PAVEMENT REQUIREMENT
12'-0" TURN LANES 4'-0" PAVED SHOULDERS
SURFACE COURSE
BASE COURSE
MEDIAN OPENINGS
2" SUPERPAVE TYPE S4 (PG 64-22 OK)
2.5" SUPERPAVE TYPE S3 (PG 64-22 OK)
(1) BACKFILL NOTE:
THIS AREA TO BE BACKFILLED WITH TBSC TYPE E AND COMPACTED AS PART
OF THE FINISHING OPERATIONS IN A MANNER APPROVED BY THE ENGINEER.
(2) TOPSOIL NOTE:
THE CONTRACTOR SHALL STRIP ALL OF THE AVAILABLE TOPSOIL, STOCKPILE
IT, AND PLACE IT BACK ON THE SECTION IN ACCORDANCE WITH SECTION 205
OF THE STANDARD SPECIFICATIONS. RESERVED TOPSOIL SHALL BE SPREAD
FIRST ON THE COMPLETED SLOPES OF THE CUT SECTIONS AND THE
REMAINDER ON COMPLETED FILL SLOPES OR OTHER PRIORITY AREAS
LOCATED BY THE ENGINEER. ALL ADDITIONAL COSTS ASSOCIATED WITH
OPERATION SHALL BE INCLUDED IN THE PAY ITEM FOR SALVAGED TOPSOIL,
LUMP SUM.
THE GRADING LINE AS SHOWN ON THE TYPICAL AND CROSS SECTIONS IS TO
THE TOP OF THE TOP SOIL. EARTHWORK QUANTITIES WERE NOT ADJUSTED
FOR SALVAGE AND THE TOPSOIL QUANTITY IS INCLUDED IN THE MASS LINE
BALANCE.
2.5" SUPERPAVE TYPE S3 (PG 64-22 OK)
2" SUPERPAVE TYPE S4 (PG 64-22 OK)
2.5" SUPERPAVE TYPE S3 (PG 64-22 OK)
2.5" SUPERPAVE TYPE S3 (PG 64-22 OK)
2" SUPERPAVE TYPE S4 (PG 64-22 OK)
2.5" SUPERPAVE TYPE S3 (PG 64-22 OK)
2.5" SUPERPAVE TYPE S3 (PG 64-22 OK)
VARIES 16' TO 40'
MEDIAN OPENING
12'
TURN LANE
12'
EXISTING
DRIVING LANE
12'
EXISTING
DRIVING LANE
8'
EXISTING
SHOULDER
12'
TURN LANE
12'
EXISTING
DRIVING LANE
12'
EXISTING
DRIVING LANE
8'
EXISTING
SHOULDER
2% &
VARIE
S
SEE X-S
ECTIONS
2% & VARIES
SEE X-SECTIONS
TACK
COAT
8" AGGREGATE
BASE TYPE A
VARIES℄ MEDIAN ℄ SURVEY
TYPICAL SECTION NO. 1
STA. 408+25.82 TO STA. 409+43.18 - STA. 476+71.96 TO STA. 477+53.52
STA. 492+30.00 TO STA. 493+08.00 - STA. 545+71.01 TO STA. 546+99.00
STA. 577+36.51 TO STA. 578+19.50 - STA. 597+57.53 TO STA. 598+05.49
STA. 628+44.54 TO STA. 629+12.50
GEOTEXTILE
REINFORCEMENT
4'
SHLDR
12'
TURN LANE
12'
EXISTING
DRIVING LANE
12'
EXISTING
DRIVING LANE
4'
EXISTING
SHOULDER
TACK
COAT
℄ SURVEY
VARIES
8'-4"
2% &
VARIE
S
SEE X-S
ECTIONS
2% & VARIES
SEE X-SECTIONS
1'-7"
TYPICAL SECTION NO. 2
STA. 472+56.33 TO STA. 476+71.96 - STA. 488+14.99 TO STA. 492+30.00
STA. 541+56.30 TO STA. 545+71.01 - STA. 573+22.42 TO STA. 577+35.00
STA. 593+43.97 TO STA. 597+55.00 - STA. 624+55.00 TO STA. 628+44.54
3'-10"
4'
SHLDR
12'
TURN LANE
12'
EXISTING
DRIVING LANE
12'
EXISTING
DRIVING LANE
4'
EXISTING
SHOULDER
2% &
VARIE
S
SEE X-S
ECTIONS
TACK
COAT
℄ SURVEY
VARIES
8'-4"
2% & VARIES
SEE X-SECTIONS
1'-7" 3'-10"
8" AGGREGATE
BASE TYPE A
8" AGGREGATE
BASE TYPE A
TYPICAL SECTION NO. 3
STA. 409+43.18 TO STA. 414+09.71 - STA. 493+08.00 TO STA. 497+22.84
STA. 546+99.00 TO STA. 551+12.90 - STA. 578+19.50 TO STA. 582+34.56
STA. 598+05.49 TO STA. 602+17.61 - STA. 629+12.50 TO STA. 633+30.00
1
:
4
(1)
1
:
4
(1)
GEOTEXTILE
REINFORCEMENT
CABLE BARRIER TYPICAL
TYPICAL ELEVATION
MINIMUM REQUIREMENTS OF CABLE BARRIER SYSTEM:
1. FULLY COMPLIES WITH NCHRP-350 TEST LEVEL 4 (TL-4).
2. 4 PRE-STRETCHED HIGH TENSION WIRE ROPES.
3. MAXIMUM OF 8' DEFLECTION.
4. PLACED ON 4% SLOPE, NOT TO EXCEED 1:6.
5. MAXIMUM OF 10'-6" POST SPACING.
(1)
(2)
(2)
GEOTEXTILE
REINFORCEMENT
SHEET NO.STATE JOB NO.
TYPICAL SECTION
02
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\T
ypical S
ection.dw
gM
egan
7/17/2018 9:20 A
M
OK
MU
LG
EE
C
OU
NT
Y
0.115
LB.
SUMMARY OF QUANTITIES
22.24
C.Y.CLASS 'AA' CONCRETE
REINFORCING STEEL
SHEET NO.STATE JOB NO.
AR01
28967(04)
U.S
. H
IG
HW
AY
75
REVISION DATE
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\S
um
maries.dw
gM
egan
7/18/2018 12:06 P
M
OK
MU
LG
EE
C
OU
NT
Y
SUMMARY OF PAY QUANTITIES
& NOTES (ROADWAY)
PAY QUANTITY NOTES
(R-5) AN ESTIMATED QUANTITY OF 1,401 C.Y. TOPSOIL TO BE RESERVED FOR
REPLACEMENT OF APPROXIMATELY 5" ON COMPLETED FORESLOPES, DITCHES, AND
BACKSLOPES. THIS QUANTITY IS INCLUDED IN THE EARTHWORK BALANCE. ANY
ADDITIONAL EXCAVATION REQUIRED IN CUT SECTIONS TO ALLOW FOR PLACEMENT
OF TOPSOIL TO FINAL GRADE, SHALL BE INCLUDED IN THE PRICE BID.
(R-7) FOR SOLID SLAB SODDING, PRICE BID TO INCLUDE COST OF 10-20-10 FERTILIZER,
ESTIMATED AT 200 POUNDS PER 1,000 SQ. YDS.
(R-8) FOR SOLID SLAB SODDING, PRICE BID TO INCLUDE COST OF WATERING, ESTIMATED
AT 40 GALLONS PER SQ. YD. OF SODDING.
(R-16) QUANTITY BASED ON TWO APPLICATIONS.
(R-32) ESTIMATED AT 112 LBS. PER SQ. YD. PER 1" THICK.
(R-49) TO BECOME THE PROPERTY OF AND BE DISPOSED OF BY THE CONTRACTOR IN A
MANNER APPROVED BY THE ENGINEER.
(R-50) MATERIALS REMOVED SHALL NOT BE MEASURED FOR PAYMENT UNDER SECTION
202.06 UNCLASSIFIED EXCAVATION.
(1) ESTIMATED QUANTITY TO BE USED IN A MANNER AND LOCATION TO BE
DETERMINED BY THE ENGINEER.
(2) COST OF PIPE TO INCLUDE TRENCH EXCAVATION & STANDARD BEDDING MATERIAL.
(3) ASPHALT USED IN THE CONSTRUCTION OF CABLE BARRIER SECTIONS WILL BE
VISUALLY INSPECTED AND WILL NOT BE REQUIRED TO MEET THE DENSITY
REQUIREMENTS OF SECTION 411.
(4) MIRAFI RS580I OR APPROVED EQUAL SHALL BE USED.
(5) SEE CONCRETE CAP DETAIL ON SHEET AX02.
(6) ESTIMATED QUANTITY TO BE USED FOR BACKFILL (SEE SHEET 2) AND OTHER
LOCATIONS AS DETERMINED BY THE ENGINEER.
GENERAL CONSTRUCTION NOTES
THIS PROJECT SHALL BE CONSTRUCTED WITHOUT CLOSING THE EXISTING ROAD TO LOCAL
AND THROUGH TRAFFIC. SEE STANDARD SPECIFICATIONS FOR MAINTENANCE OF LOCAL AND
THROUGH TRAFFIC.
MAINTENANCE OF THROUGH TRAFFIC INCLUDES THE MAINTENANCE OF THE EXISTING ROAD IN
CLOSE PROXIMITY TO THE NEW CONSTRUCTION AS SHOWN ON THE PLANS.
THIS PROJECT SHALL BE CONSTRUCTED WITHOUT CLOSING THE EXISTING SECTION LINE
ROADS TO LOCAL AND THROUGH TRAFFIC. SEE STANDARD SPECIFICATIONS FOR
MAINTENANCE OF LOCAL AND THROUGH TRAFFIC.
ALL TREES, BRUSH, AND OTHER DEBRIS THAT MIGHT INTERFERE WITH THE FLOW OF WATER
SHALL BE CLEANED OUT TO THE RIGHT-OF-WAY LINE, AT EACH STRUCTURE AND BRIDGE, IN A
MANNER APPROVED BY THE ENGINEER. ALL COST TO BE INCLUDED IN OTHER ITEMS OF WORK.
ALL FLOWLINES THAT ARE TO BE FILLED SHALL BE THOROUGHLY TAMPED BEFORE
CONSTRUCTION OR EXTENSION OF DRAINAGE STRUCTURES. ALL COSTS TO BE INCLUDED IN
OTHER ITEMS OF WORK.
IN ORDER TO ALLEVIATE DUST CONDITIONS DURING GRADING OPERATIONS AND BEFORE
PAVEMENT WORK IS COMPLETED, THE CONTRACTOR SHALL SPRINKLE GRADING AT INTERVALS
APPROVED BY THE ENGINEER. ALL COST TO BE INCLUDED IN OTHER ITEMS OF WORK.
THE CONTRACTOR SHALL NOT WASTE ANY EXCESS EXCAVATION UNTIL ALL PLANNED
EMBANKMENTS AND BACKFILLS ARE COMPLETED. EXCESS UNCLASSIFIED EXCAVATION
MATERIAL DETERMINED BY THE ENGINEER TO BE SUITABLE FOR BACKFILL SHALL BE USED TO
REDUCE ANY UNCLASSIFIED BORROW NEEDED. COST OF SECOND HANDLING SHALL BE
INCLUDED IN OTHER ITEMS OF WORK. ANY REMAINING EXCESS EXCAVATION SHALL BECOME
THE PROPERTY OF THE CONTRACTOR AND BE DISPOSED OF IN A MANNER APPROVED BY THE
ENGINEER.
THE CONTRACTOR SHALL KEEP THE OPEN TRENCH DRAINED. COST TO BE INCLUDED IN OTHER
ITEMS OF WORK.
AREAS ON WHICH SALVAGED TOPSOIL IS TO BE REPLACED SHALL HAVE 18-46-0 FERTILIZER
APPLIED, AT THE RATE OF 150 POUNDS PER ACRE, JUST PRIOR TO THE REPLACEMENT OF
SALVAGED TOPSOIL.
AT THE BEGINNING OF TURFING OPERATIONS, ANY AREAS INCLUDED IN PLANNED QUANTITIES
THAT HAVE GROWN A SATISFACTORY VOLUNTEER TURF OF PERENNIAL GRASS, AS
DETERMINED BY THE ENGINEER, SHALL BE FERTILIZED AND WATERED AS CALLED FOR ON THE
PLANS, BUT SHALL NOT BE SEEDED, SODDED, OR SPRIGGED.
FOR PROJECTS THAT INCLUDE WIDENING AND/ OR RESURFACING, THE CONTRACTOR SHALL
SCHEDULE OPERATIONS TO MINIMIZE POTENTIAL DROP-OFF HAZARDS AND SHALL SUBMIT A
SEQUENCE OF CONSTRUCTION OPERATIONS TO THE RESIDENT ENGINEER FOR APPROVAL
BEFORE OPERATIONS BEGIN. ANY PORTION OF THE CONSTRUCTION OPERATIONS, SUCH AS
SUPER PAVE LAYING OPERATIONS, EXCAVATION FOR PAVEMENT WIDENING, OR EXTENSION OF
ROADWAY STRUCTURES, SHALL BE LIMITED TO ONE SIDE AT A TIME, AND THE PRODUCERS
OUTLINED IN THE PAVEMENT DROP-OFF TREATMENT STANDARD PDT-1 (LATEST REVISION)
SHALL BE IMPLEMENTED. ONLY THAT AMOUNT OF OPEN TRENCH WILL BE ALLOWED THAT CAN
BE RESURFACED IN 1 (ONE) DAYS TIME WITHOUT APPROVAL FROM THE ENGINEER. LIGHTS,
SIGNS AND BARRICADES SHALL BE MOVED AS WORK PROGRESSES.
