38 Pipeline News November 2018 • www.pipeline-news.com GAS – International Africa DANGOTE INDUSTRIES LTD. – (4/18) Owner: Dangote Group Project: East West Offshore Gas Gathering System Type: Project includes construction of two parallel subsea pipelines Length: 684 miles Diameter: 38 inches Location: Bonny, Rivers - Ogidigben – Olokola - Lekki, Lagos Capacity: 3 Bcf/d Completion: 3Q 2018 (Phase I) 2Q 2025 (Phase II) Comments: Project will create a corridor for evacuation of trapped gas from offshore platforms in Nigeria to allow their monetization and will deliver gas to a new build gas receiving plant to be located at the Dangote Refinery Complex in Lekki, Lagos Contractor: Paradigm Environmental System Consultants Type: Contracts includes conducting an Environmental Impact Assessment for the project GALSI PIPELINE – (REV 10/16) Owners: Sonatrach/Edison/Enel/Hera Group Project: Galsi Pipeline Type: Project includes the construction of 351 miles of offshore pipeline crossing the Mediterranean Sea and 161 miles of onshore pipeline, including gas compression facilities Length: 512 miles Location: Koudiet Draouche - Piombino Completion: 2018 Comments: The initial transport capacity will be 8 Bcm per year KINGDOM OF MOROCCO/ FEDERAL REPUBLIC OF NIGERIA – (1/17) Pipeline: Trans-African Pipeline Type: Project includes the construction of a new gas pipeline Location: Nigeria – Morocco - Europe. Comments: The Trans-African Pipeline will improve access to energy across West Africa and establish a competitive regional market for electricity NIGERIAN NATIONAL PETROLEUM CORP. — (6/18) Project: Ajaokuta - Kaduna – Kano (AKK) Pipeline Type: Project includes pipeline construction Length: 381 miles Diameter: 40 inches Location: Kaduna - Kano Cost: $2.8 billion Completion: 4Q 2020 Comments: Project will help establish connectivity between the East, West and North parts of Nigeria Contractor: OilServe/Oando Type: Contract includes construction of Lot 1 of the pipeline Length: 125 miles Cost: $855 million Contractor: Brentex/China Petroleum Pipeline Bureau Type: Contract includes construction of Lot 3 of the pipeline Length: 137 miles Cost: $1.2 billion Asia Pacific APA GROUP – (3/18) Owner 1: Gold Road Resources Ltd., 50% Owner 2: Gold Fields Ltd., 50% Project: Yamarna Gas Pipeline Type: Project includes pipeline construction and a gas-fired station Length: 123 miles Location: Yamarna, Western Australia Cost: $180 million Comments: Project is part of the Gruyere Project and will be built east of Laverton in Western Australia, running from a connection point off the existing Eastern Goldfields Gas Pipeline to the new Gruyere gold mine project site Contractor: Nacap Type: Project includes pipeline construction ARROW ENERGY – (REV 5/16) Project: Arrow Bowen Pipeline Type: Project includes the construction of high- pressure steel pipeline Length: 512 miles Location: Bowen Basin - Gladstone Completion: 2018 AZERBAIJAN INTERNATIONAL OPERATING CO. – (REV 11/15) Project: Azeri Pipeline Type: Project includes the construction of new pipeline Length: 2,175 miles Location: Georgia, Turkey, Greece, Bulgaria, Albania and Italy Completion: 2019 Comments: Pipeline will have a capacity of 16 Bcm/y GAIL INDIA LTD. – (3/18) Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas Pipeline (Phase I) Type: Project includes construction of a transmission pipeline and multiple spur lines Length: 470 miles Diameter: 4, 8, 12, 18, 30 and 36 inches Location: Phulpur – Dobhi Capacity: 565 Bcf/d (Phase I and II) Cost: $50 million Completion: 4Q 2018 Comments: Project will usher Industrial development in eastern part of India by supplying environmentally clean natural gas to fertilizer and power plant, refineries, steel plants and other Industries Contract: JSIW Infrastructure Pvt. Ltd. Type: Project includes engineering, design, procurement and construction Contract: IL&FS Engineering & Construction Co. Ltd. Type: Project includes pipelaying Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas Pipeline (Phase II) Type: Project includes pipeline construction Length: 1,180 miles Diameter: 4, 8, 12, 18, 30 and 36 inches Location: Jharkhand - West Bengal - Odisha Capacity: 565 Bcf/d (Phase I and II) Cost: $146 million Completion: 4Q 2020 Comments: Project will usher Industrial development in eastern part of India by supplying environmentally clean natural gas to fertilizer and power plant, refineries, steel plants and other Industries Contract: JSIW Infrastructure Pvt. Ltd. Type: Project includes engineering, design, procurement and construction Contract: IL&FS Engineering & Construction Co. Ltd. Type: Project includes pipelaying GUJARAT STATE PETROLEUM CORP. – (REV 12/16) Contractor: GSPL India Gasnet Project: Mehsana-Bhatinda Pipeline Type: Project includes the construction of new pipeline Length: 1,037 miles Location: Mehsana-Bhatinda Projects added for the current month are highlighted and in bold face type ONGOING PROJECTS Construction Underway

Upload: others

Post on 23-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

38 Pipeline News November 2018 • www.pipeline-news.com

GAS – International Africa DANGOTE INDUSTRIES LTD. – (4/18)Owner: Dangote GroupProject: East West Offshore Gas Gathering SystemType: Project includes construction of two

parallel subsea pipelinesLength: 684 milesDiameter: 38 inchesLocation: Bonny, Rivers - Ogidigben – Olokola -

Lekki, LagosCapacity: 3 Bcf/dCompletion: 3Q 2018 (Phase I) 2Q 2025 (Phase II)Comments: Project will create a corridor for

evacuation of trapped gas from offshore platforms in Nigeria to allow their monetization and will deliver gas to a new build gas receiving plant to be located at the Dangote Refinery Complex in Lekki, Lagos

Contractor: Paradigm Environmental System Consultants

Type: Contracts includes conducting an Environmental Impact Assessment for the project

GALSI PIPELINE – (REV 10/16) Owners: Sonatrach/Edison/Enel/Hera GroupProject: Galsi PipelineType: Project includes the construction of

351 miles of offshore pipeline crossing the Mediterranean Sea and 161 miles of onshore pipeline, including gas compression facilities

Length: 512 milesLocation: Koudiet Draouche - PiombinoCompletion: 2018Comments: The initial transport capacity will be 8 Bcm

per year

KINGDOM OF MOROCCO/FEDERAL REPUBLIC OF NIGERIA – (1/17)Pipeline: Trans-African Pipeline Type: Project includes the construction of a new

gas pipelineLocation: Nigeria – Morocco - Europe.Comments: The Trans-African Pipeline will improve

access to energy across West Africa and establish a competitive regional market for electricity

