our ref: ax(1) to ep2/n7/a/52 jltju!ihis~jilt · vep no. 458/2014 3 december 2014 vary conditions...
TRANSCRIPT
-
*tHI~ JltJU!iHIS~ JiltOUR REF: Ax(1) to EP2/N7/A/52 Environmental Protection Department 3lHilll" !fi!Uiff YOUR REF : Branch Office lf!E~·. ~
-s=+~ TEL. NO.: 2835 1581 28th Floor, Southom Centre, ~liitP~tlJUIII:SC!Wll
FAX NO : 2591 0558 130 Hennessy Road, ii-Ttl!i4= E-MAIL: Wan Chai, Hong Kong.
jj ill:
HOMEPAGE: http://www.epd.gov.hk
12 March 2015
By Registered Pos·
Dear
Environmental Impact Assessment (EIA) Ordinance, Cap. 499
Application for Variation of an Environmental Permit
Project Title: Liantang I Heung Yuen Wai Boundary Control Point and Associated Works
(Application No. VEP-466/2015)
I refer to your above application received on 17 Febmary 2015 for variation of an environmental permit under Section 13(1) ofthe EIA Ordinance.
Pursuant to Section 13(5) of the EIA Ordinance, we have amended the Environmental Permit (No. EP-404/2011/B). I attach the Environmental Permit as amended (No. EP-404/2011/C) for your use.
Under Section 15 of the EIA Ordinance, the amended Environmental Permit will be placed on the EIA Ordinance Register. It will also be placed on the EIA Ordinance website (http://www.epd.gov.hk/eia/).
Please note that if you are aggrieved by any of the conditions imposed in this Permit, you may appeal under Section 17 of the EIA Ordinance within 30 days of receipt of this Permit.
Should you have any queries on the above application, please contact my colleague Mr. Terence Tsang at 2835 1868.
Yours sincerely,
(Maurice YEUNG)
Principal Environmental Protection Officer
for Director ofEnvironmental Protection
Encl. b.c.c. S(RN)3
http://www.epd.gov.hk/eiahttp://www.epd.gov.hk
-
Environmental Permit No. EP~404/2011/C
J:l'tffl:~lfi'iJm*i5!JE EP-404/2011/C
ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
Section 10
l'IUW~~m (~499.)
~1~
ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE
A DESIGNATED PROJECT
~~&~~~~m~§~lllm~~m
PART A (MAIN PERMIT)
A$ ~orlfftl::~$:5})
Pursuant to Section I 0 of the Environmental Impact Assessment Ordinance (the EIA Ordinance), the Director
of Environmental Protection (the Director) granted the environmental permit (No. EP-404/2011) to Civil
Engineering and Development Department (hereinafter referred to as the "Permit Holder") on 24 March
2011. Pursuant to Section 13 of the EIAO, the Director amends the environmental permit (No. EP-404/2011/B)
based on the Application No. VEP-466/2015. The amendments, described below, are incorporated into this
environmental permit (No. VEP-404/2011/C). This environmental permit as amended is for the construction
and operation of the designated project described in Part B subject to the conditions specified in Part C.
1'1-UI! ( J:l't m13 ~~ {cl; {IJfi {JU> (J:l't ~ f!IR {JU) ~ 10 {IJfi 8'.1 J;Ji. lE , J:l't m{5iHI ~iiH~: (~ -R m 2 0 I I if: 3 fl 24 BM~J:l'tm~torm
-
Environmental Permit No. EP-404/2011/C
~:i:Jt§'fCJm~.liiJJ}1 EP-404/2011/C
[Hereinafter referred to as the "EIA Report"]
- Environmental Monitoring and Audit Manual (December 2010)
[Hereinafter referred to as the "EM&A Manual"]
- Environmental Impact Assessment Executive Summary (December
2010) [Hereinafter referred to as the "EIA Executive Summary"]
(Register No. AEIAR-16112011)
(1) 1S-~"J~il)J}1 : CE 45/2008 (CE) li~/i!J'~IIJDff!WtEIBmir.lJl. : - ~:l:lt~~§'!'1MIH5· (2010 :¥12 JlHHJl} '~~f¥H\r J l - ~:l:ltlliii'~&*1t.f.fffi (2010 :¥12 fl) Cffll} '~~'l'iil1i~J l - ~m~~~1tHri&Jil1i~ c2o1o :¥12 JJHH]l} '~lliii'.f.fffi J 1 (1Hi.'. fffi ~i lJJ}1 : AEIAR-161/2011)
(2) The Director's letter of approval of the EIA Report dated 24 March
2011, ref.: (60) in Ax(l) to EP 2/N7/ A/52 Part 6.
(2) ~-&. ~n 2011 :¥ 3 JJ 24 8 ~ t±Htt>t~ ~ ¥~ 15- s'J 1§ fif , m ;r,;~,lil)J}1 : (60) in Ax(1) to EP 2/N?/A/52 Part 6 o
(3) Application for Environmental Permit submitted on 25 October 2010
(Application No. AEP-404/2010)
(3) In 2 o I o :¥ I o Jl 2 5 8 :J1i! :X 8"1 :El{ :l:lt ~'f CiJ m Efi ~)!! (Efi ~UH.Ii lJJ}1 : AEP-404/20 I 0) o
(4) Environmental Permit issued on 24 March 2011 (Permit No.
EP-404/2011).
(4)/n 2011 :¥ 3 JJ 24 8®:~8'J~:I:lt~'fCJm (~'fCJm~il)J}1 EP-404/20 11) o
(5) Application for Variation of Environmental Permit including all
attachments submitted by the Permit Holder on 8 October 2013
(Application No. VEP-414/2013).
(5) ~CJm~1'! A. in 2013:¥ 10 fl 8 8 tli!:XB'J~&~:I:Jt§'fCiJ m Efi § ft5 PJT 1'f Jlf1 {if (Efi §)!! i!Hi lJJ}1 VEP -414/20 13) o
-
Environmental Permit No. EP-404/2011/C
:liJ:.lt~'fCiJ~*i~ EP-404/2011/C
(6) Environmental Permit issued on 28 October 2013 (Permit
No. EP-404/20 11/A)
(6) ~ 2013 1f: 10 A 28 B ~~B'.J:Eil:.lt~OJ~(~'fOJ~*i~ EP-404/20 11 IA)
(7) Application for Variation of Environmental Permit including all
attachments submitted by the Permit Holder on 3 December 2014
(Application No. VEP-458/2014).
(7) ~'f OJ ~ ffli'f A ~ 2o14 1f: 12 A 3 B ~x il'H! all :£! J:.lt ~'f OJ 0~ "fl 'El. :f\5 .PJT 1'f JliHH"fl ~J!H!Hi ~ VEP-458/2014)
(8) Environmental Permit issued on 24 December 2014
(Permit No. EP-404/2011/B)
(8) ~ 2014 1f: 12 A 24 B ~~8'9:Eil:.lt~OJ~O'fOJ~*i~ EP-404/20 11/B)
(9) Application for Variation of Environmental Permit including all
attachments submitted by the Permit Holder on 17 February 2015
(Application No. VEP-466/2015).
C9H'f OJ~ffli'f A~ 2015 1f: 2 A 17 B ~x 8'9 ~ a\ll!J:.lt~'f OJ ~ "fl 'El. :f\5 PJT 1'f Jli;J {tf ( "f! ~~ *i 5!11 VEP-466/20 15) o
Application No. Date of List of Amendments Date of Amendment
"fl wtlf&i~ Application Incorporated into ~~BM $1iitBM Environmental Permit
e-Ez~:e::E~m~OJml*l8'9~~
~El
VEP No. 414/2013 8 October 20 13
20131f: 10 A 8 B Addition of Figure I a to cover the
off-site works areas.
28 October 2013
20131f: 10 A 28 B "=
§t IAO'\)) .,. E ~· ~""*tUI '1$1~~ -,
-
Environmental Permit No. EP-404/2011/C
:rt:!~~tPJ~:!Hillm EP-404/2011/C
ii'JT !(llliJ- a J;.J, )ilSJ ~I fPJl El liB Ill :91'- il':J ~Ho I !i!l o
VEP No. 458/2014 3 December 2014 Vary Conditions 1.7, 3.10, 3.11, 24 December 2014
2014:tj::12)'§ 3 B 3.12 andFigure 3inPart Cof 2014:¥12)'§ 24 B Environmental Permit No.
EP -404/20111 A
~ & :rt:! ~ ~t PJ 5Hi llm EP-404/2011/A Q.___j'ill_il':J {liF- {if=~ 1.7, 3.10, 3.11, 3.12 JJj_&IJil-
Addition of Figure 1 b to show the
locations ofNoise Barriers.
ii'JT !(lllliJ - b w& ~ ~Pii 'I§' m'' il':J {J'L if
VEP No. 466/2015 17 February 2015 Vary Conditions 1.7, 3.5, Figure 12 March 2015
2015:¥2 !'§ 17 B 1, 4a to 4b, 5a to 5b, 6a to 6d, 7b 2015 if 3 !'§ 12 B to 7e and Table 2 in Part C of
Environmental Permit No.
