1 PARIKSHIT LAMINATE PVT. LTD. Survey no. 898/P Village Susvav (Iswarnagar) Taluka Halvad District Morbi State Gujarat O O O N N N S S S I I I T T T E E E E E E M M M E E E R R R G G G E E E N N N C C C Y Y Y P P P L L L A A A N N N Prepared By Checked By Approved By Safety Officer Safety Manager Unit Head [Names & Signature]

Upload: others

Post on 17-Jun-2020

1 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

1

PARIKSHIT LAMINATE PVT. LTD.   

Survey no. 898/P Village Susvav (Iswarnagar) 

Taluka Halvad  District Morbi 

 State Gujarat OOONNN SSSIIITTTEEE EEEMMMEEERRRGGGEEENNNCCCYYY PPPLLLAAANNN

Prepared By Checked By Approved By

Safety Officer Safety Manager Unit Head [Names & Signature]

Page 2: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

2

INDEX

CHAPTER NO.

TOPICS PAGE NO.

1 PREFACE 4

2 PREAMBLE 5 - 9 1 Emergency 5 2 Nature of Emergency 5 3 Process Description 6 4 Identification of Hazardous Area 6 5 Objectives of the Plan 7 6 Emergency Control Center 7 7 Assembly Points 8 8 Codification of Sirens 8

9 10 11

Training & Education Mock drill Updating the Plan

9 9 9

3 EMERGENCY ORGANISATION 10

4 KEY PERSONNEL AND THEIR RESPONSIBILITIES

11 - 15

1 Site Controller 11 2 Incident Controller 12 3 Personnel / Administrative Manger 13 4 Security Officer 13 5 Departmental Heads 14 6 First Aid team 14 7 Factory Fire Squad Personnel 15

5

6.

EMERGENCY ACTION PLAN LIST OF ANNEXURES

16-22

23-32

------------------------------

Page 3: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

3

LIST OF ANNEXURES

A. Brief description of the manufacturing process B. Telephone numbers of Police, Fire Brigade, Hospitals & other outside Emergency Services C. Telephone numbers & addresses of Key Personnel D. Telephone numbers of MARG members. E. List of Fire and Rescue Squad Members F. Information on Fire hydrant System G. List of fire Extinguisher. H. List of Personnel Protective Equipment. I First aid medical facilities. J List of Some hazardous Chemical and action. K Scenario Based Emergency action. L Emergency organization Chart

------------------------------

Page 4: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

4

CHAPTER 1

PREFACE 1.1.1 The enclosed On-site Emergency Plan is made for the proposed resins manufacturing

unit of Parikshit Laminate Pvt.Ltd. , Survey No. 898, Village Susvav (Iswarnagar), Taluka : Halvad, District Morbi, State Gujarat.

1.2 The plant will be having a manufacturing facility to produce resins phenol formaldehyde

and melamine formaldehyde.

1.3 The plant will be designed and equipped to handle hazardous chemical and to carry out

various processes and operations on these chemicals. The plant will be provided with

Fire Hydrant system, Fire extinguishers and Scrubber system. In addition to this

adequate types and number of Personal Protective Equipments, First Aid Boxes, Eye

washers, Ventilation system has been provided.

1.4 Considering the types of operations carried out in the plant and the nature, extent of

hazards existing, the management of M/s Shri Sai Nath Decor L.L.P. have planned it

necessary to have some system of tackling an emergency.

------------------------------

Page 5: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

5

CHAPTER 2

PREAMBLE In spite of various preventive and precautionary measures taken in the plant, the possibility of

a mishap cannot be totally ruled out. Hence, the need to prepare a Contingency Plan for

dealing with incidences which may still occur and are likely to affect LIFE and / or PROPERTY,

both within the plant and in the immediate neighborhood.

Such an emergency could be the result of malfunction of the Plant & Equipment or non-

observance of operating instructions. It could, at times, be the consequence of acts outside

the control of plant management like severe storm, earthquake, flooding, or deliberate acts of

arson or sabotage.

