OREGON DEPARTMENT OREGON DEPARTMENT Practical Design Decision Matrix

Upload: linette-thomas

Post on 03-Jan-2016

224 views

Category:

Documents


2 download

TRANSCRIPT

OREGON DEPARTMENT OF TRANSPORTATION OREGON DEPARTMENT OF TRANSPORTATION

Practical Design Decision Matrix

OREGON DEPARTMENT OF TRANSPORTATION OREGON DEPARTMENT OF TRANSPORTATION

Practical Design Practical Design Decision MatrixDecision Matrix

The Project Delivery System

TransportationPlanning

Identify Potential Projects

ManagementSystemsAnalysis

Preliminary Plans for

Construction

Right of Way & Permits

Design Acceptance

PhaseDAP

Draft Scope, Schedule, Cost Estimate – Draft

STIP

Project Selection – Final

STIP

Survey, Maps, Engineering & Environmental

Reports

Advertise &Bid Opening for

DBBDesign/Bid/Build

Project Initiation

PS&EPackage

Final Plans, Specs &

Estimates for Construction

Before On-Site Work Begins

Award Contract

Transition to Maintenance

On- Site Work Completed

Acceptance of Project

ST

AR

T

On- Site Work Begins

FINISH

ODOT Project Delivery Life-Cycle Model

Co

ns t

r uc t

i on

M

an

ag

em

en

t

Award Construction Contract

Project Development

Integrate & Document

Integrate & Document

Program Development

Integrate & Document

Integrate & Document

Safety

Corridor Context

O ptimize the System

Public Support

E fficient Cost

Safety

C orridor Context

O ptimize the System

P ublic Support

E fficient Cost

Integrate & Document

OREGON DEPARTMENT OF TRANSPORTATION OREGON DEPARTMENT OF TRANSPORTATION

“SCOPE” (PD’s primary values)

JTA Sec. 18 Guiding Principles

Practical Design Practical Design ++

JTA Section 18JTA Section 18

The Project Delivery System

TransportationPlanning

Identify Potential Projects

ManagementSystemsAnalysis

Preliminary Plans for

Construction

Right of Way & Permits

Design Acceptance

PhaseDAP

Draft Scope , Schedule, Cost Estimate – Draft

STIP

Project Selection – Final

STIP

Survey, Maps, Engineering & Environmental

Reports

Advertise &Bid Opening for

DBBDesign/Bid/Build

Project Initiation

PS&EPackage

Final Plans, Specs &

Estimates for Construction

Before On-Site Work Begins

Award Contract

Transition to Maintenance

On-Site Work Completed

Acceptance of Project

ST

AR

T

On-Site Work Begins

FINISH

ODOT Project Delivery Life-Cycle Model

Co

ns

tru

cti

on

M

an

ag

em

en

t

Award Construction Contract

Project Development

Integrate & Document

Integrate & Document

Program Development

Integrate & Document

Integrate & Document

Integrate & Document

OREGON DEPARTMENT OF TRANSPORTATION OREGON DEPARTMENT OF TRANSPORTATION

“SCOPE” (PD’s primary values)

JTA Sec. 18 Guiding Principles

TransportationPlanning

Identify Potential Projects

ManagementSystemsAnalysis

Preliminary Plans for

Construction

Right of Way & Permits

Design Acceptance

PhaseDAP

Draft Scope , Schedule, Cost Estimate – Draft

STIP

Project Selection – Final

STIP

Survey, Maps, Engineering & Environmental

Reports

Advertise &Bid Opening for

DBBDesign/Bid/Build

Project Initiation

PS&EPackage

Final Plans, Specs &

Estimates for Construction

Before On-Site Work Begins

Award Contract

Transition to Maintenance

On-Site Work Completed

Acceptance of Project

ST

AR

T

On-Site Work Begins

FINISH

ODOT Project Delivery Life-Cycle Model

Co

ns

tru

cti

on

M

an

ag

em

en

t

Award Construction Contract

Project Development

Integrate & Document

Integrate & Document

Program Development

Integrate & Document

Integrate & Document

Integrate & Document

The Project Delivery System

Post-Construction CommitmentManagement

Integrate &

Document

NEW

OREGON DEPARTMENT OF TRANSPORTATION OREGON DEPARTMENT OF TRANSPORTATION

2(a) Incorporating EPS into the design and construction of all state highway construction projects…

Construction Management

Award Construction Contract

Project Development

Program Development

EPS

EPS Contract language & SpecialProvisions

EPS Doc.

