OSHAWA INTERACTIVE – TOUR OF GROWTH AND INVESTMENT Welcome to the City of Oshawa. Oshawa Interactive is a new way for developers and site selectors to track Oshawa's growth and investigate Oshawa's newest projects, whether just completed, under-construction, or in the pipeline. 1. Downtown Oshawa 2. Central Oshawa 3. Southwest Oshawa 4. Southeast Oshawa 5. East Oshawa 6. Northeast Oshawa 7. Taunton 8. Kedron 9. Windfields 10. Northwood 11. University and College Area 12. Northwest Oshawa 13. North Simcoe 14. West Oshawa

Upload: others

Post on 12-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

OSHAWA INTERACTIVE – TOUR OF GROWTH AND INVESTMENT

Welcome to the City of Oshawa. Oshawa Interactive is a new way for developers and site selectors to track Oshawa's growth and investigate Oshawa's newest projects, whether just completed, under-construction, or in the pipeline.

1. Downtown Oshawa 2. Central Oshawa 3. Southwest Oshawa 4. Southeast Oshawa 5. East Oshawa 6. Northeast Oshawa 7. Taunton 8. Kedron 9. Windfields 10. Northwood 11. University and College Area 12. Northwest Oshawa 13. North Simcoe 14. West Oshawa

Page 2: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

DOWNTOWN OSHAWA

Journal Entry Content Map Content Pictures

Rental Apartments - 100 Bond A $50 million luxury rental development, completed in 2017, 100 Bond is the newest large residential project to open its doors in the downtown. A fully rental building, it will provide an affordable but modern home for over 200 potential residents.

Number & Type of Units: 239 apartment units

Land Area: 1 Acre

New Gross Floor Area (GFA): 1,326 square metres of ground floor commercial, 16,022 square metres of residential

Estimated Project Value: $50 million

Anticipated Construction Completion: Spring 2017

Height / Number of Stories: 12 storeys

Page 3: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

Dual High-Rises - 80 Bond Street East and 55 Mary Street North 80 Bond Street East - 258 condominium units in Phase 2B of Bond and Mary Developments. Includes a 21 storey residential condo tower and 541 square metres of ground floor commercial space. Construction is expected to begin in Fall 2017. 55 Mary Street North - 331 student housing units in Phase 2A of Bond and Mary Developments. Includes a 18 storey residential tower and 113 square metres of ground floor commercial space. Construction is expected to begin in Fall 2017.

Number & Type of Units: 258 apartment units (55 Mary Street N) and 331 student housing units (80 Bond Street E)

Land Area: 1 Acre

New Gross Floor Area (GFA): 673 square metres of ground floor commercial, 32,312 square metres of residential

Anticipated Construction Commencement: Fall 2017

Height / Number of Stories: 55 Mary Street: 18 storeys, 60.7 metres; 80 Bond Street: 21 storeys, 69.9 metres

Page 4: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

Student Residences - 157 Athol Street East 188 units of student housing in downtown Oshawa. Building will be nine storeys tall and conveniently located near several UOIT campus buildings as well as the Tribute Communities Center. Construction timeline is not known.

Number & Type of Units: 188 student housing units

Land Area: 0.5 acres

New Gross Floor Area (GFA): ~8,000 square metres

Height / Number of Stories: 9 storeys, 30.0 metres

Page 5: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

CENTRAL OSHAWA

Journal Entry Content Map Content Pictures

Medallion Development - 135 Bruce Street A brand new neighbourhood is being planned in Oshawa's core; a 2,241 unit mixed-use redevelopment of a former industrial site. The project will include 2,145 apartment units and 96 townhouse units, as well as office and retail ground floor space, in buildings ranging from 3 to 18 stories in height. Construction is anticipated to begin in early 2018.

