only information - mississippisp.mdot.ms.gov/contract administration/designbuild/adams... ·...
TRANSCRIPT
{
EQUATIONS EXCEPTIONSLENGTH DATA
LENGTH OF ROADWAY
LENGTH OF BRIDGES
LENGTH OF PROJECT (NET)
LENGTH OF PROJECT (GROSS)
LENGTH OF EXCEPTIONS
DATE
REVISIO
NS
BY
APPROVED:
APPROVED:
CHIEF ENGINEER DATE
EXECUTIVE DIRECTOR DATE
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
1
MISS. 1
PROJECT NO.STATESHEET
NO.
SCALES
PLAN
PROFILE
LAYOUT
HOR.VERT.
STATE OF MISSISSIPPI
PLAN AND PROFILE OF PROPOSED
STATE HIGHWAY
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
DIVISION ADMINISTRATOR DATE
DESIGN CONTROL
ADT ( ) = : ADT ( ) =
DHV = : D = % T= %
MPH = V (SPEED DESIGN)
BRIDGE STRUCTURES REQ'D.
NOTE
INDICATES APPROXIMATE
LOCATION OF PROJECT.
PASCAGOULA
GULFPORT
LUCEDALE
HATTIESBURG
LAUREL
MC COMB
BROOKHAVEN
PORT
GIBSON
NATCHEZ
VICKSBURGFOREST
MERIDIA
N
YAZOO
CITY
KOSCIU
SKO
WEST
POINT
COLUMBUS
GREEN
WO
OD
IN
DIA
NO
LA
GREEN
VIL
LE
GRENADA
HOUSTON
OXFORD
BA
TES
VILLE
CL
AR
KD
ALE
HOLLY
SPRINGSNEW
ALBANY
TUP
EL
O
FU
LT
ON
CORINTH
ABERDEEN
JACKSON
RO
AD
WA
Y
DESIG
N
DIVISIO
N
MIS
SIS
SIP
PI D
EP
AR
TM
EN
T
OF
TR
AN
SP
OR
TA
TIO
N
TIT
LE
BOX BRIDGES REQ'D.
MM
DD
YY
00:00
DG
NFI
LE
NA
ME
AM
PM
PERMITS ACQUIRED BY MDOT
NATIONWIDE #14
NATIONWIDE (OTHER)*
GENERAL*
INDIVIDUAL (404)*
WETLANDS AND WATERS PERMITS
WATERS WETLANDS
* ACQUISITION OF PERMITS FOR TEMPORARY IMPACTS DURING
CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR
APPROVED BY:
STORMWATER PERMIT
NO STORMWATER PERMIT REQUIRED (<1 ACRE)
Y
S
N
REQUIRED, CNOI SUBMITTED BY MDOT
REQUIRED, SCNOI TO BE SUBMITTED BY
DATE:
(NECESSARY FOR ULTIMATE IMPROVEMENTS ONLY):
(APPROX. MIDDLE OF PROJECT)
STATE MAP
(DISTURBED AREA=5 ACRES)
CONTRACTOR (1 TO 4.99 ACRES)
GPS CONTROL NOTES
NORTH EAST
ALL AZIMUTHS AND DISTANCES ARE
CONVERSION VALUES
GRID TO GEODETIC AZIMUTH
MS ZONEHORIZONTAL DATUM:
HORIZONTAL MONUMENT
VERTICAL DATUM:
VERTICAL MONUMENT ELEVATION
GROUND TO GRID (COMBINED) FACTOR
GRID VALUES, US SURVEY FEET
(US SURVEY FEET)NAD
NAVD (US SURVEY FEET)
PROJECT AVERAGE
A
A
BR-0015-01(120)
Ft
Ft
Ft
Ft
Ft
TOTAL
NONE
NONE
N/A
MS PROJ. NO. BR-0015-01(120)
ADAMS CNTY./CONCORDIA PAR.BR-0015-01(120)
FMS-106487/30100
MIS
SIS
SIP
PI
RIV
ER
ADAMS COUNTY, MSCONCORDIA PARISH, LA
P.E.: BR-0015-01(120) FMS: 106487/101000
CONSTRUCTION
NOT FOR
PRELIMINARY
FEDERAL AID PROJECT NO. BR-0015-01(120)
BEG OF PROJ. STA. 60+16.5 END OF PROJ. STA. 23+52.5
LAT. N 31° 33' 33" LONG. W 91°25' 11"
N/A
N/AN/A
N/A
ADAMS COUNTY, MISSISSIPPI CONCORDIA PARISH, LOUISIANA
U.S. HIGHWAY 84 WESTBOUND MISSISSIPPI RIVER BRIDGE
U29 AND U49 PIN AND LINK REPLACEMENTS
REQUEST FOR QUALIFICATIONS PLAN NOTES
Contract Plans Provided To Shortlisted Responders.
Scope Of Work And Plan Details Shown In the Conceptual Plans May Change Or Be Modified For
Detailed Contract Plans Will Be Provided To Shortlisted Responders.
These Plans Are Not Intneded For Construction.
The Following Set Of Plans Are Conceptual And Are Intended For The Request For Qualifications.
FOR INFORMATIO
N ONLY
NUMBER
WORKING
NUMBER
SHEET DESCRIPTION OF SHEET
A02
2
DETAILED INDEX
J.Gregg B.Gautreau
J.Bernard J.Gregg
A18
A17
A16
A15
A14
A13
A12
A11
A10
A09
A08
A07
A06
A05
A04
A03
A02
A01
76-97
71-75
70
67-69
64-66
61-63
58-60
46-57
19-45
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
AS-BUILT PLANS - 2003 CONTRACT PLANS
AS-BUILT PLANS - 1939 SHOP DRAWING TOP LATERALS, TOP WIND LINK, AND BOTTOM WIND LINK
AS-BUILT PLANS - 1939 SHOP DRAWING PIN AND LINK
AS-BUILT PLANS - 1939 SHOP DRAWING BOTTOM CHORD JOINT L48 & L49
AS-BUILT PLANS - 1939 SHOP DRAWING BOTTOM CHORD JOINT L28 & L29
AS-BUILT PLANS - 1939 SHOP DRAWING TOP CHORD JOINT U49
AS-BUILT PLANS - 1939 SHOP DRAWING TOP CHORD JOINT U29
AS-BUILT PLANS - 1939 ERECTION DRAWINGS AND SHOP DRAWING GENERAL NOTES
AS-BUILT PLANS - 1939 SUPERSTRUCTURE CONTRACT PLANS
TRAFFIC CONTROL PLAN
TRAFFIC CONTROL PLAN
TRAFFIC CONTROL NOTES
DAILY MAXIMUM SUSTAINED WIND SPEEDS
DAILY MEAN WIND SPEEDS
DAILY MAXIMUM AND MINIMUM TEMPERATURES
U29 & U49 LINK INFLUENCE LINES
U49 UPSTREAM TRUSS LINK REPLACEMENT
U49 UPSTREAM TRUSS LOWER PIN REPLACEMENT
U29 DOWNSTREAM TRUSS LOWER PIN REPLACEMENT
U49 TEMPORARY RESTRAINTS
SUGGESTED SEQUENCE OF CONSTRUCTION
U49 UPSTREAM TRUSS EXISTING CONDITION
U29 DOWNSTREAM TRUSS EXSTING CONDITION
GENERAL PLAN & ELEVATION WESTBOUND BRIDGE
GENERAL NOTES & QUANTITIES
DETAILED INDEX
TITLE SHEET
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\
BA
Tw00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A02.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
30-AP
R-2014 13:4
1
FOR INFORMATIO
N ONLY
STRUCTURAL STEEL:
ERECTION AND JACKING:
PAINTING NOTES:
WELDING NOTES:
3
A03
J.Gregg L.Evans
J.Bernard
DESIGN CRITERIA:
SPECIFICATIONS:
SHOP DRAWINGS:
ACCESS PLATFORMS:
NUMBER ITEM UNIT
1618-A MAINTENANCE OF TRAFFIC LUMP SUM
1620-A LUMP SUMMOBILIZATION
STRUCTURAL
907-810-A1
QUANTITY
EA
SUMMARY OF QUANTITIES
2
GENERAL NOTES & QUANTITIES
PAYMENT OF WORK:
PLAN CHANGES BY CONTRACTOR:
TEMPERATURE:
Included In The Price And Payment Of Other Bid Items.
This Item Will Not Be Paid For Directly, And Compensation Therefore Will Be Considered
To Be Connected.