A Major Emergency in the plant is one that may cause serious injury or loss of life and damage

to the property.

This On Site Emergency Plan (OEP) explains the code of conduct of all personnel in the plant

along with the actions to be carried out in case of an Emergency. This plan gives the

guidelines for employees, contractors, transporters, etc. It not only defines responsibilities but

also informs about prompt rescue operations, evacuations, rehabilitation, co-ordination and

communication.

1. EMERGENCY:

An Emergency is a situation, which may lead to or cause large-scale damage or

destruction of life, property or environment within or out side the Factory. Such an

unexpected situation may be too difficult to handle for the normal work force within the

plant.

2. NATURE OF EMERGENCY:

The emergency specified in the OEP refers to occurrence of one or more of the following

events: -

Page 6: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

6

a. Fire/Explosion.

b. Major accident such as structural or building collapse, overturning of road tanker

containing flammable substances.

c. Natural calamities like storm, flood, earthquake, etc.,

d. Sabotage act of terrorism, civil commotion, air raid etc.

3. PROCESS DESCRIPTION: A brief description of the Manufacturing Process is given in ‘Annexure A’.

4. IDENTIFICATION OF HAZARDOUS AREAS:

HAZARD AREA PROBABLE CAUSE OF THE

ACCIDENT Explosion Boiler Malfunctioning of the

Safety Valve Flammable solvents

storage tank External fire causing pressure built up in the tanks / barrels

Fire Flammable solvents

storage tank Flammable vapor / air mixture and source of ignition.

Formation on pool in the dyke wall and source of ignition.

External fire → Built up of

internal pressure → Failure of the top cover → Tank on Fire

Spillage Hazardous Chemicals Spillage of phenol,

formaldehyde and acid due to rupture of the pipe line, collapse of the storage tank

Page 7: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

7

5. OBJECTIVES OF THE PLAN:

a) To control the emergency, localize it and if possible eliminate it.

b ) To avoid confusion, panic and to handle the emergency with clear cut actions.

c ) To minimize loss of life and property to the plant as well as to the

neighborhood.

d ) To make head count and carry out rescue operations.

e ) To treat the injured persons.

f ) To preserve records and to take steps to prevent recurrence.

g ) To restore normalcy.

6. EMERGENCY CONTROL CENTRE:

For the purpose of handling emergency, the following Emergency Control Centers has

been identified.

• During normal working hours - The Administrative Office

• During other times - The Security Office.

All communications to and from will originate at this CONTROL CENTRE. The

Emergency Control Center will have the following: -

a) A copy of ON-SITE EMERGENCY PLAN.

b) List of important telephone numbers such as Police, Fire

Brigade, Hospitals, and other outside Emergency Services, etc. (Refer

Annexure B).

c) List of key Personnel with addresses and telephone numbers. (Refer

Annexure C).

d ) List of Fire and Rescue Squad Members (Refer Annexure E).

e) Plant layout indicating storage of hazardous materials

f) List Fire Extinguisher. (Refer Annexure G).

g) Fire Fighting System (layout of Fire Hydrants)

h) List of Personal Protective Equipment (Refer Annexure H)

i) First Aid box.

Page 8: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

8

7. ASSEMBLY POINTS

In case of an EMERGENCY the employees should assemble near the defined

Assembly Points, as indicated below: -

• Fire Fighters - Area near Security Gate.

• First Aiders - Area near Security Gate.

• Others - Area near Security Gate.