EPS?

Post Construction Commitment Management

• EPS Doc.• Monitoring• Reporting

EPS

OREGON DEPARTMENT OF TRANSPORTATION OREGON DEPARTMENT OF TRANSPORTATION

“SCOPE” (PD’s primary values)

JTA Sec. 18 Guiding Principles

The Project Delivery System

TransportationPlanning

Identify Potential Projects

ManagementSystemsAnalysis

Preliminary Plans for

Construction

Right of Way & Permits

Design Acceptance

PhaseDAP

Draft Scope, Schedule, Cost Estimate – Draft

STIP

Project Selection – Final

STIP

Survey, Maps, Engineering & Environmental

Reports

Advertise &Bid Opening for

DBB

Project Initiation

PS&EPackage

Final Plans,Specs &

Estimates for Construction

Before On-Site Work Begins

Award Contract

Transition to Maintenance

On-Site Work Completed

Acceptance of Project

ST

AR

T

On-Site Work Begins

FINISH

ODOT Project Delivery Life-Cycle Model

Award Construction Contract

Project Development

Integrate & Document

Integrate & Document

Program Development

Integrate & Document

Integrate & Document

Integrate & Document

Check-In # 1Id program purpose and scale

Check-In # 2Project Charter– initialize, finalize, validate and document

Check-In # 3 Finalize DAP—validate and document

Check-In # 4Document:-- decisions made (what and who)-- changes (what and why)-- how values addressed

Check-In # 5Success indicators—evaluate and document

Co

ns

tru

cti

on

Man

ag

eme

nt

OREGON DEPARTMENT OF TRANSPORTATION OREGON DEPARTMENT OF TRANSPORTATION

ODOT Environmental Permitting Processes

Regulatory Agency Permitting Processes

• Compliance documentation

• Permit applications

• Special Provisions

• IGAs and MOAs w/ regulatory agencies

• Site inspections/monitoring reports

• Permits/clearances

• Notices of violation

• Site inspections

• Programmatic permits

• MOAs and IGAs with ODOT

Environmental Permitting Process

2(b) Improving the environmental permitting process for state highway construction projects in order to…(A) – (D)

??

Construction Management

Award Construction Contract

Project Development

Program Development

EPS

EPS Contract/ SpecialProvisions

EPS Doc.

EPS?

Post Construction Commitment Management

• EPS Doc.• Monitoring• Reporting

EPS

Environmental Permitting Process

OREGON DEPARTMENT OF TRANSPORTATION OREGON DEPARTMENT OF TRANSPORTATION

Environmental Permitting Process

EnvironmentalScoping and Assessment

Compliance Documentation

• Environmental compliance documentation

• Special Provisions (if applicable)

OD

OT

En

viro

nm

enta

l P

roce

sses

Project Delivery Processes (Project Design)

Project review request

No application submittals necessary

Examples

• Projects where impacts avoided

• Projects that meet regulatory exemptions

• COE ODOT Bridge RGP (OTIA 3) – Tier 1

• 401 Certifications for COE NWPs

• SHPO 106 PA

Batching

Regulatory Agencyreview

OREGON DEPARTMENT OF TRANSPORTATION OREGON DEPARTMENT OF TRANSPORTATION

Environmental Permitting Process (Generic)

EnvironmentalScoping and Assessment

Compliance Documentation

Applicationdevelopment

Applicationcheck

Final agency

decision

Pre-App Meeting

Issued permit/clearance

App

Re

gu

lato

ry

Ag

en

cy

Pro

ce

ss

OD

OT

En

viro

nm

enta

l

Project Delivery Processes (Design)

OREGON DEPARTMENT OF TRANSPORTATION OREGON DEPARTMENT OF TRANSPORTATION

Environmental Permitting Process (Generic)

EnvironmentalScoping and Assessment

Compliance Documentation

Applicationdevelopment

Applicationcheck

Public review

Final agency

decision

ODOT Review and Response

Pre-App Meeting

Other Regulatory Agency Processes

Issued permit/clearance

App

Re

gu

lato

ry

Ag

en

cy

Pro

ce

ss

OD

OT

En

vir

on

me

nta

l

Project Delivery Processes (Design)