EP-404/2011/B
~ & :rt:! ~ ~t PJ 51' *i llm EP-404/2011/B Q.___j'ill_s'J {I* {if=~ 1.7, 3.5 JJl, llil-, lZ!l a ~ lZ!l b. 1ia~ lib, 7\a~ 7\d, tb
~ te& ~ 2
Addition of Figure 5c, 6e and 7f
to 7h to show the locations of
Noise Barriers.
ii'JT!Illlil1ic, 7\e& tf~th !;)_ ~~ 'Pii 'I§' m~ ll':l 1rr if Deletion ofFigure 7a.
ll!IIJ !!*Ill t a
-
Environmental Permit No. EP-404/2011/C
J!i!:ij'tglfOJm*i~ EP-404/2011/C
12March2015
Date Principal Environmental Protection Officer
(Assessment and Noise)
for Director of Environmental Protection
J!i!:ij't{)f.;~~~ft
~f,'j!;ffl:ij't{)f.;~j.:l:{:E(~{[l;_&D*'Iif)f~~ ~{{JJ') ~=...
-
Environmental Permit No. EP-404/2011/C
J:i:Eli~tOJI@l*i~ EP-404/2011/C
PART B (DESCRIPTIONS OF DESIGNATED PROJECT)
B flll (:ftin~lf'J El®~~>
Hereunder is the description of the designated project mentioned in Part A of this environmental permit
(hereinafter referred to as the "Permit"):
TYU ~:$:J:i:Eli§t0Ji@l(T!jij"~OJI@l") A{IBJ'ifi~£!i;fn~§!Eifli1JJl: El fn~~sjj:
Title of Designated Liantang I Heung Yuen Wai Boundary Control Point and Associated
Project Works
:mn~lf'JEI®-i!JW li~till'11!1111Dw!MrEJ~mifli1
[This designated project is hereinafter referred to as "the Project"]
[;$:~§!Eifli1JJl: El Tljij "If)i1r~ El"]
Nature of Designated (i) Construction of a new road which is a trunk road
Project (i) Jt~~ffllif*j~fnl!JTml!&
:mn~lf'J El ®'t:i'it (ii) Reuse of treated sewage effluent from a treatment plant
(ii) fJEJJtlll:llllliifrtl±lJftf!JJt>J.ss;'57.KllHr~it!tl
Location of Designated The overall view of alignment and works sites of the Project including
Project the additional off-site works areas are shown in Figure I and 1 a attached
:mn~lf'JEI®:f.t!lll!i to this Permit.
If)i1r~ El B'Jll§:£~&Itlfl§l'!5Ifli1JJl: El !fBIIJ:9~B'J!Ii11.JOitlfl~:@:IIJJV!tt m-:$:~0Ji@l~!lf1B'J lll-.&-a o
Scale and Scope of The Project mainly consists of the followings:
Designated Project ImlJi:El~~!fBIIJ§l'!5~T~JJi::-
:mn~lf'JEI®mm:f!I
will (i) construction of a dual two-lane trunk road of !!km in length; (i) ~*-filii 11 0m-&s'J~fli1~*Jll5t~~~l'fl!& ;
(ii) on-site sewage treatment facility and effluent reuse;
(ii) )'57.K!Jtlll:l§~!illl&~Jtl E.!Jtf!B'J)'57.K ;
(iii) site formation for construction of a Boundary Control Point
-
Environmental Permit No. EP-404/2011/C
$~~f0Jil!Hi5!Jt EP-404/2011/C
(BCP) building in the area of Chuk Yuen Village;
(iv) associated drainage facilities discharging into the Shenzhen
River;
(v) cargo processing facilities;
(vi) passenger related facilities;
(vii) accommodation for and facilities of the Government
departments;
(viii) provision of transport related facilities inside the BCP;
(ix) other peripheral structures and supporting facilities;
(x) associated diversion I modification works at Lin Ma Hang Road;
and
(xi) associated environmental mitigation measures.
(xi)
-
Environmental Permit No. EP-404/2011/C
~~~DJ~1U~~ EP-404/2011/C
PART C (PERMIT CONDITIONS)
1. General Conditions
1.1 The Permit Holder and any person working on the Project shall comply with all conditions
set out in this Permit. Any non-compliance by any person may constitute a contravention of
the Environmental Impact Assessment Ordinance (Cap. 499) and may become the subject of
appropriate action under the Ordinance.
1.2 Pennit Holder shall ensure full compliance with all legislation from time to time in force
including but without limitation to the Noise Control Ordinance (Cap. 400), Air Pollution
Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358), Waste
Disposal Ordinance (Cap. 354) and Dumping at Sea Ordinance (Cap. 466). This Permit does
not of itself constitute any ground of defence against any proceedings instituted under any
legislation or imply any approval under any legislation.
1.3 The Pennit Holder shall make copies ofthis Permit together with all documents referred to in
this Permit or the documents referred to in Part A of the Permit readily available at all times
for inspection by the Director or his authorised officers at all sites/offices covered by this
Permit. Any reference to the Permit shall include all documents referred to in the Permit and
also the relevant documents in the Register.
1.4 The Permit Holder shall give a copy ofthis Permit to the person(s) in charge ofthe site(s) and
ensure that such person(s) fully understands all conditions and all requirements incorporated
by the Permit. The site(s) refers to site(s) of construction and operation of the Project and
shall mean the same hereafter.
1.5 The Permit Holder shall display conspicuously a copy of this Permit on the Project site(s) at
all vehicular site entrances/exits or at a convenient location for public ' s information at all
times. The Permit Holder shall ensure that the most updated information about the Permit,
including any amended Permit, is displayed at such locations. If the Permit Holder surrenders
a part or the whole of the Pennit, the notice he sends to the Director shall also be displayed at
the same locations as the original Permit. The suspended, varied or cancelled Permit shall be
removed from display at the Project site(s).
1.6 The Pennit Holder shall construct and operate the Project in accordance with the project
descriptions in Part B of this Permit.
-
Environmental Permit No. EP-404/2011/C
lf:t~~orm~ism EP-404/2011/c
1.7 The Permit Holder shall ensure that the Project is designed, constructed and operated in
accordance with the information and recommendations described in the EIA Report (Register
No.: AEIAR-161/2011), the application documents including all attachments for Environmental
Permit (Application No. AEP-404/2011), the application documents including all attachments for
variation of Environmental Permit, (Application No. VEP-414/2013, VEP-458/2014, VEP-466/2015),
other relevant documents in the Register; and the information or mitigation measures described in
this Permit, and mitigation measures to be recommended in submissions that shall be
deposited with or approved by the Director as a result of permit conditions contained in this
Permit, and mitigation measures to be recommended under ongoing surveillance and
monitoring activities during all stages of the Project. Where recommendations referred to in
the documents of the Register are not expressly referred to in this Permit, such
recommendations are nevertheless to be implemented unless expressly excluded or impliedly
amended in this Permit.
1.8 All deposited submissions, as required under this Permit, shall be rectified and resubmitted in
accordance with the comments, if any, made by the Director within one month of the receipt
of the Director's comments or otherwise as specified by the Director.
1.9 All submissions approved by the Director, all submissions deposited without comments by
the Director, and all submissions rectified in accordance with comments by the Director
under this Permit shall be construed as part of the permit conditions described in Part C of
this Permit. Any variation of the submissions shall be approved by the Director in writing or
as prescribed in the relevant permit conditions. Any non-compliance with the submissions
may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap.
499). All submissions or any variation of the submissions shall be certified by the
Environmental Team (ET) Leader and verified by the Independent Environmental Checker
(IEC) referred to in Conditions 2.1 and 2.3 of this Permit below, before submitting to the
Director under this Permit.
1.10 The Permit Holder shall release all finalised submissions as required under this Permit, to the
public by depositing copies in the Environmental Impact Assessment Ordinance Register
Office, or in any other places, or any Internet websites as specified by the Director, or by any
means as specified by the Director, for public inspection. For this purpose, the Permit Holder
shall provide sufficient copies of the submissions.
1.11 All submissions to the Director required under this Permit shall be delivered either in person
or by registered mail to the Environmental Impact Assessment Ordinance Register Office
(currently at 27/F, Southom Centre, 130 Hennessy Road, Wanchai, Hong Kong). Electronic
-
Environmental Permit No. EP-404/2011/C
l!:t~~lfOJ§~HliiWc EP-404/2011/C
copies of all fmalised submissions required under this Permit shall be prepared in Hyper Text
Markup Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF)
(version 1.3 or later), unless otherwise agreed by the Director and shall be submitted at the
same time as the hardcopies.
1.12 The Permit Holder shall notify the Director in writing the commencement date of
construction of the Project no later than one month prior to the commencement of
construction of the Project. The Permit Holder shall notify the Director in writing
immediately ifthere is any change of the commencement date of the construction.
1.13 For the purpose of this Permit, "commencement of construction" does not include works
related to site clearance and preparation, or other works as agreed by the Director.