Wind direction to be determined by the WIND SOCKS installed on top of the Engineering

Building. THE EMPLOYEES SHOULD RUN PERPENDICULAR TO THE WIND

DIRECTION AND NOT AGAINST / ALONG THE WIND DIRECTION. 8. CODIFICATION OF SIRENS

Sr. SIRENS INDICATES AUTHORITY

1. 30 SECOND

CONTINUOUS

ON SITE

EMERGENCY (ALERT)

INCIDENT

CONTROLLER

2. 1 MINUTE

CONTINOUS

EMERGENCY

CONTROLLED

(ALL CLEAR)

SITE CONTROLLER

NOTE: 1) EMERGENCY SIREN TO BE SOUNDED ONLY IF REQUIRED

2) ALL EMPLOYEES IN AREAS OTHER THAN AFFECTED TO CONTINUE

WORK UNLESS DISASTER SIREN IS BLOWN.

3) NO EMERGENCY ORGANIZATION MEMBER WILL LEAVE THE EMERGENCY

SPOT UNLESS `ALL CLEAR’ SIREN BLOWN.

Page 9: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

9

9. TRAINING AND EDUCATION:

Experience with on site –emergency planning has proved the need of training and

rehearsal. Major emergency procedure should be laid down clearly and convincingly to

everyone on site particularly Key Personnel and Essential workers.

It is obvious that in house or outdoor training is essential. The duties and responsibilities

of each person and the emergency procedure to be followed by him should be very

clear.

a. Seminar/refresher guidance On Site Emergency Plan.

b. Emergency instruction Booklet.

Seminar: Seminar is conducted in house/. Site controller will explain the plan to all

associated concerned employees.

Expert from outside explain the plan to all associated concerned employees. Expert from

also may be invited to impart training.

Emergency instruction Booklet:

Emergency instruction Booklet contains all detailed emergency duties. The booklet contains –

Emergency duties,

Reporting relationship.

Thus everyone is conspicuous about his role in the Emergency Plan.

10. MOCK REHEARSAL: Inform all the employees about mock drill.

Fix the date for mock drill.

Observers will not be involved in the exercise. They will monitor the Mock drill.

Emergency Siren / alarm will be raised.

After hearing the Siren / alarm, Emergency procedure will be followed as mentioned

in the OEP.

Observer will note down the activities with respect to the time.

Page 10: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

10

11. UPDATING THE PLAN:

As and when required the On Site Emergency Management plan will be updated. After

each drill the plan will be thoroughly received to take account of shortcoming and

accordingly plan will be updated.

Page 11: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

11

CHAPTER - 3

EMERGENCY ORGANISATION

Responsibility will be automatically delegated in absence of concern person/s in following manner.

SITE CONTROLLER: xyz

INCIDENT CONTROLLER:

DUTY OFFICER– ON SUNDAYS/HOLIDAYS

ADVISORY COMMITTEE: ALL HODs,

COMMUNICATION COMMITTEE:

P&A DEPARTMENTS

------------------------------

Page 12: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

12

CHAPTER - 4

KEY PERSONNEL & THEIR RESPONSIBILITIES

Key Personnel’s Responsibility during normal working hours :- 1. Site Controller:

He will retain overall responsibility for the factory and its personnel. As soon as he is

informed of the emergency he shall proceed to the control room and meet the P&A.

Manager. His duties shall be:

i) Assess the magnitude of the situation and decide if staff needs to be evacuated

from their assembly points.

ii) Exercise direct operational control over areas other than those affected.

iii) Maintain a continuous review of possible development and assess in consultation

with Incident Controller and other Key personnel as to whether shutting down of

the plant or any section of the plant and evacuation of persons is required.

iv) Liaison with Senior Officials of Police, Fire Brigade, Directorate of Industrial Safety,

provide advice on possible effects on areas outside the factory premises.

v) Control rehabilitation of affected areas on discontinuation of emergency.

vi) Issue authorised statements to news media, and ensure that evidence is preserved

for inquiries to be conducted by statutory authorities.

Page 13: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

13

2. Incident Controller:

On hearing of an emergency siren he will rush to the scene of the occurrence and take

overall charge and report to Site Controller. On arrival he will assess the scale of

emergency and decide if major emergency exists or is likely and inform the

Communication Officer accordingly.

(1) Direct all operations within the affected areas with the priorities for safety of

personnel minimise damage to the plant, property and minimise loss of materials.