PRIOR TO PLACING UNCLASSIFIED BORROW AND CONSTRUCTING THE NEW ASPHALT
CONCRETE OR CONCRETE PAVEMENT, THE CONTRACTOR SHALL STRIP ALL VEGETATION
ABOVE THE SURFACE, SUCH AS GRASS, HERBAGE, FOLIAGE, LEAFAGE, ECT., AND UPROOT OR
GRUB THE VEGETATIVE APPENDAGES BELOW THE SURFACE SUCH AS ROOTS, STEAMS,
STUMPS, ECT. THE SURFACE SHALL BE CLEAR OF ALL VEGETATIVE REMNANTS PRIOR TO
PLACING THE UNCLASSIFIED BORROW AND NEW PAVEMENT CONSTRUCTION. ALL VEGETATION
AND APPENDAGES SHALL BE REMOVE AND DISPOSED OF OFF SITE AT AN APPROVED
LOCATION. ALL WORK SHALL BE DONE TO THE SATISFACTION OF AND IN A MANNER APPROVED
BY THE ENGINEERING.
DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
SURFACE DRAINAGE, SHALL VISUALLY INSPECT AND/ OR MONITOR IT DURING RAINY OR WET
WEATHER, AND TAKE NECESSARY STEPS TO INSURE ALL AREAS IN THE MEDIAN ADEQUATELY
DRAINS TO THE SATISFACTION OF THE ENGINEER.
VEGETATION, ROOTS, OR OTHER VEGETATIVE SUPPORT STRUCTURES SHALL NOT BE
PERMITTED ON THIS PROJECT, NOR CONTAMINATED OR MIXED WITH THE UNCLASSIFIED
BORROW. PRIOR TO PLACEMENT, PRIOR TO PLACEMENT, THE UNCLASSIFIED BORROW SHALL
BE CLEAN AND CLEAR OF ALL VEGETATIVE IMPURITIES, AND IT SHALL BE DONE BY THE
CONTRACTOR TO THE SATISFACTION OF AND IN A MANNER APPROVED BY THE ENGINEER.
T.B.S.C. SURFACES SHALL BE SPRINKLED WITH WATER AND ROLLED WITH A PNEUMATIC
ROLLER IN A MANNER APPROVED BY THE ENGINEER.
EXCESS ASPHALT AT JOINTS AND CRACKS IN EXISTING PAVEMENT SHALL BE REMOVED FLUSH
TO TOP OF PAVING IN A MANNER APPROVED BY THE ENGINEER.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE HE MAY INFLECT TO THE
EXISTING UNDERGROUND UTILITIES WITHIN THE PROJECT AREA AS A RESULT OF HIS DIGGING,
TRENCHING, BORING, ECT., IN ACCORDANCE WITH THE OKLAHOMA UNDERGROUND FACILITIES
DAMAGE PREVENTION ACT THE CONTRACTOR SHALL NOTIFY THE OKLAHOMA ONE-CALL
SYSTEM, INC. 48 HOURS PRIOR TO BEGINNING EXCAVATION. OKLAHOMA ONE-CALL SYSTEM,
INC. "CALL OKIE" 1-800-522-6543 OR 811.
DEPTH OF EXISTING UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO
CONSTRUCTION.
THE ITEMS TO BE REMOVED AND/ OR RESET SHALL BE HANDLED WITH CARE. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DURING THESE OPERATIONS.
THE STATIONS AND LOCATIONS OF THE CABLE BARRIER SYSTEM AND END ANCHOR UNITS
PLACEMENT SHOWN ON THE PLAN AND DETAIL SHEETS ARE APPROXIMATE. THE ENGINEER
SHALL DETERMINE THE EXACT LOCATION OF THE CABLE BARRIER SYSTEM AND/ OR END
ANCHOR UNITS.THE CONTRACTOR SHALL VISUALLY VERIFY THESE LOCATIONS.
SPECIES PLAN NOTES:
AMERICAN BURYING BEETLE NOTE: THE AMERICAN BURYING BEETLE IS A LARGE CARRION
BURYING BEETLE THAT OCCURS WITHIN THE PROJECT LIMITS. NO ARTIFICIAL LIGHTING SHALL
BE USED DURING CONSTRUCTION WITHOUT PRIOR CONSULTATION WITH USFWS THRU ODOT
ENVIRONMENTAL PROGRAMS DIVISION. DO NOT PROCEED WITH ANY USE OF ARTIFICIAL
LIGHTING WITHOUT WRITTEN CONSENT FROM ODOT ENVIRONMENTAL PROGRAMS DIVISION.
CARCASSES AND ALL FOOD TRASH SHALL BE REMOVED FROM THE PERMANENT AND
TEMPORARY RIGHT-OF-WAY THROUGHOUT THE DURATION OF PROJECT ACTIVITIES.
BAT LIGHTING NOTE: THE NORTHERN LONG-EARED BAT IS A LISTED BAT SPECIES THAT
OCCURS WITHIN THE PROJECT'S ACTION AREA. IF ANY PERMANENT LIGHTING IS INSTALLED OR
REPLACED, DOWNWARD-FACING FULL CUT-OFF LENS LIGHTS SHALL BE INSTALLED AND
DIRECTED AWAY FROM WOODED AREAS AND STREAMS.
DURING CONSTRUCTION, ROCK MAY BE ENCOUNTERED AT
VARIOUS LOCATIONS AT OR NEAR THE SURFACE. COST
OF REMOVAL TO BE INCLUDED IN THE PRICE BID FOR
UNCLASSIFIED EXCAVATION.
GENERAL CONSTRUCTION NOTES
A FIELD OFFICE WILL NOT BE REQUIRED FOR THIS PROJECT.
DURING CONSTRUCTION, ROCK MAY BE ENCOUNTERED AT VARIOUS LOCATIONS AT OR NEAR
THE SURFACE. COST OF ROCK EXCAVATION OR ROCK REMOVAL TO BE INCLUDED IN PRICE BID
FOR UNCLASSIFIED EXCAVATION.
NOTE:
STAKING & MOBILIZATION WILL BE INCLUDED IN
PROJECT NO. HSIPG-256N(041)PM, J/P NO. 29760(04)
MANDATORY TIED PROJECTS
THE FOLLOWING PROJECTS WILL BE MANDATORILY TIED.
1. PROJECT NO. NHPP-256N(034)PM, STATE JOB PIECE NO. 28967(04),
OKMULGEE COUNTY U.S. HIGHWAY 75.
2 PROJECT NO. HSIPG-256N(041)PM, STATE JOB PIECE NO. 29760(04),
OKMULGEE COUNTY U.S. HIGHWAY 75.
ITEM CODE REVISIONS 8/14/18
1
1
1
1
SHEET NO.STATE JOB NO.
AR02
28967(04)
U.S
. H
IG
HW
AY
75
REVISION DATE
Revision Note xx/xx/xx
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\S
um
maries.dw
gM
egan
7/18/2018 12:06 P
M
OK
MU
LG
EE
C
OU
NT
Y
SUMMARY SHEET (ROADWAY)
*
* * *
COST FOR THESE ITEM SHALL BE CARRIED UNDER
REMOVAL OF STRUCTURES & OBSTRUCTIONS
*
FOR INFORMATION ONLY.
*
*
NOTE: FOR INFORMATION ONLY. TRAFFIC PAY ITEMS AND NOTES TO BE CARRIED ON PROJECT HSIPG-256N(041)PM
JOB PIECE NUMBER: 29760(04)
#4 REIF. STEEL
@ 6" CENTERS
#4 REIF. STEEL
@ 6" CENTERS
CONCRETE CAP DETAIL
A - A
4"
2" CLR.
4"
2" CLR.
#4 REFI. STEEL
@ 6" C/C EACH WAY
4"EXISTING SMD
CONCRETE
CAP
0.115
LB.
SUMMARY OF QUANTITIES
22.24
C.Y.CLASS 'AA' CONCRETE
REINFORCING STEEL
SHEET NO.STATE JOB NO.
AR03
28967(04)
U.S
. H
IG
HW
AY
75
REVISION DATE
Revision Note xx/xx/xx
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\S
um
maries.dw
gM
egan
7/18/2018 12:06 P
M
OK
MU
LG
EE
C
OU
NT
Y
SUMMARY SHEET
(DRAINAGE STRUCTURES)
&
CONCRETE CAP DETAIL
SHEET NO.STATE JOB NO.
AT01
28967(04)
U.S
. H
IG
HW
AY
75
REVISION DATE
Revision Note xx/xx/xx
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\S
um
maries.dw
gM
egan
7/18/2018 12:06 P
M
OK
MU
LG
EE
C
OU
NT
Y
SUMMARY OF PAY
QUANTITIES & NOTES
(TRAFFIC & CABLE BARRIER)
NOTE:
TRAFFIC CONTROL PAY ITEM AND NOTES WILL BE
CARRIED ON PROJECT NUMBER: HSIPG-256N(041)PM
JOB PIECE NUMBER: 29760(04)
PAY QUANTITY NOTES
(1) QUANTITY INCLUDES AN ADDITIONAL 10% FOR USE AS DIRECTED BY THE ENGINEER.
(2) PAY QUANTITY INCLUDES 6,589 L.F. OF 4" WHITE AND 5,748 L.F. OF YELLOW.
CABLE BARRIER NOTES
(TP-44) INCLUDED IN THIS PAY ITEM WILL BE TWO (2) DAYS OF TRAINING FROM THE
MANUFACTURE'S REPRESENTATIVE FOR MAINTAINING WIRE ROPE SAFETY FENCE
SYSTEM. THE TRAINING SESSION(S) SHALL INCLUDE TRAINING TO PERTINENT ODOT
AND LOCAL EMERGENCY PERSONNEL. PARTICIPANT SELECTION AND TRAINING
LOCATION SHALL BE APPROVED BY THE ENGINEER.
(TP-45) INCLUDED IN THIS PAY ITEM IS ALL MISCELLANEOUS HARDWARE REQUIRED BY THE
MANUFACTURE TO BE USED FOR INSTALLATION OF SOCKETED \CABLE BARRIER
SYSTEM. ALSO, AN ADDITIONAL 200 POST AND POST ACCESSORIES (CAPS, PLASTIC
HARDWARE, GROUND COVER, ECT.) SHALL BE DELIVERED TO THE ODOT OKMULGEE
COUNTY MAINTENANCE YARD IN OKMULGEE.
(TP-46) CABLE WILL BE MEASURED FROM BEGINNING OF WIRE ROPE CABLE TO END OF
WIRE ROPE CABLE.
(TP-47) ALL POST HAVE CAPS WHICH SHALL BE AFFIXED TO THE POST WITH A DURABLE
LIQUID ADHESIVE, SUCH AS LIQUID NAILS.EVERY FIFTH POST SHALL BE DELINEATED
IN EACH DIRECTION WITH RETROFLECTIVE SHEETING MEETING SPECIFICATIONS
ASTM D-4956 TYPE VII, VIII, OR IX (MIN. 7 SW. IN. YELLOW)
.
(TP-48) IF THE SYSTEM POST FALL ON TOP OF A CROSS DRAIN BOX OR OTHER
CONFLICTING UNDERGROUND STRUCTURE, SPECIAL POST DESIGN WILL BE
REQUIRED. CABLE MANUFACTURER SHALL PROVIDE THE POST DESIGN TO THE
ENGINEER FOR APPROVAL. ALL INSTALLATIONS MUST BE IN ACCORDANCE TO THE
MANUFACTURER'S SPECIFICATIONS AND/ OR RECOMMENDATION.
(TP-49) THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE LETTER OF
APPROVAL FROM THE F.H.W.A. INDICATING THE INSTALLED CABLE BARRIER
SYSTEM MEET ALL TEST CRITERIA OF NCHRP-350 TEST LEVEL 4(TL-4) AND SUBMIT IT
TO THE RESIDENT ENGINEER AND THE CHIEF TRAFFIC ENGINEER.
TP-50) TURNBUCKLES SHALL BE NO LONGER THAN 1' TO THE CABLE POST. IF IT
INTERFERES WITH THE TENSIONING OPERATION OF THE SYSTEM, THE HEIGHTS
FOR ALL ROWS OF CABLES SHALL CONFORM TO THE MANUFACTURER'S
RECOMMENDED SPECIFICATIONS.THE BOTTOM OF THE CABLE MUST BE WITHIN THE
TOLERANCE LIMITS RECOMMENDED BY THE MANUFACTURER.
(TP-51) THE TENSION METER SHALL BE OF THE TYPE RECOMMENDED BY THE
MANUFACTURER OF THE CABLE BARRIER SYSTEM PROVIDED, AND SHALL BE
APPROVED BY THE ODOT TRAFFIC ENGINEERING DIVISION. IT SHALL ALSO BE NEW,
CALIBRATED, FUNCTIONAL, AND CAPABLE OF READING TENSION ON THE CABLE
BARRIER SYSTEM TO WITHIN THE MANUFACTURER'S RECOMMEND TOLERANCES.