2 Submissions or Measures before Commencement of Construction of the Project
Employment ofEnvironmental Monitoring and Audit (EM&A) Personnel
2.1 An Environmental Team (ET) shall be established by the Permit Holder no later than one
month before the commencement of construction of the Project. The ET shall not be in any
way an associated body ofthe Independent Environmental Checker (IEC) for the Project. The
ET shall be headed by an ET Leader. The ET Leader shall be a person who has at least 7
years of experience in environmental monitoring and auditing (EM&A) or environmental
management.
2.2 The ET and the ET Leader shall be responsible for the implementation of the EM&A
programme in accordance with the EM&A requirements as contained in the EM&A Manual
of the Project. The ET Leader shall keep a contemporaneous log-book of each and every
instance or circumstance or change of circumstances, which may affect the compliance with
the recommendations of the EIA Report and this Permit. The ET Leader shall notify the IEC
within one working day of the occurrence of any such instance or circumstance or change of
circumstances. The ET Leader's log-book shall be kept readily available for inspection by all
persons assisting in supervision of the implementation of the recommendations of the EIA
Report and this Permit or by the Director or his authorized officers. Failure to maintain
records in the log-book, failure to discharge the duties of the ET Leader as defined in the
EM&A Manual or failure to comply with this Condition would entitle the Director to require
the Permit Holder by notice in writing to replace the ET Leader. Failure by the Permit Holder
to makereplacement, or further failure to keep contemporaneous records in the log-book
-
Environmental Permit No. EP-404/2011 /C
JJ±.fi~LJ=PJm~iSift EP-404/201 1/C
despite the employment of a new ET Leader may render the Permit liable to suspension,
cancellation or variation.
2.3 An Independent Environmental Checker (IEC) shall be employed by the Permit Holder no
later than one month before commencement of construction of the Project. The IEC shall not
be in any way an associated body of the Contractor or the ET for the Project. The IEC shall
be a person who has at least 7 years of experience in EM&A or environmental management.
2.4 IEC shall be responsible for duties defmed in the EM&A Manual and shall audit the overall
EM&A performance, including the implementation of all environmental mitigation measures,
submissions required in the EM&A Manual, and any other submissions required under this
Permit. In addition, the IEC shall be responsible for verifying the environmental acceptability
of permanent and temporary works, relevant design plans and submissions under this Permit.
The IEC shall verify the log-book(s) mentioned in Condition 2.2 of this Permit. The IEC shall
notify the Director by fax, within one working day of receipt of notification from the ET
Leader of each and every occurrence, change of circumstances or non-compliance with the
EIA Report and/or this Permit, which might affect the monitoring or control of adverse
environmental impacts from the Project. In the case where the IEC fails to so notify the
Director of the same fails to discharge the duties of the IEC as defined in the EM&A Manual
or fails to comply with this Condition, the Director may require the Permit Holder by notice
in writing to replace the IEC. Failure to replace the IEC as directed or further failure to so
notify the Director despite employment of a new IEC may render the Permit liable to
suspension, cancellation or variation. Notification by the Permit Holder is the same as
notification by the IEC for the purpose of this Condition.
2.5 All documents to be submitted or deposited as required under tlus Permit shall be certified by
the ET Leader and verified by the IEC as conforming to the information, requirements and
recommendations set out in the EIA Report.
2.6 The Pennit Holder shall, no later than one month before the commencement of construction
of the Project, inform the Director in writing the management organization of the main
construction companies and/or any form ofjoint ventures associated with the construction of
the Project. The submitted information shall include at least an organization chart, names of
responsible persons and their contact details.
Submissions ofProject Layout Plans
-
Environmental Permit No. EP-404/2011/C
Jti!lj'I;~OJ~~H,Ii5JJE EP-404/2011/C
2.7 The Permit Holder shall, no later than one month before the commencement of construction
of the Project, deposit with the Director 3 sets of layout plan(s) of scale I :1000 with an
explanatory statement detailing the works schedule, works boundary, the works areas and the
tunnel alignment of the Project. The plan(s) shall be certified by the ET Leader and verified
by the IEC as conforming to the information and recommendations contained in the EIA
Report.
Submission ofa Vegetation Survey Report
2.8 The Permit Holder shall, no later than three months before commencement of construction of
the Project, deposit with the Director 3 sets of Vegetation Surveys Report. The submission
shall provide the results of a detailed vegetation survey for the purpose of:
(a) confirming the conditions of individual flora species of conservation importance
identified in the EIA Report and during the course of the survey, includingEuonymus
kwangtungensis and Aquilaria sinensis;
(b) preparing an updated location plan showing the individual species of
conservation importance and identifying the individuals which will be affected by the
Project;
(c) identifying suitable treatment for the identified individual species of conservation
importance and reception site(s) for transplantation; and
(d) reconunending an implementation programme for in-situ preservation of the identified
species of conservation importance and transplantation of the affected species.
Before submission to the Director, the report shall be certified by the ET Leader and verified
bytheiEC.
Submission ofan updated Woodland Compensation Plan
2.9 The Permit Holder shall update the Woodland Compensation Plan (WCP) in the EIA Report
based on the Vegetation Survey Report referred to in Condition 2.8 of this Permit and, no
later than three months before commencement of construction of the Project, submit 3 sets of
updated Woodland Compensation Plan to the Director for approval. The submission shall set
out the planting strategy including details of plantation species, specifications for the
establishment of the habitats and subsequent maintenance and monitoring requirements for
the Woodland Compensation Area of an area not less than 18.6 hectares shown in Figure
2a of this Permit. The compensation ratio for Aquilaria sinensis shall not be less than 3:1 (ie.
more than three seedlings to one individual tree lost from the Project). Before submission to
-
Environmental Permit No. EP-404/2011/C
f!{:IJI;ii'fPJ~*i5!.it EP-404/2011/C
the Director, the WCP shall be certified by the ET Leader and verified by the IEC as
confirming to the information and recommendations contained in the approved EIA Report.
Submission ofa Habitat Creation and Management Plan
2.10 The Permit Holder shall, no later than three months before commencement of construction of
the Project, submit to the Director for approval 3 sets of Habitat Creation and Management
Plan (HCMP) for the Wetland Compensation Area of an area not less than 1.4 hectares shown
in Figure 2b of this Permit. The submission shall take into account the recommendations of
the EIA Report to set out details of the specifications for the habitats and ecological functions
and to define the management and ecological monitoring and audit requirements of the
Wetland Compensation Area. Before submission to the Director, the HCMP shall be certified
by the ET Leader and verified by the IEC as confirming to the information and
recommendations contained in the approved EIA Report.
Submission ofLandscape Plan
2.11 The Pennit Holder shall, no later than one month before commencement of construction of
the Project, submit 3 sets of Landscape Plan to the Director for approval. The landscape plan
shall include considerations for minimizing habitat fragmentation and show the locations,
size, number and species of planting, design details, implementation programme,
maintenance and management schedules, and drawings in the scale of 1: 1000 or other
appropriate scale showing the landscape and visual mitigation measures of the Project, in
particular the landscape and compensatory planting, construction hoarding, noise barriers and
buildings. Before submission to the Director, the landscape plan shall be certified by the ET
Leader and verified by the IEC as confirming to the information and recommendations
contained in the approved EIA Report.
Submission ofTopsoil Management Plan
2.12 The Permit Holder shall, no later than three months before commencement of construction of
the Project, submit to the Director for approval 3 sets of Topsoil Management Plan. The
submission shall set out guidelines and implementation programme for maximizing the reuse
of the excavated topsoil arising from Project. Before submission to the Director, the
landscape plan shall be certified by the ET Leader and verified by the IEC as confirming to
the information and recommendations contained in the approved EIA Report.
Submission ofEnvironmental Monitoring and Audit Programme
http:f!{:IJI;ii'fPJ~*i5!.it
-
Environmental Permit No. EP-404/2011/C
:£Jm~lfOJ~~i5ffE EP-404/2011/C
2.13 The Permit Holder shall, no later than three months before commencement of construction of
the Project, submit 3 copies of Enviromnental Monitoring and Audit (EM&A) Programme to
the Director for approval. The programme shall set out detailed requirements on baseline
monitoring, impact monitoring and compliance monitoring during construction and operation
of the Project. The programme shall include a monitoring and response mechanism for
handling exceedances of enviromnental standards during the construction phase in
collaboration with relevant parties of other concurrent projects in the vicinity. Before
submission to the Director, the EM&A Programme shall be certified by the ET Leader and
verified by the IEC as confirming to the information and recommendations contained in the
approved EIA Report.
Measures for Mitigating Cultural Heritage Impact
2.14 After resumption of private lands and before the commencement of construction works for
the project, the following archaeological surveys shall be conducted and the Permit Holder
shall submit 3 copies of report on the findings of the archaeological surveys and further
mitigation measure requirements to the Director for approval. Before submission to the
Director, the EM&A Programme shall be certified by the ET Leader and verified by the IEC
as confrrming to the information and recommendations contained in the approved EIA Report.
The survey shall include the following:
(i) additional test pits and auger holes along the section of the project between Lin Ma
Hang and Frontier Closed Area Boundary; and
(ii) a survey-cum-rescue excavation along the section of the project between Ping Yeung
and Wo Keng Shan.
2.15 The further mitigation measures described in the repot1 approved under Condition 2.14 of this
Permit shall be fully implemented.