NIGERIAN NATIONAL PETROLEUM CORP. — (6/18)

Project: Ajaokuta - Kaduna – Kano (AKK) PipelineType: Project includes pipeline construction

Length: 381 milesDiameter: 40 inchesLocation: Kaduna - KanoCost: $2.8 billionCompletion: 4Q 2020Comments: Project will help establish connectivity

between the East, West and North parts of Nigeria

Contractor: OilServe/OandoType: Contract includes construction of Lot 1 of

the pipelineLength: 125 milesCost: $855 million

Contractor: Brentex/China Petroleum Pipeline BureauType: Contract includes construction of Lot 3 of

the pipelineLength: 137 milesCost: $1.2 billion

Asia PacificAPA GROUP – (3/18)Owner 1: Gold Road Resources Ltd., 50%Owner 2: Gold Fields Ltd., 50%Project: Yamarna Gas PipelineType: Project includes pipeline construction and

a gas-fired stationLength: 123 milesLocation: Yamarna, Western AustraliaCost: $180 millionComments: Project is part of the Gruyere Project and

will be built east of Laverton in Western Australia, running from a connection point off the existing Eastern Goldfields Gas Pipeline to the new Gruyere gold mine project site

Contractor: NacapType: Project includes pipeline construction

ARROW ENERGY – (REV 5/16)Project: Arrow Bowen PipelineType: Project includes the construction of high-

pressure steel pipelineLength: 512 milesLocation: Bowen Basin - GladstoneCompletion: 2018

AZERBAIJAN INTERNATIONAL OPERATING CO. – (REV 11/15)Project: Azeri PipelineType: Project includes the construction of new

pipelineLength: 2,175 milesLocation: Georgia, Turkey, Greece, Bulgaria, Albania

and ItalyCompletion: 2019

Comments: Pipeline will have a capacity of 16 Bcm/y

GAIL INDIA LTD. – (3/18)Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas

Pipeline (Phase I)Type: Project includes construction of a

transmission pipeline and multiple spur lines

Length: 470 milesDiameter: 4, 8, 12, 18, 30 and 36 inchesLocation: Phulpur – DobhiCapacity: 565 Bcf/d (Phase I and II)Cost: $50 millionCompletion: 4Q 2018Comments: Project will usher Industrial development

in eastern part of India by supplying environmentally clean natural gas to fertilizer and power plant, refineries, steel plants and other Industries

Contract: JSIW Infrastructure Pvt. Ltd.Type: Project includes engineering, design,

procurement and construction

Contract: IL&FS Engineering & Construction Co. Ltd.Type: Project includes pipelaying

Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas Pipeline (Phase II)

Type: Project includes pipeline constructionLength: 1,180 milesDiameter: 4, 8, 12, 18, 30 and 36 inchesLocation: Jharkhand - West Bengal - OdishaCapacity: 565 Bcf/d (Phase I and II)Cost: $146 millionCompletion: 4Q 2020Comments: Project will usher Industrial development

in eastern part of India by supplying environmentally clean natural gas to fertilizer and power plant, refineries, steel plants and other Industries

Contract: JSIW Infrastructure Pvt. Ltd.Type: Project includes engineering, design,

procurement and construction

Contract: IL&FS Engineering & Construction Co. Ltd.Type: Project includes pipelaying

GUJARAT STATE PETROLEUM CORP. – (REV 12/16)Contractor: GSPL India GasnetProject: Mehsana-Bhatinda PipelineType: Project includes the construction of new

pipelineLength: 1,037 milesLocation: Mehsana-Bhatinda

Projects added for the current month are highlighted and in bold face type

ONGOING PROJECTS Construction Underway

www.pipeline-news.com • November 2018 • Pipeline News 39

Comments: Pipeline is currently being considered for cancellation but, if built, will have a transportation capacity of 30 MMcf/d

Contractor: GAILProject: Mallavaram-Bhilwara PipelineType: Project includes the construction of new

pipelineLength: 984 milesLocation: Mallavaram - BhilwaraComments: Pipeline is currently being considered

for cancellation but, if built, will have a transportation capacity of 30 MMcf/d

IIL&FS ENGINEERING AND CONSTRUCTION CO. LTD. – (REV 2/17)Owner: Gas Authority of India Ltd.Project: Kochi-Koottanad-Bangalore-Mangalore

PipelineType: Project includes the laying and

construction of 30-inch pipeline along with associated works

Length: 685 milesLocation: KeralaCompletion: 2019Comments: GAIL has won a second extension for

completing the project as it faces unprecedented problems in getting land in Kerala and Tamil Nadu

PERUSAHAAN GAS NEGARA – (8/17)Operator: PertaminaProject: Duri-Dumai Pipeline SystemType: Project includes construction of

transmission and distribution pipelines Length: 75 milesDiameter: 24 inchesLocation: Dumai, RiauCapacity: 140 MMcf/d Cost: $574 million Start: 3Q 2017Completion: 4Q 2018

Contractor: P.T. Connusa EnergindoType: Project includes engineering,

procurement and design

Contractor: PertaminaType: Project includes construction of

transmission and distribution pipelines

PETROVIETNAM GAS/MOECO/PTTEP – (REV 6/16)Project: O Mon Gas PipelineType: Project includes the construction of risers,

subsea pipeline, onshore pipeline and a line break valve

Length: 248 milesLocation: Malay Basin - southern Vietnam

Completion: 2023Comments: Pipeline will have a capacity of 20.3

MMcm/y

PUNJ LLOYD – (5/16)Type: Project includes the construction of a

14-inch pipeline (186 miles) and a 32-inch pipeline (187 miles) and the construction of a block valve and pigging stations

Length: 373 milesLocation: Oman New Delhi Completion: 2018

RELIANCE INDUSTRIES – (REV 11/16)Owner: China National Petroleum Corp.Project: Shahdol-Phulpur PipelineType: Project includes the construction of new

pipelineLength: 188 milesLocation: Shahdol - Jaysing Nagar - Beohari-Gurh

- PhulpurCompletion: 2023Comments: Pipeline will have a capacity of 4.3

MMcm/d

Project: Dahej Nagothane Ethane Pipeline Project Type: Project includes the construction of new

pipelineLength: 301 milesLocation: Dahej, Gujarat – Nagothane, Maharashtra Comments: Project will transport 1.25 MMtpa of liquid

ethane

FSU Eastern EuropeAZERBAIJAN INTERNATIONAL OPERATING CO. – (REV 12/16)Project: South Caucasus Pipeline ExpansionType: Project includes pipeline looping and two

new compressor stationsLength: 303 milesCompletion: 2019Location: Azerbaijan - Georgia-Turkey borderComments: Project will connect with the Trans-