Shall Be Size And Type Compatible With Existing Electrical Conduit And The Components
Conduit Shall Be Rigid Aluminum With Stainless Steel Hardware, Conduit And Wiring
Accordance With The Standard Specifications And National Electrical Code.
Electrical Conduit Systems Damaged Or Requiring Modification Shall Be Replaced In
And Wiring As Required To Make Bridge Repairs.
Contractor Shall Remove, Maintain And Replace Existing Bridge Electrical Conduits, Hardware
GENERAL NOTES
SCOPE OF WORK
The Director Of Structures, State Bridge Engineer.
Steel Shop Drawings And Matching Weld Metal Shall Be Used. All Welds Are Subject To Approval Of
All Welds That Are To Be Made On Any Structural Steel Shall Be Shown In The Structural
And By Certified Welders.
All Welding Shall Be Done By The Electric Arc Process. Welding Shall Be Done With Approved Electrodes
All Welds Shall Conform To ANSI/AASHTO/AWS D1.5 Bridge Welding Code.
Of Structures, State Bridge Engineer For Approval Prior To Fabrication.
Contractor Shall Submit Shop Drawings For All Structural Steel And Temporary Structures To The Director
EA 4
All Temporary Restraints Have Been Designed By The Service Load Method.
PIN AND LINK REMOVAL PLAN:
For The Last Three (3) Year Maximum And Minimum Temperatures, See Sheet 13.
Contractor Shall Engage Longitudinal Restraints At Daily Low Temperature.
10 Day Daily Forcasted Low Temperature Is Expected To Be Lower Than 40 Degrees Fahrenheit.
Contractor Shall Not Be Permitted To Engage Any Restraints Nor Remove The Pins And Link When The
Contractor Shall Be Responsible For Monitoring And Recording The Fluctuations In Daily Temperatures.
REQUEST FOR QUALIFICATIONS PLAN NOTES
Contractor Shall Be Permitted To Use Destructive Measures On The Existing Pins And Links To Be Removed.
Temporary Restraints, Equipment, Schedule, Sequence Of Construction, Etc.
U49 To The Director Of Structure, State Bridge Engineer For Approval. Submittal Shall Include Use Of
Contractor Shall Submit Detailed Procedures Outlining Means And Methods For Removing Lower Pins At U29 And
Plans And Calculations For Review And Approval By The Director Of Structures, State Bridge Engineer.
Modified. If Removed, Contractor Shall Reinstall Platforms In-Kind. If Modified, Contractor Shall Submit
U29 Downstream Truss And U49 Upstream Truss Access Platforms Shall Be Temporarily Removed Or
For Three (3) Year Daily Maximum And Average Wind Speeds, See Sheet 14 And 15.
In The Gulf Of Mexico And Expected To Make Landfall Near Louisiana, Mississippi, Or Alabama.
Contractor Shall Not Proceed With Pin Removal When A Tropical Storm Or Hurricane Is
Contractor Shall Not Remove Pins And Link When The Average Wind Speed Exceeds 30 Miles Per Hour.
The Natchez-Adams County Airport.
Contractor Shall Be Responsible For Monitoring The Wind Speeds As Reported From
Construction Or Fabrication Of Temporary Assemblies.
It Is The Contractors Responsibility To Field Verify All Dimensions Before Beginning
The Dimensions Shown Are Based On The Existing Bridge Plans And Shop Drawings.
Of 80 Fahrenheit.
All Dimensions Are Horizontal Unless Noted Otherwise On The Plans At A Normal Temperature
AISC Manual Of Steel Construction, 9th Ed, 1989 (Temporary Structures)
Design Specifications: AASHTO Standard Specifications For Highway Bridges, 17th Ed, 2002.
AASHTO LRFD Bridge Construction Specifications, 3rd Ed. With Interim Revisions.
Construction Specifications: Mississippi Standard Specifications For Road and Bridge Construction, 2004.
LIGHTING:
Contract Plans Provided To Shortlisted Responders.
Scope Of Work And Plan Details Shown In the Conceptual Plans May Change Or Be Modified For
Detailed Contract Plans Will Be Provided To Shortlisted Responders.
These Plans Are Not Intneded For Construction.
The Following Set Of Plans Are Conceptual And Are Intended For The Request For Qualifications.
STRUCTURAL STEEL (PIN AND LINK REMOVAL AND REPLACEMENT)
907-810-A2
WIND SPEED:
ELECTRICAL CONDUITS:
TOP LATERAL AND COVER PLATES:
DIMENSIONS:
Approval From The Director Of Structures, State Bridge Engineer.
Any Variation To The Suggested Sequence Of Construction Shown On These Plans Is Not Allowed Without
Contractor Shall Only Be Permitted To Install Temporary Restraints For One Joint Location At A Time.
The Opposite Location Pins And Links.
Contractor Shall Remove And Replace Only One Location (U29 Or U49) Pins And Link Prior To Replacing
See Sheet 7.
For Suggested Sequence Of Construction For Removing U29 Downstream And U49 Upstream Trus Pins And Link,
All Steel To Remain Shall Be Painted In Accordance With The Mississippi Standard Specifications.
All Temporary Steel Shall Be Shop Painted.
Mississippi Standard Specifications.
Any Existing Paint Removed Or Damaged During Construction Shall Be Re-Painted In Accordance With
U29 And U49 Existing Pins And Links Shall Become Property Of MDOT After Removal.
All Open Holes Shall Be Filled With A490 Bolts.
In The Bid Prices.
Shall Become The Property Of The Contractor And Its Removal From The Job Site Shall Be Included
Unless Noted Otherwise, Structural Steel Removed From The Bridge And All Temporary Structural Steel
All Temporary And Replacement Bolts Shall Be ASTM A490.
U29 And U49 New Pins And Links Are Designated Fracture Critical Members (FCM).
All New Link Steel Shall Be ASTM A709 (Grade 50W) F3.
0.35 Max %.
All New Pin Steel Shall Conform To ASTM A668, Class G. Max Carbon Content Shall Be Limited To
All Temporary Post-Tensioning Bars Shall Not Be Reused.
Otherwise Noted On The Plans.
All Temporary Thread Post-Tensioning Bars Shall Conform To ASTM A722, Type II (Grade 150) Unless
Otherwise Noted On The Plans.
All New And Temporary Structural Steel Shall Conform To A709 (Grade 50) Unless
Contractor May Disconnect Aesthetic Lighting With Approval From The Project Engineer.
Contractor Shall Be Responsible For Maintaining All Navigational And Aerial Lighting.
MAINTEANCE OF TRAFFIC:
Fields Measurements.
Saturday And Sunday, Except For Days Which Include Events, In Orders To Take
From 7:00 Am To 4:00 Pm Monday Thru Friday And From 7:00 Am To 6:00 Pm
Conctractor Shall Be Permitted To Close One Lane Of Traffic On The Westbound Bridge
Contractor Shall Maintain And Not Interfere With Marine Traffic.
Influence Lines.
The Load On The Pins And Link Being Replaced. See Sheet 12 For U29 And U49 Link
And Link And Shall Not Be Permitted To Place Any Equipment On Areas That Influence
Contractor Shall Limit Equipment On The Westbound Bridge When Replacing U29 And U49 Pins
Westbound Bridge Closure Date And Time Shall Be Approved By MDOT.
Links Not Installed.
Emergency Except For When The Existing Pins Have Been Removed And New Pins And
The Contractor May Be Required To Re-Open The Westbound Bridge In The Event Of An
Weeks Without Written Permission From The Project Engineer.
Contractor Shall Not Be Permitted To Close The Westbound Bridge To Traffic More Than 7
16 Thru 18.
Contractor Shall Redirect Westbound Traffic To The Eastbound Bridge As Outlined On Sheets
Of Temporary Restraints And Removal And Replacement Of Pins And Link.
Contractor Shall Be Permitted To Close The Westbound Bridge To Traffic During Installation
Will Only Review The Contractors Re-Design For General Conformance With The Plans.
Registered In The State Of Mississippi With Experience In Rehabilitating Truss Bridges. MDOT
Qualifications (RFQ). The Contractor's Construction Engineer Shall Be A Professional Engineer
Construction Engineer. Contractor's Construction Engineer Is As Defined In The Request For
Allowed, But Will Be Considered A Re-Design And Must Be Signed And Sealed By The Contractor's
Alternative Temporary Jack Assembly And Procedures For Removing The U29 And U49 Pins And Links Are
Contract Price Adjustments.
Of Structures State Bridge Engineer, Provided Such Changes Are Not Justifiable Reasons For
Minor Changes In Details Of Design Or Construction May Be Authorized In Writing By The Director
State Bridge Engineer.