(2) Pending arrival of Site Controller, assume the duties of his post and, in particular.

(3) (a) Direct the shutting down and evacuation of plant and areas likely to be

adversely affected by the emergency.

(b) Ensure that all Key personnel and outside help are called in.

(4) Provide advice and information to the Fire squad & Security Officer and the local

fire service as and when they arrive.

(5) Ensure that all non-essential workers/staff of the areas affected are evacuated to

the appropriate assembly points, and the areas are searched for casualties.

(6) In the event of failure of electric supply and internal telephones, set up

communication point and establish contact with Emergency Control Centre.

(7) Report on all significant developments to the P. & A manager.

Page 14: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

14

(8) Have regard to the need for preservation of evidence so as to facilitate any inquiry

into the causes and circumstances, which caused or escalated the emergency.

3. Human Resources Manager:

He will also work as liaison Officer and will be stationed at the Main Entrance (Security

Office near Main Gate) during the emergency. He will under the direction of the site

Controller handle police, press and other inquiries, receive reports from roll-call leaders

from assembly points and pass on the absentee information to the Incident Controller.

His responsibilities shall include -

(1) To ensure that casualties receive adequate attention, to arrange additional help if

required and information relatives.

(2) To control traffic movements into the factory and ensuring that alternative transport

is available when need arises.

(3) When emergency is prolonged, arrange for the relief of personnel and organise

refreshments / catering facility.

(4) From information received, advise the Site Controller of the situation,

recommending (if necessary) evacuation of staff from assembly points.

(5) Recruit suitable staff to act as runners between the Incident Controller and himself

if the telephone and other system of communication fails due to whatsoever

reasons.

(6) Maintain prior agreed inventory in the control centre.

(7) In case of prolonged emergency involving risk to outside areas by wind-blown

materials, contact local Meteorological Office to receive early notification of

changes in weather conditions.

4. Security Officer:

On hearing alarm advise fire squad and security staff in the factory of the incident zone

and cancel the alarm. He will also announce through telephone or messengers to the

HR Manager, Incident Controller and Site Controller that incident has occurred in such

and such zone. He will open the gates nearest to the incident and stand by to direct the

emergency service.

Page 15: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

15

If told of a large escape of gas he shall inform the Incident Controller by telephone and

stand-by the telephone to receive further messages.

On hearing the emergency alarm, he will immediately contact Site Controller and on his

advice call the local fire brigade. In case fire is discovered but no alarm is sounding he

shall receive information about location from the person discovering the fire and

thereafter immediately consult the Site Incident Controller and make announcement on

telephone telling the staff location of the incident and to evacuate to their assembly

points. He will continue to operate the switchboard advising the calls connected with the

incident to the Communications Officer.

5. Departmental Heads:

The Departmental head wherein the incident has taken place will report to Incident

Controller and provide assistance as required. They will decide which members of their

staff they require at the scene.

6. First-aid Teams:

The Personnel Manager shall keep in security the roll call lists for the fire and first-

aid teams on duty. Each Departmental Head for his shift-team appoints roll call

leaders and first aiders. Roll call leaders shall check their rolls as members of the

services report for emergency duty. Names of any unaccounted for absentees will

be informed to the Security Officer.

Members of first-aid Teams will report to the Incident Controller on hearing of the

alarm in day time. The Emergency vehicle driver, if safe to do so, shall collect the

emergency vehicle and park nearest to the scene of the incident. First aider shall

inform the incident controller that the Emergency Vehicle is leaving the site, giving

the name of the patient and destination i.e. hospital or doctor’s room and request

the Incident Controller to inform the destination (hospital, etc.) advising them about

the casualties reaching there.