Anatolian Natural Gas Pipeline

FGSZ LTD. – (12/17)Project: Bulgaria-Romania-Hungary-Austria (BRUA) Pipeline ProjectType: Project includes construction of pipeline and three compressor stationsLength: 819 milesDiameter: 32 inchesLocation: Bulgaria - Romania - Hungary – AustriaCapacity: 1.7 Bcm/y (initial) 4.4 Bcm/y (maximum)Completion:4Q 2019

Comments: Project will increase security of gas supply and to reduce energy dependence by making it possible to diversify gas supply routes and sources

Contractor: Transgaz Type: Contract includes the first phase of construction for the Romanian section of the pipelineLength: 297 milesLocation: Podisor - Recas

GASCADE – (10/18)Project: European Gas Pipeline Link (EUGAL)Type: Project includes pipeline constructionLength: 298 milesDiameter: 56 inchesLocation: Mecklenburg-Western Pomerania –

Brandenburg - SaxonyCapacity: 55 Bcf/yCompletion: 4Q 2020Comments: System will be powered by the Nord

Stream 2, the gas transport network that connects Siberia to the heart of Europe via the Baltic Sea

Contractor: Bonatti/Max Streicher JVType: Contract includes construction of six lots

of the European Gas Pipeline Link

Contractor: EuropipeType: Contract includes pipeline supply and

delivery for the project

Contractor: Mulheim Pipecoatings Type: Contract includes pipe coating for the

project

GAZPROM – (2/16)Project: Power of Siberia PipelineType: Project includes the construction of

55-inch pipeline that will run through swampy, mountainous and seismically hazardous areas

Length: 1,864 milesLocation: Irkutsk Region - Republic of Sakha

(Yakutia) - Amur RegionCapacity: 38 Bcm/y of natural gas from RussiaCost: $400 billionStatus: According to Russian media, the project is

moving ahead of schedule and 448 miles of the pipeline has been completed

Completion: 2018Comments: Project is a key element in a 30-year gas

supply deal between Moscow and Beijing

Project: Yakutia-Kahbarovsk-Vladivostok PipelineType: Project includes the construction of new

56-inch pipeline

40 Pipeline News November 2018 • www.pipeline-news.com

Length: 2,500 milesLocation: Yakutia - VladivostokCompletion: 2019Comments: Project will have a design capacity of 61

Bcm/y of natural gas

GAZ-SYSTEM S.A — (8/18)Project: Lwówek-Odolanów PipelineType: Project includes pipeline constructionLength: 168 milesLocation: Lwówek-OdolanówCompletion: 2020Comments: System is part of the international North-

South Gas Corridor. It also constitutes the final element of the mainline connecting the LNG terminal in Swinoujscie with the underground gas storage facilities in Wierzchowice and Mogilno

Project: Baltic Connector Pipeline Type: Project includes the construction of a

bi-directional gas transmission pipeline, two onshore gas transmission pipelines, a gas metering station and two compressor stations

Length: 93 milesDiameter: 20 and 27 inchesLocation: Paldiski (Estonia) - Inkoo (Finland)Capacity: 7.2 MMcm/dCompletion: 1Q 2020Comments: Project will connect the Finnish and Baltic

gas grids, which are also expected to be linked with Poland at around the end of this decade. Russia’s Gazprom is currently the sole supplier of pipeline natural gas to Finland. The EU is striving to reduce its reliance on Russian gas across its member states to improve the security of its supplies

Contractor: Dovre GroupType: Contract includes project management

for the pipeline

Contractor: Neste JacobsType: Contract includes engineering for the

project

Contractor: MMTType: Contract includes a route survey for the

offshore pipeline

Contractor: Corinth PipeworksType: Contract includes pipeline supply for the

onshore portion of the project

Contractor: AllseasType: Contract includes offshore pipeline

installation

NORD STREAM 2 AG – (5/18)Project: Nord Stream 2 PipelineType: Project includes twinned pipeline

constructionLength: 745 milesDiameter: 48 inchesLocation: Russia - Baltic Sea - Greifswald in

Germany

Capacity: 55 Bcm/yCompletion: 4Q 2019

Contractor: Next GeosolutionsType: Project includes survey work on the

pipeline deploying the Go Electra vessel from Hanko in Finland, which will be supported by 15 of M² Subsea’s personnel who will carry out the UXO identification work

Contractor: Allseas GroupType: Project includes offshore pipe laying of

both pipelines through the Baltic Sea

Contractor: WascoType: Project includes applying concrete weight

coating to the 48-inch pipe

Contractor: MMT SwedenType: Project includes the visual and

instrumental inspection of both lines with remotely operated vehicles over the entire length of the route, including the project’s trenched sections and cable crossings

Contractor: Wasco Coatings Europe BVType: Project includes transport, handling and

storage of 113,000 pipes

Contractor: IntertekType: Project includes pipeline inspection

POLAND/LITHUANIA – (REV 3/12)Type: Project includes the construction of new

pipelineLength: 445 milesLocation: Estonia - Latvia - Lithuania - PolandComments: Project is in the feasibility stage

ROSTEC – (12/15)Owner: Russia/PakistanProject: Karachi-Lahore PipelineType: Project includes the construction of new

pipeline and eight compressor stations along the route

Length: 684 milesLocation: Karachi - Lahore Completion: 2018Comments: Project will have a capacity of 12.4 Bcm/y

will link the liquefied natural gas terminals in the port of Karachi and the city of Lahore

STROYGAZMONTAZH – (2/17)Owner: GazpromProject: Ukhta-Torzhok 2 PipelineType: Project includes the construction and

installation of 60-inch pipeline and seven compressor stations

Length: 173 miles (602 miles total)Location: Yamal - Ukhta - Torzhok Completion: 2019Comments: Project will play a key role in ensuring

the delivery of the needed gas volumes to northwestern Russia for domestic consumption and export purposes, including an order to deliver natural gas

into Nord Stream 2, and will have an annual capacity of 45 Bcm of natural gas

TRANS ADRIATIC PIPELINE AG – (10/16)Contractor: Himachal Futuristic Communications Ltd. Owner: Trans Adriatic Pipeline AG Project: Trans Adriatic PipelineType: Project includes the supply and delivery of

963 miles of fiber optic cableLength: 545 milesLocation: Azerbaijan – EuropeCompletion: 2020Comments: The pipeline will connect with the Trans