No Changes Of The Plans Will Be Permitted Except By Written Authority Of The Director Of Structures,
For Location Of Top Lateral And Cover Plates, See Sheets 5 And 6.
Contractor Shall Reuse Existing Top Lateral And Cover Plate.
Contractor Shall Replace Rivets With Bolts.
Inspect The Remaining Links.
Contractor Shall Temporarily Remove Top Lateral And Cover Plates And Allow MDOT To
Provide And Maintain Traffic Control In Accordance With These Plans And Mississippi Standard Specifications.
Install New Gusset Plate At U49 Lower Pin As Directed By MDOT.
Fabricate And Replace U49 Upstream Truss Lower And Upper Pins With New 10‚" Diameter Pins.
Fabricate And Replace U49 Upstream Truss Links.
" Diameter Holes Through Existing Gussets At Upper And Lower Pin Locations.329
Bore New 10
Remove Existing 10"x16"x 7'-6" Link At U49 Upstream Truss.
Remove The Existing 10ˆ" Diameter Lower And Upper Pins At U49 Upstream Truss.
Install New Splice Plate Over Existing U49 Gusset.
Install Temporary Bypass On U49 Upstream Truss.
Install Temporary Longitudinal Restraint On U49 And L49 Upstream And Downstream Trusses.
U49 Upstream Truss
Provide And Maintain Traffic Control In Accordance With These Plans And Mississippi Standard Specifications.
Install New Gusset Plate At U29 Lower Pin As Directed By MDOT.
Fabricate And Replace U29 Downstream Truss Lower And Upper Pin With New 10‚" Diameter Pins.
Fabricate And Replace U29 Downstream Truss Links.
" Diameter Holes Through Existing Gussets At Upper And Lower Pin Locations.329 Bore New 10
Remove Existing 10"x16"x 7'-6" Link At U29 Downstream Truss.
Remove Existing 10ˆ" Diameter Lower And Upper Pins At U29 Downstream Truss.
Install New Splice Over Existing U29 Gusset.
Install Temporary Bypass On U29 Downstream Truss.
Install Temporary Longitudinal Restraint On U29 And L29 Upstream And Downstream Trusses.
U29 Downstream Truss
The Lower Pins And Links:
Upper Pins And Links. The Following Is An Overview Of The Scope Of Work Required To Replace
In General, The Scope Of Work Shall Consist Of Replacing U29 Downstream And U49 Upstream Lower And
907-810-A3 EA 12STRUCTURAL STEEL (TEMPORARILY REMOVE EXISTING PLATES)
STRUCTURAL STEEL (INSTALL NEW GUSSET PLATE)
Payment For Other Items.
Directly And Compensations Therefore Will Be Considered Included In The Prices And
All Work For Which No Pay Items Are Required In The Proposal Will Not Be Paid For
Plates)".
Cover Plates Shall Be Paid For Under 907-810-A3 "Structural Steel (Temporarily Remove
All Labor And Materials Associated With Temporarily Removing The Top Lateral And
907-810-A2 "Structural Steel (Install New Gusset Plate)".
All Labor And Materials Associated With Installing New Gusset Plates Shall Be Paid For Under
(Pin And Link Removal And Replacement)".
Upper And Lower Pins And Link Shall Be Paid For Under 907-810-A1 "Structural Steel
All Labor And Materials (Including Temporary Restraints) Required To Remove And Replace The
NEW GUSSET PLATES:
If A New Gusset Is Required, Both Faces Shall Recieve New Gusset Plates.
Gusset Plate In The Event Excessive Pack Rust Is Found In The Existing Gussets During Pin Removal.
Contractor Shall Be Responible For Either Re-Using The Temporary Splice Plate Or Providing A New
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\bat
w00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A03.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
05-
MA
Y-2014 18:0
2
FOR INFORMATIO
N ONLY
ELEVATION
558'-3"
(Span 5)
797'-6"
(Span 4)
875'-0"
(Span 3)
875'-0"
(Span 2)
558'-3"
(Span 1)
3664'-0" Total Main River Structure
14 Panels @ 39.875' 20 Panels @ 39.875' 20 Panels @ 43.75' 14 Panels @ 39.875'
Unit 1Unit 2Unit 3Unit 4
43.75' 437'-0" Suspended Span 43.75'
5 Panels @ 10 Panels @ 43.75' 5 Panels @
East
Abut
ment
VIDALIA, LA.
NATCHEZ, MISS.
PLAN
33'-0"
30'-5" Horizontal Clearance
12'-0" Lane
Typ.Typ.
1'-6"
15'-
11"
Vertic
al
Cle
arance
TYPICAL ROADWAY SECTION
F EF E F
EF E
E
Varies (5
9'-
6"
At
Panel
Point
U29
&
U49)
Mississippi River
F
Sta.
60
+16.5
Sta.
23
+52.5
Sta.
54
+58.2
5
Sta.
46
+60.7
5
Sta.
37
+85.7
5
Sta.
29
+10.7
5
?
Pier
5
?
Pier
4
?
Pier
3
?
Pier
2
?
Pier
1
(Eastbound Bridge Not Shown For Clarity)
(Westbound Bridge)
U69 Pins And Link U49 Pins And LinkU29 Pins And Link
U19 Pins And Link
? Bearing
? Upper Chord
? Roadway
4'-2•"
? Lower Chord
? Truss
? Truss
? Bearing
NOTES
WESTBOUND BRIDGE
GENERAL PLAN & ELEVATION
U29 Temporary Upper and Lower Longitudinal Restraint
Location Of U29 Pins and Link Replacement
Lower Longitudinal Restraint
U49 Temporary Upper and
Location Of U49 Lower Pins and Link Repacement
L48-U49 Temporary Bypass L28-U29 Temporary Bypass
L.Kalita
A04
4J.Gregg
M.Xin
Lower Longitudinal Restraint
U29 Temporary Strenghten Plates And
Lower Longitudinal Restraint
U49 Temporary Strenghten Plates And
For General Notes, See Sheet 3.
For Suggested Sequence of Construction, See Sheet 7.
Elev. 142.75'
Low Chord
H.W. El. 77.09'
Clearance
55' Min Vertical
Clearance
55' Min Vertical
Temporary Splice Plateand L48-U49 Temporary Bypass
U49 ByPass Jack Beam Assembly, Anchor Assembly,
And L28-U29 Temporary Bypass
Anchor Assembly, Temporary Splice Plate,
U29 ByPass Jack Beam Assembly,
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\bat
w00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A04.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
05-
MA
Y-2014 18:11
U74
L88
U86 U84 U82 U80U78
U76 U72U70 U68 U66 U64 U62 U60
U58U56
U54
U48U52
U50U46 U44 U42 U40
U38U36
U34
U32U30
U28 U26 U24 U22 U20U18
U16
U14
U12U10
U8 U6 U4 U2
L0
L36L38L40L42L46L48L50L52L56L58L60 L32 L30 L28 L26 L22 L20 L18 L16 L12L24 L10 L8 L6 L4 L2L62L64L66L68L70L72L44
L76L78L80L82L84L86
FOR INFORMATIO
N ONLY
A
A
SECTION A-A
B
B
10ˆ" $ Upper Pin
Not Shown For Clarity)
(Top Lateral And Portal
U28-U29
L28-U29
U29-L30
U29-U3
0
Lower Pin
10ˆ" $
(C) Carbon Steel
(S) Silicon Steel
* 2010 Ultrasonic Test Of Pin
1'-9‡"
•" Gusset ` (S)
1'-6„"
1'-4„" In To In
Washers
ƒ" Gusset ` (S)
†" Gusset ` (S)
(10„" I.D.)
