100 companies and including US government agencies such as Exxon, Halliburton, Edison Electric, United Sates Air Force and Navy, and Department of Energy. He has delivered training curriculum training for operators of electric power generators. Dr. Kline Jr. holds a Ph.D. in Engineering from the University of North Carolina and a M.Ed from the University of North Carolina.

Lawrence E. Gillespie, Sr., Brigadier General, USA (Ret.) General Gillespie is a senior executive with over 30 years of progressive and demanding leadership in National Security, and military aviation as a General Officer in the United States Army. He is a recognized authority in many of the technical challenges and solutions associated with Homeland Security and National Defence As a civilian Generalchallenges and solutions associated with Homeland Security and National Defence. As a civilian, General Gillespie has held a series of increasingly important positions with the Air Transport Association, Hughes Aircraft Company, Raytheon Systems Company, NCI, Hampton University, and Eagle Force Association. BA, State University of New York. MBA, Shippensburg University.

D Vi k R D ’ f i l i i h fi ld f i i d 20 l iDr. Vivek R. Dave’s professional experience in the field of engineering expands over 20 years solving complex problems involving Sensing, Data Interrogation, Process Understanding, Process Control in fields such as Manufacturing, Security and Defense applications with a specialty in Energy Infrastructure, Management of Nuclear Power and Manufacturing Engineering. The above mentioned technologies of risk reduction follow through Next Generation Data in manufacturing with National Security. Dr. Daves

29

g g yholds a Ph.D. in Engineering and Applied Science from Caltech and a Masters in Materials Engineering from MIT.

Page 30: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

Dr. Beverly Ann Barta has over 15 years of professional experience in the area of EnvironmentalEngineering, Water Resources and Field Biology. She has hands on experience in the filed of Ecology andinvolved in Disaster Assistance including Funding and Management. Her responsibilities have been both

EXECUTIVE ADVISORY GROUP cont’d

g g g pin the United States and Iraq. She was responsible for the water sector with 91 projects totally $522million dollars. Dr. Barta holds a Ph.D. in Environmental Engineering and Water Resources from theUniversity of Florida. In addition she holds a Master in Environmental Engineering from the University ofAkron and a Master of Science in Environmental Studies from the University of Akron and a Bachelors inScience in Field Biology from the University of OhioScience in Field Biology from the University of Ohio.

Carl Bartoli, PE, Consultant Project Executive. An Engineering and Construction Business Executivewith 30 years of domestic and international experience in the utility industry. Experience covers allfacets of engineering and construction industry including project management, project development,senior line management and executive positions. Mr Bartoli served as Executive Vice President of FosterWheeler International where he was responsible for directing and coordinating the activities of theEngineering and Construction Group in the development of projects in the United States, South East Asiawith installed value of over $2.8 billion dollars. Previously he served as President of Foster Wheeler USA.MSME Columbia University BSME Farleigh Dickinson UniversityMSME, Columbia University. BSME, Farleigh Dickinson University.

30

Page 31: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

EXECUTIVE ADVISORY GROUP Cont’dDr. Ahmed Rubai has over 25 years of progressive experience in Electrical Power Generation. He hasresearched the development of intelligent controls for manufacturing systems. He has done extensiveengineering hardware testing in laboratory. He has worked with Amtrak, US Army and NASA at their GlenResearch Center. Dr. Ahmed Rubaai holds a Ph.D. in Electrical Engineering from Cleveland StateUniversity He also holds a Master of Science in Electrical Engineering from Case Western ReserveUniversity and a Bachelor of Electrical Engineering from El-Fathe University in Libya. Dr. Rubaai holds thedepartment chair as a Professor on Computer Engineering at Howard University in Washington DC.department chair as a Professor on Computer Engineering at Howard University in Washington DC.

Dr. Parthasarathy Jagannathan (JAGAN), Senior Turbine Engineer - 30 years with BHEL Ltd., India(Manuf. of GE & Siemens Turbines) Exe. Director of Corp. Engineering and Quality Development; GeneralManage of Engineering and R&D Tendering (for complete power plants to 200 MW); General Manager ofM h i l & C i l i h f ll h i l l b t i P l t A l i Di ti dMechanical & Commercial in charge of all mechanical laboratories, Power plant Analysis, Diagnostics andOptimization Package (PADO) development; Head of Dynamics and Control (substation automation, design& development); 2 years as Consulting Engineer; 1 year New York University, Post Doctoral Fellow; BS,MS & Ph.D. Mechanical Engineering.

31

Page 32: Oil & Gas yWateryElectricity Generationadditives used successfully to allow powering of Gas Turbine Engines with crude oil ... Project Title: Mechanical Erection works for Gail Pata

WINTARA

EXECUTIVE ADVISORY GROUP cont’dDr A. Ashraf A. Ibrahim work expands over 30 years of domestic and international experience. It includesdeveloping strategies and guideline for new water and environmental department in municipalities in theMiddle East. He has prepared tenders and RFP on Water Sewage Treatment Plants, Compact Units, StormWater Systems, Pumping Station, Illicit Connection Elimination Program, Manual and Automatic SamplingPrograms, QA/QC and Value Engineering. He completed all the technical engineering and managementactivities for 4 phases of Barracks 1 through 5 and JOC Buildings in Bagram Air Field in Afghanistan. Hiswork includes Surveying Civil Site Reading and Engineering, Utility Relocation, Drainage, HVAC,work includes Surveying Civil Site Reading and Engineering, Utility Relocation, Drainage, HVAC,Electrical and Construction Management. His responsibility has included transmitting engineering andconstruction submittals to the CEO responding to their comments. He was highly involved in the WaterTreatment Plants in Erbil and Dukon along with the Water Distribution System. He managed the projectwith a cost over $250 million dollars in the construction for the second largest Water Treatment Plant in Iraq

i ti f 6000 3/h I dditi h i h f th d i t d t ti f thconsisting of 6000 m3/hr. In addition he was in charge of the design, procurement and construction of theplant along with the training of Iraqi engineers in design and O&M area. He rehabilitated and constructedthe new sewage system, rehabilitation and construction of 12 pumping stations in Baghdad with a cost forthis project of over $50 million dollars. Dr. Ibrahim holds a Ph.D. and P.E. in Engineering, ConstructionManagement and Geo Environmental matters.g

32