Anatolian Pipeline

Contractor: SPIECAPAGOwner: Trans Adriatic Pipeline AG Project: Trans Adriatic PipelineType: Project includes supplying 4-inch pre-

commissioning tools, tracking equipment, as well as accessories for the pipeline

Contractor: SiemensProject: Trans Adriatic Pipeline Type: Project includes the installation of six

15-megawatt SGT-400-driven turbo compressor trains

Contractor: TechnipProject: Trans Adriatic PipelineType: Project includes supplying 4-inch pre-

commissioning tools, tracking equipment, as well as accessories for the pipeline

Contractor: TechnipProject: Trans Adriatic PipelineType: Project includes the overall project and

site management, procurement and subcontracting for all the EPC packages throughout the engineering, procurement and construction phases, as well as warranty management and the project close-out

Contractor: Industria Meccanica Bassi S.p.AProject: Trans Adriatic PipelineType: Project includes two contracts: first,

for engineering, manufacturing and delivery of 48-inch and 36-inch piggable T-pieces and welded elbows of different characteristics and, second, scraper traps units for intelligent pigging

Contractor: Nuova GiungasProject: Trans Adriatic PipelineType: Project includes the engineering,

manufacturing and delivery of 48-inch and 36-inch isolating joints

Middle EastPETROJET – (3/17)Owner: Oman Gas Co.Project: Duqm PipelineType: Project includes the construction and

looping of 36-inch pipelineLength: 137 miles

ONGOING PROJECTS Construction Underway

www.pipeline-news.com • November 2018 • Pipeline News 41

Location: Saih Nihayda - Wusta coastCompletion: 2018

SAUDI ARABIAN OIL CO. – (9/18)Project: South Gas Compression Plant PipelinesType: Project includes construction of flowlines,

trunklines and transmission linesLength: 435 milesLocation: Eastern Saudi ArabiaCompletion: 2021Comments: Project is associated with the Haradh Gas

Plant and comes under the Southern Area Energy Efficiency Program

Contractor: SaipemType: Contract includes procurement and

construction for the project

Contractor: TefkenType: Contract includes building satellite gas

compression plant pipelines for the Haradh Gas Plant

TAPI PIPELINE CO. LTD. – (4/18) Owners: TurkmenGaz, Afghan Gas Enterprise, Inter

State Gas Systems, GAILProject: Turkmenistan – Afghanistan – Pakistan -

India (TAPI) PipelineType: Project includes pipeline constructionLength: 1,127 milesDiameter: 56 inchesLocation: Heart – Kandahar – Chamman – Zhob

– DG Khan – Multan - Fazilika (Pakistan-India Border) Capacity: 3.2 Bcf/d

Cost: $22.5 billionCompletion: 1Q 2020Comments: Project is being funded by the Asian

Development Bank and will connect the state of Punjab in northern India with the Galkynysh gas field in the desert in eastern Turkmenistan

LNG - InternationalAsia PacificKUMUL PETROLEUM HOLDINGS LTD. —

(10/17)Project: Kikori Energy HubType: Project includes a mid-scale LNG

liquefaction and regional export facility,180MW power generation facility, methanol process facility and a condensate stabilization, storage and regional export facility

Location: Gulf Province, Papua New GuineaStatus: Project is in the preliminary front-end

engineering and design stageComments: Project is part of the Western Pipeline

Extension Project, which will allow stranded oil and gas fields in the western provinces to come to the coast for export

Contractor: KBR Inc.Type: Project includes conceptual development

and feasibility study services for the Kikori Energy Hub

OIL - InternationalAsia PacificBANGLADESH PETROLEUM CORP. – (12/17)Type: Project includes the construction of off shore and onshore pipelineLength: 135 miles (90 miles offshore) and (45 miles onshore)Location: Bay of BengalCost: $550 millionStatus: Exim Bank of China will finance the projectCompletion: 1Q 2020Comments: Pipeline will unload oil from ships in the Bay of Bengal and deliver it onshore

CHINA – (8/16)Project: Gwadar-Kashgar PipelineType: Project includes the construction of

pipelineLength: 1,500 milesLocation: Gwadar - KashgarStart: 2017Completion: 2021

RELIANCE INDUSTRIES LTD. – (12/17)Project: KG-D6 Subsea Field DevelopmentType: Project includes developing the R-series fields as a subsea tieback to the existing control and riser platform off Block KGD6Location: Krishna Godavari Basin, offshore IndiaCapacity: 425 MMcf/dCost: $6 billionCompletion: 2020

Contractor: McDermott International Inc. Type: Contract includes engineering, procurement, installation and pre-commissioning for the projectComments: The optional scope also consists of two additional subsea structures and flowlines at a water depth between 4,593 and 5,905 feet

TRANSNEFT PCD LLC — (8/18)Project: Novovelichkovskaya - Krasnodar Oil

PipelineType: Project includes pipeline constructionLength: 31 milesDiameter: 21 inchesLocation: Novovelichkovskaya - KrasnodarCapacity: 4.5 MMt/yCompletion: 2019Comments: System will join Novovelichkovskaya oil

pump station with refineries of Krasnodar Territory - Afipsky and Ilsky

UGANDA/TOTAL E&P – (7/17)Contractor: Gulf Interstate Engineering has been

awarded a contract for the front-end engineering and design of the pipeline

Project: Uganda–Tanzania Crude Oil PipelineType: Project includes the construction of an

export pipeline and an associated oil refinery

Length: 897 milesDiameter: 24 inchesLocation: Hoima, Uganda - Tanga, Tanzania

Capacity: 200 MbpdCost: $4 billionStatus: President Museveni and his Tanzanian

counterpart John Pombe Magufuli signed the East African Crude Oil Pipeline Agreement in Dar es Salaam to express intent to go ahead with the construction of the project

Completion: 4Q 2020

AfricaGOVERNMENT OF KENYA – (7/18)Owner 1: Tullow Oil PLCOwner 2: African Oil Ltd.Owner 3: Maersk OilProject: Lokichar - Lamu Pipeline (Kenya Crude Oil

Pipeline)Type: Project includes pipeline constructionLength: 537 milesDiameter: 20 inches Location: Lokichar, Kenya – Lamu, KenyaCapacity: 80 Mbpd (initial) 120 Mbpd (maximum)Completion: 1Q 2021Comments: Pipeline will transport Uganda’s crude oil

from Kabaale, in Hoima district, northwest of Kampala to Chongoleani peninsula, near the Tanga port in Tanzania