2.16 The Permit Holder shall conduct photographic and cartographic records of the directly
impacted graves (GR01 , GR02, GR05, GR06, GR08, GRlO, GR13, GR15, GR16, GR17,
GR18, GR19 and GR20), built structure (BS64 and BS65) and cultural/historical landscape
feature (LF08) as listed in Table 1 of this Permit, prior to their removal to preserve them by
record.
-
Environmental Permit No. EP-404/2011/C
f!i!:lj't~OJ~~i5iit EP-404/2011/C
3. Submissions or Measures for the Construction ofthe Project
Works areas ofthe Project
3.1 To avoid environmental impacts to nearby area of the Project as indicated in Figure
I and la of this Permit, all activities which is related to or arises as a result of construction of
the Project shall be within the works boundary and the works areas as indicated in the layout
plan(s) deposited under Condition 2.7 of this Permit. No extension of the works boundary
and works areas shall be permitted without the written approval of the Director.
Submission of Waste Management Plan
3.2 The Permit Holder shall, within one month after the commencement of construction of the
Project, submit to the Director 3 sets of Waste Management Plan (WMP) for
approval. Before submission to the Director, the EM&A Programme shall be certified by the
ET Leader and verified by the IEC as confirming to the information and recommendations
contained in the approved EIA Report. The WMP shall describe the arrangements for
avoidance, reuse, recovery and recycling, storage, collection, treatment including dewatering
of spoil and disposal of different categories of waste to be generated from the construction
activities and shall indicate the disposallocations(s) of all surplus excavated spoil and other
waste. A trip ticket system shall be included in the WMP.
Measures on Waste Management
3.3 All measures recommended in the WMP approved under Condition 3.2 of this Permit shall be
fully implemented. Surplus excavated spoil and other waste shall only be disposed of at
designated public filling areas unless otherwise approved by the Director.
3.4 After resumption of private lands, site inspection shall be carried out to ascertain
contaminative sources and hotspots of contamination. The Permit Holder shall carry out
further site investigation regarding potential land contamination in accordance with the EIA
Report and submit to the Director for approval 3 sets of revised Contamination Assessment
Plan (CAP) with sampling and testing schedule updated based on latest site investigations. If
contamination is identified, the Permit Holder shall submit to the Director 3 sets of
Remediation Assessment Plan (RAP) for approval. Before submission to the Director, the
CAP shall be certified by the ET Leader and verified by the IEC as confirming to the
information and recommendations contained in the approved EIA Report. No work on the
identified potentially contaminated sites shall be carried out unless and until the CAP and
-
Environmental Permit No. EP-404/2011/C
$J:l't~CiJ~*i5m EP-404/2011/C
RAP submitted under this condition are approved by the Director and RAP is fully
implemented.
Measures for Mitigate Road Traffic Noise
3.5 To mitigate traffic noise, the noise barrier described in Table 2 of this Permit shall be
installed at locations shown in Figure 4a-b, Sa-c, 6a-e and 7b-h of this Permit prior to the
commencement ofoperation of the Project.
Measures for Mitigating Ecological Impact
3.6 All measures recommended in the Vegetation Survey Report, updated Woodland
Compensation Plan and the Habitat Creation and Management Plan approved under
Condition 2.8, 2.9 and 2.10 of this Permit respectively shall be fully implemented and
thereafter maintained.
3.7 To reduce collisions from birds, the design of noise barriers shall avoid/minimize the use of
transparent I reflective materials or adopt bird-friendly design on such surfaces.
Measures for Mitigating Landscape, Visual and Glare Impact
3.8 All measures recommended in the Landscape Plan approved under Condition 2.11 of this
Permit shall be fully implemented and maintained.
3.9 Outdoor lighting for the Project shall be designed to reduce glare impact on nearby dwellings.
For this purpose, light housing with full-cut-off designs which reflect light totally downward
and better design oflight shielding are examples that can be considered.
Measures for Mitigating Water Quality Impacts from Tunnel Water Inflow and
Groundwater Drawdown
3.10 Locations of tunnel construction works using tunnel boring machine (TBM) or drill & blast
methods are shown in Figure I b. For drill & blast tunnelling works, grout injection works
shall be conducted before blasting for sealing areas around the tunnel to control potential
groundwater inflows. On-site treatment for the groundwater ingress pumped out shall be
provided to remove any contamination by grouting materials before discharge off-site.
-
Environmental Permit No. EP-404/2011/C
:$~~1fPJmHi51.11 EP-404/20 11/C
Measures for Mitigating Operational Odour and Water Quality Impacts Generated from
the Sewage Treatment Works
3.11 The sewage treatment plant installed for the Project shall be installed at the location shown
in Figure 3 of this Permit and the plant shall be designed with the following odour
containment and control measures :
(i) Negative Pressure Ventilation
The treatment plant shall be totally enclosed with negative pressure ventilation to avoid
odorous emission from the treatment works. The tanks will be connected
to deodorisation facilities designed for a minimum removal of 90% directly to
eliminate odour problem.
(ii) Total Containment of Sewage Channels
(a) air-tight cover shall be installed to sewage channels, sewage tanks, and
equipment with potential odour emission and the trapped gases shall be collected
by air handling equipment for containing and directing odorous gases to
deodorisation facilities.
(b) Gravity sewer, equalization and sludge holding tanks shall be designed with
suitable sewer distance and retention time to prevent sewage septicity.
(iii) Deodorisation
Deodorisation facilities at the sewage treatment plant shall be designed with a
minimum odour removal efficiency of 90%.
3.12 The air intake point of Boundary Control Point Building shall be located at least 150m from
the sewage treatment plant.
4. Measures During Operation ofthe Project
Long Term Management of the Ecological Mitigation Measures
4.1 The Permit Holder shall ensure the ecological mitigation measures stated in the Woodland
Compensation Plan and Habitat Creation and Management Plan are properly implemented,
maintained and monitored during the entire period of the life of the Project.
5. Environmental Monitoring and Audit (EM&A) Requirements
5.1 The Permit Holder shall implement the EM&A programme in accordance with the
procedures and requirements as set out in the EM&A Manual. Any changes to the
http:1fPJmHi51.11
-
Environmental Permit No. EP-404/2011/C
:Ei:l:l'iii'f0JirrUi$!E EP-404/20 11 /C
programme shall be justified by the ET Leader and verified by the IEC as conforming to the
information and requirements contained .in the EM&A Manual before submission to the
Director for approval.
5.2 Samples, measurements and necessary remedial actions shall be taken in accordance with the
requirements of the EM&A Manual by:
(i) conducting baseline environmental monitoring;
(ii) conducting impact monitoring;
(iii) carrying out remedial actions described in Event/Action Plans of the EM&A Manual in
accordance with the time frames set out in Event/Action Plans, or as agreed by the
Director, in case where specified criteria in the EM&A Manual are exceeded; and
(iv) logging and keeping records of details of (a) to (c) above for all parameters within 3
working days of collection of data or completion of remedial action(s), for the purpose
of preparing and submitting the monthly EM&A Reports and to make available for
inspection on site.
5.3 The Permit Holder shall deposit with the Director six hard copies and one electronic copy of
the Baseline Monitoring Report at least one month before commencement of construction of
the Project. Additional copies of the submission shall be made available to the Director upon
his request.
5.4 The Permit Holder shall deposit with the Director six hard copies and one electronic copy of
monthly EM&A Report within 10 working days after the end of the reporting month. The
EM&A Reports shall include a summary of all non-compliance (exceedances) of the
environmental quality performance limits (Action and Limit Levels). A summary and
progress update of the Project Implementation Schedule (Table 15.1 of the EIA Report) shall
also be included in each EM&A Report. Additional copies of the submission shall be
provided to the Director upon request by the Director.
5.5 The Permit Holder shall, no later than three months after the commencement of operation of
the Project, deposit with the Director an Environmental Monitoring and Audit report on the
implementation of the mitigation measures for operation stage of the Project in accordance
with the EIA Report and the submissions required under of this Permit.
-
Environmental Permit No. EP-404/2011/C
:£ti!:\l'lglfOJ~~i5m EP-404/2011/C
6. Electronic Reporting of EM&A Information
6.1 To facilitate public inspection of the documents to be submitted or deposited as required
under this Permit, the Baseline Monitoring Report and EM&A Reports via the EIAO Internet
Website and at the EIAO Register Office, the Permit Holder shall prepare electronic copies of
these documents and Reports in Hyper Text Markup Language (HTML) (version 4.0 or later)
and in Portable Document Format (PDF) (version 1.3 or later) or other format agreed by the
Director, and shall submit the electronic copies at the same time as the hardcopies. For the
HTML version, a content page capable ofproviding hyperlink to each section and sub-section
of these documents and Reports shall be included in the beginning of the document.
Hyperlinks to all figures, drawings and tables in these documents and Reports shall be
provided in the main text from where the respective references are made. All graphics in
these documents and Reports shall be in interlaced GIF format unless otherwise agreed by the
Director. The content of the electronic copies of these documents and Reports must be the
same as the hardcopies.