Number & Type of Units: 2,145 apartment units, 96 townhouse units

Land Area: 26.4 Acres

New Gross Floor Area (GFA): 138,941 square metres in Phase 1 (1,797 units), Phase 2 GFA is unknown

Estimated Project Value: $600 million

Anticipated Construction Commencement: Spring 2018

Height / Number of Stories: Ranging from 3 to 18 storeys

Page 6: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

Central Oshawa GO Station In June 2016 the Provincial Government announced the approval of the Lakeshore East Go Train Extension, which includes new GO Train Stations in Oshawa, Courtice and Bowmanville. This extension will connect East Durham by rail to Whitby, Ajax, Pickering, Scarborough, Downtown Toronto, and the rest of the GTA. As part of this extension, a GO Station and Multi-modal Hub has been proposed by Metrolinx for the former Knob Hill Farms site. This development will integrate bus, rail and vehicle travel, and spur gentrification of the surrounding Central Oshawa neighbourhood.

Anticipated Project Completion: 2023

Land Area: ~24 acres

New Gross Floor Area (GFA): Unknown, project is still in design stages

Estimated Project Economic Value: $1.1 billion in transit-oriented, walkable urban development

Estimated Jobs Generated: 21,000 permanent new jobs

Page 7: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

139 Celina Street - Infill Apartments A three-storey residential building containing 6 units, construction is anticipated to begin Spring 2017.

Number & Type of Units: 6 apartment units

Land Area: 0.2 acres

New Gross Floor Area (GFA): 456 square metres

Anticipated Construction Commencement: Spring 2017

Height / Number of Stories: 3 storeys, 9.72 metres

Durham Outlook for the Needy - Headquarters Development of a long-vacant lot on Simcoe Street South into a brand new headquarters for Durham Outlook for the Needy. Building will be one story and 565 square metres in size. Construction timelines are not known at this time.

Number & Type of Units: 1 commercial unit

Land Area: 0.4 acres

New Gross Floor Area (GFA): 566 square metres

Anticipated Construction Commencement: TBD

Height / Number of Stories: 1 storey, 5.5 metres

Page 8: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

SOUTHWEST OSHAWA

Journal Entry Content Map Content Pictures

Oshawa GO Station Renovation Opening in Summer 2017, the complete renovation of the Oshawa GO Train Station will offer an improved commuter experience, a larger facility, and, beginning in 2023, Regional Express Rail that will better connect Oshawa to the GTA, with every 15 minute service being implemented across the Lakeshore East line.

New Gross Floor Area (GFA): 1,095 square metres

Anticipated Construction Commencement: Summer 2017

Land Area: 27.6 Acres

Height / Number of Stories: 1 storey, 13.5 metres

Page 9: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

General Motors In September 2016, General Motors announced an investment of $424 million for upgrades at the Oshawa assembly plant. Production of the Chevrolet Impala, which had previously been scheduled to terminate in 2019, has been extended indefinitely. As well, the Cadillac XTS production, which had been scheduled to end in 2018, will also be extended indefinitely.

New Investment in 2016: $424 million for plant upgrades

Land Area: ~700 acres

Facility Size, Manufacturing Operations: 473,805 square metres

Facility Size, Supplier Parks: 269,418 square metres

Number of Employees: 2,690

Apartment - 143 Bloor Street W Construction of a 14 unit, 4 storey apartment building near the intersection of Bloor Street West and Simcoe Street South. Construction anticipated to begin Summer 2018.

New Gross Floor Area (GFA): 1,827 square metres

Land Area: 0.5 acres

Anticipated Construction Commencement: Summer 2018

Height / Number of Stories: 4 storeys, 14 metres

Page 10: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

SOUTHEAST OSHAWA

Journal Entry Content Map Content Pictures

Port of Oshawa In 2015 the Port handled 378,365 tonnes of cargo, a 5.96% increase from 2014. The Port of Oshawa opened a rail spur in 2015, allowing the port to become intermodal and move cargo of all sizes year round, creating opportunities for further industrial growth.

Tonnes of Cargo Handled /year: 378,365 metric tonnes

Value of Cargo Handled /year: $23 million

Direct and Indirect Jobs Created: 294

Federal and Provincial Tax Dollars Generated /year: $6 million

Land Area: ~120 acres

Coming Soon - Oshawa Marina Potential Number of Boat

Slips: Up to 320

Land Area: 19 acres

Anticipated Construction Commencement: 3-5 years

Page 11: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

485 Bloor Street East 18 units of townhouses in two buildings near the intersection of Bloor Street East and Wilson Road South. Both buildings are two storeys. Project will break ground Summer 2017.

