one team: relevant, ready, responsive, reliable 1 permanent international association of navigation...

8
1 One Team: Relevant, Ready, Responsive, Reliable Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our “Invisible” Transportation Network Richard C. Lockwood Richard C. Lockwood Chief, Operations Division Chief, Operations Division U.S. Army Corps of Engineers, Pittsburgh District U.S. Army Corps of Engineers, Pittsburgh District

Upload: owen-caldwell

Post on 27-Mar-2015

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: One Team: Relevant, Ready, Responsive, Reliable 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION

1

One Team: Relevant, Ready, Responsive, Reliable

Permanent International Association of Navigation Congresses - PIANC

July 15, 2008

RIS - RIVERS INFORMATION SYSTEMOur “Invisible” Transportation Network

Richard C. LockwoodRichard C. LockwoodChief, Operations DivisionChief, Operations Division

U.S. Army Corps of Engineers, Pittsburgh DistrictU.S. Army Corps of Engineers, Pittsburgh District

Page 2: One Team: Relevant, Ready, Responsive, Reliable 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION

2

One Team: Relevant, Ready, Responsive, Reliable

RIS GOALS

RIS will be an electronic system that will pull data from various existing sources both Government and commercial and process and display that information in customizable user friendly formats

RIS will modify or replace existing USACE systems to achieve a single system that will inform and be informed by the systems already in use by our navigation partners.

Page 3: One Team: Relevant, Ready, Responsive, Reliable 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION

3

One Team: Relevant, Ready, Responsive, Reliable

RIS will use existing technology, Electronic Navigation Charting and data summarizing to provide all partners with the specific information they need to staff, operate and use the Inland Navigation system.

RIS will eliminate duplication of data entry and ensure seamless transfer between USACE systems and Navigation and Government partners.

RIS will generate confidence both within and outside the Government that the Inland Waterways System is an efficient, safe and reliable transportation system.

Page 4: One Team: Relevant, Ready, Responsive, Reliable 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION

4

One Team: Relevant, Ready, Responsive, Reliable

CONSTRAINTS RIS must protect sensitive and proprietary information of the

commercial Navigation partners.

RIS must fit seamlessly into the bigger CRIS service and use existing standards for data coding and classification

RIS must be capable of informing and being informed by USCG’s AIS (Automated Identification System) and other existing commercial systems for tow tracking and scheduling

RIS must be capable of informing and being informed by other USACE systems (Asset Management, OMBIL, CWMS, etc) and other Partner systems (NWS, USGS, IRS, Customs, etc.)

Navigation data (current, wind speed, lock condition, gauge readings, dam operating data, etc.) provided via or by RIS must not expose USACE to any liability concerning the use of that data.

Page 5: One Team: Relevant, Ready, Responsive, Reliable 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION

5

One Team: Relevant, Ready, Responsive, Reliable

RIS

TOWING VESSELS

USACE ASSET MANAGEMENT

LOCKLOCAL DATA

SYSTEM DATA

TOWING COMPANIES

TERMINAL OPERATORS

PORT AUTHORITIES

SHIPPERS

USCG AIS

OMBILNATNL WEATHER SER

USGS

RECREATIONAL BOATERS

CWMS

IRS

DHS

RIVER INFORMATION SERVICE

CUSTOMS

DOE

Page 6: One Team: Relevant, Ready, Responsive, Reliable 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION

6

One Team: Relevant, Ready, Responsive, Reliable

CURRENT INITIATIVES

CRIS PM and Champion have asked LRP to define:

What information is needed from the Corps What data needs to be stored and what is for local use How to broadcast locally used information What should be done by Industry or Govt What equipment will industry need to have

“SOURCES SOUGHT” – INDUSTRY DAY DEFINE DISPLAYS

LOCKMASTER DISPLAY – LRD/MVD INITIATIVE TOW MASTER/PILOT DISPLAY – AWO USACE MANAGEMENT DISPLAY – ASSET MANAGEMENT

LINKAGE

Page 7: One Team: Relevant, Ready, Responsive, Reliable 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION

10

One Team: Relevant, Ready, Responsive, Reliable

Page 8: One Team: Relevant, Ready, Responsive, Reliable 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION

13

One Team: Relevant, Ready, Responsive, Reliable

Questions?