Page 1Mackay Isaac Whitsunday Regional OfficeLevel 4, 44 Nelson StreetPO Box 257Mackay QLD 4740
Our reference: SDA-0816-032962Your reference: DA-2016-11
13 February 2017
Chief Executive OfficerMackay Regional Council PO Box 41Mackay QLD 4740
Attention: Josephine McCann
Dear Mrs. McCann,
Concurrence agency response—with conditions given under section 285 of the Sustainable Planning Act 2009 for Development Permit for Material Change of Use – Intensive Animal Industry (Cattle Feedlot) over Lot 1 on RP731366 and Lot 2 on RP719070 at 133 Inneston Road and Lot 1, East Inneston Road, Koumala QLD 4738
The referral agency material for the development application described below was received by the Department of Infrastructure, Local Government and Planning under section 272 of the Sustainable Planning Act 2009 on 24 August 2016.
Applicant details
Applicant name: Stewart & Sarah Borg C/- RPS
Applicant contact details: PO Box 1895Mackay QLD [email protected]
Site details
Street address: 133 Inneston Road, Koumala QLD 4738
Lot 1 East Inneston Road, Koumala QLD 4738
Lot on plan: Lot 1 on RP731366;
Lot 2 on RP719070
Local government area: Mackay Regional Council
SDA-0816-032962
Department of Infrastructure, Local Government and Planning Page 2
Application detailsProposed development: Development Permit for Material Change of Use – Intensive
Animal Industry (Cattle Feedlot)
Referral triggers
The development application was referred to the department under the following provisions of the Sustainable Planning Regulation 2009:
Referral trigger Schedule 7, Table 3, Item 5 – Coastal Management District
Schedule 7, Table 3, Item 15A – Railways
ConditionsUnder section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in Attachment 1 must be attached to any development approval.
Reasons for decision to impose conditionsUnder section 289(1) of the Sustainable Planning Act 2009, the department must set out the reasons for the decision to impose conditions. These reasons are set out in Attachment 2.
Further adviceUnder section 287(6) of the Sustainable Planning Act 2009, the department offers advice about the application to the assessment manager—see Attachment 3.
Approved plans and specificationsThe department requires that the following plans and specifications set out below and in Attachment 4 must be attached to any development approval.
Drawing/Report Title Prepared by Date Reference no.
Version/Issue
Aspect of development: Material Change of Use – Intensive Animal Industry (Cattle Feedlot)Proposed Plan of Development - Part of Lot 2 on RP719070 & Part of Lot 1 on RP731366 - 133 North Inneston Road, Koumala (Preliminary)
RPS Australia East Pty Ltd
11 October 2016
Drawing number 127729-1-P02, sheet no. 1-4
Revision A
Marklands Feedlot Operation Plan
RPS Australia East Pty Ltd
30 November 2016
127729-1 Revision 2
SDA-0816-032962
Department of Infrastructure, Local Government and Planning Page 3
A copy of this response has been sent to the applicant for their information.
For further information, please contact Vivian Luxton, Planning Officer, SARA Mackay Isaac Whitsunday on (07) 4898 6815, or email [email protected] who will be pleased to assist.
Yours sincerely
Patrick RuettjesManager (Planning)
cc: Stewart & Sarah Borg, C/- RPS, [email protected]: Attachment 1—Conditions to be imposed
Attachment 2—Reasons for decision to impose conditionsAttachment 3—Further adviceAttachment 4—Approved Plans and Specifications
SDA-0816-032962
Department of Infrastructure, Local Government and Planning Page 4
Our reference: SDA-0816-032962Your reference: DA-2016-11
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Development Permit for Material Change of Use – Intensive Animal Industry (Cattle Feedlot)
Schedule 7, Table 3, Item 5—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of the Department of Environment and Heritage Protection to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions:
1. The development must be carried out generally in accordance with the following plans:
Proposed Plan of Development - Part of Lot 2 on RP719070 & Part of Lot 1 on RP731366 - 133 North Inneston Road, Koumala (Preliminary), prepared by RPS Australia East Pty Ltd, dated 11/10/16, drawing number 127729-1-P02, sheet no. 1-4 and revision A.
Prior to the commencement of use and to be maintained at all times.
2. For the proposed works only use materials which are free from contaminants as defined under section 11 of the Environmental Protection Act 1994.
For the duration of the works the subject of this approval.
3. Erosion and sediment control measures are to be installed and maintained to prevent the release of sediment to High Ecological Significance wetlands and tidal waters.
For the duration of the works the subject of this approval.
4. Submit “As Constructed drawings” to [email protected] or mail to
Department of Environment and Heritage ProtectionPermit and License ManagementImplementation and Support UnitGPO Box 2454Brisbane QLD 4001
Within two (2) weeks of the completion of the works.