6.2 The Permit Holder shall set up a dedicated Internet website and notify the Director in writing
the Internet address where the environmental monitoring and project data are to be placed,
within six weeks after the commencement of construction of the Project. All environmental
monitoring data described in Condition 6.1 of this Permit above shall be made available to
the public via a dedicated Internet website to be set up by the Permit Holder in the shortest
possible time and in no event later than 2 weeks after the relevant environmental monitoring
data are collected or become available, unless otherwise agreed with the Director.
6.3 The Internet website as described in Condition 6.2 of this Permit above shall enable
user-friendly public access to the monitoring and project data including the EIA Report, the
environmental permit(s) and the project profile of the Project. Unless otherwise agreed with
the Director, the Internet website shall have features capable of:
(i) providing access to all environmental monitoring data collected smce the
commencement ofworks;
(ii) searching by date;
(iii) searching by types of monitoring data (noise, water and air quality); and hyperlinks to
relevant monitoring data after searching.
Notes:
1. This Permit consists of three parts, namely, PART A (Main Permit), PART B (Description
of Designated Project) and PART C (Permit Conditions). Any person relying on this permit
-
Environmental Permit No. EP-404/2011/C
:E.i:tJ!~LJ=CiJm~i5ffE EP-404/2011/C
should obtain independent legal advice on the legal implications under the Ordinance, and the
following notes are for general information only.
2. If there is a breach of any conditions of this Permit, the Director or his authorized officer
may, with the consent of the Secretary for the Environment, order the cessation of associated
work until the remedial action is taken in respect of the resultant environmental damage, and
in that case the Pennit Holder shall not carry out any associated works without the permission
of the Director or his authorized officer.
3. The Permit Holder may apply under Section 13 of the Ordinance to the Director for a
variation ofthe conditions ofthis Permit. The Permit Holder shall replace the original permit
displayed on the Project site(s) py the amended permit.
4. A person who assumes the responsibility for the whole or a part of the designated project
may, before the person assumes responsibility of the designated project, apply under Section
12 of the Ordinance to the Director for a further environmental permit.
5. Under Section 14 of the Ordinance, the Director may with the consent of the Secretary for
the Environment, suspend, vary or cancel this Permit. The suspended, varied or cancelled
Permit shall be removed from display at the Project site(s).
6. If this Permit is cancelled or surrendered during construction or operation of the Project,
another environmental permit must be obtained under the Ordinance before the Project could
be continued. It is an offence under section 26(1) ofthe Ordinance to construct or operate a
designated project listed in Part I of schedule 2 of the Ordinance without a valid
enviromnental permit.
7. Any person who constructs or operates the Project contrary to the conditions in the Permit,
and is convicted of an offence under the Ordinance, is liable:
1. on a first conviction on indictment to a fine of$ 2 1nillion and to imprisonment for 6
months;
2. on a second or subsequent conviction on indictment to a fine of $ 5 million and to
imprisonment for 2 years;
3. on a first summary conviction to a fine at level 6 and to imprisonment for 6 months;
4. on a second or subsequent summary conviction to a fine of $1 million and to
imprisonment for 1 year; and
-
Environmental Permit No. EP-404/2011/C
~!J!glfCiJm#i5fft EP-404/2011/C
5. in any case where the offence is of a continuing nature, the court or magistrate may
impose a fine of$ 10,000 for each day on which he is satisfied the offence continued.
8. The Permit Holder may appeal against any condition of this Permit under Section 17 of the
Ordinance within 30 days ofreceipt ofthis Permit.
9. The Notes are for general reference only and that the Permit Holder should refer to the EIA
Ordinance for details and seek independent legal advice.
Environmental Permit No. EP-404/2011/C
-
Environmental Permit No. EP-404/2011/C
~:i:lt~'f5J~1Hi%'t EP-404/2011/C
Table I Location of Grave, Well and Village House for Photographic Record
Site Code Site Name Location
Current location ofChuk Yuen Village
(4 Nos.)
GR02
GROI Group of Law Clan Graves
Group ofTang Clan Current location ofChuk Yuen Village
Graves (5 Nos.)
GR05 Within the drainage diversion works boundary of the
Project (Section between Lin Ma Hang and Frontier
Closed Area Boundary)
GR06
Fu Grave
Yiu Grave Within the works boundary of the Project (Section
between Lin Ma Hang and Frontier Closed Area
Boundary)
GR08 Chan Grave Within the works boundary of the Project (Section
between Ping Yeung and Wo Keng Shan)
GRIO Within the works boundary of the Project (Section
between Ping Yeung and Wo Keng Shan)
GR13
Tsui Grave
Yirn Grave Within the works boundary (blasting impact area for
Portal! of the South Tunnel) of the Project
(Fanling Section)
GR15 Within the works boundary of the Project
(Fanling Section)
GR16
Chan Grave
Within the works boundary of the Project
(Fanling Section)
GR17
Ho Grave
Cheung Grave Within the works boundary of the Project
(Fanling Section)
GR18 Within the works boundary of the Project (Section
between Ping Yeung and Wo Keng Shan)
GR19
Yip Grave
Current location ofChuk Yuen Village
GR20
Law Grave
Within the works boundary of the Project (Cheung
Shan Tunnel Section (North Tunnel))
BS64
Lam Grave
Village Houses, Within the works boundary of the Project (Section
Ha Wo KengShan Village between Ping Yeung and Wo Keng Shan)
BS65 Village Houses, Within the works boundary of the Project (Section
Ha Wo KengShan Village between Ping Yeung and Wo Keng Shan)
LF08 Well Former Chuk Yuen village ~
~ • •®
-
Environmental Permit No. EP-404/2011/C
!i:f:li~fOJ[I!~jjjljjj1 EP-404/2011/C
9040 - 9085 (Main Road- Vertical PingYeung 0.8m 85 4b
North Bound) Barrier
P03 400- NIA (Slip Road Vertical 2m 73 4a
P03 -North Bound) Barrier
Nga YiuHa NIA (Access Road to Ping Vertical
Yeung) - P17 281 (Local 2m 20 4a Barrier
Road- North Bound)
8585 - 8500 (Main Road- Vertical 2m 85 Sa
North Bound) Barrier
8500 - 8355 (Main Road- Vertical 2mabove 145 Sa
North Bound) Barrier parapet Wo KengShan
8180 - 8290 (Main Road- Vertical 1mabove 110 Sb
South Bound) Barrier parapet
CRP 8330 - 8550 (Connecting Vertical 2.5mabove 214 Se
Road- South Bound) Barrier parapet
6488 - 6855 (Main Road- Vertical Loi Tung l.Sm 367 6b
South Bound) Barrier
6800 - 6855 (Main Road- Vertical 0.8m 55 6a
South Bound) Barrier
360 (Sha Tau Kok Rd- West
Bound) - 380 (Slip Road -
South Bound)
Vertical
Barrier 2m 108 6c
195 (Wo Keng Shan Rd)- 400
(Sha TauKok Rd- East
Bound)
Vertical
Barrier l.Sm 182 6b
40 (Sha Tau Kok Rd ) - 400 Vertical Sm 120 6d
(Slip Road- North Bound) Barrier
NIA (Sha Tau Kok Road Vertical Sm 44 6d
Interchange- North Bound) Barrier
-
Environmental Permit No. EP-404/2011/C
f~J:Jl:glpP}iiTf*i5il! EP-404/2011/C
CRP 6807- 6854 (Connecting Vertical
Road -North Bound) Barrier
O.Sm 50 6a
CRP 6807- 6859 (Connecting Vertical O.Sm 52 6a
Road - North Bound) Barrier
CRP 6857 6917 Vertical
(Connecting Road - North Barrier
2m 55 6c
Bound)
Pl2 290- NIA (Slip Road SI- Vertical 6m 65 6e
North Bound) Barrier
PO! 1071 -Portal Side (Main Vertical Tong Hang 3m 45 7c
Road - South Bound) Barrier
PO! 1019 - 1048 (Main Vertical 3m 29 7c
Road - South Bound) Barrier
PO! 937 - 1019 (Link Vertical 4mabove 82 7d
Road 4) Barrier parapet
LOS 320-389 (Access to Main Vertical Sm 69 7e
Road South Bound) Barrier
DOl 1379 - 1424 (Main Vertical 1.2m above 45 7f
Road- North Bound) Barrier parapet
L02 206 - 456 (Tai Wo Vertical Wo Hop Shek 3m 250 7c
Service Road East) Barrier
P02 333-472 (Link Road I) Vertical 2.5mabove NamWanPo 137 7b
Barrier parapet
P02 285-333 (Link Road 1) Vertical 2.5m 50 7b
Barrier
D02 289 - 352 (Link Road Vertical 1.7m above 63 7g
4) Barrier parapet
LOl Connecting Road Vertical
1.2mabove
412 (Tai
West)
Wo Service Road Barrier
parapet of
access road
58 7f
-
Environmental Permit No. EP-404/2011/C
;!!:t)t~OJ§fgjji5J.!t EP-404/2011/C
101 304 - 357 (Tai Wo Service Road West)
Vertical 3mabove 53 7c
Barrier parapet
101 210 304 (Tai Wo Vertical O.Sm 94 7h
Service Road West) Barrier
Notes: (*) The parapet wall is O.Sm high above road surface
-
SH ENZHEN
~#ll
LEGEND:
------ IOIII
-
=e:'::: 0
0
~~ J.ro.