Washer(C) 14" $ x 1" Thick
Heavy Hex Nut(C)
1'-
5‹"
1•"
Fill PL „x4(C)MC 18x42.7(C)
1'-
0"
UpstreamDownstream2•" Depth)
(3‚" $ Counterbore
(2" $ Bored Hole)
10ˆ" $ x 1'-11„"
Forged Pin
(1Ž" $ Hole)
11" (I.D.) x ƒ" Thick
Existing Pin Cap(C) 12•" (O.D)
Forged Link
1" 0"
(Sept. 2012)
UpstreamDownstream
1'-4"
Link
(Existing)
Direction Pin Was Originally Driven
A05
5
Forged Link 1'-4"x10"x9'-6ˆ"
10ˆ" $ Upper Pin
Rod(C) 1ƒ" $
Gusset `
3ƒ" 3ƒ"
Gusset `
Bottom of Existing For Clarity)
(Access Platform Not Shown
(Looking Downstream)
†" Gusset `
(Each Side)
ƒ" Gusset `
(Each Side)
†" Gusset `
(Each Side)
•" Gusset `
(Each Side)
•" Gusset `
(Each Side)
ƒ" Gusset `
(Each Side)
Œ" Gusset `
12"
Œ"
About 4" To 5" (Measured At 80 Degrees)
Hanger
NOTES
` •x29‡x3'-1•"
10ˆ" $ Lower Pin
10ˆ" $ Erection Pin
(Upstream & Downstream Ends)
Various Areas Full Circumference
*Signs Of Barrel Surface Pitting
In Pin
Counterbore
(11:00-1:00)
Outward Bulge In Gussets
J.Gregg L.Evans
J.Bernard
10" x 1'-4" x 7'-6ˆ" (Center-To-Center) Link
Between Pin-Link And Pin-Gusset
Signs Of Acoustic Coupling
For Additional Details Refer To Construction Shop Drawings.
Acoustic Coupling Indicates Contact Area With High Contact Pressure.
As Part Of The 2012 And 2013 Inspection.
Ultrasonic Testing Was Performed On The Lower Pins
Inspection And The 2012 Routine Inspection Of The Bridge.
U29 Downstream Truss Existing Condition Is Based On The 2010 In-Depth
EXISTING CONDITION(U29 LOWER PIN DETAILS)
SECTION B-B
" $ Hole (Link), (Typ.)323
Bored 10
TRUSS ELEVATION
U29 DOWNSTREAM
U29 LOWER PIN MEASUREMENT
Top Lateral Plate
Cover Plate
U29 DOWNSTREAM TRUSS
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\
BA
Tw00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A05.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
30-AP
R-2014 17:0
2
FOR INFORMATIO
N ONLY
A
A
SECTION A-A
B
B
10ˆ" $ Upper Pin
Not Shown For Clarity)
(Top Lateral And Portal
1'-5‚"
1'-9…"
1'-4„" In To In
Washers
•" Gusset ` (S)
•" Gusset ` (S)
†" Gusset ` (S)
(10„" I.D.)
Washer(C) 14" $ x Ž" Thick
(1Ž" $ Hole)
11" (I.D.) x ƒ" Thick
Pin Cap(C) 12•" (O.D)
Heavy Hex Nut(C)
1'-
7Š"
1•"
Fill PL „x4(C)
3.94"
(U49 LOWER PIN DETAILS)
SECTION B-B
1'-
0"
UpstreamDownstream
Full Circumference
Corrosion Groove
*Signs Of Wear Or
2•" Depth)
(3‚" $ Counterbore
(2" $ Bored Hole)
10ˆ" $ x 1'-10†"
Forged Pin
U49-U50
U49-L50
L48-U49
U48-U49
Lower Pin
10ˆ" $
(C) Carbon Steel
(S) Silicon Steel
* 2010 Ultrasonic Test Of Pin
Forged Link
‡" ˆ"
(Sept. 2012)
UpstreamDownstream
1'-4"
Link
(Existing)
Direction Pin Was Originally Driven
U06
6
Forged Link 1'-4"x10"x9'-6ˆ"
Rod(C) 1ƒ" $
` • x17(C)
L4x3•(C)
Counterbore In Pin
12"
Œ"
Gusset `
Gusset `
Bottom of Existing
5‰" 5‰"
(Each Side)
1" Gusset `
(Each Side)
•" Gusset `
(Each Side)
…" Gusset `
(Each Side)
†" Gusset `
(Each Side)
•" Gusset `
(Each Side)
•" Gusset `
Hanger
About 4" To 5" (Measured At 80 Degrees)
NOTES
Upstream and Downstream Ends
Between 12:00 And 6:00 At
Signs Of Acoustic Coupling
` •x29…x3'-4‰"
(12:00-12:30)
Upstream Gusset `
Outward Bulge in
10ˆ" $ Lower Pin
Downstream Ends)
(Upstream &
Full Circumference
Pitting Various Areas
*Signs Of Barrel Surface
10" x 1'-2" x 7'-6ˆ" (Center-To-Center) Link
J.Gregg L.Evans
J.Bernard
For Clarity)
(Inspection Platform Not Shown
(Looking Upstream)
TRUSS ELEVATION
U49 UPSTREAM
U49 UPSTREAM TRUSS
EXISTING CONDITION
For Additional Details Refer To Construction Shop Drawings
Acoustic Coupling Indicates Contact Area With High Contact Pressure.
The 2012 And 2013 Inspection.
Ultrasonic Testing Was Performed On The Lower Pins As Part Of
Inspection And The 2012 Routine Inspection Of The Bridge.
U49 Upstream Truss Existing Condition Is Based On The 2010 In-Depth
10ˆ" $ Upper Pin
U49 LOWER PIN MEASUREMENT
Cover Plate
Top Lateral Plate
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\
BA
Tw00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A06.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
30-AP
R-2014 17:0
1
FOR INFORMATIO
N ONLY
(PT Bars)
L48-U49 Temporary Bypass
PT Bars
Temporary
Proposed
SUGGESTED SEQUENCE OF CONSTRUCTION
L50 L48L49L49a
Existing Hanger
U50
U48
U49 Upper Longitudinal Restraint
Bypass Jack Beam Assemblyand Pins
Flared Out To Allow Installation Of New Link
Temporary Bypass PT Shall Be
Upper Restraining Blocks
Lower Restraining Blocks
Lower Strengthening Plate
Lower Longitudinal Restraint
(Each Face To Remain)
Anchor Assembly
U49 UPSTREAM TRUSS TEMPORARY RESTRAINTS
U29 Downstream Truss Similar
M.Xin
J.Gregg
L.Kalita
7
A07
•
•
OF CONSTRUCTION
SUGGESTED SEQUENCE
16. Remove Temporary Restraints In Reverse Order
15. Install Angles On All Plate Free Edges Similar To Previous Angles Removed
U49 Splice Plate *14. Remove
13. Install New Pin And Link
Diameter hole Through Existing Gusset At Upper And Lower Pin Locations32912. Bore New 10
11. Remove Link And Pins From Top
10. Cut Upper And Lower Pins Past Gusset
9. Cut Link From Top to Remove And Transfer Any Remaining Load In Link To Temporary Restraints
8. Remove Top Plate Above Link On Member U49-U50
f. Repeat The Same Step On Opposite Face.
To Drill The Holes For The Newly Placed Bolt On Installed Splice Plate, Instead Of Pre-Drilling)
e. Install ‡" Diameter Bolts In The New Splice Plate. (Optional: Templates Can Be Used
d. Place Filler Plates And New Splice Plates
Replacing Removed Rivets and Newly installed Bolts.
c. Make New Splice Plates With "Diameter Holes For The ‡" Diameter Bolts
b. Repeat Step a) For All Existing Rivets Be Replaced As Shown In The Plan.
On Both Sides.
a. Remove Existing One Rivet At A Time Immediate Replace With A New ‡" Diameter Bolt Thread
Clean U49 Outside Gusset Contact Surface And Install New Splice Plates
Option B:
f. Repeat The Same Step On Opposite Face.
To Drill The Holes For The Newly Placed Bolt On Installed Splice Plate, Instead Of Pre-Drilling)
e. Install ‡" Diameter Bolts In The New Splice Plate. (Optional: Templates Can Be Used
d. Place Filler Plates And New Splice
Replacing Removed Rivets And Newly Installed Bolts.
c. Make New Splice Plates With "Diameter Holes For The ‡" Diameter Bolts
To Avoid Remaining Rivet Heads.
Step a), New ‡" Diameter Bolt Pattern shown In The Plans, And Oversized Holes
b. Make Templates And Filler Plates Which Include Holes Matching With Removed Rivet Holes In
a. Remove Existing Rivets As Shown In The Plan.
Clean U49 Outside Gusset Contact Surface And Install New Gusset Plates
7. Option A:
6. Remove U49 Existing L4x4 Angles On Free Edge Of Gusset Near Link
Member L48-U49 (761 Kips +/-). Contractor Shall Post-Tension Bars Simultaneously.
5. Post-Tension L48-U49 Temporary Bypass. Tension To Dead Load Force In Existing Truss
Upper And Lower Longitudinal Restraints. (Upstream And Downstream Trusses)
4. Install Upper And Lower Restraining Blocks, Lower Strengthening Plate, Post-Tension
3. Remove Traffic From Bridge And Redirect To Eastbound Bridge
Frame And Panels Curb Supports & Handrail Post Near L48.