5. Manure management, sediment dam management and water quality monitoring are to be carried out in accordance with the Marklands Feedlot Operation Plan prepared by RPS Australia East Pty Ltd dated 30 November 2016, reference 127729-1 and revision 2.
At all times.
6. As a result of works the subject of this approval any disturbed or oxidised acid sulfate soil must be treated and managed in accordance with the current Queensland Acid Sulfate Soil Technical Manual: Soil management guidelines, prepared by the Department of Science, Information Technology, Innovation and the Arts, 2014.
For the duration of the works the subject of this approval.
7. The cattle feedlot must not keep more than 999 standard cattle units of cattle.
At all times.
T13
SDA-0816-032962
Department of Infrastructure, Local Government and Planning Page 5
Our reference: SDA-0816-032962Your reference: DA-2016-11
Attachment 2—Reasons for decision to impose conditions
The reasons for this decision are: Condition 1: To ensure the development is carried out generally in accordance with the
plans of development submitted with the application. Conditions 2, 3 and 4: To ensure the development avoids or minimises adverse impacts
on coastal resources and their values; to allow for compliance in relation to what is considered generally in accordance with the approved plans when preliminary plans are submitted with the application - development inconsistent with the approval may have an impact on coastal management that was not considered in the assessment of the application; and to ensure that the design of the feedlot will prevent the release of any sediment or animal waste into the High Ecological Significance wetlands, or the tidal waters and the Great Barrier Reef Marine Park.
Condition 5: To ensure that manure management practices are undertaken which remove the manure, stock pile and dry it and then use it as fertiliser for the surrounding cane farms during dry periods; to ensure the sediment dam is emptied during dry periods so that the potential of an overflow during flood events is minimised; and to ensure the current water quality monitoring regime is continued to provide a comparison with pre-feedlot water quality in accordance with the Marklands Feedlot Operation Plan to prevent and monitor any adverse impacts on coastal environments.
Condition 6: To ensure any disturbance to acid sulfate soils is managed to prevent impacts to coastal environments.
Condition 7: To ensure that the feedlot keeps 999 standard units of cattle or less to minimise impacts on coastal environments.
T13
SDA-0816-032962
Department of Infrastructure, Local Government and Planning Page 6
Our reference: SDA-0816-032962Your reference: DA-2016-11
Attachment 3—Further advice
Railways 1. B-Double Route
A B-Double permit will likely be required to travel on North Inneston Road. Consultation with the railway manager (Queensland Rail) should occur through this application process. Further information can be obtained from the National Heavy Vehicle Regulators website at: https://www.nhvr.gov.au/road-access/access-management/applications-and-forms/b-double-permit.
T13
SDA-0816-032962
Department of Infrastructure, Local Government and Planning Page 7
Our reference: SDA-0816-032962Your reference: DA-2016-11
Attachment 4—Approved plans and specifications
T13
127729-1-P02
PROPOSED PLAN OF DEVELOPEMENT
(A3)
KELVIN
KOUMALA
CARLISLE
MACKAY REGIONAL COUNCIL
STEWART & SARAH BORG
1:25000 10/10/2016 127729-1
BG 10/10/2016
ST/CS
BG
DCDB
N/A
N/A
PART of LOT 2 on RP719070 & PART of LOT 1 on RP731366133 NORTH INNESTON ROAD, KOUMALA
1 of 41:1000
not permitted. Please contact the author.
Unauthorised reproduction or amendment
COPYRIGHT PROTECTS THIS PLANC
+61 7 4953 3577
+61 7 4953 3622
Mackay QLD 4740
Level 1, 38 Wellington Street
PO Box 1895
ACN 140 292 762
ABN 44 140 292 762
TF
W
RPS Australia East Pty Ltd
rpsgroup.com.au
11/10/2016
PRELIMINARY
11/10/2016
IMPORTANT NOTE
1. This plan was prepared for the sole purposes of the client for the specific purpose of producing
a concept plan. This plan is strictly limited to the Purpose and does not apply directly or
indirectly and will not be used for any other application, purpose, use or matter. The plan is
presented without the assumption of a duty of care to any other person (other than the Client)
("Third Party") and may not be relied on by Third Party.