Page 16: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

16

7. Factory Fire Squad Personnel:

The duty Fire fighting Squad under the command of the Security Officer shall be

responsible for fire fighting and rescue. On hearing the alarm, they shall proceed

to the place of incident. The men at security gate shall find out the location of the

emergency and proceed to the site of the occurrence. At the incident scene, a

team members detailed for this purpose will check squad members against roll-call

sheet. At the site, all the squad members will respond to the advice and

information given by the Incident Controller On arrival of the local fire brigade, they

will also assist in fire-fighting work with the advice of the Incident Controller.

------------------------------

Page 17: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

17

CHAPTER - 5

EMERGENCY ACTION PLAN

ANY ONE NOTICING EMERGENCY SITUATION LIKE FIRE, EXPLOSION, TOXIC GAS LEAKAGE ETC. MUST

DO’s

• Attract the nearby person/employee by shouting “FIRE – FIRE – FIRE. “

• Seek help from the persons working nearby.

• Try to control the incident at its initial stage with available means/sources quickly.

• Inform Shift In-charge / Duty Officer (In Night Shift ) about the Incident.

DON’Ts

• Do not be panicky.

• Do not run – Walk fast.

INCIDENT CONTROLLER MUST

DO’s

A. IF FIRE / OTHER INCIDENTS ARE CONTROLLABLE

• Approach the emergency site immediately taking note of wind direction.

• Assess the situation.

• Inform Security Officer, Tell – NAME, TYPE OF INCIDENT, ACTION TAKEN, HELP

NEEDED and Order Security Officer/Guard to inform all KEY persons.

• Take lead in controlling emergency until such time concerned Section Manager takes over

the charge.

Page 18: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

18

DON’TS

• Do not be panicky.

• Do not lose temperament.

B. IF FIRE/OTHR INCIDENTS ARE NOT CONTROLLABLE In Addition to Above (A)

• Order to blow emergency `ALERT’ Siren (30 second continuous).

• Organize Fire fighting / rescue team members to control the Incident.

• Take stock of situation if required shut down the plant / process in affected area.

• Call Fire Brigade if situation demands.

• Evacuate affected area.

• Organize head count of the plant.

• Act as INCIDENT CONTROLLER till such time senior person takes charges as indicated in

Emergency organisation

NOTE: 1) Messenger will wait until such time Security Officer arrives.

2) Also inform Telephone Operator.

SECURITY OFFICER / GUARD

DO’s

• Do not allow any vehicle to come inside the factory.

• Do not entertain any outside call except for emergency purpose.

• Do not allow visitors to move around.

• Inform all key persons about location and type of emergency.

• Follow this sequence – Inform concerned HOD/Section Head, Main Site Controller, Main

Incident Controller & Safety Officer and other KEY persons.

• Inform Main Site Controller about Government visitors, if any.

DON’Ts

• Do not entertain any outside call except for emergency purpose.

• Do not allow visitor to move around, from reception.

Page 19: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

19

SECURITY GUARD DO’s

• Immediately report at Security Gate in shortest possible time.

• Follow instructions of Officer In-charge.

• Assist in controlling emergency.

• Assist in controlling contractors, vehicle movement and mob.

• Assist in cordoning off the area.

• Take note of wind direction while approaching emergency site.

• Render all possible help for controlling overall situation.

DON’Ts

• Do not leave the site unless asked to do so.

EMERGENCY VEHICLE DRIVER DO’s

• Immediately start vehicle and reach rescue squad assembly point (near security gate).

• Rescue squad members to emergency site.

• Take vehicle near to emergency site as directed.

• Take note of wind direction.

• Reverse the emergency vehicle for quick transports of injured, if any.

• Keep vehicle engine running.

• Always be on Driver’s seat of the vehicle.

• Take the injured to the hospital as directed.

DON’Ts

• Do not leave the vehicle.

• Do not take the vehicle very near to the site.

Page 20: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

20

INCIDENT CONTROLLER

DO’s

• Approach emergency site as early as possible taking note of wind direction.

• Take stock of situation.

• Interact with all concerned departments as the situation demands.

• Keep Main Site Controller informed about the latest emergency situation on continuous

basis.