: IIJ
I.:I r"'
~,;
) ~
z
~] e
.,. t ~I
l - ~
_ -~ la'
... , -~f !!(
~-' '
~~
x,.!
\i-IIJ"'
Cl
1'
~
+
zN
~
.... ~
· z...
~ ~
1!1 ; I
-
su.Jit ' t t
n'"t ~1
LOCATIIII PUH
LEGEND: Ul£t C.IMt
Figure lb !fi! b
Liantang I Heung Yuen Wai Boundary Control Poi nt and Associated Works (j}f!!Qf/i!i'llllmD~Mitl) Location ofTBM Tunnel Sections (fle!f!Mill~t!B':lf:I'Lfi)
TI1is figure was prepared based on Figure I b o f Application for Variation o f Environmental Permits (No. : VEP-458120 14) ;$:1i!~:ffiJil!l!c9:J~Jft1fuHtttflm (filtt: VEP-458120I4)(l';Jiil- b tan~J
Environmental Permit No.: EP-404/201 1/C
Jii.tjU-fUJiti!~~ : EP-404/20 11 /C
-
·.---..-0
[CII..OGICil A551.SSI(NT ·~
IICJIIS AIU
.............--.U1611
Figure 2a
fli= a
Lianlang/Heung Yucn Wa1 Boundary Control Pmnl a nd Associated Works
Location of Woodland Compensation Area (#it!!?ilifaft!!li(r.i!rl
MU.
'\.\ ·}. I '-. . '\ . . '\ \ \
-· ·-........ ....... ....
-
--
0 -
·-·'--~c:-u. il
-"'' "'..........,..
KEY PLAN x..l11.
..._ L£C£110: "·
11 - ·-·- I(JIItS AREA
fll2ZI WETI.NjD COMPENSATION AR£A ...,... • ! · ...:-· •
Liantangll lcung Ym:n Wai BowKiary Control Poml lllld Associated Works Cii!«/HililD~ff:l!iiiiW Figure2b Location ofWelland CompeDS3tion Area ( ORdbuod oa frt1110 '.vordlcEll\~ (1\c:c•cr JW. AEIA-161 l911}
'RI_.,IIIII• .f~1fl"t (Ri!."'IW IIEIAR-16112011 :llt.nr.
Environmental Perm1t No EP-404f2011 /C~p.JI ltl.tJl;i'filJ;litlQ~ EP-404'2011 /C Cl!
http:EP-404f2011/C~p.JI
-
PROPOSED LIANTANG BOUNDARY
CONTROL POINT IN SHENZHEN
PROPOSED HEUNG YUEN WA I BOUNDARY CONTROL POINT I N HKSAR
BOUNDARY CONTROL POINT BUILDI NG
-----,/ / '
/ IPROPOSEDSEWAGE TREATMENT PLANT I
I
I \ \ \
' ' _,_
I
Liantangl Heung Yuen Wai Boundary Control Point and Associated Works (Wif81iS'lfl!!mD./¥~~~If~)
Location of Sewage Treatment Plant ()'57.K~fttt'g{lr'E[)
This figW"e was prepared based on Figure 3 ofApplication for Variation ofEnvironmental Permits (No.: VEP
-458/20 14)
:
-
Figure 4a ~e9a
Liantanfllleung Yucn Wni Boundary Control Point and Associated Works
l...ocation of:-loise Barriers (~"8'»W.lU'LJ27)
This figure was prepared based on Figure 4a of Application for Variation of Environmental Permits (No. VEP466120 15) i$:1ill:leill.!liiJ![j!c.IJ(!11;:1't nJ,Tillp~($~: VE P-466120 15)tf.JI:.'il1'4 aflillt~J
KEY PLAN SCAlE 1 : 1SOOOO
LEGEND : 30011 ASSESSIENT All( A
_,.S &A(A
0... HIGH NOISE BJ.RIIIER
2• HICII NOISE BARRIER
- NOISE SENSIIIY( RECEivtRS
1-- FACAO£ FAC IHC
1. THE SI'£CIFI(D 8AAI!IER H(ICHT IS FRON FINISHED ROAD SIJRFAC[ l[Y(L UNlESS SI'£CIFIED OTHERWISE.
2. litE HEICIIT OF THE PARAPET IS D ... FRON FIN ISHED ROAD SIJRF ACE.
-
KEY PLAN SCAlE 1 : 1SOOOO
LEGEND: lOOol ASSCSSIO I AAEA
10111( § AA[A
o.a• HICH NOISE llloRA IEA
2• HICH NOISE BAAAIEA
- NO ISE SENSITIVE AECEIVEAS
f--- f ACAOE rACI1_,
1. IHE SP£Cifi ED llloRAIEA HE ICHI IS fAON fi NI SHED AOAO SIJAI'ACE LEYI:l lH.ESS SPECIFIED OIHEAWISE .
z. IH[ HEICHI IX IH[ PAAAPEI IS o.a. IAON fiNISHED A0A0 SlllrACE.
Liantanf/llc..'llllg Yucn Wai Boundary Control Point and Associated Works Gj.J«/gRIIliJD~ftlAIIIfl) Figure 4b Location of:\oise Barriers (~'fflfm'tUlil)ifileg b
This figure was prepared based on Figure 4b of Application for Variation of Environmental Permits (No. VEP466/20 15) 4i:lftl:li!:IRJlil:!I!:Clk.IJV$t~'F •iJill$~(fQ\\'1: VEP-466/20 15)(1911'l!flll bt{.J1.JJ
http:bt{.J1.JJ
-
KEY PLAN SCAI.( 1 : ISOOOO
LEGEND: 30011 A55(55>€Nl AII(A
III)RII.S AA(A
IIJKL S£CIIDN
PfiOPOS(D TIJKL V[NIILAII DN IIOILDINCC=:J 111 HIGII NO IS£ BARRIER
2• HIGII NOIS£ BARRIER
2. 511 HIGII NOIS£ B&RRIER .... ' '~ - "
NOIS£ SCHSIIIVE Rt:CEIVERS """... ... ' ,; FACADE FACING::-...._ )~~ ..... -I-
." l "' ...... REMARKS: ~ I. IHE SI'ECifiED BARRIER HEIGIII IS fROW FIN ISHED. ".."', '"' ~', ', ··~"'""h'~""~"I!OAD SURrA(( L(VEL IH.(SS SI'ECifi(D OIHEAIIS£. , >, '"'- ' ' ' HEIGIII !1 IHE
"" ......... ~ ', 2. ~ SURrAC(.~ ~ 0 ..... """ ' '"" '..... ~ ',"-, .....
......... ~ "'~ ... ~
'' .F ', ~'- '-.:: ~·',
..., """~" ·~ .... ... , " -~" ::-.... ...... ....." ~" ::-...._ ...
',.:' ~\:~,, ... -· . ', ~ ~ ..., , ...... '' "-"'- '"x.. .... ' "
-
KEY PLAN SCAlE I : 150000
LEGEND: lOOol ASSE551Utl AREA
IIOI!ItS ARE •
IUNHEL SECIION
c=J PAOPOSED IUNHEL VENIILAIION l!tJILD IHC I• HICII NOISE SARIIIER
2• HICII NOISE SARIIIER
- 2.Sfo HICII NOISE BARR IER NO ISE SEHSIIIVE RECEIVERS 1- fACADE FACIHC REMARKS : I. IHE sPECIFIED BARRIER HEICIII IS FRIJI FIN ISHED
ROAD Sl.flrACE LEVEL UNLESS sPECIFIED OIHERII SE.
2. IHE HEIGitl OF IHE PAR.IPEI IS O.S. FRIJI FINISHED
Liantang/l lcung Yucn Wai Boundary Control Point and Associated Wori.s
Figure 5b Location ofNoise Barriers (ltt!mlf~llnr&)1§11i b
This figure was prepared based on Figure 5b of Application for Variation of Environmental Permits (No. VEP466120 15) *ll'll:fiHR.IJJ!J!~JJ:ll1iiY-FiiJilli:fl,:N(kf;i~: VEP-4661201 5)~1fll1i bkf;iltll
-
SllloLO 11*
KEY PLAN SCALE 1 : 1SOOOO
LEGEND: l()Ool ASSESSI(N1 AR(A
1IORKs All( A
TUNN(L SEC11DN
PR!J'OSED TUNN(LYENIILAIIDN BU ILDI NGc=J 1m HIGII NOISE BARR IER
2• HIGII NOISE BARRIER
' \ 2. S. HIGII NOI SE BARRIER' \ "", NOISE SEHSII IY£ R£CEI Y£RS~~~ ...... -f-- FACAll( FACING ~ "~ ' ..,
REMARKS: 1. TH( SPECIFIED BARRIER HEIGIII IS FRDN ~FIN ISH(D'-'..'. " ~ '' ' " "KO
ROAD SURFACE LEVEL lH.ESS SPEC IF IED OIH{RI ISE •>, "-~ "- :::::-..... ' ', I rs IS D.S.OIll( PARAP£T ,_, ·_." ',,~~~~', 2. ~HEJ:AC£. .. ,~~ ~,.... , ' ', ....... ~ """ ',~'-'' ',.:-'~ ~ ',
:;.. ',,'0~~~ ...., '- -r '," ~'\: ~ ', -.