Assembly (Do Not Tension). May Require Temporarily Removing Existing Sway
2. Install L48-U49 Temporary Bypass, Jack Beam Assembly, And Anchor Bypass
(Install On Upstream And Downstream Trusses).
1. Install Upper And Lower Longitudinal Restraints (Do Not Tension Or Install Blocks)
Removing Temporary Splice Plate.
* At MDOT's Direction, Contractor May Be Required To Install A New Gusset Plate At Lower Pin After
Temporary Splice Plate (Each Face)
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\bat
w00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A07.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
05-
MA
Y-2014 16:4
3
FOR INFORMATIO
N ONLY
Provide Longitudinal Restraint At Each Truss
(Looking Upstream)
Shim Pack
Temporary Lower Blocking
(Each Side)
Existing Lower Pin Gusset ` •"
Existing Lower Pin Gusset ` †" (Each Side)
Existing Hanger
Support Bracket
Temporary Lower Blocking
Existing L3•x3•x…
(Each Side)
Pin Gusset ` •"
Existing Lower
U48-U49
12
2ˆ
Existing L3•x3•x…
LEGEND
(Each side)
Temporary Bypass (PT Bars)
U49 - U50Temporary Post-Tension Bar (Each Side of Truss)
Post-Tensioning Assembly
Temporary Longitudinal
Temporary Upper Blocking Support Bracket
Temporary Upper Blocking Shim Pack
ByPass Jack AssemblyTop Plate to be Removed For Access to Link
A08
8
L.KalitaM.Xin
J.Gregg
RESTRAINTS
U49 TEMPORARY
Splice Plate
1'-1" Dia Hole In
U49 SPLICE PLATE, TEMPORARY LONGITUDINAL RESTRAINT AND TEMPORARY BY-PASS
SECTION A-A
(To Remain)
Splice Plate (To Remain)
Splice Plate
Gusset Plate
•" Existing
Gusset Plate
†" Existing
A
A
NEW SPLICE PLATE CONNECTION DETAILS
Existing Gusset Plate
Nuts To Fill The Gap
Temporarily Removed
Existing Stay Plate
•"(Each Side)
Existing Upper Pin Gusset Plate
Temporarily Removed
Existing Stay Plate
L4xL4 Angles
Temporary Remove Existing
Temporary Gusset DiaphragmTemporary Gusset Diaphragm
Gusset Plate
•" Existing
New Splice Plate
H.S. Bolts, (Typ.)
Repalce With ‡" Dia.
Remove Exist. Rivet And
Existing Link
Existing Pin
Existing L4x3 •
Existing Plate 2x17
Bolt
Proposed ‡" Dia.
New ‡"$ Bolt In •"$ Hole To Be Field Drilled.
Remove Existing Rivet For New ‡"$ High Strength Bolt.
Existing Rivet To Remain
(Each Side)
Temporary Splice Plate
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\bat
w00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A08.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
06-
MA
Y-2014 16:0
5
FOR INFORMATIO
N ONLY
1'-9‡"
1'-6„"
SECTION A-A
A09
9
U28-U29
U29-L30
U29-U30
1'-4"2•" 2•"
Existing Gusset ` •"
Existing Gusset ` ƒ"
Existing Gusset ` †"
L28-U29Existing Gusset ` •"
Existing Gusset ` ƒ"
Existing Gusset ` †"
New Lower Pin
Pin Nut (Typ.)
New Recessed
Existing Hangers
1'-4„"
Existing Washers
Inside To Inside
NOTES:
NEW LOWER PIN
NEW RECESSED PIN NUT
ANSI 125 Or Better
…"…"
6"
1'-
0‚"
1'-2„"
11†"
2…"
ƒ"
Existing Link
New Lower Pin
And Gusset Plates For
Existing Link, Washers
Straight Line Bore In
"$329
And ? New 10
? Existing Hole In Link
New Lower Pin
(Each Side)
Existing Lower Pin Gusset ` †"
(Each Side)
Existing Lower Pin Gusset ` ƒ"
LOWER PIN REPLACEMENT
U29 DOWNSTREAM TRUSS
(Each Side)
Existing Lower Pin Gusset ` •"
(Each Side)
Pin Gusset Plates
Existing Upper
(Each Side)
New Washer ` †"
(Each Side)
New Recessed Pin Nut
ASTM A668 Class G Pin
10‚"
Dia
meter
2„"
2„"
With 11"$ Hole, (Typ.)
New Washer ` †"x14•"$
SECTION B-B
J.Bernard
J.Gregg
S.Hebert
B B
A
A
New Upper Pin
New Link
New Link
Shall Then Be Coated Per MDOT Standard Specifications.
Adherence Of Paint Shall Be Completely Removed. The Exposed Surfaces Of The Pin
Any Corrosion, Excess Grease, And Any Other Contaminants That Would Prevent
Grade Lubricant Grease Having Non-Corrosive Properties. Immediately After Erection,
From The Entire Pin, And Only The Bearing Surfaces Shall Then Be Coated With High
Immediately Prior To Erection, The Protective Coating Shall Be Thoroughly Removed
Entire Pin Surface Shall Then Be Given A Coat Of An Approved Protective Coating.
White Blast Cleaning To Achieve A Surface Profile Depth Of 1.5 To 2.5 Mils.
Areas, Shall Be Abrasive Blast Cleaned In Accordance With SSPC-10 Near
After Fabrication, Finished Surfaces Of Pins With The Exception Of The Bearing
Pin Nuts Shall Be Secured By A Set Screw With A Cotter Pin Backup.
Provide Driving Nut And Pilot Nut To Protect The Pin Threads During Installation.
Shall Be Limited To 0.35 Max %.
Pin Steel Shall Conform To ASTM A668, Class G Max Carbon Content
For Suggested Sequence Of Construction, See Sheet 7.
For General Notes, See Sheet 3.
LOWER PIN REPLACEMENT
U29 DOWNSTREAM TRUSS
Cotter Pin (Typ.) (Bend Top In Field)
4"4"
COTTER PIN
12"
Min
` ‚"x‚"
3" Min.
2‚"
(Temporary Restraints Not Shown For Clarity)
(Looking Downstream)
ƒ" $ Hole For Cotter Pin (Typ.)
…" $ Set Screw
2'-2…"
New Gusset (Each Side)
New Washer ` 16"$ With 11"$ Hole, (Typ.)
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\bat
w00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A09.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
06-
MA
Y-2014 16:0
8
FOR INFORMATIO
N ONLY
1'-9…"
1'-5ƒ"
SECTION A-A
A10
1'-4"2•" 2•"
Existing Gusset ` •"
Existing Gusset ` †"
Existing Gusset ` •"
Existing Gusset ` •"
Existing Gusset ` †"
Existing Gusset ` •"
Pin Nut (Typ.)
New Recessed
1'-4„"
Existing Washers
Inside To Inside
NOTES:
LOWER PIN REPLACEMENT
U49 UPSTREAM
U48-U49
U49-U50
U49-L50
(Each Side)
Pin Gusset Plates
Existing Upper
(Each Side)
Pin Gusset ` •"
Existing Lower
(Each Side)
Pin Gusset ` †"
Existing Lower
L48-U49
LOWER PIN REPLACEMENT
U49 UPSTREAM TRUSS
Existing Hangers
Existing Link
6"
…" …"
ANSI 125 Or Better
NEW LOWER PIN
11†"
1'-
0‚"
1'-2„"
NEW RECESSED PIN NUT
2…"
ƒ"
(Each Side)
New Washer ` †"(Each Side)
New Recessed Pin Nut
New Lower Pin
(Each Side)
Existing Lower Pin Gusset ` •"
New Lower Pin
And Gusset Plates For
Existing Link, Washers
Straight Line Bore In
"$329
And ? New 10
? Existing Hole In Link
10‚"
Dia
meter
2„"
2„"
With 11"$ Hole, (Typ.)
New Washer ` †"x14•"$
SECTION B-B
10
J.Bernard
J.Gregg
S.Hebert
A
A
B B
(FCM)
ASTM A668 Class G Pin
New Link
New Link
New Upper Pin
New Lower Pin (FCM)
4"4"
2‚"
(Temporary Restraints Not Shown For Clarity)
(Looking Upstream)
Cotter Pin (Typ.) (Bend Top In Feild)
ƒ" $ Hole For Cotter Pin (Typ.)