THE DEVICE SHALL ALSO BE DEMONSTRATED BY THE INSTRUCTOR(S) ON HOW TO
OPERATE THEM AND PROVIDE OTHER HELPFUL INFORMATION TO THE
PARTICIPANTS. IT SHALL BE DELIVERED TO THE ODOT OKMULGEE COUNTY
MAINTENANCE YARD IN OKMULGEE.
(TP-52) PRICE BID FOR THIS ITEM INCLUDES A SOIL REPORT TO BE PROVIDED BY THE
CONTRACTOR TO THE CABLE MANUFACTURER INDICATING ALL NECESSARY SOIL
INFORMATION REQUIRED FOR THE MANUFACTURER TO DESIGN POST FOOTINGS
AND ANCHOR UNITS FOR THIS PROJECT. THE SOIL REPORT AND FOUNDATION
FOOTING DESIGN SHALL BE COMPLETED AND APPROVED BY THE ENGINEER, PRIOR
TO EXCAVATION OF THE END ANCHORS AND POST FOOTINGS. ALL POST AND
ANCHOR UNITS SHALL BE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER. THE
POST FOOTINGS SHALL NOT BE LESS THAN 12" DIAMETER BY 36" DEEP. FOOTINGS
SHALL NOT EXTEND ABOVE THE GROUND MORE THAN 1".
(TP-53) THIS IS AN ESTIMATED QUANTITY TO BE USED FOR POST FOOTINGS AND AND END
ANCHOR UNITS FOR THIS PROJECT. THIS ITEM SHALL ALSO INCLUDE REINFORCING
STEEL BARS REQUIRED FOR POST FOOTINGS AND ANCHOR UNITS AS SHOWN BY
THE MANUFACTURER'S DESIGN.
DA 1
DA 2
DA 3
DA 4
DA 5
DA 6
DA 7
U:\P
roje
cts\
198
~ O
DO
T - E
C-1
465
US
-75
Saf
ety
Impr
ovem
ents
in O
kmul
gee
Cou
nty\
DW
G\D
rain
age
Map
.dw
gM
egan
7/17
/201
8 9:
21 A
M
OK
MU
LGE
E C
OU
NTY
U.S
. HIG
HW
AY
75
SHEET NO.STATE JOB NO. R0128967(04)
DRAINAGE STRUCTURE DESIGN RECORD&
DRAINAGE MAP
STORM WATER
MANAGEMENT PLAN
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\S
WP
PP
.dw
gS
WP
PP
LA
YO
UT
1-1
Megan
7/17/2018 9:29 A
M
U.S
. H
IG
HW
AY
75
R02
28967(04)
OK
MU
LG
EE
C
OU
NT
Y
STATE JOB NO. SHEET NO.
STORM WATER MANAGEMENT PLAN
EROSION AND SEDIMENT CONTROLSSITE DESCRIPTION
DESCRIPTION
DATE
PROJECT LIMITS:
PROJECT DESCRIPTION:
SUGGESTED SEQUENCE OF EROSION CONTROL ACTIVITIES:
SOIL TYPE:
OFFSITE AREA TO BE DISTURBED:(FOR CONTRACTOR USE)
LATITUDE & LONGITUDEOF CENTER OF PROJECT:
NAME OF RECEIVING WATERS:
SENSITIVE WATERS OR WATERSHEDS:
REVISED 08 / 18 / 2017
IN ADDITION:
THE FOLLOWING SECTIONS OF THE 2009 ODOT STANDARD SPECIFICATIONS SHOULDBE NOTED:
GENERAL NOTES:
HAZARDOUS MATERIALS:
WASTE MATERIALS:
THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THEFOLLOWING:
SOIL STABILIZATION PRACTICES:
STRUCTURAL PRACTICES:
MAINTENANCE AND INSPECTION:
OFFSITE VEHICLE TRACKING:
NOTES:
LOCATED IN A TMDL:
LAKE THUNDERBIRD TMDL:
PROJECT WILL DISCHARGE TO:
IF YES, LIST IMPAIRMENT:
YES NOMS4 ENTITY
IF YES, LOCATION:
303(d) IMPAIRED WATERS:
TOTAL AREA OF THECONSTRUCTION SITE:
POST-CONSTRUCTION RUNOFFCOEFFICIENT OF THE SITE:
ESTIMATED AREA TO BE DISTURBED:
TOTAL IMPERVIOUS AREAPRE-CONSTRUCTION:
TOTAL IMPERVIOUS AREAPOST-CONSTRUCTION:
YES NO
YES NO
YES NO
YES NO
IMPROVE THE EXISTING MEDIAN OPENINGS, ROADWAY
DECELERATION LANES AND EXTEND EXISTING CABLE BARRIER.
X
X
X
X
X
X
X
X
X
US-75 FROM APPROXIMATLEY 7.5 MILES NORTH OF US-62
JUNCTION, NORTH 4.7 MILES IN OKMULGEE COUNTY, OKLAHOMA.
INSTALLATION TEMPORARY EROSION CONTROL MEASURES AND BEST MANAGEMENT PRACTICES.
REMOVAL OF THE EXISTING PAVEMENT DRIVES AND STORM SEWER. INSTALLATION OF NEW STORM SEWER
INLETS AND STORM SEWER. GRADE THE NEW LANES & OPENINGS AND STABLIZE SUB-GRADE. INSTALL NEW
PAVEMENT.
INSTALL PERMANENT EROSION CONTROL DEVICES (SOLID SLAB SOD). REMOVE ALL TEMPORARY EROSION
CONTROL MEASURES.
HECTOR-ENDSAW COMPLEX
2.27 ACRES
35° 44' 16.74" N 96° 00' 17.30" W
FLAT ROCK CREEK & EAST BEGGS CREEK
X
NO SINGLE DISTURBED AREA EXCEEDS 5 ACRES TO ONE FALLOUT.
4.63 ACRES
1.09 ACRES
2.32 ACRES
0.72
REVISED NOTES
1
xx/xx/xx
4
0
0
+
0
0
405+
00
410+
00
4
1
5
+
0
0
SCALE: 1"=50'
632.78 L.F.
PAVEMENT SAWING
207.41 L.F.
PAVEMENT SAWING
REMOVE 583.19 SY
ASPHALT PAVEMENT
SHEET NO.STATE JOB NO.
REMOVAL & EROSION CONTROL
SHEET 1 OF 4
R03
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\R
em
oval &
E
rosion C
ontrol S
heets.dw
gM
egan
7/17/2018 9:32 A
M
OK
MU
LG
EE
C
OU
NT
Y
S
T
A
. 4
0
1
+
0
0
ASPHALT PAVEMENT
SAWING PAVEMENT
583.19
840.19
S.Y.
L.F.
REMOVAL QUANTITIES
ASPHALT PAVEMENT
LEGEND: (EROSION CONTROL)
TEMP. SILT DIKE
TEMP. SEDIMENT FILTER
EROSION CONTROL QUANTITIES
TEMPORARY SILT DIKE L.F. 12.00
TEMP. SEDIMENT FILTER EA. 3.00
S
T
A
. 4
1
6
+
0
0
485+
00
490+
00
495+
00
500+
00
SCALE: 1"=50'
536.01 L.F.
PAVEMENT SAWING
REMOVE 632.75 SY
ASPHALT PAVEMENT
REMOVE
HEADWALL
REMOVE
HEADWALL
52.50 L.F.
DRAINAGE PIPE
538.86 L.F.
PAVEMENT SAWING
REMOVE 50' EXISTING
CABLE BARRIER &
SET NEW ANCHOR UNIT.
REMOVE 50' EXISTING
CABLE BARRIER &
SET NEW ANCHOR UNIT.
470+
00
475+
00
480+
00
4
8
5
+
0
0
SCALE: 1"=50'
51.44 L.F.
DRAINAGE PIPE
REMOVE
HEADWALL
REMOVE
HEADWALL
546.96 L.F.
PAVEMENT SAWING
169.98 L.F.
PAVEMENT SAWING
REMOVE 470.05 SY
ASPHALT PAVEMENT
SHEET NO.STATE JOB NO.
REMOVAL & EROSION CONTROL
SHEET 2 OF 4
R04
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\R
em
oval &
E
rosion C
ontrol S
heets.dw
gM
egan
7/17/2018 9:32 A
M
OK
MU
LG
EE
C
OU
NT
Y
ASPHALT PAVEMENT
SAWING PAVEMENT
470.05
716.94
S.Y.
L.F.
REMOVAL QUANTITIES
ASPHALT PAVEMENT
LEGEND: (EROSION CONTROL)
TEMP. SILT DIKE
EROSION CONTROL QUANTITIES
TEMPORARY SILT DIKE L.F. 12.00
ASPHALT PAVEMENT
SAWING PAVEMENT
632.75
1074.87
S.Y.
L.F.
REMOVAL QUANTITIES
ASPHALT PAVEMENT
LEGEND: (EROSION CONTROL)
TEMP. SILT DIKE
EROSION CONTROL QUANTITIES
TEMPORARY SILT DIKE 48.00L.F.
DRAINAGE PIPE 51.44L.F.
HEADWALL 2.00EA.
DRAINAGE PIPE 52.50L.F.
HEADWALL 2.00EA.
ST
A. 470+
00
S
T
A
. 4
8
5
+
0
0
S
TA
. 485+
00
ST
A. 5
00
+0
0
CABLE BARRIER 100.00L.F.
570+
00
575+
00
580+
00
585+
00
SCALE: 1"=50'
558.31 L.F.
PAVEMENT SAWING
REMOVE 943.22 SY
ASPHALT PAVEMENT
REMOVE
HEADWALL
REMOVE
HEADWALL
53.43 L.F.
DRAINAGE PIPE
555.91 L.F.
PAVEMENT SAWING
REMOVE 100' EXISTING
CABLE BARRIER &
SET NEW ANCHOR UNIT.
REMOVE 30' EXISTING
CABLE BARRIER &
SET NEW ANCHOR UNIT.
54
0+
00
54
5+
00
55
0+
00
SCALE: 1"=50'
REMOVE 716.95 SY
ASPHALT PAVEMENT
439.50 L.F.
PAVEMENT SAWING
REMOVE
HEADWALL
REMOVE
HEADWALL
66.36 L.F.
DRAINAGE PIPE
594.36 L.F.
PAVEMENT SAWING
REMOVE 45' EXISTING
CABLE BARRIER &
SET NEW ANCHOR UNIT.
REMOVE 150' EXISTING
CABLE BARRIER &
SET NEW ANCHOR UNIT.
REMOVE INLET
SHEET NO.STATE JOB NO.
REMOVAL & EROSION CONTROL
SHEET 3 OF 4
R05
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\R
em
oval &
E
rosion C
ontrol S
heets.dw
gM
egan
7/17/2018 9:32 A
M
OK
MU
LG
EE
C
OU
NT
Y
ASPHALT PAVEMENT
SAWING PAVEMENT
716.95
1033.86
S.Y.
L.F.
REMOVAL QUANTITIES
ASPHALT PAVEMENT
LEGEND: (EROSION CONTROL)
TEMP. SILT DIKE
TEMP. SEDIMENT FILTER
EROSION CONTROL QUANTITIES
TEMPORARY SILT DIKE
TEMP. SEDIMENT FILTER EA.
24.00
1.00
L.F.
ASPHALT PAVEMENT
SAWING PAVEMENT
943.22
1114.22
S.Y.
L.F.
REMOVAL QUANTITIES
ASPHALT PAVEMENT
LEGEND: (EROSION CONTROL)
TEMP. SILT DIKE
EROSION CONTROL QUANTITIES
TEMPORARY SILT DIKE 36.00L.F.
DRAINAGE PIPE 66.36L.F.
HEADWALL 2.00EA.
DRAINAGE PIPE 53.43L.F.
HEADWALL 2.00EA.
ST
A. 570+
00
ST
A. 585+
00
ST
A. 539+
00
ST
A. 554+
00
CABLE BARRIER 130.00L.F.
CABLE BARRIER 195.00L.F.
INLET 1.00EA.
5
9
0
+
0
0
595+
00
600+
00
605+
00
SCALE: 1"=50'
REMOVE 795.30 SY
ASPHALT PAVEMENT
522.78 L.F.
PAVEMENT SAWING
REMOVE
HEADWALL
REMOVE
HEADWALL
51.54 L.F.
DRAINAGE PIPE
520.58 L.F.
PAVEMENT SAWING
REMOVE 50' EXISTING
CABLE BARRIER &
SET NEW ANCHOR UNIT.
REMOVE 90' EXISTING
CABLE BARRIER &
SET NEW ANCHOR UNIT.
625+
00
630+
00
635+
00
SCALE: 1"=50'
536.05 L.F.
PAVEMENT SAWING
REMOVE 1147.15 SY
ASPHALT PAVEMENT
REMOVE
HEADWALL
REMOVE
HEADWALL
54.22 L.F.
DRAINAGE PIPE
532.83 L.F.
PAVEMENT SAWING
REMOVE 65' EXISTING
CABLE BARRIER &
SET NEW ANCHOR UNIT.
REMOVE 50' EXISTING
CABLE BARRIER &
SET NEW ANCHOR UNIT.