Number & Type of Units: 18 apartment units

Land Area: 1.0 acres

New Gross Floor Area (GFA): 3,883 square metres

Anticipated Construction Commencement: Summer 2017

Height / Number of Stories: 2 storeys, 7.4 metres

IBEW Office - 1001 Ritson Road South The new home of the International Brotherhood of Electrical Workers (IBEW), 1001 Ritson Road South will be re-purposed, with proposed changes include partial demolition, parking expansion, and interior and exterior renovations.

Number & Type of Units: 1 industrial unit

Land Area: 5.1 acres

Renovated Gross Floor Area (GFA): 7,180 square metres

Anticipated Construction Commencement: Spring 2017

Height / Number of Stories: 1 storey

Page 12: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

Commercial Building - 360 Marwood Drive Small commercial building to be built on Marwood Drive in the South Oshawa Industrial Park. Building can house 1-2 commercial units, and is approximately 724 square metres in size. Construction timeline is still to be determined.

Number & Type of Units: 1-2 commercial units

Land Area: 0.9 acres

New Gross Floor Area (GFA): 725 square metres

Anticipated Construction Commencement: Unknown

Height / Number of Stories: 1 storey, 6.5 metres

Page 13: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

EAST OSHAWA

Journal Entry Content Map Content Pictures

Harmony GO Station In June 2016 the Provincial Government announced the approval of the Lakeshore East GO Train Extension, connecting East Durham by rail to Whitby, Ajax, Pickering, Scarborough, Downtown Toronto, and the rest of the GTA. In the initial stages of the project, a GO Station was proposed for the lands south of Bloor Street East and west of Townline Road South. This GO Station would integrate bus, rail and vehicle travel, and spur development of the industrial areas south of the highway, and intensification of the residential neighbourhoods to the north, west and east. The Province approved plans only for GO Stations at Thornton Road (West

Anticipated Project Completion: Unknown

Land Area: ~25 acres

New Gross Floor Area (GFA): Unknown, project is still in design stages

Estimated Project Economic Value: $1.1 billion in transit-oriented, walkable urban development

Estimated Jobs Generated: 21,000 permanent new jobs

Page 14: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

Oshawa), the Knob Hill Site (Central Oshawa), in Courtice, and in Bowmanville, but the Harmony site is still an option and could be considered in future review of the extension plans.

Durham Hotel and Conference Centre Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook an extensive renovation, adding 344 square metres of space and investing $4.3 million.

Estimated Investment Value: $4.3 million

Land Area: 8.3 acres

New Gross Floor Area (GFA): 344 square metres

Anticipated Construction Completion: Spring 2017

Page 15: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

NORTHEAST OSHAWA

Journal Entry Content Map Content Pictures

707 Harmony Road N - Commercial New commercial office space on Harmony Road North, north of Rossland Road East. Project is an adaptive reuse of a single-detached house. Real Estate office in space will open in 2017.

Number & Type of Units: 1 commercial office unit

Land Area: 0.4 acres

New Gross Floor Area (GFA): 1,456 square metres

Anticipated Construction Completion: Spring 2017

Height / Number of Stories: 1 storey

251 Ritson Road North - Retail 2 buildings of new retail space, including a Tim Hortons and an Automotive Shop. 6 units of commercial space total, totaling 858 square feet of space. Project will be completed Spring 2017.

Number & Type of Units: 6 commercial units

Land Area: 1.6 acres

New Gross Floor Area (GFA): 858 square metres

Anticipated Construction Completion: Spring 2017

Page 16: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

TAUNTON

Journal Entry Content Map Content Pictures

Infill Townhouses - Missom Gate 80 townhouse units, 16 north of Missom Gate, 74 south of Missom Gate, all three storeys in height. Located directly across road from Smart Centres North Oshawa Retail Plaza. Construction is expected to begin Fall 2017

Number & Type of Units: 80 townhouse units

Land Area: 3.7 acres

Anticipated Construction Commencement: Fall 2017

Height / Number of Stories: 3 storeys, 11 metres

Mixed Use Building - 490 Taunton Road W A four storey mixed-use building, with 18 residential units, slated to begin construction in Spring 2017. This development will intensify the current property, a one storey commercial building.

