Our RecordSpeaks For Itself
September 2012
TSX: FM; LSE: FQM
Some of the statements contained in the following materialare forward looking statements and not statement of facts.Such statements are based on the current beliefs ofmanagement, as well as assumptions based on managementinformation currently available. Forward-looking statementsare subject to various risks, uncertainties and other factorsthat could cause actual results to differ materially fromexpected results. Readers must rely on their own evaluation ofthese uncertainties.
Note: all dollar amounts in US dollars unless otherwise indicated
Cautionary Note ConcerningForward-Looking Statements
2
First Quantum Today
• A significant copper producer– 2012E : 270k – 290k tonnes
• A new and growing nickel producer– 2012E : 36k– 40k tonnes
• On the cusp of transformational growth– Copper : tripling production capacity
– Nickel : increasing annual production capacity to 125ktonnes
• Delivering growth at costs well below industrynorms
3
First Quantum Today
4
Jun 30, 2012
$ millions
Cash $857
Total Debt $40
Undrawn and available financing $1,250
Note receivable 2015 $500
Strong Financial Position
What We have Delivered
Best-in-class Copper Growth2000 – 2011
Leading Shareholder Returns2000 – 2011
5
ENRCKazakhmys
Anglo AmericanVedanta
XstrataRio Tinto
LundinHudbay
FreeportEramet
TeckBHP Billiton
ValeNorilsk
AntofagastaSouthern Peru
InmetFirst Quantum 32%
Rio Tinto
Kazakhmys
KGHM
Norilsk
Codelco
BHPB
Anglo American
Antofagasta
Freeport
Glencore
Teck
First Quantum
Southern Copper
Barrick
21%
Looking Forward: Our Production Targets
6
0
300
600
9000
4
05
06
07
08
09
10
11
F
12
F
13
F
14
F
15
F
16
F
Base Projects
Copper Production000’s tonnes
0
25
50
75
100
125
11F 12F 13F 14F 15F 16F
Base Projects Optional
Nickel Production000’s tonnes
A New & Growing Nickel Producer
Ravensthorpe mine, Australia• Acquired as a decommissioned plant
• First production within 20 months of purchase
• Commercial production declared Dec 28 2011
• Production– Q4’11 : 5,666 tonnes– Q1’12 : 6,617 tonnes– Q2’12 : 8,053 tonnes
• C1 cash cost 1H’ 12 : $5.70/payable lb of nickel
7
A New & Growing Nickel Producer
Kevitsa project, Finland
• Nickel-copper-PGE project
• Commissioning underway; 1st concentrateproduced on May 26 ‘12
• Initial ore feed of 5.5 mt/yr ; intention to expand by~50% in 2013
• Target operations:– 10 ktpa nickel @ ~$6.70 - $7.00 /lb– 20 ktpa copper @ ~$1.45 - $1.60 /lb
8
A New & Growing Nickel Producer
Enterprise target, Zambia• Located 12 km northwest of Sentinel
• High grade sulphide nickel
• Open pit potential
• Resource definition programnearing completion
• Preliminary metallurgical test work results show goodrecoveries of nickel sulphides generating a high gradenickel concentrate
9
Tripling Copper Production Capacity
Sentinel project, Zambia
• Located ~ 140 km northwest of Solwezi, northernZambia
• M&I resource of 1,027 Mt at 0.51% Cu grade,containing 5.2 Mt Cu
• Estimates:
– 2.2:1 LOM strip ratio
– >15 years mine life
– $1.7B capex
– Annual production upto 300,000 tonnes
10
Tripling Copper Production Capacity
Sentinel project, Zambia• Commercial terms for electric power agreed in
principle
• Board approval granted
• Full-scale development started within originaltimeframe
• Detailed design progressing; commitments for long-lead items in place
• Construction completion targeted for late 2014
11
Tripling Copper Production Capacity
12
Copper smelter, Zambia
• Processing capacity of 1.2 Mtpa
—71% Sentinel
—100% Kansanshi
—Average copper grade 26%
• Blister copper production 300,000 tpa; acidproduction 1.0 Mtpa
• Estimates:− Capital cost of US$650M− Operating cost US$69/tonne of concentrate− Commissioning from mid 2014
Economic Benefits of the Copper Smelter
Total Annual Savings * US$340 MM – US$510 MM• Transport
Kansanshi * 100% of concentrate to smelterSentinel * 71% of concentrate to smelter and remainder