SHEET NO.STATE JOB NO.
REMOVAL & EROSION CONTROL
SHEET 4 OF 4
R06
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\R
em
oval &
E
rosion C
ontrol S
heets.dw
gM
egan
7/17/2018 9:32 A
M
OK
MU
LG
EE
C
OU
NT
Y
ASPHALT PAVEMENT
SAWING PAVEMENT
795.30
1043.36
S.Y.
L.F.
REMOVAL QUANTITIES
ASPHALT PAVEMENT
LEGEND: (EROSION CONTROL)
TEMP. SILT DIKE
EROSION CONTROL QUANTITIES
TEMPORARY SILT DIKE 48.00L.F.
ASPHALT PAVEMENT
SAWING PAVEMENT
1147.15
1068.88
S.Y.
L.F.
REMOVAL QUANTITIES
ASPHALT PAVEMENT
CABLE BARRIER 115.00L.F.
LEGEND: (EROSION CONTROL)
TEMP. SILT DIKE
TEMP. SEDIMENT FILTER
EROSION CONTROL QUANTITIES
TEMPORARY SILT DIKE
TEMP. SEDIMENT FILTER L.F.
48.00
1.00
L.F.
DRAINAGE PIPE 54.22L.F.
HEADWALL 2.00EA.
DRAINAGE PIPE 51.54L.F.
HEADWALL 2.00EA.
S
T
A
. 5
9
0
+
0
0
ST
A. 605+
00
ST
A. 6
21
+0
0
ST
A. 6
36
+0
0
CABLE BARRIER 140.00L.F.
SCALE: 1"=50'
BM #1
MAG NAIL ON EAST SHOULDER APPROX.
1216 FEET S. OF WILL SAMPSON ROAD
STA. 383+41.30 53.60' RT. ELEV. = 786.56'
SURVEY U.S. 75
37
3+
09
37
5+
00
38
0+
00
38
5+
00
CONST. 211.86 L.F.
CABLE BARRIER
W/ ANCHOR UNIT
SHEET NO.STATE JOB NO.
PLAN SHEET
US-75 AT
WILL SAMPSON ROAD
R07
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\P
lan S
heets.dw
gM
egan
7/17/2018 9:33 A
M
OK
MU
LG
EE
C
OU
NT
Y
ST
A. 3
86
+0
0
SEC. 12 , T-14-N, R-12-E
SEC. 12 , T-14-N, R-12-E
ST
A. 3
83
+9
2.0
0 B
EG
IN
C
ON
ST
RU
CT
IO
N
S
TA
TE
JO
B N
O. 2
896
7(0
4)
ST
A. 3
72
+0
0
UTILITY OWNERS
OWNER PHONE NUMBER
AT&T (580) 221-2148
BEGGS TELEPHONE
COMPANY, INC.
(918) 267-3636
EAST CENTRAL OKLAHOMA
ELECTRIC COOPERATIVE
(918) 756-0833
(918) 706-5218
EXPLORER PIPELINE (918) 591-3261
GRDA (918) 610-9600
MAGELLAN (918) 574-7873
ONG 405.556.6411
OG&E (405) 553-5785
OKMULGEE RWD NO. 2 (918) 756-8910
OKMULGEE RWD NO.6 (918) 827-6350
PUBLIC SERVICE OF
OKLAHOMA (PSO)
(918) 758-2313
SCISSORTAIL ENERGY
(KINDER MORGAN)
(713) 420-4539
SCALE: 1"=50'
BM #2
MAG NAIL ON EAST SHOULDER APPROX.
898 FEET S. OF WILL SAMPSON ROAD
STA. 386+59.00 53.20' RT. ELEV. = 797.75'
BM #3
MAG NAIL ON EAST SIDE SHOULDER APPROX.
395 FEET S. OF WILL SAMPSON ROAD
STA. 391+60.00 53.70' RT. ELEV. = 808.46'
E
X
I
S
T
I
N
G
C
A
B
L
E
B
A
R
R
I
E
R
S
Y
S
T
E
M
SU
RV
EY
U.S
. 75
390+
00
39
5+
00
4
0
0
+
0
0
CONST. 856.91 L.F.
CABLE BARRIER
W/ ANCHOR UNIT
SHEET NO.STATE JOB NO.
PLAN SHEET
US-75 AT
WILL SAMPSON ROAD
R08
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\P
lan S
heets.dw
gM
egan
7/17/2018 9:33 A
M
OK
MU
LG
EE
C
OU
NT
Y
S
T
A
. 4
0
1
+
0
0
ST
A. 386+
00
SEC. 12 , T-14-N, R-12-E
SEC. 12 , T-14-N, R-12-ESEC. 1 , T-14-N, R-12-E
SEC. 1 , T-14-N, R-12-E
RE
MO
VE
SCALE: 1"=50'
BM #4
MON. NO. O-56-423 RAILROAD SPIKE ON
EAST SHOULDER FROM SWO 4950(1) BM 118
STA. 402+50.40 54.20' RT. ELEV. = 798.39'
BM #5
MAG NAIL ON EAST SHOULDER APPROX.
1316 FEET N. OF WILL SAMPSON ROAD
STA. 408+10.80 52.20' RT. ELEV. = 775.90'
BM #6
MAG NAIL ON EAST SHOULDER APPROX.
858 FEET N.W. FROM BM #5
STA. 416+62.50 52.90' RT. ELEV. = 773.92'
EXISTING CABLE
BARRIER SYSTEM
EXISTING CABLE
BARRIER SYSTEM
125'
4
0
0
+
0
0
405+
00
410+
00
4
1
5
+
0
0
CAP EXIST.
INLET
STR. NO. 4 ~ STA. 407+98.17
CONST. SMD TYPE 2 &
STUB 26 L.F. 18" CGMP
INTO EXIST. INLET
TG= 770.21 OUT= 768.99
R= 5'
R= 5'
STR. NO. 5 ~ STA. 408+29.32
CONST. CONC. CAP
FOR EXIST. INLET
IN= 768.99 OUT= 768.99
4
R= 75'
5
CONST. 517.68 L.F.
CABLE BARRIER
W/ ANCHOR UNIT
DEMO STRUCTURE
AND EXTEND
R= 75'
+ 07.56
+ 61.79
+31.84
+40.58
FL= 770.21
FL= 768.99
CAP EXIST.
INLET
R= 5'
R= 5'
4
R= 75'
5
DEMO STRUCTURE
AND EXTEND
R= 75'
+ 07.56
+ 61.79
+31.84
+40.58
FL= 770.21
FL= 768.99
SHEET NO.STATE JOB NO.
PLAN SHEET
US-75 AT
WILL SAMPSON ROAD
R09
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\P
lan S
heets.dw
gM
egan
7/17/2018 9:33 A
M
OK
MU
LG
EE
C
OU
NT
Y
S
T
A
. 4
0
1
+
0
0
S
T
A
. 4
1
6
+
0
0
SEC. 1 , T-14-N, R-12-E
SEC. 1 , T-14-N, R-12-E
ST
A. 4
14
+1
1.0
0 ~
B
EG
IN
E
XC
EP
TIO
N
ST
A. 4
07
+8
2.1
1 ~
E
ND
EX
CE
PT
IO
N
SCALE: 1"=50'
EXISTING CABLE
BARRIER SYSTEM
EXISTING CABLE
BARRIER SYSTEM
TOP OF CUT
TOE OF SLOPE
470+
00
475+
00
480+
00
4
8
5
+
0
0
FL= 916.49
STR. NO. 6 ~ STA. 476+72.00
CONST. 28"X18"X170' RCPA
CROSS DRAIN W/ SCES
IN= 926.36 OUT= 916.49
FL= 926.36
(REMOVE)
(REMOVE)
(REMOVE)
R= 75'
R= 5'
R= 75'
R= 75'
R= 75'
R= 5'
6
SHEET NO.STATE JOB NO.
PLAN SHEET
US-75 AT
E0890 ROAD
R10
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\P
lan S
heets.dw
gM
egan
7/17/2018 9:33 A
M
OK
MU
LG
EE
C
OU
NT
Y
S
T
A
. 4
8
5
+
0
0
ST
A. 470+
00
SEC. 35 , T-15-N, R-12-E
SEC. 35 , T-15-N, R-12-E
ST
A. 4
72
+6
0.0
0 ~
E
ND
EX
CE
PT
IO
N
ST
A. 4
78
+0
3.0
0 ~
B
EG
IN
E
XC
EP
TIO
N
R= 75'
+03.03
R= 5'
+54.48
R= 75'
+41.10
R= 75'
+03.23
R= 75'
+40.96
R= 5'
+80.62
SCALE: 1"=50'
BM #8
MAG NAIL ON EAST SHOULDER APPROX.
2357 FEET S. OF S.H. 15
STA. 494+43.90 51.10' RT. ELEV. = 954.10'
BM #7
MAG NAIL ON EAST SHOULDER APPROX.
2806 FEET S. OF S.H. 16
STA. 489+93.70 50.50' RT. ELEV. = 956.84'
BM #9
MAG NAIL ON EAST SHOULDER APPROX.
1968 FEET S. OF S.H. 15
STA. 498+28.90 48.60' RT. ELEV. = 946.85'
EXISTING CABLE
BARRIER SYSTEM
EXISTING CABLE
BARRIER SYSTEM
TOP OF CUT
TOE OF SLOPE
TOP OF CUT
TOE OF SLOPE
485+
00
49
0+
00
49
5+
00
50
0+
00
FL= 953.10
FL= 951.95
STR. NO. 7 ~ STA. 492+75.00
CONST. 24"X150' RCP
CROSS DRAIN W/ SCES
IN
= 953.10,
OUT
= 951.95
(REMOVE)
(REMOVE)
(REMOVE)
R= 5'
R= 75'
R= 75'
R= 5'
R= 75'
R= 75'
7
SHEET NO.STATE JOB NO.
PLAN SHEET
US-75 AT
PRIVATE DRIVE
R11
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\P
lan S
heets.dw
gM
egan
7/17/2018 9:33 A
M
OK
MU
LG
EE
C
OU
NT
Y
S
TA
. 485+
00
ST
A. 5
00
+0
0
SEC. 35 , T-15-N, R-12-E
SEC. 35 , T-15-N, R-12-E
ST
A. 4
88
+2
2.0
0 ~
E
ND
EX
CE
PT
IO
N
ST
A. 4
97
+3
0.0
0 ~
B
EG
IN
E
XC
EP
TIO
N
R= 75'
+50.00
R= 75'
+02.24
R= 5'
+11.16
R= 75'
+02.15
R= 75'
+53.62
R= 5'
+41.17
SCALE: 1"=50'
BM #10
MAG NAIL ON EAST SHOULDER APPROX.
2202 FEET N. OF S.H. 75
STA. 539+77.40 52.90' RT. ELEV. = 880.53'
BM #11
MAG NAIL ON EAST SHOULDER APPROX.
2985 FEET N. OF S.H. 15
STA. 547+32.90 53.60' RT. ELEV. = 854.43'
BM #12
MAG NAIL ON EAST SHOULDER APPROX.
3453 FEET N. OF S.H. 15
STA. 552+11.60 53.10' RT. ELEV. = 837.79'
EXISTING CABLE
BARRIER SYSTEM
EXISTING CABLE
BARRIER SYSTEM
TOP OF CUT
TOE OF SLOPE
TOP OF CUT
TOE OF SLOPE
54
0+
00
545+
00
550+
00
FL= 856.43
FL= 851.50
STR. NO. 8 ~ STA. 546+50.00
CONST. 18"X200' RCP
CROSS DRAIN W/ SCES
IN= 856.43 OUT= 851.80
REMOVE EXISTING
INLET
CONSTRUCT INLET
TG=848.01
STR. NO. 9 ~ STA. 548+81.24
CONST. SMD TYPE 2 &
STUB INTO EXIST. 18" CGMP
TG= 848.01 = 844.95
(REMOVE)
(REMOVE)
(REMOVE)
R= 5' R= 5'
R= 75'
R= 75'
R= 75'
R= 75'
8
9
SHEET NO.STATE JOB NO.
PLAN SHEET
US-75 AT
HASTING ROAD
R12
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\P
lan S
heets.dw
gM
egan
7/17/2018 9:33 A
M
OK
MU
LG
EE
C
OU
NT
Y
ST
A. 5
39
+0
0
ST
A. 5
54
+0
0
SEC. 26 , T-15-N, R-12-E
SEC. 26 , T-15-N, R-12-E
ST
A. 5
41
+5
9.0
0 ~
E
ND
EX
CE
PT
IO
N
ST
A. 5
51
.1
7.0
0 ~
B
EG
IN
E
XC
EP
TIO
N
R= 75'
+36.11
R= 75'
+39.69
R= 75'
+39.42
R= 75'
+36.40
R= 5'
+98.50
R= 5'
+78.51
SCALE: 1"=50'
BM #15
MAG NAIL ON EAST SHOULDER APPROX. 87
FEET N. OF 281ST. STREET SOUTH CROSSING
STA. 578+67.90 53.40' RT. ELEV. = 852.47'
BM #16
MAG NAIL ON EAST SHOULDER APPROX. 571
FEET N. OF 281ST. STREET SOUTH CROSSING
STA. 583+78.50 53.90' RT. ELEV. = 858.52'
EXISTING CABLE
BARRIER SYSTEM
EXISTING CABLE
BARRIER SYSTEM
TOP OF CUT
TOE OF SLOPE
TOP OF CUT
TOE OF SLOPE
570+
00
575+
00
580+
00
585+
00
FL= 847.78
FL= 850.03
STR. NO. 10 ~ STA. 577+75.00
CONST. 28"X18"X150' RCPA
CROSS DRAIN W/ SCES
IN= 850.03 OUT= 847.78
(REMOVE)
(REMOVE)
R= 5'
R= 75'
R= 5'
R= 75'
R= 75'
R= 75'
10
SHEET NO.STATE JOB NO.