Number & Type of Units: 18 residential units

New Gross Floor Area (GFA): 4,512 square metres

Anticipated Construction Commencement: 2017

Height / Number of Stories: 4 storeys, 14 metres

Page 17: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

Midrise Apartment - 1658 Ritson Road North 75 unit, 4 storey apartment development overlooking the scenic Camp Samac Conservation Area. Construction was completed in Winter 2016.

Number & Type of Units: 75 apartment units

Land Area: 1.7 acres

New Gross Floor Area (GFA): 5,299 square metres

Construction Completed: Winter 2016

Height / Number of Stories: 4 storeys, 14.8 metres

Page 18: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

KEDRON

Journal Entry Content Map Content Pictures

Kedron Part II Planning Area The Kedron Planning Area, in coordination with the Kedron Part II Plan approved in 2014, is expected to grow to accommodate 22,000 new residents on 466 hectares of land. Currently, there are active development applications on 85% of the land, with an expected build-out time of 2-3 years. As well, of the remaining 15%, there are development applications in the pre-consultation stages for 5% of the land, with an expected build out time of 3-4 years.

Kedron Lands with Active Applications for Residential Development

Population Capacity: 18,700

Land Area: 974 acres

Anticipated Construction Commencement: 2018

Anticipated Time to Full Build out: 2022-2027

Kedron Lands not under development as of Spring 2017

Population Capacity: 3,300

Land Area: 165 acres

Anticipated Construction Commencement: 2019

Anticipated Time to Full Build out: 2022-2027

Page 19: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

WINDFIELDS

Journal Entry Content Map Content Pictures

RioCan Windfields Retail Hub The RioCan Windfields Retail Hub is a 160 acre site which will include 77,926 square metres of commercial space as well as 343 townhouse units and 352 apartment units. Construction is expected to begin late 2017.

New Gross Floor Area (GFA): 77,926 square metres of commercial and residential development

Land Area: 160 acres

Anticipated Construction Commencement: 2018

Number / Type of Residential Units: 695 units

Stacked Townhouses - 2500 Hill Rise Court 132 residential condominium units in a complex of three-storey stacked townhouses. Project is anticipated to begin construction in Spring 2017.

Number & Type of Units: 132 townhouse units

Total Gross Floor Area (GFA): 14,560 square metres

Land Area: 3.7 Acres

Anticipated Construction Commencement: Spring 2017

Height / Number of Stories: 3

Page 20: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

storeys, 10.5 metres

Stacked Townhouses - 150 Windfields Drive 170 units of stacked townhouses, between 3 and 4 storeys high, just west of the RioCan Commercial Hub. Construction is anticipated to begin in Fall 2017.

Number & Type of Units: 170 townhouse units

Land Area: 8.2 Acres

Anticipated Construction Commencement: Spring 2018

Height / Number of Stories: Ranging from 3 to 4 storeys

Page 21: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

NORTHWOOD

Journal Entry Content Map Content Pictures

Northwood Business Park Northwood Industrial Park is a large area of industrially designated underdeveloped land. The area currently is in the process of being serviced and zoned to allow for industrial development. This area has the advantage of being located in proximity to the UOIT/Durham College main campus, the Highway 407 and the Oshawa Municipal Airport. Industrial developments have already begun to come to fruition, including 1472 Thornton Road North.

1472 Thornton Road North Recently completed 1472 Thornton Road North is the first of many planned industrial developments in the Northwood Business Park. It contains 28

Number & Type of Units: 28 industrial condo units

Total Gross Floor Area (GFA): 4,115 square metres

Page 22: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

industrial condo units, 4,115 square metres of total space, and offers two storey units up to 6.1 metres.

