opex real life challenge
TRANSCRIPT
![Page 1: OPEX real life challenge](https://reader036.vdocument.in/reader036/viewer/2022083022/58a8f53b1a28ab837c8b4d7f/html5/thumbnails/1.jpg)
Real life challenge OPEXminor
Do you have challenges?We are looking for them.
Quality
ProductProcess
Delivery
Time
Value-Customer Focus
TargetsOperational Excellence
Resources
PeopleMaterialsMachines
![Page 2: OPEX real life challenge](https://reader036.vdocument.in/reader036/viewer/2022083022/58a8f53b1a28ab837c8b4d7f/html5/thumbnails/2.jpg)
Who, what, where, when
What: a real project or task in your company fitting in your continuous improvement programme
Who: Group of 4 or 5 3rd year students Industrial Engineering; International or Dutch group
Where: 4 days per week in company for 4 weeks
When: 4 weeks from December 5th till January 13th (excluding Christmas and New Year’s Eve holiday period)
![Page 3: OPEX real life challenge](https://reader036.vdocument.in/reader036/viewer/2022083022/58a8f53b1a28ab837c8b4d7f/html5/thumbnails/3.jpg)
Deliverables
• Accepted step within a continuous improvement program, chosen by the company, e.g.– Kaizen event– Walk of waste– Daily meeting
A change has to be made. • Level of (lean) maturity scan
![Page 4: OPEX real life challenge](https://reader036.vdocument.in/reader036/viewer/2022083022/58a8f53b1a28ab837c8b4d7f/html5/thumbnails/4.jpg)
Activities of students• (Assist in) Developing, preparing and carrying out of
“improvement event” • Gain acceptance for this event from relevant
stakeholders. • Analyse Lean Maturity Level
![Page 5: OPEX real life challenge](https://reader036.vdocument.in/reader036/viewer/2022083022/58a8f53b1a28ab837c8b4d7f/html5/thumbnails/5.jpg)
Learning objectives
• Hands-on experience in improvement • Understand that improving needs a situation-dependent
approach• Know how to pinpoint required level of intervention
![Page 6: OPEX real life challenge](https://reader036.vdocument.in/reader036/viewer/2022083022/58a8f53b1a28ab837c8b4d7f/html5/thumbnails/6.jpg)
Prior knowledge of students
Increase Availability of Machine ZImprove Quality of Product Y
Reduce Lead Time in Factory X
These are third year students that already carried out projects in companies during their second year.
![Page 7: OPEX real life challenge](https://reader036.vdocument.in/reader036/viewer/2022083022/58a8f53b1a28ab837c8b4d7f/html5/thumbnails/7.jpg)
What we ask from youPrior to challenge• Decide together: Subproject, task, part of
programme• Introduction for students before start (last week
of November)
During challenge:- 2 meetings/week (30 min) with principle- Resources or data available
End of challenge:- Rating the deliverables (of the students) as
member of the jury
![Page 8: OPEX real life challenge](https://reader036.vdocument.in/reader036/viewer/2022083022/58a8f53b1a28ab837c8b4d7f/html5/thumbnails/8.jpg)
Do you have challenges for us?
Contact:Marijke van Benschop at [email protected]:Muriël van Alphen: [email protected] Contreras Conde: [email protected]é Dirne: [email protected]
We will help you out