SITE CONTROLLER DO’s

• Will approach emergency site immediately / Assess the situation.

• Consult Incident Controller.

• Consult advising Committee Members.

• Instruct Main Incident Controller.

• Communicate to higher ups and Govt. authorities, if required.

• Decide upon need for evacuation and blow `Disaster Siren’.

• After getting satisfied with the situation, give instruction to blow ALL CLEAR Siren.

DON’Ts

• Do not instruct to blow ALL CLEAR siren unless the situation is fully under control.

• Don’t evacuate the entire plant unless the situation demands.

FIRE FIGHTING SQUAD ON HEARING SIREN DO’s

• Inform fellow employees/Officers.

• Report to Fire Squad Assembly point.

• Find out emergency location.

Page 21: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

21

• Approach emergency site immediately.

• Take quick action as per the instructions from Incident controller.

• Bring emergency under control as early as possible.

DON’Ts

• Do not leave process/equipment in UNSAFE CONDITION.

• Do not leave emergency site unless ALL CLEAR siren blown.

• Do not use improper fire extinguisher.

• Do not be panicky.

RESCUE SQUAD DO’s

• Report to assembly point near Gate.

• Get in touch with security about location and type of emergency.

• Approach emergency site quickly with Breathing Apparatus set and First Aid box.

• Get in touch with incident controller.

• Follow instructions of Incident controller.

• Render first aid to the injured, hospitalize, if required.

• Accompany him to hospital and assist Doctor / Nurse.

• Search for missing person in that area, if required.

• Help in head count.

ALL GENERAL EMPLOYEES EXCEPT THOSE WHO ARE IN EMERGENCY ORGANIZATION ON HEARING SIREN DO’s

• Be alert and be available if required.

• Wait for further instructions.

• Bring down the process/plant/equipment in SAFE CONDITION in case of DISASTER siren

as per instructions from Incident Controller.

• Approach respective safe assembling points route as taking note of wind direction.

Page 22: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

22

• Help in taking roll call.

• After hearing ALL CLEAR, go back to the departments.

• Start the work again after setting instruction from Incident controller.

DON’Ts

• Do not be panicky. Do not run.

• Do not approach emergency site unless asked for.

• Do not engage telephone except for emergency purpose. Keep lines free.

TECHNICAL TEAM: ENGINEERING DEPARTMENT / ENVIRONMNET, SAFETY AND HEALTH DEPARTMENT ON HEARING SIREN DO’s

• Be available in Engineering Department at respective location for any help.

• Approach emergency site with required with tools and equipments and should work on

instructions of Incident controlle.

• Help Incident Controller to provide technical assistance.

• Isolate lines, process equipments, if required by Incident Controller.

• Provide emergency equipments like Fire Extinguisher, Hoses, etc., if asked by Incident

Controller.

• Provide stop gap arrangements as per the requirement of Incident Controller.

• Carry out electrical isolation of area as per instructions from Incident Controller.

ADVISORY COMMITTEE (ALL DEPARTMENT HEADS)

DO’s

• Approach emergency site as early as possible.

• Render advise to Main Incident Controller and Main Site Controller to control emergency.

Page 23: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

23

COMMUNICATION COMMITTEE – (P&A) DO’s

• Consult Main Site Controller

• Give necessary instructions to security / Telephone Operator.

• Give instruction to Security to control traffic / crowd.

• Look after injured, communicate with the family members, if situation demands.

• Arrange transportation, if required.

DON’Ts

• Do not communicate to any one or brief press without permission of Main Site Controller.

GENERAL INTRUCTIONS DO’S

• Stop work at height. / Stop all hot works.

• Stop all vessel entry.

• Take note of wind direction.

• On hearing Disaster Siren evacuates as per evacuation route without running and panicky

and assembles at respective safe Assembly Points.

DON’Ts

• Do not use telephone except for emergency purpose.

• Do not start work at height, vessel entry, hot work unless permit conditions are verified.

• Do not allow unauthorized person to approach emergency site.