PLAN SHEET
US-75 AT
HARRELD ROAD
R13
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\P
lan S
heets.dw
gM
egan
7/17/2018 9:33 A
M
OK
MU
LG
EE
C
OU
NT
Y
ST
A. 585+
00
ST
A. 570+
00
SEC. 23 , T-15-N, R-12-ESEC. 12 , T-15-N, R-12-E
SEC. 26 , T-15-N, R-12-E SEC. 23 , T-15-N, R-12-E
ST
A. 57
3+
25
.0
0 ~
E
ND
EX
CE
PT
IO
N
ST
A. 58
2+
39
.0
0 ~
B
EG
IN
E
XC
EP
TIO
N
R= 75'
+58.06
R= 75'
+05.14
R= 5'
+19.00
R= 75'
+05.91
R= 75'
+57.69
R= 5'
+44.01
SCALE: 1"=50'
BM #18
MAG NAIL ON EAST SHOULDER APPROX. 2974
FEET S. OF 271ST STREET SOUTH CROSSING
STA. 599+19.10 53.10' RT. ELEV. = 834.54'
BM #19
MAG NAIL ON EAST SHOULDER APPROX. 2437
FEET S. OF 271ST STREET SOUTH CROSSING
STA. 604+38.60 52.80' RT. ELEV. = 819.25'
EXISTING CABLE
BARRIER SYSTEM
EXISTING CABLE
BARRIER SYSTEM
TOP OF CUT
TOE OF SLOPE
TOP OF CUT
TOE OF SLOPE
BM #17
MAG NAIL ON EAST SHOULDER APPROX. 1510
FEET n. OF 281ST STREET SOUTH CROSSING
STA. 593+24.40 53.80' RT. ELEV. = 851.51'
5
9
0
+
0
0
595+
00
600+
00
605+
00
FL= 839.25
FL= 835.11
STR. NO. 11 ~ STA. 597+75.00
CONST. 22"X13"X150' RCPA
CROSS DRAIN W/ SCES
IN= 839.25 OUT= 835.11
(REMOVE)
R= 5'
R= 75'
R= 5'
R= 75'
R= 75'
R= 75'
11
SHEET NO.STATE JOB NO.
PLAN SHEET
US-75 AT
276th STREET
R14
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\P
lan S
heets.dw
gM
egan
7/17/2018 9:33 A
M
OK
MU
LG
EE
C
OU
NT
Y
S
T
A
. 5
9
0
+
0
0
ST
A. 605+
00
SEC. 23 , T-15-N, R-12-E
SEC. 22 , T-15-N, R-12-E
ST
A. 5
93
+4
9.0
0 ~
E
ND
EX
CE
PT
IO
N
ST
A. 60
2+
25
.0
0 ~
B
EG
IN
E
XC
EP
TIO
N
R= 75'
+44.01
R= 5'
+07.98
R= 75'
+44.11
R= 75'
+30.31
R= 75'
+31.88
R= 5'
+67.87
SCALE: 1"=50'
BM #20
MAG NAIL ON EAST SHOULDER APPROX. 741
FEET S. OF 271ST STREET SOUTH CROSSING
STA. 621+49.00 52.60' RT. ELEV. = 784.80'
BM #21
MAG NAIL ON EAST SHOULDER APPROX. 211
FEET S. OF 271ST STREET SOUTH CROSSING
STA. 626+93.50 53.00' RT. ELEV. = 785.88'
BM #22
MAG NAIL ON EAST SHOULDER APPROX. 318
FEET N. OF 271ST STREET SOUTH CROSSING
STA. 632+30.60 52.40' RT. ELEV. = 788.13
BM #22
MAG NAIL ON EAST SHOULDER APPROX. 880
FEET N. OF 271ST STREET SOUTH CROSSING
STA. 637+90.00 52.80' RT. ELEV. = 790.29
FL= 784.30
FL= 785.00
STR. NO. 12 ~ STA. 628+75.00
CONST. 36"X22"X150' RCPA
CROSS DRAIN W/ SCES
IN= 785.00 OUT= 784.30
EXISTING CABLE
BARRIER SYSTEM
EXISTING CABLE
BARRIER SYSTEM
(REMOVE)
(REMOVE)
TOP OF CUT
TOE OF SLOPE
TOP OF CUT
TOE OF SLOPE
62
5+
00
63
0+
00
63
5+
00
R= 5'
R= 75'
R= 5'
R= 75'
R= 75'
R= 75'
12
SHEET NO.STATE JOB NO.
PLAN SHEET
US-75 AT
271st STREET
R15
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\P
lan S
heets.dw
gM
egan
7/17/2018 9:33 A
M
OK
MU
LG
EE
C
OU
NT
Y
ST
A. 6
36
+0
0
ST
A. 6
21
+0
0
SEC. 23 , T-15-N, R-12-E
SEC. 22 , T-15-N, R-12-E SEC.15 , T-15-N, R-12-E
SEC. 14 , T-15-N, R-12-E
ST
A. 6
24
+3
4.0
0 ~
E
ND
EX
CE
PT
IO
N
ST
A. 6
33
+3
9.00
~
E
ND
C
ON
ST
RU
CT
IO
N
S
TA
TE
JO
B N
O.2
89
67
(0
4)
R= 75'
+14.70
R= 5'
+16.42
R= 75'
+14.26
R= 75'
+55.29
R= 75'
+58.61
R= 5'
+56.47
RO
AD
WO
RK
1500 F
EE
T
RO
AD
WO
RK
1/2 M
ILE
RO
AD
WO
RK
1 M
ILE
750' 750' 2500' 500' 500'
RO
AD
W
OR
K
NE
XT
7.5 M
ILE
S
WO
RK
Z
ON
E
FIN
ES
D
OU
BLE
WH
EN
W
OR
KE
RS
AR
E P
RE
SE
NT
SP
EE
D
LIM
IT
55
SP
EE
D
LIM
IT
55
750' 750'
G2
0-1
A
(1
) W
20
-1
(1 M
ILE
)
(1
) W
20
-1
(1
/2 M
ILE
)
(1
) W
20
-1
(1
500 F
EE
T)
(1
) R
2-1
E(5
5)
CS
-1
6E
CS
-1
7E
CS
-1
8E
WO
RK
ZO
NE
(1
) C
S-1
3E
(1
) C
S-1
4E
BE
GIN
(1
) R
2-1
E(5
5)
RO
AD
WO
RK
1500 F
EE
T
RO
AD
WO
RK
1/2 M
ILE
RO
AD
WO
RK
1 M
ILE
750'750'2500'500'500'
RO
AD
W
OR
K
NE
XT
7.5 M
ILE
S
WO
RK
Z
ON
E
FIN
ES
D
OU
BLE
WH
EN
W
OR
KE
RS
AR
E P
RE
SE
NT
SP
EE
D
LIM
IT
55
SP
EE
D
LIM
IT
55
750'750'
G20-1A
(1) W
20-1(1 M
ILE
)
(1) W
20-1(1/2 M
ILE
)
(1) W
20-1(1500 F
EE
T)
(1) R
2-1E
(55)
CS
-16E
CS
-17E
CS
-18E
WO
RK
ZO
NE
(1) C
S-13E
(1) C
S-14E
BE
GIN
(1) R
2-1E
(55)
SHEET NO.STATE JOB NO.
T01
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\T
raffic C
ontrol S
heets.dw
gM
egan
7/17/2018 9:36 A
M
OK
MU
LG
EE
C
OU
NT
Y
CONSTRUCTION TRAFFIC CONTROL
ADVANCED WARNING SIGNS
SURVEY U.S. 75
37
5+
00
38
0+
00
38
5+
00
SCALE: 1"=50'
100' BUFFER
AREA
WORK AREA
4" YELLOW
STRIPE
660' TAPER
SU
RV
EY
U.S
. 75
390+
00
395+
00
4
0
0
+
0
0
SCALE: 1"=50'
660' T
AP
ER
100' B
UF
FE
R
AR
EA
WORK AREA
DR
UM
S @
50' S
PA
CIN
G
WORK AREA
DRUMS @ 100'
SPACING N.B. & S.B.
4" YELLOW
STRIPE
4" YELLOW
STRIPE
4" Y
ELLO
W
ST
RIP
E
4" WHITE
STRIPE
4" WHITE
STRIPE
SHEET NO.STATE JOB NO.
TRAFFIC CONTROL
SHEET 1 OF 2
T02
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\T
raffic C
ontrol S
heets.dw
gM
egan
7/17/2018 9:36 A
M
OK
MU
LG
EE
C
OU
NT
Y
ST
A. 386+
00
ST
A. 386+
00
S
T
A
. 4
0
1
+
0
0
ST
A. 374+
00
TRAFFIC CONTROL
TRAFFIC CONTROL
SEC. 12 , T-14-N, R-12-E
SEC. 12 , T-14-N, R-12-E SEC. 1 , T-14-N, R-12-E
4
0
0
+
0
0
405+
00
410+
00
4
1
5
+
0
0
SCALE: 1"=50'
WORK AREA
1
0
0
' B
U
F
F
E
R
A
R
E
A
DRUMS @ 100'
SPACING N.B. & S.B.
1
0
0
' B
U
F
F
E
R
A
R
E
A
6
0
0
' T
A
P
E
R
WORK AREA
DRUMS @ 50'
SPACING
4" YELLOW
STRIPE
4" YELLOW
STRIPE
SHEET NO.STATE JOB NO.
T03
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\T
raffic C
ontrol S
heets.dw
gM
egan
7/17/2018 9:36 A
M
OK
MU
LG
EE
C
OU
NT
Y
S
T
A
. 4
0
1
+
0
0
S
T
A
. 4
1
6
+
0
0
TRAFFIC CONTROL
TRAFFIC CONTROL
SHEET 2 OF 2
SEC. 1 , T-14-N, R-12-E
49
0+
00
49
5+
00
50
0+
00
SCALE: 1"=50'
WORK AREA
100' BUFFER
AREA
660' TAPER
DRUMS @ 50' SPACING
DRUMS @ 100' SPACING
100' BUFFER
AREA
WORK AREA
100' BUFFER
AREA
100' BUFFER
AREA660' T
AP
ER
DR
UM
S @
50' S
PA
CIN
G
DRUMS @ 100' SPACING
4" YELLOW
STRIPE
4" YELLOW
STRIPE
SHEET NO.STATE JOB NO.
T04
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\T
raffic C
ontrol S
heets.dw
gM
egan
7/17/2018 9:36 A
M
OK
MU
LG
EE
C
OU
NT
Y
MEDIAN CROSSOVER TRAFFIC CONTROL
TRAFFIC CONTROL
MEDIAN CROSSOVER
SHEET 1 OF 1
SCALE: 1"=50'
514.72 L.F. 4"
YELLOW STRIPE
624.84 L.F. 4"
WHITE STRIPE
4
0
0
+
0
0
405+
00
410+
00
4
1
5
+
0
0
CONST.
R5-1 SIGN
51.97 L.F. 4"
YELLOW STRIPE
CONST.
R5-1 SIGN
DELINEATOR
DELINEATOR
SHEET NO.STATE JOB NO.
SIGNING & STRIPING
SHEET 1 OF 4
T05
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\S
igning &
Striping S
heets.dw
gM
egan
7/17/2018 9:41 A
M
OK
MU
LG
EE
C
OU
NT
Y
S
T
A
. 4
0
1
+
0
0
SIGNING & STRIPING QUANTITIES
4" WHITE STRIPE
4" YELLOW STRIPE L.F.
624.84
566.69
L.F.
R5-1 SIGN EA. 2.00
S
T
A
. 4
1
6
+
0
0
ARROW EA. 3.00
DELINEATOR EA. 2.00
SCALE: 1"=50'
470.39 L.F. 4"
YELLOW STRIPE
466.69 L.F. 4"
YELLOW STRIPE
531.06 L.F. 4"
WHITE STRIPE
527.77 L.F. 4"
WHITE STRIPE
485+
00
490+
00
495+
00
500+
00
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
DELINEATOR
DELINEATOR
SCALE: 1"=50'
540.12 L.F. 4"
WHITE STRIPE
468.59 L.F. 4"
YELLOW STRIPE
470+
00
475+
00
480+
00
4
8
5
+
0
0
CONST. R5-1 SIGN
41.98 L.F. 4"
YELLOW STRIPE
CONST. R5-1 SIGN
DELINEATOR
DELINEATOR
SHEET NO.STATE JOB NO.