For Cotter Pin Detail, See Sheet 9
Shall Then Be Coated Per MDOT Standard Specifications.
Adherence Of Paint Shall Be Completely Removed. The Exposed Surfaces Of The Pin
Any Corrosion, Excess Grease, And Any Other Contaminants That Would Prevent
Grade Lubricant Grease Having Non-Corrosive Properties. Immediately After Erection,
From The Entire Pin, And Only The Bearing Surfaces Shall Then Be Coated With High
Immediately Prior To Erection, The Protective Coating Shall Be Thoroughly Removed
Entire Pin Surface Shall Then Be Given A Coat Of An Approved Protective Coating.
White Blast Cleaning To Achieve A Surface Profile Depth Of 1.5 To 2.5 Mils.
Areas, Shall Be Abrasive Blast Cleaned In Accordance With SSPC-10 Near
After Fabrication, Finished Surfaces Of Pins With The Exception Of The Bearing
Pin Nuts Shall Be Secured By A Set Screw With A Cotter Pin Backup.
Provide Driving Nut And Pilot Nut To Protect The Pin Threads During Installation.
Be Limited To 0.35 Max %.
Pin Steel Shall Conform To ASTM A668, Class G. Max Carbon Content Shall
For Suggested Sequence Of Construction, See Sheet 7.
For General Notes, See Sheet 3.
…" $ Set Screw
2'-1‡"
New Washer ` 16"$ With 11"$ Hole, (Typ.)
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\bat
w00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A10.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
05-
MA
Y-2014 17:5
2
FOR INFORMATIO
N ONLY
A11
NOTES:
U48-U49
U49-U50
U49-L50
(Each Side)
Pin Gusset Plates
Existing Upper
(Each Side)
Pin Gusset ` •"
Existing Lower
(Each Side)
Pin Gusset ` †"
Existing Lower
L48-U49
Existing Hangers
(Each Side)
New Washer ` †"(Each Side)
New Recessed Pin Nut
New Lower Pin
(Each Side)
Existing Lower Pin Gusset ` •"
11
J.Bernard
J.Gregg
S.Hebert
A
A
New Link
New Upper Pin
2'-0"
7'-
6"
Edges Smooth (ANSI 250)
Grind All Flane Cut
"32910
1-1•"
SECTION A-A
NEW VERTICAL LINK
2" (6 Total)
? Link
? Pin And Hole
? Pin And Hole
? New Pin
Links And Spacers Shall Be ASTM A709 (Grade 50W) F3
Links Are Designated As Fracture Critical Members (FCM)
New Link (FCM)
New Link (FCM)
LINK REPLACEMENT
U49 UPSTREAM TRUSS
LINK REPLACEMENT
U49 UPSTREAM TRUSS
(Temporary Restraints Not Shown For Clarity)
(Looking Upstream)
(5 Bottom, 10 Total)
Spacer •"x16" O.D. 10Š" I.D. (Typ.)
Ž"x14" O.D. 10Š" I.D. Washer (Typ.)
In Place With Existing Weld To Gusset
Existing Ž" x 14" Washer Held
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\bat
w00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A11.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
05-
MA
Y-2014 18:0
0
FOR INFORMATIO
N ONLY
LinkLinkLinkLink
East
Abut
ment
VIDALIA, LA.
NATCHEZ, MISS.
Location Of U29 Repairs
Location Of U49 Repairs
F EF E F
EF E
E
(Eastbound Bridge Not Shown For Clarity)
(Westbound Bridge)
F
INFLUENCE LINES
U29 AND U49 LINK
1.0
-1.0
L74 L54 L49 L34 L14
L0
-1.0
1.0
1.0
-1.0
L74 L54 L34 L14
1.0
L0
-1.0
L29
L29
L19
L19
1.0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1 0.0
-0.3
33
-0.3
00
-0.2
67
-0.2
33
-0.2
00
-0.1
67
-0.1
33
-0.1
00
-0.0
67
-0.0
33
-0.2
67
-0.2
00
-0.1
33
-0.0
67
1.0
0.9
33
0.8
67
0.8
00
0.7
33
0.6
67
0.6
00
0.5
33
0.4
67
0.4
00
0.3
33
0.2
67
.020
0
0.1
33
0.0
67
0.0
0.0
(Axial)
(Axial)
A12
12
ELEVATION
U49 LINK INFLUENCE LINE
U29 LINK INFLUENCE LINE
NOTES
J.Gregg B.Gautreau
J.Bernard
Sta.
60
+16.5
Sta.
54
+58.2
5
Sta.
46
+60.7
5
Sta.
37
+85.7
5
Sta.
29
+10.7
5
Sta.
23
+52.5
?
Pier
5
?
Pier
4
?
Pier
3
?
Pier
2
?
Pier
1
Directed By MDOT.
The Load On The Pin Being Removed When Vertical Restraints Are Engaged Unless Otherwise
Contractor Will Not Be Allowed To Place Any Equipment On Areas That Will Influence
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\
BA
Tw00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A12.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
29-AP
R-2014 21:48
U74
L88
U86 U84 U82 U80U78
U76 U72U70 U68 U66 U64 U62 U60
U58U56
U54
U48U52
U50U46 U44 U42 U40
U38U36
U34
U32U30
U28 U26 U24 U22 U20U18
U16
U14
U12U10
U8 U6 U4 U2
L0
L36L38L40L42L46L48L50L52L56L58L60 L32 L30 L28 L26 L22 L20 L18 L16 L12L24 L10 L8 L6 L4 L2L62L64L66L68L70L72L44
L76L78L80L82L84L86
FOR INFORMATIO
N ONLY
A13
J.Gregg
100
80
60
90
70
50
40
20
10
Natchez, MS
DAILY MAXIMUM AND MINIMUM TEMPERATURES
Janurary
20
11
Daily Minimum Tempature
Daily Maximum Tempature
NOTES:
J.Gregg
J.Bernard
TEMPATURES
DAILY MAXIMUM AND MINIMUM
Te
mperature (D
egrees
Fahrenheit)
30
February
20
11
Septe
mber
20
11
Nove
mber
20
11
Dece
mber
20
11
Janurary
20
12
February
20
13
Septe
mber
20
12
Nove
mber
20
12
Dece
mber
20
12
Janurary
20
13
February
20
13
Septe
mber
20
13
Nove
mber
20
13
March
20
11
April
20
11
May
20
11
June
20
11
July
20
11
August
20
11
October
20
11
March
20
12
April
20
12
May
20
12
June
20
12
July
20
12
August
20
12
October
20
12
March
20
13
April
20
13
May
20
13
June
20
13
July
20
13
August
20
13
October
20
13
13
Weather Data.
Daily Maximum And Minimum Temperatures Were Obtained From WeatherUnderground Historical
The Daily Maximum And Minimum Temperatures Are For Informational Purposes Only.
For General Notes, See Sheet 3.
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\
BA
Tw00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A13.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
29-AP
R-2014 22:3
6
FOR INFORMATIO
N ONLY
A14
J.Gregg
Natchez, MS
Janurary
20
11
February
20
11
March
20
11
April
20
11
May
20
11
June
20
11
July
20
11
August
20
11
October
20
11
August
20
12
August
20
13
October
20
13
Septe
mber
20
11
Nove
mber
20
11
Dece
mber
20
11
Janurary
20
12
February
20
12
March
20
12
April
20
12
May
20
12
June
20
12
July
20
12
Septe
mber
20
12
Nove
mber
20
12
Dece
mber
20
12
Janruary
20
13
Feburary
20
13
March
20
13
April
20
13
May
20
13
June
20
13
July
20
13
Septe
mber
20
13
Nove
mber
20
13
October
20
12
NOTES:
J.Gregg
J.Bernard
18
16
14
12
10
8
6
4
2
0
DAILY MEAN WIND SPEEDSDAILY MEAN WIND SPEEDS
Mean
Win
d
Speed (M
PH)
(Hourly
Mean)
3s 3600s
14
Daily Mean Wind Speeds Were Obtained From WeatherUnderground Historical Data.
3 Second To One Hour Conversion = (V /V = 1.53)
Mean Wind Speeds Shown Are The Average Wind Speed Over A One Hour Duration.
The Daily Mean Wind Speeds Are For Informational Purposes Only.
For General Notes, See Sheet 3.