Contractor: Wood Group Type: Contract includes the front-end

engineering design for the project

Contractor: Total SAType: Project includes pipeline construction

FSU Eastern EuropeAMBO LLC – (9/13)Project: AMBO Pipeline Type: Project includes the construction of new

pipelineLength: 575 milesLocation: Burgas - VloreComments: Pipeline is on hold due to the lack of

availability of crude oil coupled with financial hurdles

Middle EastKURDISTAN REGIONAL GOVERNMENT –

(1/18)Project: Kirkuk–Ceyhan PipelineType: Project includes the construction of

pipeline and two pumping stationsLength: 217 milesDiameter: 40 inchesLocation: Baiji, Saladin Province - Fish-Khabur

border crossing with TurkeyCapacity: 1 MMbpdComments: The new pipeline section will replace an

old pipeline that suffered severe damage in terror attacks after ISIS took control of Mosul in June 2014

42 Pipeline News November 2018 • www.pipeline-news.com

KUWAIT OIL CO. – (11/17)Project: Al Zour RefineryType: Project includes construction of an oil

refining plant, which will be one of the largest refining plants worldwide

Location: KuwaitCapacity: 615 MbpdCost: $14.5 billionCompletion: 1Q 2019Comments: Project is part of the Clean Fuels Project to

upgrade, expand, and transform the 270 Mbpd Mina Abdullah and 466 Mbpd Mina Al Ahmadi refineries into an integrated 800 Mbpd merchant refining complex and permanently shut down the 200 Mbpd Shuaiba Refinery

Contractor: Larsen & Toubro Type: Project includes engineering,

procurement and construction for the refinery

Cost: $265 million

Contractor: Saipem Type: Project includes engineering,

procurement, construction and commissioning activities associated with the feed pipelines for the Al Zour Refinery

Length: 280 milesCost: $850 millionComments: Project is designed to transport crude oil

and gas from various South Tank Farm manifolds to the new Al Zour Refinery and refined products to storage areas in the Mina Al Ahmadi Refinery

Contractor: Amec Foster WheelerType: Work scope includes front-end

engineering and design for the project

Contractor: Essar ProjectsType: Work scope includes engineering,

procurement and construction for the Al-Zour Refinery Project, Package-4

Cost: $1.57 billion

Contractor: Fluor Corp.Type: Work scope includes two engineering,

procurement and construction contracts for key process units, utilities and infrastructure for the new Al-Zour Refinery Project

Cost: $2.6 billion

Contractor: Técnicas ReunidasType: Work scope includes the installation of

processing units for the Al-Zour Refinery Project

Cost: $4.1 million

MINISTRY OF OIL OF IRAQ – (4/18)Operator: Iraq State Co. for Oil Projects Project: Basra-Aqaba PipelineType: Project includes construction of dual oil

and gas pipelinesLength: 1,044Location: Basra, Iraq - Aqaba, JordanCapacity: 1 MMbpd (oil), 258 MMcf/d (gas)Cost: $18 billion

Comments: Project will help to meet Jordan’s energy needs and crude will be supplied by state-owned South Oil Co., via the State Oil Marketing Organization

Contractor: SNC LavalinType: Project includes engineering,

procurement and design

NATIONAL IRANIAN OIL ENGINEERING AND CONSTRUCTION CO. – (REV 12/17)

Project: Goureh-Jask Crude Oil Pipeline Type: Project includes construction of pipeline and five pumping facilitiesLength: 621 milesDiameter: 42 inchesLocation: Genaveh – JaskCapacity: 1 MMbpdComments: Project will transfer crude oil to Jask Oil Terminal in the southern Hormozgan Province

PRODUCTS – InternationalMiddle EastTENGIZCHEVROIL – (3/18)Project: Area 51 PipelinesType: Project includes construction of a pipeline

gathering systemLength: 234 milesLocation: KazakhstanComments: Project is part of the FGP-WPMP Project

and will transport fluids (water, fuel gas, diesel) from the Tengiz and Korolev reservoirs to the new FGP processing facilities

Contractor: BonattiType: Project includes construction and pre-

commissioning of the pipeline gathering system

ZAKHEM INTERNATIONAL – (REV 8/14)Owner: Kenya Pipeline Co.Project: Mombasa-Nairobi PipelineType: Project includes the design and

supervision of the construction of new 14-inch pipeline

Length: 280 milesLocation: Mombasa-Nairobi Comments: As of April 2016, the project has been

delayed

Western Europe & EU CountriesYOKOGAWA ELECTRIC CORP. – (3/17)Owner: British Pipeline Agency Ltd.Type: Project includes the engineering,

installation and commissioning of a major multi-product fuel pipeline system consisting of three integrated pipelines

Length: 404 milesLocation: Ellesmere port in northwestern England -

southeastern coastCompletion: 2018

Comments: The pipelines connect to the City of London’s major airports and are a critical part of the UK’s infrastructure

OFFSHORE – International AfricaDANGOTE OIL REFINERY CO. – (3/18)Owner: Dangote GroupProject: Dangote Oil PipelineType: Project includes the transportation and

installation of nine subsea pipelinesLength: 62 milesDiameter: 24 and 48 inchesLocation: Lagos, NigeriaCompletion: 3Q 2019Comments: Project will connect to the 650 Mbpd

Dangote Oil Refinery and is part of Dangote’s $17 billion gas pipeline, fertilizer, petrochemicals and refinery projects

Contractor: China Harbor Engineering Co.Type: Project includes engineering,

procurement and construction

Contractor: China’s Offshore Oil Engineering Co.Type: Project includes engineering,

procurement and construction

MOBIL PRODUCING NIGERIA UNLIMITED — (6/18)

Project: Uplift PipelineType: Project includes offshore pipeline

constructionLength: 12.5 milesDiameter: 24 inchesLocation: offshore NigeriaComments: Project will run between the Idoho

platform, an onshore terminal, and the Edop and Idoho platforms

Contractor: Subsea 7Type: Contract includes engineering,

construction, transportation, installation and pre-commissioning of pipeline

Cost: $300 million

PETROSHOROUK – (11/17)Project: Zohr Field Development ProjectType: Project includes construction and

installation of an export pipeline and umbilicals

Diameter: 8 and 30 inchesLocation: offshore EgyptCompletion: 4Q 2018

Contractor: BHGESegment: Zohr Field Development Project Phase IIType: Contract includes project management,

engineering, procurement, fabrication, construction, testing and transportation of the subsea production system

Contractor: SaipemSegment: Optimized Ramp Up Phase

ONGOING PROJECTS Construction Underway

www.pipeline-news.com • November 2018 • Pipeline News 43

Type: Project includes engineering, procurement, construction and installation of an export pipeline and umbilicals