for exportCost savings per annum * Concentrate @ US$220 /t: US$130 MM –
US$200 MM• Export Levy on Concentrate
Current * 10% of export valueBlister Production * 230,000 - 310,000 tpaCost savings per annum * Cu @ US$7,000 /t: US$160 MM – US$220 MM
• Acid SupplyCurrent Consumption * 1,200 tpd @ US$200 / t: US$90 MM / yearIncrease with AP5 * +900 tpd @ US$200 / t: US$150 MM /year
13
Tripling Copper Production Capacity
Haquira project, Peru
• Large scale copper project located in southern Peru
M&I resource of 3.7 Mt of copper equivalent and aninferred resource of 2.4 Mt of copper equivalent
• Current focus:
Community relations and land access; expanding drillprogram and environmental matters
14
Building a Portfolio of Early-Stage Projects
• 19.99% ownership stake in Zincore Metals Inc.– Mineral exploration company focused mainly on zinc and related
base metal opportunities in the Americas, namely Peru, Mexicoand Canada
– Delores copper porphyry project located ~ 40 km from Haquira
• 19.2% ownership stake in Empire Mining Company– Bursa Licenses cover the Demirtepe skarn and Karapinar
porphyry projects in Western Turkey
15
A Significant Copper Producer
Kansanshi mine, Zambia• Located near Solwezi in the north western Province of
Zambia
• First production in 2005
• Open pit mining
• Flexible ore treatment to allow for variation in ore type– sulphide circuit; oxide circuit; gold facility
• Near mine resource definition and exploration programs
• Workforce of ~1,800
16
A Significant Copper Producer
Kansanshi mine, Zambia
• Multi-phase production expansion project underway– 2012 – 2015
60% increase in overallproduction capacity
– 2012 – 2014130% increase in oxideproduction capacity
– 2014 - 201590% increase in sulphideproduction capacity
17
Expansion Project Capacity Completion
EstimateCost Production Impact
($M)
AcidPlant 5 1000t/day 2012 18
Oxide 7.2 mtpa 2012 31 Copper: 10,000 - 15,000 tpa
Oxide 12 mtpa 2013 - 2014 200 Copper: 60,000 - 75,000 tpa
Smelter 1.2 mtpa 2014 635 Smelter Acid – 1.0 Mtpa @
$40-$50/tonne
Sulphide14 - 16
mtpa 2015 400 Copper: 60,000 - 70,000 tpa
A Significant Copper Producer
18
Guelb Moghrein mine, Mauritania• 100% ownership
• Located 250 kilometres northeast of thenation’s capital, Nouakchott
• As at December 31, 2011, the estimatedminelife was ~10 years (including stockpiles)
• First production in 2006
• Workforce of ~1,200
A Significant Copper Producer
19
Guelb Moghrein mine, Mauritania
• Record quarterly throughput in Q1’12
• Continuous improvement– Augmenting mining operations with the addition
of larger equipment
– Optimizing flotation performance with improvedauto control and reagent changes
Within the Top 10 Largest Producers by 2016
20
Projected 2016 Copper Producer Landscape
Capital Intensity – US$/Tonne
- 5,000 10,000 15,000 20,000 25,000
Kansanshi ExpansionSentinelKonkola
Buena VistaGaleno
AntapaccayAntamina
Rio BlancoQuellavecoCanariaco
Quebrada BlancaMinistro Mina Hales
Cerro VerdeLos Bronces
SaloboLas Bambas
Oyu TolgoiToromochoTampakan
TelegraphioEl Moro
Sierra GordaCaserones
CaraclesCobre Panama
$5,000$6,000
21
• Define and plan, set contracting strategy early• Identify risks• Copy existing designs, duplication, standardization• Maximize commonality of equipment• Maximize in-house work:
− Project management− Technical involvement− Procurement, expediting, logistics, shipping− Self perform construction− Own tools and equipment− FQM construction supervision
• Efficient construction labour from Indonesiaand Philippines
Owner
By Others
Traditional Project
ByOthers
ByFQM
First Quantum Project
22
How We Do Projects
What Our Shareholders Own
• A substantial copper producer;within the world’s top ten by 2016
• An emerging nickel producer;within the world’s top ten by 2016
• A strong financial position
• Production in an industry withstrong fundamentals
The ability and proventrack record to addvalue through efficientdelivery of growth atcosts below industrynorms
Our RecordSpeaks For Itself