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\
BA
Tw00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A14.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
29-AP
R-2014 22:3
7
FOR INFORMATIO
N ONLY
A15
J.Gregg
Natchez, MS
Janurary
20
11
February
20
11
March
20
11
April
20
11
May
20
11
June
20
11
July
20
11
August
20
11
October
20
11
August
20
12
August
20
13
October
20
13
Septe
mber
20
11
Nove
mber
20
11
Dece
mber
20
11
Janurary
20
12
February
20
12
March
20
12
April
20
12
May
20
12
June
20
12
July
20
12
Septe
mber
20
12
Nove
mber
20
12
Dece
mber
20
12
Janruary
20
13
Feburary
20
13
March
20
13
April
20
13
May
20
13
June
20
13
July
20
13
Septe
mber
20
13
Nove
mber
20
13
October
20
12
NOTES:
J.Gregg
J.Bernard
35
0
DAILY MAXIMUM WIND SPEEDS
30
25
20
15
10
5
3s 120s
WIND SPEEDS
DAILY MAXIMUM SUSTAINED
Maxim
um
Sustained
Win
d
Speed (M
PH)
(2-
Miniute
Mean)
15
Daily Maximum Wind Speeds Were Obtained From WeatherUnderground Historical Data.
3 Second To 2 Minuite Conversion = (V /V = 1.29)
Maximum Sustained Wind Speeds Shown Are Based On A 2 Minute Mean
The Daily Maximum Wind Speeds Are For Informational Purposes Only.
For General Notes, See Sheet 3.
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATIONSEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
ADAMS COUNTY
SEAL:
U.S. HIGHWAY 84 MISSISSIPPI RIVER BRIDGE
DA
TE
RE
VISIO
NS
BY
DESIGNED DETAILED TRACED
CHECKED ISSUED DATE
STATE
MISS.
PROJECT NO.
WORKING NUMBER
SHEET NUMBER
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
PROJECT
\\
BA
Tw00\jobs\55932-Brid
ge
Desig
nServic
es
Master\
CA
DD\brid
ge\
Task
Order_15\Fin
al\
A15.d
gn
jgregg
PL
OTTE
D:
BR-0015-01(120)
106487/301000
BR-0015-01(120)
CONSTRUCTION
NOT FOR
PRELIMINARY
29-AP
R-2014 22:3
8
FOR INFORMATIO
N ONLY
TEMPORARY TRAFFIC CONTROL NOTES
CLOSURE.
CONTACTOR SHALL NOTIFY THE PROJECT ENGINEER 14 DAYS PRIOR TO ANY SCHEDULED
OTHER STATE, MUNICIPAL OR FEDERAL ENTITY AFFECTED BY LANE CLOSURES. THE
ENFORCEMENT AGENCIES, MISSISSIPPI DOT AND LOUISIANA DOTD OFFICIALS, AND /OR ANY
THE CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION WITH LOCAL AND STATE LAW
CIRCUMSTANCES WARRANT OTHERWISE.
BELOW THE POSTED SPEED LIMIT. CONTRACTOR MUST CONSULT WITH PROJECT ENGINEER IF
THE SPEED LIMIT IN CONSTRUCTION ZONES SHOULD NOT BE REDUCED MORE THAN 10 M.P.H.
ADDITIONAL COST.
INSTALLED AND PAID FOR UNDER ITEM 618-A001 MAINTENANCE OF TRAFFIC AT NO
DEVICES REQUIRED BY THE MUTCD, TCP SHEETS OR THE PROJECT ENGINEER WILL BE
MINIMUM CONSTRUCTION SIGNING IS SHOWN IN THESE PLANS. ANY ADDITIONAL SIGNS OR
EXPENSE.
WHICH ARE DAMAGED DUE TO CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S
DISCONNECTED AND/OR COVERED WHEN NOT IN USE UNLESS OTHERWISE NOTED. ANY DEVICES
TRAFFIC CONTROL DEVICES (MUTCD). MISLEADING DEVICES SHALL BE REMOVED,
TRAFFIC CONTROL SPECIAL DETAIL SHEETS (TCP SHEETS) AND THE MANUAL OF UNIFORM
ALL TEMPORARY TRAFFIC CONTROL DEVICES TO BE IN ACCORDANCE WITH MDOT TEMPORARY
CHANGE IN TRAFFIC PATTERNS. LIST TO BE PROVIDED BY THE PROJECT ENGINEER.
CONTRACTOR SHALL NOTIFY EMERGENCY SERVICES AND MEDIA WITHIN 72 HOURS OF A
LA DOTD PUBLIC INFORMATION SECTIONS.
ALL LANE CLOSURES SHALL BE COORDINATED WITH THE PROJECT ENGINEER, THE MDOT AND
MESSAGE SIGN".
ENGINEER. CHANGEABLE MESSAGE SIGNS PAID FOR UNDER ITEM 907-619-E3 "CHANGEABLE
ADVANCE OF THE LANE CLOSURE. LOCATIONS TO BE DETERMINED BY THE PROJECT
A MINIMUM OF TWO CHANGEABLE MESSAGE SIGNS PER DIRECTION SHALL BE PLACED IN
TIMES OF EMERGENCY EVACUATION, AS DETERMINED BY THE PROJECT ENGINEER.
INCLUDING THE FRIDAY BEFORE A HOLIDAY OR THE MONDAY AFTER A HOLIDAY, OR DURING
REFER TO SPECIAL PROVISIONS REGARDING LANE CLOSURES ALLOWED DURING HOLIDAYS,
ADHERE TO THE PUBLICIZED DATES/HOURS OF CLOSURE.
VARIOUS MEDIA OUTLETS AND DYNAMIC MESSAGE SIGNS. CONTRACTOR SHALL STRICTLY
CONTRACTOR SHALL PROVIDE ONE WEEK ADVANCE NOTICE TO THE PUBLIC THROUGH THE
NOT IN PROGRESS.
ALL LANES SHALL BE MAINTAINED CONTINUOUSLY AT THOSE TIMES THAT CONSTRUCTION IS
SECTION 619 AND 615 OF THE STANDARD SPECIFICATIONS AND THESE PLANS.
TEMPORARY PRECAST CONCRETE MEDIAN BARRIERS SHALL BE IN ACCORDINACE WITH SUB
OF FIRST AND SECOND PIN.
REMOVE AND REPLACE TEMPORARY PRECAST CONCRETE MEDIAN BARRIERS BETWEEN REMOVAL
INCLUDED IN ITEM 618-A "MAINTEANCE OF TRAFFIC". CONTRACTOR WILL BE REQUIRED TO
PLACEMENT AND REMOVAL OF TEMPORARY PRECAST CONCRETE MEDIAN BARRIERS SHALL BE
ATTENUATORS SHALL BE PAID FOR UNDER 618-A "MAINTEANCE OF TRAFFIC".
TEMPORARY PRECAST CONCRETE MEDIAN BARRIER, CHANEABLE MESSAGE SIGNS, IMPACT
ALL TEMPORARY TRAFFIC STRIPE, REFLECTIVE RAISED PAVEMENT MARKES, SIGNAGE,
CONTRACTOR SHALL COORDINATE ALL TRAFFIC CONTROL WITH OTHER AFFECTED CONTRACTS.
PROPER PLACEMENT AT ALL TIMES DURING LANE CLOSURE.
CONTRACTOR MUST MAINTAIN REFLECTIVE DEVICES AND STEADY BURN LIGHTS AND INSURE
STATE PROJECT NO.
MISS.
DA
TE
RE
VISIO
NB
Y
WORKING NUMBER
SHEET NUMBERFILENAME:
DESIGN TEAM CHECKED DATE 04/16/13
TC-01
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
RO
AD
WA
Y
DESIG
N
DIVISIO
NMIS
SIS
SIP
PI D
EP
AR
TM
EN
T
OF
TR
AN
SP
OR
TA
TIO
N
PL
AN
COUNTY: ADAMS
PROJ. NO. BR-0015-01(120)
MM
DD
YY
00:00
DG
NFI
LE
NA
ME
AM
PM
BR-0015-01(120)
TRAFFIC CONTROL NOTES
CONSTRUCTION
NOT FOR
PRELIMINARY
TC001_SH.DGN
A16
MISSISSIPPI RIVER BRIDGE
WESTBOUND
REPLACEMENT US HIGHWAY 84
U29 AND U49 PIN AND LINK
FOR INFORMATIO
N ONLY
OA
K S
T.
SP
RU
CE S
T.
PIN
E S
T
CE
DA
R
ST.
Mc
CO
Y
LN.
CR
OSS S
T.
JOHN DALE DR.
MURRAY DR.
MA
GN
OLIA
ST.
LO
UISIA
NA
AV
E.
GREGORY ST.
CARTER ST.
CONCORDIA AVE.
TEXAS ST.