Cost: $900 millionComments: Saipem will deploy several vessels from

its highly specialized fleet, including the Castorone (the latest generation ultra-deepwater pipelayer); the subsea field development ship DSSaipem F2; the Saipem 3000 (a subsea construction vessel), the Castoro 6 and the trenching barge Castoro 10

Asia PacificCHEVRON AUSTRALIA – (9/18)Project: Gorgon LNG Project (Stage II)Type: Project includes 15 new wells, subsea

installations and pipelaying workLocation: Offshore AustraliaCapacity: 15.6 MMtpyComments: Project comprises offshore field facilities

feeding gas and condensate into three LNG trains and a domestic gas plant on Barrow Island

Contractor: TechnipFMCType: Contract includes project management

and engineering, transportation, installation and pre-commissioning of umbilicals and flying leads as well as manifolds

Comments: Contract also includes fabrication, transportation, installation and testing of rigid spools

Contractor: Wood GroupType: Contract includes engineering, design,

construction management, procurement, logistics, quality assurance, health, environment and safety management services for Chevron-operated onshore and offshore assets

CHINA NATIONAL OFFSHORE OIL CORP. – (11/17)

Project: Lingshui 17-2 Gas DevelopmentType: Project includes construction and

installation of a subsea production system, including the installation of a subsea distribution unit south of the floater, a pipeline-end manifold and five other manifolds, three to be installed in the east and two in the west

Location: Qiongdongnan Basin, South China SeaCapacity: 2.3 Bcm/y (initial) 30 Bcm/y (maximum)Completion: 2020Comments: Gas will initially be sent to Hong Kong

through an existing pipeline for power generation, but will also target the Pearl River Mouth Delta region in Guangdong province

Contractor: Offshore Oil Engineering Co.Type: Contract includes the front-end

engineering and design for the project

Contractor: Wood GroupType: Contract includes subsea and flow

assurance services

INPEX OPERATIONS AUSTRALIA PTY LTD. — (10/17)

Operator: INPEX Operations Australia Pty Ltd.Project: Ichthys LNG ProjectType: Project includes the development of a

gas export pipeline (lchthys LNG Project GEP), onshore LNG facilities, a central processing facility and an FPSO facility

Length: 553 milesDiameter: 42 inchesLocation: offshore Western AustraliaCapacity: 8.9 MMtpa (LNG) 1.6 MMtpa (LPG) 100 Mbpd (condensate)Cost: $34 billionCompletion: 3Q 2018Comments: Gas and condensate from the Ichthys

Field will be exported to onshore facilities for processing near Darwin via the export pipeline. Most condensate will be directly shipped to global markets from a floating production, storage and offloading facility permanently moored near the Ichthys Field in the Browse Basin

Contractor: SaipemType: Project includes engineering,

procurement, construction and installation of the gas export pipeline associated with Ichthys LNG Project

Comments: Saipem’s deep water installation vessel, Castorone, will lay the pipe to the Ichthys Field

Contractor: Wood GroupType: Projects includes subsea engineering

services for the gas export pipeline associated with Ichthys LNG Project

Contractor: HalfwaveType: Project includes multiple inline pipeline

inspectionsComments: The scope of work includes a custom built

42-inch acoustic resonance technology (ART) Scan™ by Halfwave to inspect the subsea pipeline that requires a low flow subsea launch with high speed inspection of the transmission pipeline

Contractor: JKC Australia LNG Type: Project includes construction of the

onshore facilities associated with Ichthys LNG Project

Contractor: Samsung Heavy IndustriesType: Project includes construction of the

central processing facility associated with the Ichthys LNG Project

Contractor: Daewoo Shipbuilding and Marine Engineering

Type: Project includes construction of the FPSO associated with the Ichthys LNG Project

L&T HYDROCARBON ENGINEERING LTD. – (5/17)Project: Neelam Re-Development & B173AC

ProjectType: Project includes the engineering,

procurement, construction, installation and commissioning and includes one new process platform containing gas processing and compression facilities, three new well head platforms, a 20-mile pipeline, and modification work on eight existing platforms

Length: 20 milesLocation: Neelam Field offshore IndiaCompletion: 2019

MURPHY SABAH OIL – (12/17)Owner 2: PETRONAS (56%)Project: Phase 1A Block H Gas DevelopmentType: Project includes the construction of a floating LNG facilityLocation: offshore Sabah, Malaysia (Sabah Delta Basin – Block H)Completion: 2018

Contractor: TechnipFMC Type: Contract includes the engineering, procurement, construction, installation and commissioning of the umbilicals, risers and flowlines as well as the transportation and installation of subsea hardware and controls

NEXEN PETROLEUM UK LTD. – (9/18)Project: Buzzard Phase II Development ProjectType: Project includes a subsea development of

the Buzzard northern area consisting of a 12-slot manifold and will be tied back to the existing Buzzard complex with a pipeline bundle assembly incorporating pipelines, manifolds, subsea controls and chemical injection

Location: Offshore ScotlandCompletion: 1Q 2021Completion: Project will allow production at Buzzard

to be accelerated and increased by accessing reserves in these reservoir blocks which cannot be reached from the existing Buzzard Wellhead Platform

Contractor: TechnipFMCType: Contract includes project management,

engineering, procurement, construction and installation of a pipeline bundle along with associated well and platform tie-ins, and provision of a heavy lift vessel for transport and installation of a new topside module

OIL & NATURAL GAS CORP. – (1/18)Project: Pipeline Replacement Project-4 (PRP4)Type: Project includes surveys; residual design;

engineering, procurement and fabrication; anti-corrosion and weight coating; installation of a submarine pipeline, riser and I/J tubes; modifications on existing facilities; and hook-up, testing, pre-commissioning and commissioning of facilities

44 Pipeline News November 2018 • www.pipeline-news.com

Length: 54 milesLocation: Arabian SeaComments: Project is part of ONGC’s strategy to

replace some of its well fluid, gas lift and water injection pipelines along with brownfield modification works on existing platforms in the company’s Mumbai High, Neelam, Heera and Bassein and Satellite fields in the Western Offshore field in the Arabian Sea on the continental shelf of Western India

Contractor: L&T Hydrocarbon Engineering Ltd.Type: Project includes engineering,

procurement, construction, installation and commissioning activities

Cost: $194 million

SUBSEA 7 S.A. – (5/17)Owner: Cooper Energy Ltd.Project: Sole Development ProjectType: Project includes the subsea tie-back

of the Sole well to the Orbost Gas Plant, the fabrication and installation of pipeline, spool and manifold, along with installation of a 40-mile umbilical and the commissioning of the system