Land Area: 8.2 Acres

Construction Completed: Fall 2016

Height / Number of Stories: 2 storeys, 6.1 metres

Page 23: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

UNIVERSITY & COLLEGE AREA

Journal Entry Content Map Content Pictures

SIRC - Software and Informatics Research Centre UOIT’s new $33.5 million SIRC will be a hub for research in health and business analytics, IT security, networking, gaming, and software engineering. It will have a strong focus on promoting interdisciplinary and experiential learning for students in computer science, IT and engineering.

Estimated Investment Value: $33.5 million

New Gross Floor Area (GFA): 7,614 square metres

Anticipated Construction Completion: September 2017

Height / Number of Stories: 4 storeys, 23.3 metres

Page 24: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

CFCE - Centre for Collaborative Education Durham College is preparing to break ground on its $35 million Centre for Collaborative Education. The 75,000 square foot building will embody the College’s commitment to working with its partners to create a new facility where students, employees and the broader community can work together in ways that transcend the traditional concepts of education.

Estimated Investment Value: $35 million

New Gross Floor Area (GFA): 7,027 square metres

Anticipated Construction Completion: September 2018

Height / Number of Stories: 4 storeys, 17.5 metres

CARIE UOIT has announced plans for a new $100 million Centre for Advanced Research, Innovation and Entrepreneurship. CARIE will act as a catalyst for a new cluster of advanced manufacturing, research and development in strategic industries such as nuclear, electrical and alternative energy systems, automotive

Estimated Investment Value: $100 million

New Gross Floor Area (GFA): Over 12,000 square metres

Anticipated Construction Commencement: TBD

Height / Number of Stories: Estimated 2-4 storeys

Page 25: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

and transportation, new materials and robotics.

Mixed-Use Apartments - 1800 Simcoe St. N Five-building, mixed-use complex consisting of 112 townhouse units and 58 apartments. Tallest building is 4 stories, and the contains the complex's 587 m2 of commercial space. Expected completion in Fall 2018.

Number / Type of Units: 112 stacked townhouse units, 58 apartment units

Commercial Ground Floor Area: 587 square metres

Anticipated Construction Commencement: Fall 2018

Height: 4 storeys, 13 metres

Apartments - 1900 Simcoe St N 8 storey apartment building, with all 308 units being bachelors to attract students from nearby University of Ontario Institute of Technology and Durham College. Also contains 605 square metres of ground floor commercial space. Project is currently under construction, estimated completion in Fall 2018.

Number / Type of Units: 308 bachelor apartment units

Commercial Ground Floor Area: 605 square metres

Land Area: 1.2 acres

Anticipated Construction Commencement: Fall 2018

Height / Number of Stories: 8 storeys, 26.5 metres

Page 26: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

NORTHWEST OSHAWA

Journal Entry Content Map Content Pictures

Oshawa Executive Airport

Oshawa Executive Airport is taking flight, with heavy private sector investment - hangar space is up 260% in the past 10 years, and another 30% increase is projected in the next 5 years. This would increase total hangar space from 270,000 square feet currently to over 350,000 square feet. With the closing of Buttonville Airport in Fall 2017, Oshawa Airport predicts corporate travel will increase 150 percent in the next 5 years, increasing from 3,500 movements a year to 8,800. Corporate travel has been steadily increasing since 2012, up 50% in the last 5 years

Hangar Space (as of 2017): 25,083 square metres

Projected New Hangar Space (2017-2022): 7,432 square metres

Corporate Flight Movements (2016): 3,500

Projected Corporate Flight Movements (2021): 8,800

Land Area: ~484 acres

Page 27: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

NORTH SIMCOE

Journal Entry Content Map Content Pictures

Apartment Tower - 30 Adelaide Avenue East 152 apartment units in a 15 storey residential tower near Lakeridge Health and Parkwood Estate. Construction will be completed in Spring 2017.

Number / Type of Units: 152 apartment units

Land Area: 1.3 acres

Anticipated Construction Completion: Spring 2017

Height / Number of Stories: 15 storeys, 47.4 metres

976 Simcoe St. N 65 apartment units fronting onto Simcoe Street North, in a six storey intensification development. Currently 4 single detached houses occupy the site. Construction is anticipated to begin Summer 2017.