SIGNING & STRIPING
SHEET 2 OF 4
T06
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\S
igning &
Striping S
heets.dw
gM
egan
7/17/2018 9:41 A
M
OK
MU
LG
EE
C
OU
NT
Y
ST
A. 470+
00
S
T
A
. 4
8
5
+
0
0
S
TA
. 485+
00
ST
A. 5
00
+0
0
SIGNING & STRIPING QUANTITIES
4" WHITE STRIPE
4" YELLOW STRIPE L.F.
540.12
510.57
L.F.
R5-1 SIGN EA. 3.00
ARROW EA. 3.00
SIGNING & STRIPING QUANTITIES
4" WHITE STRIPE
4" YELLOW STRIPE L.F.
1058.83
937.08
L.F.
R5-1 SIGN EA. 4.00
ARROW EA. 6.00
DELINEATOR EA. 2.00
DELINEATOR EA. 2.00
SCALE: 1"=50'
576.76 L.F. 4"
WHITE STRIPE
587.30 L.F. 4"
WHITE STRIPE
466.81 L.F. 4"
YELLOW STRIPE
464.19 L.F. 4"
YELLOW STRIPE
54
0+
00
54
5+
00
55
0+
00
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
CONST.
R5-1SIGN
CONST.
R5-1 SIGN
DELINEATOR
DELINEATOR
SCALE: 1"=50'
466.83 L.F. 4"
YELLOW STRIPE
466.10 L.F. 4"
YELLOW STRIPE
546.52 L.F. 4"
WHITE STRIPE
582.26 L.F. 4"
WHITE STRIPE
570+
00
575+
00
580+
00
585+
00
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
DELINEATOR
DELINEATOR
SHEET NO.STATE JOB NO.
SIGNING & STRIPING
SHEET 3 OF 4
T07
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\S
igning &
Striping S
heets.dw
gM
egan
7/17/2018 9:41 A
M
OK
MU
LG
EE
C
OU
NT
Y
ST
A. 570+
00
ST
A. 585+
00
ST
A. 539+
00
ST
A. 554+
00
SIGNING & STRIPING QUANTITIES
4" WHITE STRIPE
4" YELLOW STRIPE L.F.
1164.06
931.00
L.F.
R5-1 SIGN EA. 4.00
ARROW EA. 6.00
SIGNING & STRIPING QUANTITIES
4" WHITE STRIPE
4" YELLOW STRIPE L.F.
1128.78
932.93
L.F.
R5-1 SIGN EA. 4.00
ARROW EA. 6.00
DELINEATOR EA. 2.00
DELINEATOR EA. 2.00
SCALE: 1"=50'
462.36 L.F. 4"
YELLOW STRIPE
461.69 L.F. 4"
YELLOW STRIPE
515.84 L.F. 4"
WHITE STRIPE
511.12 L.F. 4"
WHITE STRIPE
5
9
0
+
0
0
595+
00
600+
00
605+
00
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
DELINEATOR
DELINEATOR
SCALE: 1"=50'
521.03 L.F. 4"
WHITE STRIPE
523.89 L.F. 4"
WHITE STRIPE
471.18 L.F. 4"
YELLOW STRIPE
474.10 L.F. 4"
YELLOW STRIPE
625+
00
630+
00
635+
00
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
CONST.
R5-1 SIGN
DELINEATOR
DELINEATOR
SHEET NO.STATE JOB NO.
SIGNING & STRIPING
SHEET 4 OF 4
T08
28967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\S
igning &
Striping S
heets.dw
gM
egan
7/17/2018 9:41 A
M
OK
MU
LG
EE
C
OU
NT
Y
S
T
A
. 5
9
0
+
0
0
ST
A. 605+
00
ST
A. 6
21
+0
0
ST
A. 6
36
+0
0
SIGNING & STRIPING QUANTITIES
4" WHITE STRIPE
4" YELLOW STRIPE L.F.
1026.96
924.05
L.F.
R5-1 SIGN EA. 4.00
ARROW EA. 6.00
SIGNING & STRIPING QUANTITIES
4" WHITE STRIPE
4" YELLOW STRIPE L.F.
1044.92
945.28
L.F.
R5-1 SIGN EA. 4.00
ARROW EA. 6.00
DELINEATOR EA. 2.00
DELINEATOR EA. 2.00
STATION 407+00.00
760
770
780
790
760
770
780
790
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 407+50.00
760
770
780
790
760
770
780
790
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 408+00.00
750
760
770
780
750
760
770
780
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 408+50.00
760
770
780
790
760
770
780
790
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
EG ELEV. = 776.95
FG ELEV. = 776.95
EG ELEV. = 776.74
FG ELEV. = 776.74
EG ELEV. = 773.49
FG ELEV. = 773.49
EG ELEV. = 773.35
FG ELEV. = 773.35
XS 13
CUT VOLUME: 0
FILL VOLUME: 0
CUT VOLUME: 0
FILL VOLUME: 0
CUT VOLUME: 28
FILL VOLUME: 275
CUT VOLUME: 59
FILL VOLUME: 191
CUT AREA: 0
FILL AREA: 0
CUT AREA: 43
FILL AREA: 0
CUT AREA: 22
FILL AREA: 206
CUT AREA: 0
FILL AREA: 0
STATION 406+75.00
765
770
780
790
765
770
780
790
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
EG ELEV. = 778.12
FG ELEV. = 778.12
EXISTING OHE
STA. 408+57.87
OHE
CUT VOLUME: 0
FILL VOLUME: 0
CUT AREA: 0
FILL AREA: 0
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
R/W
R/W
R/W
R/W
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
759.35
773.98
STR. NO. 4 ~ STA. 407+98.17
CONST. SMD TYPE 2 &
STUB 26 L.F. 18" CGMP
INTO EXIST. INLET
TG= 770.21 OUT= 768.99
STR. NO. 5 ~ STA. 408+29.32
CONST. CONC CAP
FOR EXIST. INLET
IN= 768.99 OUT= 768.99
SHEET NO.STATE JOB NO.
X0128967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
150140130120110100908070605040302010150 140 130 120 110 100 90 80 70 60 50 40 30 20 10
150140130120110100908070605040302010150 140 130 120 110 100 90 80 70 60 50 40 30 20 10
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'
STATION 409+00.00
760
770
780
790
760
770
780
790
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 409+50.00
760
770
780
790
760
770
780
790
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 410+00.00
760
770
780
790
760
770
780
790
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 410+50.00
760
770
780
790
760
770
780
790
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 408+83.73
760
770
780
790
760
770
780
790
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
EG ELEV. = 772.19
FG ELEV. = 772.19
EG ELEV. = 771.68
FG ELEV. = 771.68
EG ELEV. = 770.67
FG ELEV. = 770.67
EG ELEV. = 769.39
FG ELEV. = 769.39
EG ELEV. = 767.93
FG ELEV. = 767.93
XS 14
CUT VOLUME: 54
FILL VOLUME: 0
CUT VOLUME: 26
FILL VOLUME: 0
CUT VOLUME: 79
FILL VOLUME: 0
CUT VOLUME: 73
FILL VOLUME: 0
CUT VOLUME: 49
FILL VOLUME: 0
CUT AREA: 42
FILL AREA: 0
CUT AREA: 44
FILL AREA: 0
CUT AREA: 19
FILL AREA: 0
CUT AREA: 35
FILL AREA: 0
CUT AREA: 44
FILL AREA: 0
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
769.29
768.43
767.59
SHEET NO.STATE JOB NO.
X0228967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
150140130120110100908070605040302010150 140 130 120 110 100 90 80 70 60 50 40 30 20 10
150140130120110100908070605040302010150 140 130 120 110 100 90 80 70 60 50 40 30 20 10
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'
STATION 411+00.00
750
760
770
780
750
760
770
780
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 411+50.00
750
760
770
780
750
760
770
780
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 412+00.00
750
760
770
780
750
760
770
780
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 412+50.00
750
760
770
780
750
760
770
780
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/WPRES. R/W
STATION 413+00.00
750
760
770
780
750
760
770
780
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/WPRES. R/W
EG ELEV. = 766.52
FG ELEV. = 766.52
EG ELEV. = 765.94
FG ELEV. = 765.94
EG ELEV. = 766.17
FG ELEV. = 766.17
EG ELEV. = 766.28
FG ELEV. = 766.28
EG ELEV. = 766.65
FG ELEV. = 766.65
XS 15
CUT VOLUME: 31
FILL VOLUME: 2
CUT VOLUME: 26
FILL VOLUME: 7
CUT VOLUME: 28
FILL VOLUME: 5
CUT VOLUME: 32
FILL VOLUME: 0
CUT VOLUME: 32
FILL VOLUME: 0
CUT AREA: 13
FILL AREA: 6
CUT AREA: 16
FILL AREA: 2
CUT AREA: 17
FILL AREA: 0
CUT AREA: 18
FILL AREA: 0
CUT AREA: 17
FILL AREA: 1
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
766.54
765.64
766.17
766.53
766.68
SHEET NO.STATE JOB NO.
X0328967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
150140130120110100908070605040302010150 140 130 120 110 100 90 80 70 60 50 40 30 20 10
150140130120110100908070605040302010150 140 130 120 110 100 90 80 70 60 50 40 30 20 10
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'
STATION 413+50.00
750
760
770
780
750
760
770
780
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 414+00.00
750
760
770
780
750
760
770
780
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 414+50.00
760
770
780
790
760
770
780
790
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
STATION 415+00.00
760
770
780
790
760
770
780
790
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
PRES. R/W
PRES. R/W
EG ELEV. = 767.01
FG ELEV. = 767.01
EG ELEV. = 767.53
FG ELEV. = 767.53
EG ELEV. = 767.66
FG ELEV. = 767.66
EG ELEV. = 769.05
FG ELEV. = 769.05
CUT VOLUME: 29
FILL VOLUME: 0
CUT VOLUME: 31
FILL VOLUME: 0
CUT VOLUME: 0
FILL VOLUME: 0
CUT VOLUME: 0
FILL VOLUME: 0
CUT AREA: 19
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 15
FILL AREA: 0
XS 16
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
767.16
767.16
SHEET NO.STATE JOB NO.
X0428967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
150140130120110100908070605040302010150 140 130 120 110 100 90 80 70 60 50 40 30 20 10
110100908070605040302010150 140 130 120 110 100 90 80 70 60 50 40 30 20 10
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'
STATION 472+00.00
890
900
910
920
890
900
910
920
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 472+50.00
890
900
910
920
890
900
910
920
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 473+00.00
890
900
910
920
890
900
910
920
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 473+50.00
890
900
910
920
890
900
910
920
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 474+00.00
900
910
920
930
900
910
920
930
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 474+50.00
900
910
920
930
900
910
920
930
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 475+00.00
900
910
920
930
900
910
920
930
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 475+50.00
900
910
920
930
900
910
920
930
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 476+00.00
900
910
920
930
900
910
920
930
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 476+50.00
910
920
930
940
910
920
930
940
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 903.61
FG ELEV. = 903.61
EG ELEV. = 905.69
FG ELEV. = 905.69
EG ELEV. = 907.77
FG ELEV. = 907.77
EG ELEV. = 909.85
FG ELEV. = 909.85
EG ELEV. = 911.93
FG ELEV. = 911.93
EG ELEV. = 913.98
FG ELEV. = 913.98
EG ELEV. = 916.01
FG ELEV. = 916.01
EG ELEV. = 918.07
FG ELEV. = 918.07
EG ELEV. = 919.96
FG ELEV. = 919.96
EG ELEV. = 921.81
FG ELEV. = 921.81
XS 17
CUT VOLUME: 0
FILL VOLUME: 0
CUT VOLUME: 0
FILL VOLUME: 0
CUT VOLUME: 16
FILL VOLUME: 0
CUT VOLUME: 33
FILL VOLUME: 0
CUT VOLUME: 37
FILL VOLUME: 0
CUT VOLUME: 42
FILL VOLUME: 0
CUT VOLUME: 45
FILL VOLUME: 0
CUT VOLUME: 45
FILL VOLUME: 0
CUT VOLUME: 39
FILL VOLUME: 1
CUT VOLUME: 33
FILL VOLUME: 2
CUT AREA: 22
FILL AREA: 0
CUT AREA: 19
FILL AREA: 0
CUT AREA: 17
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 18
FILL AREA: 2
CUT AREA: 18
FILL AREA: 1
CUT AREA: 24
FILL AREA: 0
CUT AREA: 24
FILL AREA: 0
CUT AREA:246
FILL AREA: 0
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
911.34
909.43
907.52
913.35
915.42
917.53
919.75
922.01
SHEET NO.STATE JOB NO.
X0528967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'SCALE: 1"=10'
STATION 477+50.00
910
920
930
940
910
920
930
940
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 478+00.00
910
920
930
940
910
920
930
940
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 477+00.00
910
920
930
940
910
920
930
940
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 923.53
FG ELEV. = 923.53
EG ELEV. = 928.01
FG ELEV. = 928.01
EG ELEV. = 928.71
FG ELEV. = 928.71
XS 18
CUT VOLUME: 44
FILL VOLUME: 5
CUT VOLUME: 28
FILL VOLUME: 3
CUT VOLUME: 0
FILL VOLUME: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 30
FILL AREA: 4
CUBIC YARDS
CUBIC YARDS
CUBIC YARDSSQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
STR. NO. 6 ~ STA. 476+72.00
CONST. 28"X18"x170' RCPA
CROSS DRAIN W/ SCES
IN
= 926.39,
OUT
= 916.49
SHEET NO.STATE JOB NO.