Length: 40 milesLocation: Gippsland Basin Completion: 2018

FSU Eastern EuropeGAZPROM — (REV 1/18)Operator: South Stream Transport B.V. Project: TurkStream Pipeline Project Type: Project includes construction of two

parallel pipelinesLength: 1,190 milesDiameter: 32 inchesLocation: Ipsala, Turkey – Black Sea – Krasnodar,

RussiaCapacity: 31.5 Bcm/yCost: $14 billionStatus: Project construction has reached Turkish

watersCompletion: 4Q 2019Comments: Project will directly connect the large

gas reserves in Russia to the Turkish gas transportation network, to provide reliable energy supplies for Turkey and south-east Europe

Contractor: PetrofacType: Project includes engineering,

procurement and construction services for onshore pipelines and a gas receiving terminal associated with the TurkStream Pipeline

Location: Kıyıköy, TurkeyCapacity: 31.5 Bcm/yCost: $409 millionComments: The facility will receive gas from the

TurkStream Pipeline, originating from the compressor station in Anapa, Russia

Contractor: Allseas Group S.A.Type: Project includes pipe laying of the first

and second string of the pipeline’s offshore section

Length: 560 miles offshore (1,190 total)

PREMIER – (10/18)Project: Tolmount Field Gas ProjectType: Project includes a minimal facilities

platform exporting gas to shore via a new gas pipeline

Location: Southern North SeaCapacity: 300 MMcf/dCompletion: 4Q 2020Comments: Field is scheduled to produce gas for 10 -

15 years

Contractor: Centrica Storage Ltd.Type: Contract includes modifications to its

Easington Terminal so that it can receive and process the gas from the Tolmount field, which will arrive through a new gas pipeline

Location: Easington, YorkshirComments: Contract will extend the life of CSL’s

gas terminal at Easington, Yorkshire, until at least 2030, creating hundreds of jobs during the construction phase and securing 80 over the lifetime of the contract

Contractor: Rosetti MarinoType: Contract includes engineering,

procurement, construction, installation and commissioning of the platform

Contractor: SaipemType: Contract includes engineering,

procurement, construction and installation of the pipeline

STATOIL – (5/18)Project: Askeladd - Snøhvit PipelineType: Project includes pipeline constructionLength: 115 milesDiameter: 27 inchesLocation: weBarents SeaComments: Snøhvit development consists of the

Snøhvit and Albatross fields, which are currently operational, and the Askeladd field, which is under development and designed to maintain a full capacity utili-zation at the Melkøya LNG plant

Contractor: Subsea 7 S.A.Type: Contract includes pipelaying Length: 75 milesDiameter: 20 inchesCompletion: 1Q 2020

Middle EastBP OMAN – (3/18)Owner 2: Oman Oil Company Exploration &

Production, 40%Project: BP Khazzan Project (Phase II)Type: Project includes the ongoing expansion of

the gas gathering system, wellsite facilities and export pipelines

Location: Sultanate of Oman

Comments: Khazzan is considered to be one of the biggest tight gas projects in the Middle East and Phase 1 is expected to develop approximately 7 Tcf of gas, deliver plateau production of 1 Bcf/d and 25 Mbpd of gas condensate

Contractor: Jacobs Engineering Group Inc.Type: Project includes engineering,

procurement and construction management of the gathering system, export pipeline and wellsite facilities

Contractor: Petrofac Corp.Type: Project includes engineering,

procurement and construction management of an additional third gas train, liquid and compression trains and associated infrastructure, as well as brownfield work

Cost: $800 millionComments: The third gas train with a capacity for

nominally handling 500 MMcfd will help drive increased total production capacity from the CPF to 1.5 Bcfd

ENERGEAN OIL & GAS PLC – (5/18)Project: Karish & Tanin Development ProjectType: Project includes pipeline constructionLength: 56 milesLocation: offshore IsraelCapacity: 3.8 Bcm/yCompletion: 1Q 2021Updates: In support of the project, Energean has

signed long-term agreements with some of the largest private power producers and industrial companies in Israel

Comments: System will connect a proposed FPSO to Israel’s domestic sales gas grid

Contractor: Technip FMCType: Contract includes engineering,

procurement, construction, installation and commissioning for the project

SAIPEM — (7/18)Type: Contract includes engineering,

procurement, construction and installation activities for four pipelines

Diameter: 24 and 32 inchesLocation: Middle EastComments: Company has not said where the pipelines

will be built or which operating company has awarded the contract

SAUDI ARAMCO – (1/18)Project: Zuluf Field ExpansionType: Project includes the installation of water

injection and oil wellhead platforms, tie-in platforms, trunk lines and flowlines along with onshore central processing facilities

Location: offshore Saudi ArabiaCapacity: 600 MbpdCompletion: 1Q 2021Comments: The gas and condensate will be sent to

the new Tanajib gas plant, which is part of the new Marjan Program

ONGOING PROJECTS Construction Underway

www.pipeline-news.com • November 2018 • Pipeline News 45

Contractor: Jacobs Engineering Group Inc.Type: Contract includes engineering and project

management for the project

Project: Haradh Gas Increment ProgramType: Project includes construction of pipeline

and new gas compression facilitiesLength: 280 milesLocation: offshore Saudi ArabiaCapacity: 290 Mcf/dCompletion: 2Q 2019Comments: Pipeline will transport natural gas from the

Haradh field to the Hawiyah processing plant

Contractor: China Petroleum Pipelines Co.Type: Contract includes pipeline construction

Project: Safaniya Field ExpansionType: Project includes the construction and

installation of a tie in platform to serve as an extra gathering hub for future oil wellhead platforms, along with a trunkline

Length: 16 milesDiameter: 30 inchesLocation: offshore Saudi ArabiaComments: Pipeline will run between the new TP-21

and the onshore Safaniya GOSP-1

Contractor: McDermott International Inc.Type: Contract includes the engineering,

procurement, construction and installation of the platform

Contractor: National Petroleum Construction Co.Type: Contract includes the engineering,

procurement, construction and installation of the pipeline

Western Europe & EU CountriesENI – (8/17) Owner 2: SonatrachOperator: Transmediterranean Pipeline Co. Ltd. Contractor: DOF SubseaProject: Trans-Mediterranean PipelineType: Project includes pipeline inspection of five

submarine pipelinesLength: 466 milesDiameter: 20 and 48 inchesLocation: Sicily-Tunisia

EQUINOR ASA — (8/18)Project: Trolls Phase III ProjectType: Project includes subsea production

systems will comprise two subsea templates or manifolds, as well as nine trees

Location: Norwegian Continental ShelfCompletion: 2Q 2021Comments: The initial development was carried

out over two phases, and now Equinor is starting the Phase 3 development to recover the large amount of gas resources in the western part of the field