Number / Type of Units: 65 apartment units

Land Area: 1.2 acres

Anticipated Construction Commencement: Summer 2017

Height / Number of Stories: 6 storeys, 23 metres

Page 28: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

WEST OSHAWA

Journal Entry Content Map Content Pictures

Oshawa Centre – Expansion On September 29th, 2016, Ivanhoe Cambridge opened the $230 million Oshawa Centre expansion to the public. The project represents a significant investment in the overall economy, as 700 new retail employees were hired because of the expansion. The expansion created 60 new stores, a 1000 seat food court and 2 new restaurants.

Project Completed: Fall 2016

Investment Value: $230 million

Number of New Stores: 60

New Gross Floor Area (GFA): ~28,000 square metres

Land Area: ~80 Acres

Page 29: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

Retail Expansion - 471-491 Gibb Street West Proposed addition of two new commercial buildings in the retail plaza south of the Oshawa Centre on Gibb Street - currently containing Canadian Tire and Real Canadian Superstore. New buildings will add over 1000 square metres of retail space, and include one restaurant and one multi-tenant commercial building. Construction is anticipated to begin in Spring 2017.

Number / Type of Units: 2 commercial buildings

Gross Floor Area (GFA): 1022 square metres

Land Area: 2.0 acres

Anticipated Construction Commencement: Spring 2017

Height / Number of Stories: 1 storey, 6.7 metres

Page 30: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

Rental Apartments - 710 King Street West 25 units of luxury rental in 4 storey on King Street, in close proximity to the Oshawa Centre and Trent University Durham. Building is set to open early 2017.

Number / Type of Units: 25 apartment units

Land Area: 1.1 acres

Anticipated Construction Completion: Spring 2017

Height / Number of Stories: 4 storeys, 13 metres

Retirement Home - 550 Bond Street West 4 storey, 129 unit retirement home just steps from the recently expanded Oshawa Centre. Building will also include a 719 square metre medical office and a walkout basement. Construction is anticipated to begin in 2018.

Number / Type of Units: 129 retirement home units, one commercial unit

Total Gross Floor Area (GFA): 11,335 square metres

Commercial Gross Floor Area: 719 square metres

Land Area: 1.9 acres

Anticipated Construction Commencement: Spring 2018

Height / Number of Stories: 4 storeys, 23 metres

Page 31: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

Durham Learning and Business District (dLab) dLab is a partnership of developers, universities and local governments. The project entails the construction of 12 new buildings, each with a minimum 60,000 square feet of fully adaptable retail and commercial space. The announced Thornton Corners GO Train station will connect dLAB to both Downtown Oshawa and the entirety of the GTA.

Anticipated Project Size: 10-12 buildings, each a minimum of 5,574 square metres in size

Land Area: ~150 Acres, ~60 acres on the Oshawa side of the border

Estimated Project Economic Value: $200 million in planned private sector investments

Potential Job Creation: Project will be built to have capacity for up to 3,000 employees

Page 32: Oshawa Interactive - Tour of Growth and Investment · Durham Hotel and Conference Centre . Located right off the Highway 401, the Durham Hotel and Conference Centre recently undertook

Thornton Corners GO Station In June 2016 the Provincial Government announced the approval of the Lakeshore East Go Train Extension, which includes new GO Train Stations in Oshawa, Courtice and Bowmanville. This extension will connect East Durham by rail to Whitby, Ajax, Pickering, Scarborough, Downtown Toronto, and the rest of the GTA. As part of this extension, a GO Station has been proposed by Metrolinx for the lands north of Champlain Avenue on Thorton Road South. This Go Station will integrate bus, rail and vehicle travel, and spur development of the adjacent Durham Learning and Business District.

Anticipated Construction Completion: 2023

Land Area: ~30 Acres

Estimated Project Economic Value: $1.1 billion in transit-oriented, walkable urban development

New Gross Floor Area (GFA): Unknown, project is in design stages