X0628967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'
6.9
2%
-0.95%
STATION 488+50.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 489+00.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 489+50.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 490+00.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 490+50.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 491+00.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 491+50.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 492+00.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 492+50.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 488+00.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 955.73
FG ELEV. = 955.73
EG ELEV. = 956.03
FG ELEV. = 956.03
EG ELEV. = 956.28
FG ELEV. = 956.28
EG ELEV. = 956.47
FG ELEV. = 956.47
EG ELEV. = 956.64
FG ELEV. = 956.64
EG ELEV. = 956.49
FG ELEV. = 956.49
EG ELEV. = 956.38
FG ELEV. = 956.38
EG ELEV. = 955.91
FG ELEV. = 955.91
EG ELEV. = 957.23
FG ELEV. = 957.23
EG ELEV. = 955.73
FG ELEV. = 955.73
XS 19
CUT VOLUME: 0
FILL VOLUME: 0
CUT VOLUME: 15
FILL VOLUME: 0
CUT VOLUME: 30
FILL VOLUME: 0
CUT VOLUME: 32
FILL VOLUME: 0
CUT VOLUME: 39
FILL VOLUME: 0
CUT VOLUME: 44
FILL VOLUME: 0
CUT VOLUME: 43
FILL VOLUME: 0
CUT VOLUME: 40
FILL VOLUME: 0
CUT VOLUME: 71
FILL VOLUME: 0
CUT VOLUME: 72
FILL VOLUME: 2
CUT AREA: 24
FILL AREA: 0
CUT AREA: 18
FILL AREA: 0
CUT AREA: 17
FILL AREA: 0
CUT AREA: 16
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 22
FILL AREA: 2
CUT AREA: 56
FILL AREA: 0
CUT AREA: 21
FILL AREA: 0
CUT AREA: 23
FILL AREA: 0
CUT AREA: 24
FILL AREA: 0
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDSSQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
APPROX. LOC. EXIST.
TUG LINE
STA. 492+30
955.70
955.80
955.73
955.65
955.61
955.54
955.37
955.18
SHEET NO.STATE JOB NO.
X0728967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'SCALE: 1"=10'
5.30%
1.63%
2.75%
4.48%
STATION 493+00.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 493+50.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 494+00.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 494+50.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 495+00.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 495+50.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 496+00.00
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 496+50.00
930
940
950
960
930
940
950
960
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 497+00.00
930
940
950
960
930
940
950
960
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 492+72.69
940
950
960
970
940
950
960
970
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 956.57
FG ELEV. = 956.57
EG ELEV. = 956.34
FG ELEV. = 956.34
EG ELEV. = 955.48
FG ELEV. = 955.48
EG ELEV. = 953.81
FG ELEV. = 953.81
EG ELEV. = 953.16
FG ELEV. = 953.16
EG ELEV. = 952.34
FG ELEV. = 952.34
EG ELEV. = 951.51
FG ELEV. = 951.51
EG ELEV. = 950.74
FG ELEV. = 950.74
EG ELEV. = 949.72
FG ELEV. = 949.72
EG ELEV. = 948.70
FG ELEV. = 948.70
XS 20
CUT VOLUME: 24
FILL VOLUME: 1
CUT VOLUME: 36
FILL VOLUME: 2
CUT VOLUME: 56
FILL VOLUME: 3
CUT VOLUME: 30
FILL VOLUME: 2
CUT VOLUME: 17
FILL VOLUME: 3
CUT VOLUME: 19
FILL VOLUME: 1
CUT VOLUME: 20
FILL VOLUME: 1
CUT VOLUME: 22
FILL VOLUME: 1
CUT VOLUME: 26
FILL VOLUME: 0
CUT VOLUME: 27
FILL VOLUME: 0
CUT AREA: 10
FILL AREA: 1
CUT AREA: 9
FILL AREA: 3
CUT AREA: 24
FILL AREA: 0
CUT AREA: 37
FILL AREA: 4
CUT AREA: 34
FILL AREA: 0
CUT AREA: 15
FILL AREA: 0
CUT AREA: 15
FILL AREA: 0
CUT AREA: 13
FILL AREA: 0
CUT AREA: 12
FILL AREA: 1
CUT AREA: 11
FILL AREA: 1
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDSSQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
953.81
953.80
953.22
952.44
951.55
950.62
949.55
948.50
STR. NO. 7 ~ STA. 492+75.00
CONST. 24"X150' RCP
CROSS DRAIN W/ SCES
IN
= 853.10,
OUT
= 851.95
SHEET NO.STATE JOB NO.
X0828967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'SCALE: 1"=10'
STATION 497+50.00
930
940
950
960
930
940
950
960
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 498+00.00
930
940
950
960
930
940
950
960
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 947.69
FG ELEV. = 947.69
EG ELEV. = 946.76
FG ELEV. = 946.76
XS 21
CUT VOLUME: 14
FILL VOLUME: 0
CUT VOLUME: 0
FILL VOLUME: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
EXISTING OHE
STA. 498+17.53
OHE
CUBIC YARDS
CUBIC YARDS
SQUARE FEET
SQUARE FEET
SHEET NO.STATE JOB NO.
X0928967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'
STATION 541+50.00
860
870
880
890
860
870
880
890
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 542+00.00
860
870
880
890
860
870
880
890
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 542+50.00
850
860
870
880
850
860
870
880
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 543+00.00
850
860
870
880
850
860
870
880
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 543+50.00
850
860
870
880
850
860
870
880
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 544+00.00
850
860
870
880
850
860
870
880
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 544+50.00
850
860
870
880
850
860
870
880
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 545+00.00
850
860
870
880
850
860
870
880
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 545+50.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 541+00.00
860
870
880
890
860
870
880
890
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 875.58
FG ELEV. = 875.58
EG ELEV. = 873.88
FG ELEV. = 873.88
EG ELEV. = 872.21
FG ELEV. = 872.21
EG ELEV. = 870.47
FG ELEV. = 870.47
EG ELEV. = 868.69
FG ELEV. = 868.69
EG ELEV. = 866.97
FG ELEV. = 866.97
EG ELEV. = 865.28
FG ELEV. = 865.28
EG ELEV. = 863.58
FG ELEV. = 863.58
EG ELEV. = 861.88
FG ELEV. = 861.88
EG ELEV. = 859.94
FG ELEV. = 859.94
XS 22
CUT VOLUME: 0
FILL VOLUME: 0
CUT VOLUME: 0
FILL VOLUME: 0
CUT VOLUME: 12
FILL VOLUME: 0
CUT VOLUME: 24
FILL VOLUME: 0
CUT VOLUME: 25
FILL VOLUME: 0
CUT VOLUME: 28
FILL VOLUME: 0
CUT VOLUME: 31
FILL VOLUME: 0
CUT VOLUME: 32
FILL VOLUME: 0
CUT VOLUME: 30
FILL VOLUME: 0
CUT VOLUME: 42
FILL VOLUME: 1
CUT AREA: 14
FILL AREA: 0
CUT AREA: 13
FILL AREA: 0
CUT AREA: 13
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 30
FILL AREA: 1
CUT AREA: 16
FILL AREA: 0
CUT AREA: 17
FILL AREA: 0
CUT AREA: 18
FILL AREA: 0
CUT AREA: 16
FILL AREA: 0
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDSSQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
871.93
870.13
868.35
859.70
861.48
863.15
864.83
866.56
SHEET NO.STATE JOB NO.
X1028967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'SCALE: 1"=10'
STATION 546+00.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 546+50.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 547+00.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 547+50.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 548+00.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 548+50.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 549+00.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 549+50.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 550+00.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 546+62.37
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 857.86
FG ELEV. = 857.86
EG ELEV. = 857.95
FG ELEV. = 857.95
EG ELEV. = 857.52
FG ELEV. = 857.52
EG ELEV. = 852.71
FG ELEV. = 852.71
EG ELEV. = 851.34
FG ELEV. = 851.34
EG ELEV. = 849.96
FG ELEV. = 849.96
EG ELEV. = 848.73
FG ELEV. = 848.73
EG ELEV. = 846.92
FG ELEV. = 846.92
EG ELEV. = 844.59
FG ELEV. = 844.59
XS 23
EG ELEV. = 855.86
FG ELEV. = 855.86
CUT VOLUME: 43
FILL VOLUME: 14
CUT VOLUME: 52
FILL VOLUME: 14
CUT VOLUME: 19
FILL VOLUME: 0
CUT VOLUME: 47
FILL VOLUME: 2
CUT VOLUME: 37
FILL VOLUME: 12
CUT VOLUME: 22
FILL VOLUME: 16
CUT VOLUME: 22
FILL VOLUME: 8
CUT VOLUME: 30
FILL VOLUME: 2
CUT VOLUME: 33
FILL VOLUME: 0
CUT VOLUME: 22
FILL VOLUME: 1
CUT AREA: 13
FILL AREA: 11
CUT AREA: 28
FILL AREA: 3
CUT AREA: 40
FILL AREA: 0
CUT AREA: 40
FILL AREA: 0
CUT AREA: 18
FILL AREA: 15
CUT AREA: 9
FILL AREA: 1
CUT AREA: 16
FILL AREA: 0
CUT AREA: 20
FILL AREA: 0
CUT AREA: 13
FILL AREA: 2
CUT AREA: 12
FILL AREA: 6
PROPOSED 18" RCP
STORM SEWER
EXISTING OHE
STA. 546+53.09
OHE
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDSSQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
852.84
851.37
849.93
848.14
846.36
844.43
STR. NO. 8 ~ STA. 546+50.00
CONST. 18"X200' RCP
CROSS DRAIN W/ SCES
IN
= 856.43,
OUT
= 851.80
STR. NO. 9 ~ STA. 548+81.24
CONST. SMD TYPE 2 &
STUB INTO EXIST. 18" CGMP
TG= 848.01 = 844.95
SHEET NO.STATE JOB NO.
X1128967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'SCALE: 1"=10'
STATION 550+50.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 551+00.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 551+50.00
820
830
840
850
820
830
840
850
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 552+00.00
820
830
840
850
820
830
840
850
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 842.72
FG ELEV. = 842.72
EG ELEV. = 840.90
FG ELEV. = 840.90
EG ELEV. = 839.18
FG ELEV. = 839.18
EG ELEV. = 837.46
FG ELEV. = 837.46
XS 24
CUT VOLUME: 15
FILL VOLUME: 1
CUT VOLUME: 16
FILL VOLUME: 1
CUT VOLUME: 8
FILL VOLUME: 0
CUT VOLUME: 0
FILL VOLUME: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 9
FILL AREA: 0
CUT AREA: 9
FILL AREA: 1
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
842.75
840.72
SHEET NO.STATE JOB NO.
X1228967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'
STATION 573+50.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 574+00.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 574+50.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 575+00.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 575+50.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 576+00.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 576+50.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 577+00.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 577+50.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 573+00.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
XS 25
EG ELEV. = 845.42
FG ELEV. = 845.42
EG ELEV. = 846.08
FG ELEV. = 846.08
EG ELEV. = 846.65
FG ELEV. = 846.65
EG ELEV. = 847.15
FG ELEV. = 847.15
EG ELEV. = 847.65
FG ELEV. = 847.65
EG ELEV. = 848.05
FG ELEV. = 848.05
EG ELEV. = 848.56
FG ELEV. = 848.56
EG ELEV. = 849.04
FG ELEV. = 849.04
EG ELEV. = 849.45
FG ELEV. = 849.45
EG ELEV. = 849.10
FG ELEV. = 849.10
CUT VOLUME: 0
FILL VOLUME: 0
CUT VOLUME: 17
FILL VOLUME: 0
CUT VOLUME: 33
FILL VOLUME: 0
CUT VOLUME: 33
FILL VOLUME: 0
CUT VOLUME: 36
FILL VOLUME: 0
CUT VOLUME: 41
FILL VOLUME: 0
CUT VOLUME: 44
FILL VOLUME: 0
CUT VOLUME: 41
FILL VOLUME: 0
CUT VOLUME: 57
FILL VOLUME: 0
CUT VOLUME: 64
FILL VOLUME: 5
CUT AREA: 21
FILL AREA: 0
CUT AREA: 18
FILL AREA: 0
CUT AREA: 18
FILL AREA: 0
CUT AREA: 18
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 28
FILL AREA: 5
CUT AREA: 42
FILL AREA: 0
CUT AREA: 20
FILL AREA: 0
CUT AREA: 25
FILL AREA: 0
CUT AREA: 24
FILL AREA: 0
EXISTING OHE
STA. 575+45.52
OHE
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDSSQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
845.28
845.87
846.48
846.96
847.16
847.55
848.84
847.74
SHEET NO.STATE JOB NO.