Contractor: Nexans S.A.Type: Contract includes providing umbilicals

required to power and control the subsea systems

Length: 18 miles

GASTRADE S.A. — (8/17)Project: Alexandroupolis Independent Natural Gas

SystemType: Project includes pipeline constructionLocation: offshore GreeceLength: 17 milesDiameter: 30 inchesCapacity: 6.1 Bcf/yCompletion: 4Q 2019Comments: Pipeline is associated with the

Alexandroupolis LNG project

Contractor: Wood Group Type: Project includes front-end engineering

and design

HURRICANE ENERGY PLC – (11/17)Project: Lancaster Early Production System ProjectType: Project includes installation of production

flowlines, manifolds and the FPSO mooring system; and commissioning and ongoing production of oil via the FPSO

Location: offshore west ShetlandCapacity: 17 MbpdCompletion: 1Q 2019

Contractor: TechnipFMCType: Contract includes engineering,

procurement, construction and installation for the project

NDT GLOBAL – (8/16)Owner: StatoilProject: Åsgard PipelineType: Project includes the development of

a suitable inline inspection tool and corresponding survey for the 14-inch pipeline

Length: 440 milesLocation: Norwegian SeaStart: 2016Completion: 2017

STATOIL – (9/17)Project: Askeladd - Snøhvit PipelineType: Project includes pipeline constructionLength: 115 milesDiameter: 27 inchesLocation: Barents SeaComments: Snøhvit development consists of the

Snøhvit and Albatross fields, which are currently operational, and the Askeladd field, which is under development and designed to maintain a full capacity utili-zation at the Melkøya LNG plant

Contractor: RambollType: Project includes pipeline front-end

engineering and procurement

Contractor: GE Oil & GasType: Project includes project development and

equipment supply

Operator: StatoilProject: Johan Sverdrup FieldSegment: Johan Sverdrup PipelineType: Project includes installation of a gas

export pipeline and an oil export pipelineLength: 170 miles (oil) 102 miles (gas)Diameter: 18 and 36 inchesLocation: North SeaCost: $18 billionCompletion: 1Q 2019Comments: The oil pipeline will be installed and

connected to the Mongstad oil terminal and the gas pipeline will be installed and connected to the Kårstø gas terminal

Contractor: Petroleum Safety Authority (PSA) NorwayType: Project includes an audit and

development of an installation concept

Contractor: Samsung Heavy IndustriesType: Project includes supply of pipeline and

fittings

Contractor: Mitsui & Co. Norway ASType: Project includes pipeline fabrication

Contractor: Wasco Coatings Malaysia Sdn. Bhd.Type: Project includes external anticorrosion

treatment and concrete weight coating

Contractor: Saipem Ltd.Type: Project includes pipelay

Contractor: DeepOceanType: Project includes engineering,

procurement, construction and installation of umbilicals and manifolds

Contractor: TechnipFMCProject: Visund Nord IOR ProjectType: Project includes engineering,

procurement and construction for subsea equipment, including delivery and installation of flowline spools and umbilicals

Location: Gullfaks Field, North Sea

Contractor: Wood GroupProject: Tampen Oil PipelineType: Project includes a feasibility study

covering subsea pipelines, risers and topside modifications

Location: Gulfaks Field, North Sea

STATOIL – (2/18)Owners: Petoro AS (30%); ExxonMobil Exploration

and Production Norway AS (17.44%); Idemitsu Petroleum Norge AS (9.6%); DEA Norge AS (8.57%); and Point Resources AS (1.1%)

Project: Snorre Expansion ProjectType: Project includes fabrication and

installation of a pipeline bundle system, modification work on Snorre A and a rig deal

Location: Tampen area, North Sea

46 Pipeline News November 2018 • www.pipeline-news.com

Completion: 2020Comments: Snorre has been producing oil and gas

since August 1992

Contractor: TechnipFMC Type: Project includes an EPC contract for the

subsea production system

Contractor: Subsea 7Type: Project includes fabrication and

installation of the pipeline bundle system

Contractor: AibelType: Project includes modification work on

Snorre A

Contractor: TransoceanType: Project includes a rig deal for the

expansion

VNG NORGE – (2/18)Owners: VNG Norge (operator, 30%); Faroe

Petroleum (25%); and Point Resources (45%)

Project: Fenja Redevelopment ProjectType: Project includes installation of subsea

equipment including umbilicals, risers, flowlines and the subsea production system for the Fenja Project, which will be tied back to the Njord platform with an electrically trace heated pipeline

Length: 23 milesLocation: offshore Norway

Contractor: Reinertsen ASType: Contract includes providing engineering

services for the project

Contractor: Aker SolutionsType: Contract includes FEED services for

subsea production systems for the project

Contractor: Subsea7Type: Contract includes FEED services for

subsea structures, umbilicals, risers and flowlines for the project

Contractor: TechnipFMCType: Contract includes integrated engineering,

procurement, construction and installation services for the project

Cost: $250 million

WOODSIDE ENERGY – (8/17)Operator: Woodside Petroleum Ltd.Project: Greater Western Flank (GWF) Project

Phase IIType: Project includes development of six

hydrocarbon fields, installation of a flowline, subsea hardware and an umbilical to tie wells into the GWF-2 Pipeline

Location: North West ShelfCapacity: 1.2 TcfCost: $2 billionCompletion: 1Q 2019

Contractor: FMC TechnologiesType: Project includes design, manufacture and

supply of subsea production systemsCost: $180 million

Operator: Woodside Petroleum Ltd.Project: GWF-2 PipelineType: Project includes construction of pipelineLength: 22 milesDiameter: 16 inchesComments: Pipeline is part of the Greater Western

Flank Project Phase II

Contractor: Wood Group KennyType: Project includes engineering support

during the fabrication and construction stages of the pipeline

Cost: $6 million

Contractor: McDermott Type: Project includes transportation and

installation of pipeline

Owner: BPProject: Forties Pipeline SystemType: Project includes delivering engineering,

procurement and construction services to six U.K. continental shelf offshore upstream assets

Location: North SeaCompletion: 2020

OTHER – InternationalAsia PacificDUBAI ELECTRICITY AND WATER AUTHORITY

(8/17)Project: Dubai Plan 2021 ProjectType: Project includes main water pipe

extensionLength: 25 milesDiameter: 23 to 47 inchesLocation: DubaiCost: $67.5 millionCompletion: 1Q 2021Status: Project has been awarded to an unknown

contractor