',""' ~" 0._ ' ', " 0._ '\: ~....
...,~~"~', ,, ... ''' "'"' ~~<
' ""'
-
KEY PLAN SCAlE 1 : 150000
~~\'r-- -__..' I LEGEND:
lOOM ASSESSI(NI AREA
IORIIS AI!(A
llNIEl SECHON
~D TlNIEl VENTILATION BUILDINGc::::::::J
,t, '' ,;·. '''f/1 ' • · I •r \ ., ' '\~~/ ~--~ p;."-,JJ rJ 1. 11] '·. r \·_ ,'1' ,/"' ~ \\~\ .' , ~.,.sn .>< _ . r · ::"l' . "1 ....,
D.... Hlc;lt NOISE BARRIER
t.S. Hlc;lt NOISE BAI!RIER
2ro Hlc;lt NOISE BAI!RIER
Sol Hlc;lt NOISE BARRIER
6ao Hlc;lt NOISE BARR IERTUNG , , I... -f- NO ISE SENSIHVE RECEIVERS FACAII( fACING REMARKS: 1. THE SPECIFIED BARRIER HEI(;Itl IS fRON fiNISHED
IIOAO SURfAC£ LEVEL UNlESS SPECifiED OTHERIJSE.
2. THE HEIGHT CY THE PAI!AI'£1 IS D.... fRON fiNISHED IIOAO SURfACE.
\
'I,, I I
I
+
Liantang/llcung Yuen Wai Bowldary Control Point and Associated Works Figure 6a
Location of~oise Bruricrs (~f1Hf1JUI;tfm)lt1l:f;;a This figure was prepared based on Figure 6a of Application for Variation of Environmental Permits (No. VEP46612015) 4>:11'll1i1::-I!Hll! 'J.!i:\!(ffl/1tJ'F nfffilp :f~(tlil~: VEP-466120 15)1¥1~ "' aklillt!J
Environmental Pcnnrt No EP-404'201 LC e,.J1 Ig.t;t.,""fiiJ.JUQ~ EP-404 2011 C [.I!
-
00"
Figure 6b [t,)l~b
., \
\ \ I
, I ' TTI2 I :~; . ~, ,, I '
I I
Liantanglllcung Yuen Wai Boundary Control Pomt and Associntcd Wads ~/:[email protected]
Location ofNoise Barriers ~1fll¥~{m)
This figure was prepared based on Figure 6b of Application for Variation of Environmental Permits (No. VEP466/20 15) :
-
Figure 6c 1~1/.; c
., \ \
\ I I
1T II2 I ~ -t--,
I
0.801 HIGH VERTICAL BARRIER
I I I
LOI TUNG
/ ll4
........, W.·LO !\JIG " ,r;l :ll
i"" KEY PLAN SCAlE I : ISOOOO
LEGEND: lOOol ASS(SSI(NI AREA
liORJ( S AR( A
fUNNEl S£CIIIlH
c:::J PRIJPOSED IUHHEL VENT ILAIIDH BUILDING D.IM HIGH NOISE BARRIER
1.~ HIGH NOISE BARRIER
1• HIGH NOIS£ BARRIER
S. HIGH NO IS£ BARRIER
""HIGH NOISE BARRIER- NO IS£ S£HSIIIVE RECEIVERS 1- FACADE FACING REMARKS: I. THE SP(CIFIED BARRIER HEIGHI IS FROW fiNISHED
RCAO Slllf.CE LEVEL IKESS SP£CIFIED OTHEitfiS£.
\ ~,.', 1.511 HIGH VERTICAl BARRIER 1. IHE HEIGHT Of IHE PARAP(I IS O.lol fROW fiNISHED RCAO Slllf .CE.'
\
' ' ' ... ,
'I I
' I I
'-; I,
~
' ',, ~~jY.'_ Linntanglll.:ung Yuen Wai Bowulary Control Point and Associated Wens (:JIUI'/ flt§11iJD@tG!miW Location ofNoise Barriers (!Qft~'ff"~Jl.t{W)
This figure was prepared based on Figure 6c of Application for Variation ofEnvironmental Permits (No. VEP466/2015) :;$:1~-Jl::-i*JHI!l!lllcJil.tJt,;t-iiJill$ tR(.fQI}t VEP-466120 1 5)1¥~~,._ dlil$1
PRIJ'OSEO IN ElA
Environmental Pcnnit No. EP-404 '20 IVC~'~~ .ItlfJl;ifuTDI}jf EP-40-1 '2011 c ~
-
KEY PLAN SCAlE I : 150000
LEGEND: lOOio ASSESSII(NI ARU
II()At(S AREA
IUHNEL SECtiON
Pfi!J'OSED IUHNE L vtHIILAIION BU ILDING
D... HIGH NOISE BAilRIEA
c=J
I.S. HIGH NOISE BA!lRIER
2• HIGH NO ISE BARRIER
-S. HICit NOISE BARRIER
ilo HIGH NOISE BARRIERLOI TUNC NOISE SENS II IVE R(CEIVERS
I-- FACAII£ FACING
REMARKS: 1. THE SPECIFIED BARRIER HEIGHt IS FROW fiN ISHED
AOAO SIJII"ACE LEVEL IJI.ESS SPECIFIED DIHERIISE. 2. IHE H(IGHT IJ" TH( PARAPET IS D.S..FROW FI NISHED1.51n HIGit VERTICAl BARRIER AOAO SIJir ACE •INEIA
WL' < ~0
~ -f. +
Liantang/1 lcung Yu~"'Tl Wai Bow!dnry Cootrol Pomt and Associated \\'ori-s Figure 6d jp.;j/, d Location ofNoise Barriers (llaff,HfUU.Uf~i)
This figure was prepared based on Figure 6d of Application for Variation of Environmental Pennits (No. VEP466120 15) 4;:1~J!.Jll1!R"!I.!il!O'{:Itft:l!fiiJ:iil t(J ;,tt(*'lli'l: VEP-46612015)i¥Jifll~ d*'IVJ
Env1ronm~'111Al Penrut No EP-40412011 C e,JI lilm:riiT~!liQ~ EP-404 1201 !IC ~
-
W ILOIIJC curuNE 2-2
S(E DRAWING NO. 601910481[111/~21
KEY PLAN SCAlE 1 : 150000
LEGEND: J00o1 ASSESSI(NT .\REA
llOR1IS AI!£A
IUHNEL SECTION
PA!J'OSED IUHNEl VENTILATION BU ILDI NGc::::J 0... Hlc;H 1CI ISE BARR IER
1.m Hlc;H 1CI ISE BARR IER
2m Hlc;H 1CIISE BARRIER
-511 Hlc;H 1CIISE BARRIER
Llo Hlc;H 1CIISE BARRIERLOI lUNG 1CIISE SENSIT IVE RECEIVERS
I-- FACADE FACING
REMARKS: 1. TH( SPECIFIED BARR IER H(lc;HT 15 FROII FINISHED
ROAD SIJAFACE LEVE L UHLESS SPECIFIED OTHERI TSE.
2. THE H( lc;HT OF rHE PARAPET 15 0 . .. FROII FIHISHEO' >.."•' • J.SOI HICH VERTICAl BARRIER PR(J'OS£0 IN (lA
-f.
Liantang/llcung Yucn Wai Bowldary Control Poml and Associat.cd \\'OI'ks Figure 6e Location ofi\oise B:uriers (~i:ffiffll{ lll~e
This figure was prepared based on Figure 6e of Application for Variation of Environmental Permits (No. VEP466/2015) *ll'll~l!Hll lJ!4lOJV$t:M'iiJm ~~JN(fQ~: VEP-466120 15){f.JI1'11"' efQ3JI
ROAD 5IJAF ACE.
\ '
I
I ' I. l
Enwonmcntal Pcnrut No. EP-404 '2011JC ~,.J lM.IflariiJD~ EP-404 2011 c [.J!J
http:Associat.cd
-
+
Ja HIQI 'f(~TICAl 8.\IIIII[A
~- HIQI VERTICAl 8.\IIIIIEA
1.211 HIQI VE~TICAl BARRIER r'"'!.,.f ABOVE PARAP£1
1.7111 HICill VER71CAl 8.\IIIIIER A80YE PARAPET
la HIQI VERTICiol. BARRIER \ A80YE PARAP(I
l2.5m HIGH VERTICAL BARRIER I.