X1328967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'SCALE: 1"=10'
STATION 578+00.00
830
840
850
860
870
830
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 578+50.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 579+00.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 579+50.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 580+00.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 580+50.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 581+00.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 581+50.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 582+00.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 577+78.01
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
XS 26
EG ELEV. = 851.60
FG ELEV. = 851.60
EG ELEV. = 851.58
FG ELEV. = 851.58
EG ELEV. = 851.64
FG ELEV. = 851.64
EG ELEV. = 852.43
FG ELEV. = 852.43
EG ELEV. = 852.98
FG ELEV. = 852.98
EG ELEV. = 853.57
FG ELEV. = 853.57
EG ELEV. = 854.14
FG ELEV. = 854.14
EG ELEV. = 854.72
FG ELEV. = 854.72
EG ELEV. = 855.37
FG ELEV. = 855.37
EG ELEV. = 856.01
FG ELEV. = 856.01
CUT VOLUME: 33
FILL VOLUME: 83
CUT VOLUME: 27
FILL VOLUME: 0
CUT VOLUME: 59
FILL VOLUME: 0
CUT VOLUME: 48
FILL VOLUME: 0
CUT VOLUME: 31
FILL VOLUME: 0
CUT VOLUME: 31
FILL VOLUME: 0
CUT VOLUME: 32
FILL VOLUME: 0
CUT VOLUME: 32
FILL VOLUME: 0
CUT VOLUME: 31
FILL VOLUME: 0
CUT VOLUME: 30
FILL VOLUME: 0
CUT AREA: 17
FILL AREA: 0
CUT AREA: 18
FILL AREA: 0
CUT AREA: 34
FILL AREA: 0
CUT AREA: 30
FILL AREA: 0
CUT AREA: 36
FILL AREA: 0
CUT AREA: 17
FILL AREA: 0
CUT AREA: 18
FILL AREA: 0
CUT AREA: 17
FILL AREA: 0
CUT AREA: 17
FILL AREA: 0
CUT AREA: 16
FILL AREA: 0
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDSSQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
850.15
852.30
852.89
853.31
853.84
854.48
855.23
855.92
STR. NO. 10 ~ STA. 577+75.00
CONST. 28"X18"X150' RCPA
CROSS DRAIN W/ SCES
IN
= 850.03,
OUT
= 847.78
SHEET NO.STATE JOB NO.
X1428967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'SCALE: 1"=10'
STATION 582+50.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 583+00.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
XS 27
EG ELEV. = 856.48
FG ELEV. = 856.48
EG ELEV. = 856.85
FG ELEV. = 856.85
CUT VOLUME: 15
FILL VOLUME: 0
CUT VOLUME: 0
FILL VOLUME: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUBIC YARDS
CUBIC YARDS
SQUARE FEET
SQUARE FEET
SHEET NO.STATE JOB NO.
X1528967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'
STATION 593+50.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 594+00.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 594+50.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 595+00.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 595+50.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 596+00.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 596+50.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 597+00.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 597+50.00
830
840
850
860
830
840
850
860
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 593+00.00
840
850
860
870
840
850
860
870
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 851.93
FG ELEV. = 851.93
EG ELEV. = 850.60
FG ELEV. = 850.60
EG ELEV. = 849.18
FG ELEV. = 849.18
EG ELEV. = 847.85
FG ELEV. = 847.85
EG ELEV. = 846.49
FG ELEV. = 846.49
EG ELEV. = 845.21
FG ELEV. = 845.21
EG ELEV. = 843.84
FG ELEV. = 843.84
EG ELEV. = 842.44
FG ELEV. = 842.44
EG ELEV. = 840.81
FG ELEV. = 840.81
EG ELEV. = 838.69
FG ELEV. = 838.69
XS 28
CUT VOLUME: 0
FILL VOLUME: 0
CUT VOLUME: 15
FILL VOLUME: 0
CUT VOLUME: 28
FILL VOLUME: 0
CUT VOLUME: 28
FILL VOLUME: 0
CUT VOLUME: 32
FILL VOLUME: 0
CUT VOLUME: 37
FILL VOLUME: 0
CUT VOLUME: 40
FILL VOLUME: 0
CUT VOLUME: 40
FILL VOLUME: 0
CUT VOLUME: 49
FILL VOLUME: 0
CUT VOLUME: 47
FILL VOLUME: 7
CUT AREA: 18
FILL AREA: 0
CUT AREA: 16
FILL AREA: 0
CUT AREA: 15
FILL AREA: 0
CUT AREA: 16
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 19
FILL AREA: 8
CUT AREA: 32
FILL AREA: 0
CUT AREA: 22
FILL AREA: 0
CUT AREA: 22
FILL AREA: 0
CUT AREA: 22
FILL AREA: 0
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDSSQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
850.40
849.09
847.65
846.17
844.65
843.15
841.73
840.06
SHEET NO.STATE JOB NO.
X1628967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'SCALE: 1"=10'
STATION 598+00.00
820
830
840
850
820
830
840
850
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 598+50.00
820
830
840
850
820
830
840
850
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 599+00.00
820
830
840
850
820
830
840
850
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 599+50.00
820
830
840
850
820
830
840
850
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 600+00.00
820
830
840
850
820
830
840
850
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 600+50.00
820
830
840
850
820
830
840
850
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 601+00.00
810
820
830
840
810
820
830
840
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 601+50.00
810
820
830
840
810
820
830
840
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 602+00.00
810
820
830
840
810
820
830
840
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 597+82.68
820
830
840
850
820
830
840
850
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 839.49
FG ELEV. = 839.49
EG ELEV. = 839.00
FG ELEV. = 839.00
EG ELEV. = 836.25
FG ELEV. = 836.25
EG ELEV. = 835.43
FG ELEV. = 835.43
EG ELEV. = 834.15
FG ELEV. = 834.15
EG ELEV. = 832.60
FG ELEV. = 832.60
EG ELEV. = 830.98
FG ELEV. = 830.98
EG ELEV. = 829.29
FG ELEV. = 829.29
EG ELEV. = 827.75
FG ELEV. = 827.75
EG ELEV. = 826.27
FG ELEV. = 826.27
XS 29
CUT VOLUME: 34
FILL VOLUME: 5
CUT VOLUME: 22
FILL VOLUME: 0
CUT VOLUME: 56
FILL VOLUME: 4
CUT VOLUME: 49
FILL VOLUME: 8
CUT VOLUME: 37
FILL VOLUME: 7
CUT VOLUME: 30
FILL VOLUME: 6
CUT VOLUME: 30
FILL VOLUME: 6
CUT VOLUME: 29
FILL VOLUME: 5
CUT VOLUME: 27
FILL VOLUME: 2
CUT VOLUME: 24
FILL VOLUME: 0
CUT AREA: 17
FILL AREA: 3
CUT AREA: 24
FILL AREA: 4
CUT AREA: 29
FILL AREA: 5
CUT AREA: 32
FILL AREA: 0
CUT AREA: 36
FILL AREA: 0
CUT AREA: 12
FILL AREA: 0
CUT AREA: 14
FILL AREA: 0
CUT AREA: 16
FILL AREA: 3
CUT AREA: 16
FILL AREA: 3
CUT AREA: 16
FILL AREA: 3
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDSSQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
835.30
834.72
833.60
832.16
830.66
828.97
828.38
826.96
STR. NO. 11 ~ STA. 597+75.00
CONST. 22"X13"X150' RCPA
CROSS DRAIN W/ SCES
IN
= 839.25,
OUT
= 835.11
SHEET NO.STATE JOB NO.
X1728967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'SCALE: 1"=10'
STATION 602+50.00
810
820
830
840
810
820
830
840
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 603+00.00
810
820
830
840
810
820
830
840
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 824.79
FG ELEV. = 824.79
EG ELEV. = 823.31
FG ELEV. = 823.31
XS 30
CUT VOLUME: 11
FILL VOLUME: 0
CUT VOLUME: 0
FILL VOLUME: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUBIC YARDS
CUBIC YARDS
SQUARE FEET
SQUARE FEET
SHEET NO.STATE JOB NO.
X1828967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'
STATION 624+50.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 625+00.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 625+50.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 626+00.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 626+50.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 627+00.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 627+50.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 628+00.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 628+50.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 624+00.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 784.17
FG ELEV. = 784.17
EG ELEV. = 784.31
FG ELEV. = 784.31
EG ELEV. = 784.43
FG ELEV. = 784.43
EG ELEV. = 784.48
FG ELEV. = 784.48
EG ELEV. = 784.49
FG ELEV. = 784.49
EG ELEV. = 784.54
FG ELEV. = 784.54
EG ELEV. = 784.59
FG ELEV. = 784.59
EG ELEV. = 784.63
FG ELEV. = 784.63
EG ELEV. = 784.55
FG ELEV. = 784.55
EG ELEV. = 784.78
FG ELEV. = 784.78
XS 31
CUT VOLUME: 0
FILL VOLUME: 0
CUT VOLUME: 19
FILL VOLUME: 0
CUT VOLUME: 37
FILL VOLUME: 0
CUT VOLUME: 39
FILL VOLUME: 0
CUT VOLUME: 42
FILL VOLUME: 0
CUT VOLUME: 43
FILL VOLUME: 0
CUT VOLUME: 45
FILL VOLUME: 0
CUT VOLUME: 47
FILL VOLUME: 0
CUT VOLUME: 35
FILL VOLUME: 32
CUT VOLUME: 31
FILL VOLUME: 51
CUT AREA: 23
FILL AREA: 0
CUT AREA: 23
FILL AREA: 0
CUT AREA: 20
FILL AREA: 0
CUT AREA: 20
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 21
FILL AREA: 21
CUT AREA: 12
FILL AREA: 35
CUT AREA: 26
FILL AREA: 0
CUT AREA: 25
FILL AREA: 0
CUT AREA: 24
FILL AREA: 0
EXISTING OHE
STA. 626+61.01
OHE
EXISTING OHE
STA. 626+44.20
OHE
EXISTING OHE
STA. 626+76.07
APPROX. LOC. EXIST.
WATER LINE
STA. 626+44.20
APPROX. LOC. EXIST.
GAS LINE
STA. 626+44.20
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDSSQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
APPROX. LOC. EXIST.
TUG LINE
STA. 627+50
784.20
784.28
784.38
784.43
784.48
784.49
784.48
785.94
OHE
-3.66%
4.79%
SHEET NO.STATE JOB NO.
X1928967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'SCALE: 1"=10'
STATION 629+00.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 629+50.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 630+00.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 630+50.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 631+00.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 631+50.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 632+00.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 632+50.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 633+00.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 628+88.59
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 787.22
FG ELEV. = 787.22
EG ELEV. = 787.27
FG ELEV. = 787.27
EG ELEV. = 784.48
FG ELEV. = 784.48
EG ELEV. = 785.12
FG ELEV. = 785.12
EG ELEV. = 785.58
FG ELEV. = 785.58
EG ELEV. = 786.06
FG ELEV. = 786.06
EG ELEV. = 786.37
FG ELEV. = 786.37
EG ELEV. = 786.67
FG ELEV. = 786.67
EG ELEV. = 786.97
FG ELEV. = 786.97
EG ELEV. = 787.30
FG ELEV. = 787.30
XS 32
CUT VOLUME: 32
FILL VOLUME: 16
CUT VOLUME: 10
FILL VOLUME: 1
CUT VOLUME: 32
FILL VOLUME: 24
CUT VOLUME: 23
FILL VOLUME: 30
CUT VOLUME: 22
FILL VOLUME: 15
CUT VOLUME: 18
FILL VOLUME: 11
CUT VOLUME: 18
FILL VOLUME: 6
CUT VOLUME: 19
FILL VOLUME: 3
CUT VOLUME: 21
FILL VOLUME: 1
CUT VOLUME: 22
FILL VOLUME: 0
CUT AREA: 11
FILL AREA: 18
CUT AREA: 14
FILL AREA: 8
CUT AREA: 12
FILL AREA: 25
CUT AREA: 23
FILL AREA: 2
CUT AREA: 24
FILL AREA: 1
CUT AREA: 13
FILL AREA: 0
CUT AREA: 12
FILL AREA: 0
CUT AREA: 11
FILL AREA: 1
CUT AREA: 11
FILL AREA: 3
CUT AREA: 10
FILL AREA: 4
EXISTING OHE
STA. 630+68.84
WATER
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDS
CUBIC YARDSSQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
SQUARE FEET
786.43
785.82
786.00
786.24
786.49
786.71
787.20
787.34
6.9
8%
-4.7
7%
7.4
6%
-4.6
0%
STR. NO. 12 ~ STA. 628+75.00
CONST. 36"X22"X150' RCPA
CROSS DRAIN W/ SCES
IN
= 785.00,
OUT
= 784.30
SHEET NO.STATE JOB NO.
X2028967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'SCALE: 1"=10'
STATION 633+50.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
STATION 634+00.00
770
780
790
800
770
780
790
800
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
EG ELEV. = 787.52
FG ELEV. = 787.52
EG ELEV. = 787.77
FG ELEV. = 787.77
XS 33
CUT VOLUME: 12
FILL VOLUME: 0
CUT VOLUME: 0
FILL VOLUME: 0
CUT AREA: 0
FILL AREA: 0
CUT AREA: 0
FILL AREA: 0
CUBIC YARDS
CUBIC YARDSSQUARE FEET
SQUARE FEET
SHEET NO.STATE JOB NO.
X2128967(04)
U.S
. H
IG
HW
AY
75
U:\P
rojects\198 ~
O
DO
T - E
C-1465 U
S-75 S
afety Im
provem
ents in O
km
ulgee C
ounty\D
WG
\C
ross S
ection S
heets.dw
gM
egan
7/17/2018 9:39 A
M
OK
MU
LG
EE
C
OU
NT
Y
SCALE: 1"=10'