on/off-site fabrication and site installation of pipework and … · boiler room deck before...
TRANSCRIPT
Modular built packages
Bespoke engineering solutions
Project management of refurbishment upgrades
On/off-site fabrication and site installation of pipework and process systems
Off-site testing of pumping systems
Company Portfolio 2015
Quality Management System
9001:2008
Environmental Management System
14001:2004
Occupational H&S
Management System
18001:2007 SAFEContractor Scheme
Utilities Verification & Assessment Scheme
Awards and Accreditations
Customers
Fabrication & Main Office Facilities
- 30,000 ft2 total
capacity with a 10t
overhead crane facility.
- Large outdoor area
currently used for site
simulation testing.
Boiler room deck before refurbishment
New and refurbished equipment in the boiler room
BAE Systems Steam Barge
- £2 million refurbishment of the steam barge ‘Steamhammer’.
Engineered for:
Lube Oil Flushing Rig
- Design and manufacture of a 2000 litre lube oil flushing rig.
- Stainless Steel tank, skid mounted design with various instrumentation.
Engineered for:
Nuclear Submarine Test Loop
- Fabrication of a 60 Bar
seawater test loop.
- 100% Radiography.
- Supply of high
performance butterfly
valves.
Engineered for:
Seawater Pump Replacement Engineered for:
- Six split case pumps providing seawater for the Astute class nuclear submarine
Existing Pump New Pump installed
The Problem
- High concentration of sandy seawater.
- Long periods of redundancy.
- Operating parameters of 43,000 l/min.
- History of problematic operation and maintenance.
The Solution
- Modified vertical upgrade split-case centrifugal pumps.
- Superior efficiency, easier maintenance.
- Design, supply and installation by NW Total.
- Ongoing data monitoring system.
New Motor New Pump delivery
- Used in the Steel industry.
- One of many Degasser units built each year at our premises.
Degasser System Engineered for:
- Dual liquid ring pump system, all
pipework vessels and frame
fabricated in house.
- Used in the Petrochemical
industry.
Simon Carves – Dual Pump Package Engineered for:
Deaeration Pump Skids Engineered for:
- 1, 2, or 3 pump skids, with
baseframes fabricated in house
to offshore specifications.
- Pipework generally GRP,
Stainless Steel, Cupro-Nickel, or
Super Duplex.
Ramsden Square Pipe Installation
- We are experienced in both
small and large scale site work.
- We regularly work on site for
the Utilities, Nuclear and
Pharmaceutical industries.
- A large amount of our site
work is carried out on a local
MoD site.
Engineered for:
Condensate Recovery System
- Bespoke condensate recovery system with integrated level control.
- Complete removal of exiting system on site.
- Designed, manufactured, and commissioned by NW Total.
Engineered for:
Industrial Water Booster Set
- Design and build of an Industrial Water Booster Set to rigid Sellafield standards.
Engineered for:
Off-site Simulation Testing
- We have a large test facility capable of simulating on-site
conditions.
- This is becoming increasingly popular in the Nuclear industry.
Engineered for:
Product Development Test Rigs
- Test rig manufactured to bespoke customer
requirements.
- PLC controlled with clean-in-place (CIP)
function.
HAST Unblocking Rig Engineered for:
- Stainless steel pipework requiring radiography and NDT.
- Sellafield quality level 02 build.
- Fully function tested at NW premises.
Engineered for:
Particle Test Rig
- A joint design with the customer to develop a test rig
for monitoring particles.
- Stainless steel welding and machined components.
- Borosilicate glass viewing window and infra red
camera.
Modular built packages | Bespoke engineering solutions | Fabricated Pipework Systems
On-site installation and final commission | Off-site testing of pumping systems
Summary
NW Total Engineered Solutions are a multi-disciplined company specialising in the following areas…
PCN Qualified Weld Inspection Engineers