--------------------

Page 24: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

24

ANNEXURE ‘A’ BRIEF DESCRIPTION OF THE MANUFACTURING PROCESS I. Preparation of the Resins : In the proposed unit, phenol formaldehyde and melamine formaldehyde resin will be manufactured. The manufacturing process description for both resins are as presented hereunder :

(a) Phenol formaldehyde (p-f) resin:

Although phenolic resins have been known and widely utilized for over many years their detailed chemical structure remains to be established. It s now known that the resins are very complex and that the various structures present will depend on the ratio of phenol to formaldehyde employed, the pH of the reaction mixture and temperature of the reaction.

Phenol formaldehyde resin is manufactured by the condensation polymerization with formaldehyde under controlled condition. The reaction is generally carried out in a reactor equipped with jacket and agitator. In the first phase phenol reacts simultaneously, additional formaldehyde may react to produce both di and tri methyl phenol. These alcohols continue to condense and polymerize with each other rapidly and almost violently. During the reaction water is eliminated. Liquid is taken in a reaction kettle and formaldehyde in equal quantity added to it. The solution mixture is heated to 60-70 °C for a short time by circulation of steam through the jacket then the further supply of heat is discontinued. As the reaction is exothermic in nature, heat is liberated with the progress of reaction. Thus the temperature of mixture rises gradually without any further supply of heat. To control temperature, cooling is effected by circulation of water, after a period of about 45 minutes of reaction water gets separated from viscose resin and two layers are formed. The upper layer is of water and bottom layer contains the resin. The product containing 70% solid is drained out from the reaction kettle and stored in a storage tank.

(b) Melamine-formaldehyde (M-F) Resins:

It is manufactured by reacting melamine with formaldehyde in a jacketed reactor. In first step melamine reacts with formaldehyde in aqueous solution (37 % w/w) to form methylol compounds. The reaction is carried out under slightly alkaline condition. Since melamine is not soluble in water at room temperature. It is necessary to heat the mixture to about 80 °C for obtaining methylol compounds. In the preparation of water soluble resins, the solution of methylol

Page 25: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

25

compound is further heated under alkaline condition until the desired viscosity or solubility characteristics are obtained from increased molecular weight. Liquid formaldehyde is taken in the reaction vessel and melamine powder is added slowly with stirring. After about 15 minutes caustic soda solution is added and the mixture is heated by steam. The temperature is controlled at about 85°C and the menthol is added as a solvent to reduce the viscosity after this the solution is made acidic by the methylol compound formed and are transformed to water soluble resins. Then the product is made alkaline by adding caustic soda solution (20% strength) and subsequently cooled to room temperature. Finally it is stored in a storage tank.

II. Impregnation of Paper with Resins :

Melamine resin is coated on tissue and design papers, whereas phenolic resin is coated on craft paper. Two impregnation processes will be carried out in a single impregnation unit alternatively to cope up with the production capacity of unit. The melamine formaldehyde resin solution is kept in a tray and paper which is to be coated through guide roll passes viz. drying chamber. The temperature remains at about 90-95 degree C, and heating is done by steam heated air. The process for phenolic resin coating is similar to above. The resin is diluted with spirit to control its viscosity and craft paper to be coated with resin is moved at a speed of 10 meters/minute and drying is done by hot air. The sheets impregnated with melamine formaldehyde resin and phenolic formaldehyde resins, after drying, are cut automatically at other end of dryers in required set size. These are then stored usually in air conditioned godown.

III. Thermo Setting of the Resin Bonded Papers: Thermo setting of the resins impregnated papers is done upon a panel under heat and pressure. In the hydraulic press, tissue and design paper coated with melamine resins and craft paper (fine fold depending on thickness) coated with phenolic resin are cut on glazing separating paper between two stainless steel plates with mirror finish. Hydraulic pressure is raised and heat is supplied by passing steam through the plates. Heat is supplied for about 45 minutes and the temperature controlled at 150-160 °C, the sheets after cooling is sized by cutting machine and transferred for sending on one side. After sending the sheets are ready for packing and stored for dispatch.

