Energizing the Waste: Baku Waste to Energy Plan Presenter : Oktay Mammadov, Head of Project Management and PR Department, «Tamiz Shahar» JSC Event: Asia Clean Energy Forum 2012 Date: June 4-8, 2012 Venue: Manila, Philippines «Tamiz Shahar» Joint Stock Company

Upload: asia-clean-energy-forum

Post on 05-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 1/10

Energizing the Waste:Baku Waste to Energy Plan 

Presenter: Oktay Mammadov,

Head of Project Management and PR Department, «Tamiz Shahar» JSC

Event: Asia Clean Energy Forum 2012

Date: June 4-8, 2012

Venue: Manila, Philippines 

«Tamiz Shahar»

Joint Stock Company

Page 2: Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 2/10

Baku city and waste management

Location:

Caspian Sea

Territory:

2 130 km2

Population:

2.5-3 mln 

Commercial, cultural and scientific centre in the Caucasus

The municipal solid waste per capita is about 350 kg per annum.

The main reason is increase of welfare and consumption basket 

Page 3: Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 3/10

Solution: establishment of «Tamiz Shahar» JSC

To improve the ecological situation in the city;

To build and manage solid municipal waste placement and disposal in

accordance with up-to-date standards;

To develop this area by stages based on the principles of market

economy in the future.

Page 4: Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 4/10

Solid Municipal Waste: 500 000 tons/year;

Clinical waste: 10 000 tons/year;

Ministry of Economic Developmentof Azerbaijan Republic

Key step – Baku Waste-to-Energy Plant

cofinanced by I slamic Development Bank  and Azerbaijan Government 

Page 5: Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 5/10

Waste-to-Energy Plant (2009-2012)

2009

2010 

2011 

2012  Electric energy generation: 231,5 million kW-h/year;

Plant construction period: 40 months;

Completion of works: end of 2012

Page 6: Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 6/10

Waste-to-Energy Plant

Technology applied: 4th Generation

Waste bunker 

Boiler 

Flue gas treatment 

Heating system Control panel 

Page 7: Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 7/10

 

Technology used

The success of Waste to Energy plants depends on several

parameters like the characteristics of the waste and theadopted technology 

Principles andadvantages:

- Reverse regime

- Sufficient mixing awaste

- Mixing ofderivative fuel

- High temperatureresistant metal

- up to 40% energyefficiency

Page 8: Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 8/10

 

Risk distribution and management

Associated risks:

The realization costs can exceed the anticipated budgetThe realization time can exceed the anticipated scheduleThe O&M costs might exceed the ones that have beenassumedThe performances might not be at the expected levelThe quality of the equipment or the O&M performances mightcause lack of availabilityThe quantity or the quality of the wastes might not be asexpected

The project risks should be allocated to the parties who arethe most suitable to face and to manage them and this througha proper and fair contractual structure

The appropriate risks allocation with the relevant contractualconditions are essential for reducing the total costs and for anefficient delivery

Page 9: Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 9/10

Reliable partner is essential!

Construction of 150 EfW plants since 50 years (23 millions tons ofwaste treated per year)

CNIM Turnkey “culture” for design, construction and operation ofMunicipal Solid Waste thermal treatment including LAB Air

Pollution Control equipments

FromParis/ 2x50t/h

in 1969

to Baku/ 500,000t/y in 2012

CNIM experience in the waste treatment as turnkey contractor:

Page 10: Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan

http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 10/10

Thank you for attention!

«Tamiz Shahar» JSC

55, Khojali ave, AZ 1025, Baku, Azerbaijan

Tel.: (+99412) 4644110; 4644111

Fax: (+99412) 4644112

E-mail: [email protected]