KEY PLAN SCAlE 1 : 150000
LEGEND:
-- lOO. AS~SSI01 AREA ----- 11011l5 4REA ----- ILH«L ~CIIDH
0.110 HIQI HO I~ BARRIER
l.la HICii HOISE 8.\IIIIIER
I .101 HIQI HOI~ 8.\IIIIIER
2.S. HIQI HOI~ BARRIER
la HIQI HOI~ IARRIER
-
I I
,
2.511 HICH YUIIIC/ol. BARRIER
1.111 =~=~BARRIER ABO'Il PAAAP£ T
-P I I +
I 3m HIGH VERTICAL BARRIER
SIII.LOIIJC
KEY PLAN SCAlE 1 : 150000
LEGEND: }O()oo ASSESSI€Nl AREA
IIORKS AI!U
1UNN(L SECTION
D. I• HI CH HO lSE BARRIER
1. 101 HICH HOISE BAAA IER
1. !01 HICH HOISE BARRIER
2.511 HICH HOISE BAARIER
)lo HICH HOISE IWIRIER
4e HI CH HO lSE IWIRIER
511 HICH HO lSE BARA IER
PRO'OSED rUH!IEt- VENIIlAIIOH BUilDING ,.}_ HOISE SENSITIVE RECEIY(RS I-- FACADE FACI NG J IIU I C=:J REMARKS : 1. THE SPECIFIED BAIIIIIER HEICHI IS FROII FI NISHED
RO.IO SI.RFACE LEY(l !K[SS SPECIFIED DIHERIISE.
2. IN( HEICHT" IN[ PARAPET IS D.... FROII FINISHED RQ.IO SI.Rf A([.
Liantang/ll.mng Yuen Wai Boundary Control Po mt and Associated \\'~ (>IJfi/HllllDJf!Wtfllmif'1) Figure 7c Location ofl\oise Barriers (Jgi!Jj,rg-~q~~-l.; c
This figure was prepared based on Figure 7c of Apphcat10n for Vanat10n of Environmental Perrmts (No VEP466/20 15) ,j.(l{llJeill.JI~ IJ!tlltf"tVJI;,:'F 11J.JlriJ ,;~' ( *'IIJR: VEP-466/20 1 5)(f~~J -l:; cmjl,9
http:j.(l{llJeill.JI
-
SHENZMI:N SH I
-f
le HI (;If 'II:ATICAL BAI!AIER 1/r--..- .,_HI (;If vtATICAl BA~!~~ IEA
SHA LO 'IIIC
~
LEGEND:
z,.,_ Kl(;lf Y{IITICAL BAIIAIER JJ/~ f CJI 1.2a=~~~~~BARRIER ,,.} f -'liO'/E PARAPET
I- -REMARKS:
KEY PLAN SCAlE I : 1SOOOO
)0010 ASSES~N1 AREA
IOIIKS AI!£ A
TUNH(L SECT ION
O.la HI (;If NOISE BARRIER
I.?a HIQI NOISE BA~!~~ IER
1.Ta HIQI NOISE BAI!AIER
2,.,_ HI (;If NO ISE BARRIER
l• Hl(;lf NOISE BARRIER
4a Hl(;lf NOISE BARRIER
S.. HI (;If NOISE BARRIER
PRO'OSED TUNH(L 'I(NIILAI ION BUILDING
NOISE SEHSIIIY£ R(CEI'II:RS
f ACADE FACINC
1. THE SI'(CifiED BARRIER H(l(;lfT IS fROH FINISHED AOAIJ SURfACE LEVEL UNlESS SPECIFIED OTHERWISE.
2. TH£ HEIQIT Of THE PARAPET IS O.IM fROH FINISHED RO.IO SURfACE.
Liantanglllcung Yucn Wai Boundlll)' Control Pomt and Associated WorksFigure 7d
Location ofNoise Barriers (INi!J'>I,HfmJn!W)~-td This figure was prepared based on Figure 7d of Application for Variation of Environmental Pennits (No. VEP466/2015) -l;:~::!!.!Rlli!i!CJX:TJllJU'fiiJ:Mrj:l,;l/(tQ~: VEP-46612015)if.JIMII::; dtliiiVJ
-
+
lot HI &it VERTICAl BARR IER
Sm HIGH VERTICAL BARRIER
.-. ,;.
LEGEND:
CJ I--
REMARKS:
KEY PLAN SCAlE 1 : 1SOOOO
lOOoo ASS(SSI€ Nl AA[A
IORKS AR£A
11JHNEL SECTl ON
0.1• HI &it NOISE BARRIER
1.2• HI&H NOISE BARRIER
I. 1• HIQt NO ISE BARRIER
l.S. HI&H NO ISE BARRIER
l01 HI &it NO ISE BARRIER
~- HI&H NOISE BARR IER
S. HI&H NOISE BARRIER
PIIIJ'OS[D 1 1JHN(L VENTI LATION !IJILOINC
NOISE SENSIIIVE RECEIVERS
FACAC£ FACINC
1. THE SI'ECIFIEO BARRIER HEI&Hl IS FROII fiNISHED AOAO SU!fACE LEVEL IAESS SI'ECIFIEO OIHERIISE.
2. lH[ HE IQtl Of IHE PARAP[l IS O. llo FROII FINISHED 110.10 SUl(A([.
Liantang/1 lcung Yucn Wai Bowldary Control Po1111 and ~iatcd \\'orl.s (~/'t/'l.iilliJD~ffilm IN) Figure 7e
Location ofNoise Barriers (IH.i!MHfrR~ftl'i)l~i {:; e
This figure was prepared based on Figure 7e of Applicalion for Variation of Environmental PcrmilS (No. VEP-166120 15) 4:1f.11Jik:ll.HJJ!!ql(.fiVJU!fliJJ!rtJ,;,I/(*'I)II!: VEP-46612015)i'J
-
-f
)11 HI Cif Y£RTICAl BNIRIER 11..----.-~ HIGit Y£RTICAl BARRIER
SHfo LD liJit
Figure 7f it-ti-t; f
+ \
·\ .\ \
1\ · \
\. '
l .\
Liantang/1 lcung Yuo.:n Wai Boundary Control Pomt and Associated \\'arks
l...ocation of:-loise Bruriers (litl!I~Hfli¥~{'1£/)
This figure was prepared based on Figure 7fof Application for Variation of Environmental Permits (No. VEP466120 15) A>:lflJiHR.Jla lf!cj!(JJV.fi.:!t-"1 ffii~J,,A'(~~: VEP-46612015)~Jir'll t f .fQ:t;JJ
LEGEND:
c=J I--
REMARKS:
KEY PLAN SCAlE I : ISOOOO
lOOM ASS(SSio(NT AREA
WORKS AREA
TIJHH(L S(CTION
0.111 HIGH HO IS( 8ARIIIER
1.1• HIGH HO IS£ BNIRIER
I. T• HI Cif HOIS( BARRIER
2.~ HI Cif HOIS( 8ARIIIER
J01 HIGH HOIS( BARRIER
~~~HIGH HOIS£ BARRIER
~~~ HICH HOIS£ BARRIER
PliO'OSE 0 TUHH£l VENIILATION IMJILOINC
HOIS£ S£MSITIVE RECE IVERS
FACAOE FACING
I. THE SI'ECIFIED BARAIER HEIGHT IS fRIIII fiNISHED ROAD SlllfACE LEVE L lJl.ESS SI'ECIFIED OIHERIIS(•
2. IHE HEICHT Of IHE PARAP(I IS 0.8111 fRIIII fiNISHED ROAD SlllfACE.
-
+
2.S.. HIGH ~AJICll BARRIER ~PAIUI'ET
1.201 HIGH ~RTICAl BARRIER A80Y( PAIUI'E T
loo HIGH ~RliCAl BAAAIER Sol HIQ! ~RIICAl BAAAIER
LEGEND:
I '/}//} I CJ I ~
,. , -f-. REMARKS:
KEY PLAN SCAlE I : ISOOOO
lOOoo ASSES~HI AREA
IIOR1CS AR(A
TIHIEL SECTION
0.1111 HIGI< NOISE IIARAIEA
1.2,. HIGH NOISE IIARAIEA
1.110 HIGH NOISE BAR!! IER
2.~ HIGH NOISE BARRIER
loo HIGH NOISE BARRIER
•• HIGI< NOISE BAAAIEA
Sol HIGH NOISE BAAAIEA
PRO'OS£0 TIHI[lYEN!ILAIION 8UILOINC
NOISE SENSITIYE AECE IYEAS
FACAOE FACINC
1. IHE SPECIFIED BAIIAIEA HEIGHT IS FIIIJI fiNISHED ROAD SIIIFACE LEVEL IIII.ESS SPECIFIED OIHERIISE.
2. THE HEIQ!T CE THE PARAPET IS 0.... FROII FINISHED AOAO SIIIFACE.
Liantang/Hcung Yucn Wai Boundary Control Point and Associated Works (~/Hl11JDtf!MAIIf1) Figure 7g Location ofNoise Barriers (tiilfta'ffrfJ~fW) ~lg
This figure was prepared based on Figure 7g ofApplication for Variation of Environmental Pennits (No. VEP466120 15) *I~:Rdlt!li~CIIOJV.l'l::'F"lill$:N(M.;~: VEP-466/2015)8
-
-f
loo HIGH ~RTICAL BAIIIII(R ~ HIGH VERTICAL BAI!IIIER
LEGEND:
~ ' '
r- -
REMARKS:
SHI. LO IIIIG
KEY PLAN SCALE I : ISOOOO
)- ASSESSI