----------------------------

Page 26: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

26

ANNEXURE ‘B’ TELEPHONE NUMBERS OF POLICE, FIRE BRIGADE, HOSPITALS, AND OTHER OUTSIDE EMERGENCY SERVICES

IMPORTANT DEPARTMENT PHONE NOS.

FIRE BRIGADE HOSPITALS SAFETY OFFICER BOILER INSPECTOR

POLICE DEPARTMENT SAFETY OFFICER

DIRECTOR

GRAMPANCHAYAT OFFICE

------------------------------

Page 27: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

27

ANNEXURE ‘C’ TELEPHONE NUMBERS AND ADDRESSESOFKEY PERSONNEL

LIST OF KEY PERSONS NAME RESIDENCE TEL. NO.

------------------------------

Page 28: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

28

ANNEXURE ‘D’

MUTUAL AID SCHEME MEMBERS MUTUAL AID RESPONSE GROUP

NAME COMPANY OFFICE PHONE

------------------------------

Page 29: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

29

ANNEXURE ‘E’

LIST OF FIRE AND RESCUE SQUAD MEMBERS

FIRE FIGHTING SQUAD FIRST AIDER(RESCUE SQUAD)

------------------------------

Page 30: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

30

ANNEXURE ‘F’ EMERGENCY CONTROL SYSTEM FIRE HYDRANT SYSTEM

An underground Fire Hydrant System has been installed in the plant with rings around all blocks

to achieve maximum coverage. Water reservoir of 100 m3 will be provided in the plant.

Following are the details of the system.

a. Water Reservoir- 30 m3.

b. Type of Hazard- Fire, Ordinary Hazard.

c. Total no. of Fire Hydrant - 10 Nos.

d. Stand by arrangement-Diesel Generator with AMF control panel.

e. Nos of Hoses -7

f. Electric Driven main pump - 40 M head 10 M3/hour flow at 7 kg./cm2 -No 1

g. Auto changeover switch operated DG set System ensures that the hydrant pump

is kept working.

--------------------------------------------

Page 31: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

31

ANNEXURE ‘G’

FIRE EXTINGUSHER

List of Fire Extinguishers

The company will give training to the personnel for fire fighting and its intends to improve the fire fighting skills of their employee by conducting training on Fire fighting. There are 15 portable fire extinguishers, the break-up of which is as under: -

Total Fire Extinguisher:

Sr. No Types of Extinguisher Total Nos.

1 DCP 10

2 CO2

02

3

Foam 03

Sand Buckets: 05 Nos

------------------------------

Page 32: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

32

ANNEXURE ‘H’

LIST OF PERSONAL PROTECTION EQUIPMENT LIST OF PERSONEL PROTECTIVE EQUIPMENTS

ITEM NOS. Safety Helmet 40 Safety Goggles 20 Safety Shoes 40 PVC Apron 02 Asbestos Gloves 02 Rubber Gloves 40 Eye Wash Fountain 02 Gum Boots 02 Cloth Mask 5 Safety Belt 01 Organic Vapor Mask 5 Self Contained Breathing Apparatus 01

Page 33: ON SITE EMERGENCY PLAN - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/online/Risk... · 2015-04-09 · Mock drill Updating the Plan 9 9 9 ... J List of Some hazardous

33

ANNEXURE ‘I’

FIRST AID MEDICAL FACILITIES.

The company has provided “First –AID” boxes at security office. Following are the contents of First aid.

1. Tincture iodine. 2. Eye wash solution. 3. Burnol 4. Soframycin (ointment) 5. Sterilized cotton wool. 6. Band-aid. 7. Antiseptic Solution (Dettol) 8. Bandage. 9. Paracetamol tablets. 10. Iodex. 11. Pair of scissor.

The company will have their own transport facilities to take the injured to the hospital.

------------------------------