LA 131/
ML
K
AV
E.
HIC
KO
RY
ST.
S. C
AN
AL ST.
GO
VERN
MENT FLEET RD.
TO
LL
HO
US
E
RD.
RA
MA
DA IN
N
MO
TEL
DR.
MO.
PA
C.
RAIL
RO
AD
MA
RIN
AV
E.
W4-2L
48x48
MILE
12
W20-5L
48x48
LEFT LANECLOSED
G20-2a
48x24
ROAD
WORK
END
500' 600' 500' 1000'
100' 300'
BE
GIN
BRID
GE (W
B)
BE
GIN
BRID
GE (E
B)
2600'
US 84/US 425
R2-124x30
SP
EE
D
LIM
IT
XX
B
B
C
C C
C
C
C
B
ST
RIPIN
GB
EGIN
TE
MP.
ON LOUISIANA SIDE OF BRIDGE.SEE SHEET A20 FOR DETOUR SIGNING AT CROSS STREETSNOTE:
1"=200'
48x48
W20-5L
LEFT LANECLOSEDAHEAD
TAPER
540'
45' C.C. 90' C.C.
B
25' C.C.
25' C.C.
(EB
BRID
GE
ONL
Y)
ME
DIA
N
BA
RRIE
R
BE
GIN T
EM
PO
RA
RY
W20-5
R48x48
RIGHT LA
NECL
OSED
1500 F
T
EN
D
BRID
GE (W
B)
EN
D
BRID
GE (E
B)
1000' 500' 600'
W4-2R
48x48
500'
2600'
G20-2a48x24
ROAD
WORK
END
100'
US 84/US 425
A
C
C
C
C
M3-424x12
M6-1R 21x15
A
M3-424x12
M5-1R
21x15
AM3-4
24x12
M5-1R
21x15
M6-1R
21x15
W20-248x48 AHEAD
DETOUR
AM3-4
24x12
R2-1
24x30
SP
EE
DLIM
IT
XX
C
ST
RIPIN
GE
ND
TE
MP.
1"=200'
48x48
W20-5
RRIG
HT LA
NECL
OSED
AHEAD
TAPER
540'
45' C.C.
90' C.C.
45' C.C.
(EB
BRID
GE
ON
LY)
ME
DIA
N
BA
RRIE
R
EN
D
TE
MP
OR
AR
Y
(TY
P.)
IM
PA
CT
AT
TE
NU
AT
OR
500'500'
2600' 2600'2600'
1 2
36x48
R16-3W
HE
N
WO
RK
ERS
AR
E P
RESE
NT
SPEEDIN
GFIN
ES
DO
UBLED
W3-5
48x48S
PE
ED
LIM
IT
XX
US 84/US 425
W20-1
48x481 MILE
WORK
ROAD 500' 500'
2600'2600' 2600'
3 1
W3-5
48x48
SP
EE
DLIM
IT
XX
36x48
R16-3
WH
EN
WO
RK
ERS
AR
E P
RESE
NT
SPEEDIN
GFIN
ES
DO
UBLED
US 84/US 425
W20-1
48x48
1 MILE
WOR
KRO
AD
PORTABLE MESSAGE SIGN
TYPE III BARRICADE WITH HIGH INTENSITY FLASHER, TYP.
TRAFFIC SIGN
TYPE "B" WARNING LIGHTS
REFLECTORIZED FREE STANDING PLASTIC DRUMS
FLASHING ARROW PANEL (TYPE "C")
TEMPORARY TRAFFIC CONTROL LEGEND
1.5 MILESCLOSEDRT. LANE
1.5 MILESCLOSEDLT. LANE
AHEAD2 MILESROAD WORK
3.
2.
1.
MESSAGE:
DETOUR M4-824x12
A
ROAD CLOSEDTO
THRU TRAFFIC
R11-4
60x30
DETOURM4-10R48x18
B
R11-248x30
ROAD
CLOSED
C
84M1-4
24x24
425M1-430x24
RIV
ER
MIS
SIS
SIP
PI
RIVER
MISSISSIPPI
MA
TC
HLIN
E
A
MA
TC
HLIN
E
B
MA
TC
HLIN
E
B
MA
TC
HLIN
E
A
STATE PROJECT NO.
MISS.
DA
TE
RE
VISIO
NB
Y
WORKING NUMBER
SHEET NUMBERFILENAME:
DESIGN TEAM CHECKED DATE 4/16/13
TC-02
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
RO
AD
WA
Y
DESIG
N
DIVISIO
NMIS
SIS
SIP
PI D
EP
AR
TM
EN
T
OF
TR
AN
SP
OR
TA
TIO
N
PL
AN
COUNTY: ADAMS
PROJ. NO. BR-0015-01(120)
MM
DD
YY
00:00
DG
NFI
LE
NA
ME
AM
PM
BR-0015-01(120)
TRAFFIC CONTROL PLAN
CONSTRUCTION
NOT FOR
PRELIMINARY
TC002_SH.DGN
A17
MISSISSIPPI RIVER BRIDGE
WESTBOUND
REPLACEMENT US HIGHWAY 84
U29 AND U49 PIN AND LINK
FOR INFORMATIO
N ONLY
BE
GIN
BRID
GE (W
B)
BE
GIN
BRID
GE (E
B)
M3-424x12
24x12M3-2
M5-1L21x15
M6-1R21x15
M6-1L
21x15
M6-1R21x15
21x15
M6-3
21x15
M6-3
21x15M6-3
M5-2L
21x15
M6-1L21x15
M6-1R
21x15
W20-248x48AHEAD
DETOUR
AA
C
A
B
C
A
A
A
A
B
A
B
A
A
C
C
C
CONCORDIA AVE.
MA
GN
OLIA
ST.
CARTER ST.
SP
RU
CE S
T.
OA
K S
T.
HIC
KO
RY
ST.
PIN
E S
T
GREGORY ST.
LO
UISIA
NA
AV
E.
W20-248x48AHEAD
DETOUR
W20-248x48AHEAD
DETOUR
G
DETOURM4-10L48x18
F
DETOURM4-10L48x18
21x15
M6-3
21x15
M6-3
G
F G
D
D
D
21x15
M6-3
F GE
E
DETOURM4-10L48x18
F GE
M6-1R
21x15
F
G
E
21x15M6-3
LA 131/
ML
K
AV
E.
M6-1R
21x15
A
B
C
TEXAS ST.
F
G
E
ONLY30x36R3-5R
M6-1R21x15
1"=100'
25' C.C
90' C.C.
25' C.C.
F GE
M6-1R
21x15
21x15M6-3
FG
21x15M6-3
G
M6-1R21x15
A
M6-1R21x15
A
M6-1L21x15
AM6-1L21x15
A
TYPE III BARRICADE WITH HIGH INTENSITY FLASHER, TYP.
TRAFFIC SIGN
REFLECTORIZED FREE STANDING PLASTIC DRUMS
TEMPORARY TRAFFIC CONTROL LEGEND
DETOUR M4-824x12
A
ROAD CLOSEDTO
THRU TRAFFIC
R11-4
60x30
DETOURM4-10R48x18
B
R11-248x30
ROAD
CLOSED
C
DETOUR M4-824x12
DETOUR M4-824x12
Spruce St.
DETOUR M4-824x12
Magnolia St.
ROAD CLOSEDTO
THRU TRAFFIC
R11-4
60x30
D
DETOURM4-10L48x18
D3-1 D3-1 D3-1Oak St.
Variesx12 Variesx12 Variesx12
E F G
84M1-4
24x24
425M1-430x24
STATE PROJECT NO.
MISS.
DA
TE
RE
VISIO
NB
Y
WORKING NUMBER
SHEET NUMBERFILENAME:
DESIGN TEAM CHECKED DATE 4/16/13
TC-03
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
RO
AD
WA
Y
DESIG
N
DIVISIO
NMIS
SIS
SIP
PI D
EP
AR
TM
EN
T
OF
TR
AN
SP
OR
TA
TIO
N
PL
AN
COUNTY: ADAMS
PROJ. NO. BR-0015-01(120)
MM
DD
YY
00:00
DG
NFI
LE
NA
ME
AM
PM
BR-0015-01(120)
TRAFFIC CONTROL PLAN
CONSTRUCTION
NOT FOR
PRELIMINARY
TC003_SH.DGN
A18
MISSISSIPPI RIVER BRIDGE
WESTBOUND
REPLACEMENT US HIGHWAY 84
U29 AND U49 PIN AND LINK
FOR INFORMATIO
N ONLY