College Station Old Wellborn Road/

General Parkway Traffic Analysis

Page 2: Old Wellborn Road-General Parkway Traffic Analysis

Study Overview• Purpose• Study Alternatives• Model Results• Observations• Alignment Evaluation – General Parkway• Next Steps

Page 3: Old Wellborn Road-General Parkway Traffic Analysis

Purpose• Evaluate Old Wellborn Road

• Evaluate Rock Prairie Cross Section

• Evaluate Alternative Routes to provide relief to the Holleman & FM 2818 intersection

Page 4: Old Wellborn Road-General Parkway Traffic Analysis

Old Wellborn Road• Low Traffic

Volumes

• Traffic Operational and Safety concerns due proximity of railroad and FM 2154

Page 5: Old Wellborn Road-General Parkway Traffic Analysis

Old Wellborn Rd. Volumes

• Daily Traffic < 2,500 vpd

Page 6: Old Wellborn Road-General Parkway Traffic Analysis

Old Wellborn Rd. Concerns• Westbound Left from Rock Prairie to Old

Wellborn• 50 feet to railroad – queuing to RR track

• Rock Prairie to be reconstructed• Old Wellborn is recommended to become right-

in, right-out and close when General Parkway is extended.

• Deacon extension to FM 2154• Would require Old Wellborn to be reconstructed

Page 7: Old Wellborn Road-General Parkway Traffic Analysis

Old Wellborn and Rock Prairie Analysis• Existing analysis - Westbound queue lengths of up to

two (2) vehicles in AM and PM peak• Two vehicles would back up to the railroad and

cause safety concerns

• Future Analysis - Westbound queue lengths of up to five (5) vehicles in the PM peak based on modeling• Would cause queueing into the Rock Prairie

intersection.

• Eastbound queuing from Rock Prairie signal makes left-turns from Old Wellborn Road difficult to navigate.

Page 8: Old Wellborn Road-General Parkway Traffic Analysis

Future Operations• Assume RIRO operation at Old Wellborn

• All left-turn volumes shift to General Parkway• Removes queuing issue• Improves operations at Old Wellborn and Rock

Prairie

• Adequate queuing space available

• Provide access to developments

Page 9: Old Wellborn Road-General Parkway Traffic Analysis

Old Wellborn and Rock Prairie Simulations - Existing

WB queue nearly backing into railroad

tracks

Page 10: Old Wellborn Road-General Parkway Traffic Analysis

Old Wellborn and Rock Prairie Simulations - Future

WB queue nearly backing into Rock Prairie and Wellborn intersection

EB queue backing into Rock Prairie and

Old Wellborn intersection

Page 11: Old Wellborn Road-General Parkway Traffic Analysis

Future Access

Wellborn Rd

Old Wellborn Rd

Graham

Rd

Rock Prai

rie Rd

General Pkwy

Page 12: Old Wellborn Road-General Parkway Traffic Analysis

Rock Prairie Cross Section

• West of General Parkway along Rock Prairie:• Both EB and WB traffic reduced by 20%

WBR turn-lane extend just past

General Parkway

Addition of EB lane west of General

Parkway

Page 13: Old Wellborn Road-General Parkway Traffic Analysis

Holleman & FM 2818 Relief Study Alternatives• General Parkway Extension• Jones Butler Extension• Combined• Luther

Page 14: Old Wellborn Road-General Parkway Traffic Analysis

Study Alternatives

General Parkway Alternative

Page 15: Old Wellborn Road-General Parkway Traffic Analysis

Study Alternatives

Jones Butler Extension Alternative

Page 16: Old Wellborn Road-General Parkway Traffic Analysis

Study Alternatives

Combined Alternative

Page 17: Old Wellborn Road-General Parkway Traffic Analysis

Study Alternatives

Luther Alternative

Page 18: Old Wellborn Road-General Parkway Traffic Analysis
Page 19: Old Wellborn Road-General Parkway Traffic Analysis

General Parkway Alternative

Page 20: Old Wellborn Road-General Parkway Traffic Analysis

Jones Butler Extension Alternative

Page 21: Old Wellborn Road-General Parkway Traffic Analysis

Combined Alternative

Page 22: Old Wellborn Road-General Parkway Traffic Analysis

Luther Alternative

Page 23: Old Wellborn Road-General Parkway Traffic Analysis

Model Alternative ResultsRoadway Limits #1 #2 #3 #4

Holleman Jones to 2818 10.61% -20.67% -10.06% -8.38%

Holleman 2818 to Dowling 11.67% -10.00% -12.67% -27.67%

Holleman Dowling to Deacon -3.49% -13.10% -2.18% -4.80%

Jones Butler Holleman to 2818 -12.93% 81.03% 75.86% -14.66%

Dowling Holleman to 2818 -46.09% -34.38% -71.09% -38.28%

• #1 – General Parkway Alternative• #2 – Jones Butler Extension Alternative• #3 – Combine Alternative• #4 – Luther Alternative

Page 24: Old Wellborn Road-General Parkway Traffic Analysis

Alignment Evaluation

Page 25: Old Wellborn Road-General Parkway Traffic Analysis

Alignment Evaluation

Page 26: Old Wellborn Road-General Parkway Traffic Analysis

Alignment Evaluation

Page 27: Old Wellborn Road-General Parkway Traffic Analysis

Observations• Old Wellborn Road

• Roadway provides traffic operation and safety concerns and is recommended to be discontinuous with the Deacon Road extension project and right-in, right-out with the Rock Prairie project.

• Existing traffic can be absorbed with General Parkway

• Main entrance for property south of Graham should be at General Parkway, not Old Wellborn

Page 28: Old Wellborn Road-General Parkway Traffic Analysis

Observations• Existing Conditions

• Very limited traffic using Dowling to Jones Butler via FM 2818

• Jones Butler between Holleman and FM 2818 is underutilized

• Future Development Conditions with Existing Roadway Network• No new roadway connections• Holleman reaches capacity and Dowling becomes

more heavily utilized• Jones Butler’s volume increases

Page 29: Old Wellborn Road-General Parkway Traffic Analysis

Observations• Future Conditions with General Parkway

Connection• Provides larger volume reduction to other roads

than Holleman• Shifts traffic away from Dowling• Acts as a circulator to local development• Does not provide relief to Holleman & FM 2818

• Future Conditions Jones Butler Extension• Provides relief to Holleman & FM 2818• Doubles the traffic on Jones Butler

Page 30: Old Wellborn Road-General Parkway Traffic Analysis

Observations• Future Conditions with Luther Alternative

• Provides greatest relief to Holleman, west of FM 2818

• Provides relief to intersection of Holleman at both FM 2818 and Dowling

• Minimal impact to Jones Butler

Page 31: Old Wellborn Road-General Parkway Traffic Analysis

Next Steps• Recommend Old Wellborn to be replaced by General

Parkway• Old Wellborn will become a right-in, right-out roadway with the Rock

Prairie Road project • Old Wellborn will not be rebuilt with the Deacon project

• FM 2818 & Holleman • Short – Term: Use signage to encourage the use of

Dowling to Jones Butler

• Long-Term: Gather input from Transportation and Mobility Committee

• Modify the Thoroughfare Plan to include General Parkway realignment?

• Evaluate the constructability/cost of Jones Butler under/overpass?

Page 32: Old Wellborn Road-General Parkway Traffic Analysis

Questions?