2. RPS Australia East Pty Ltd will not be liable (in negligence or otherwise) for any direct or
indirect loss, damage, liability or claim arising out of or incidental to:
a. a Third Party publishing, using or relying on the plan;
b. RPS Australia East Pty Ltd relying on information provided to it by the Client or a Third
Party where the information is incorrect, incomplete, inaccurate, out-of-date or
unreasonable;
c. any inaccuracies or other faults with information or data sourced from a Third Party;
d. RPS Australia East Pty Ltd relying on surface indicators that are incorrect or inaccurate;
e. the Client or any Third Party not verifying information in this plan where recommended
by RPS Australia East Pty Ltd;
f. lodgment of this plan with any local authority against the recommendation of RPS
Australia East Pty Ltd;
g. the accuracy, reliability, suitability or completeness of any approximations or estimates
made or referred to by RPS Australia East Pty Ltd in this plan.
3. Without limiting paragraph 1 or 2 above, this plan may not be copied, distributed, or
reproduced by any process unless this note is clearly displayed on the plan.
4. This plan was prepared as a concept plan only and accuracy of all aspects of the plan have not
been verified. No reliance should be placed on the plan and RPS Australia East Pty Ltd accepts
no responsibility for any loss or damage suffered howsoever arising to any person who may use
or rely on this plan.
5. The aerial photography used in this plan has not been rectified. This has been overlay as a best
fit on the boundaries shown and position.
6. Image Source: Google, Aerometer, CNES / Astrium, DNRM.
7. Based on or contains data provided by the State of Queensland (Department of NaturalResources and Mines) [2015]. In consideration of the State permitting use of this data youacknowledge and agree that the State gives no warranty in relation to the data (includingaccuracy, reliability, completeness, currency or suitability) and accepts no liability (includingwithout limitation, liability in negligence) for any loss, damage or costs (including consequentialdamage) relating to any use of the data. Data must not be used for direct marketing or be usedin breach of the privacy laws.
A
PRELIMINARY
IMPORTANT NOTE
1. This plan was prepared for the sole purposes of the client for the specific purpose of producing
a concept plan. This plan is strictly limited to the Purpose and does not apply directly or
indirectly and will not be used for any other application, purpose, use or matter. The plan is
presented without the assumption of a duty of care to any other person (other than the Client)
("Third Party") and may not be relied on by Third Party.
2. RPS Australia East Pty Ltd will not be liable (in negligence or otherwise) for any direct or
indirect loss, damage, liability or claim arising out of or incidental to:
a. a Third Party publishing, using or relying on the plan;
b. RPS Australia East Pty Ltd relying on information provided to it by the Client or a Third
Party where the information is incorrect, incomplete, inaccurate, out-of-date or
unreasonable;
c. any inaccuracies or other faults with information or data sourced from a Third Party;
d. RPS Australia East Pty Ltd relying on surface indicators that are incorrect or inaccurate;
e. the Client or any Third Party not verifying information in this plan where recommended
by RPS Australia East Pty Ltd;
f. lodgment of this plan with any local authority against the recommendation of RPS
Australia East Pty Ltd;
g. the accuracy, reliability, suitability or completeness of any approximations or estimates
made or referred to by RPS Australia East Pty Ltd in this plan.
3. Without limiting paragraph 1 or 2 above, this plan may not be copied, distributed, or
reproduced by any process unless this note is clearly displayed on the plan.
4. This plan was prepared as a concept plan only and accuracy of all aspects of the plan have not
been verified. No reliance should be placed on the plan and RPS Australia East Pty Ltd accepts
no responsibility for any loss or damage suffered howsoever arising to any person who may use
or rely on this plan.
5. The aerial photography used in this plan has not been rectified. This has been overlay as a best
fit on the boundaries shown and position.
6. Image Source: Google, Aerometer, CNES / Astrium, DNRM.
7. Based on or contains data provided by the State of Queensland (Department of NaturalResources and Mines) [2015]. In consideration of the State permitting use of this data youacknowledge and agree that the State gives no warranty in relation to the data (includingaccuracy, reliability, completeness, currency or suitability) and accepts no liability (includingwithout limitation, liability in negligence) for any loss, damage or costs (including consequentialdamage) relating to any use of the data. Data must not be used for direct marketing or be usedin breach of the privacy laws.
127729-1-P02
PROPOSED PLAN OF DEVELOPEMENT
(A3)
KELVIN
KOUMALA
CARLISLE
MACKAY REGIONAL COUNCIL
STEWART & SARAH BORG
1:3000 10/10/2016 127729-1
BG 10/10/2016
ST/CS
BG
DCDB
N/A
N/A
PART of LOT 2 on RP719070 & PART of LOT 1 on RP731366133 NORTH INNESTON ROAD, KOUMALA
2 of 41:1000
not permitted. Please contact the author.
Unauthorised reproduction or amendment
COPYRIGHT PROTECTS THIS PLANC
+61 7 4953 3577
+61 7 4953 3622
Mackay QLD 4740
Level 1, 38 Wellington Street
PO Box 1895
ACN 140 292 762
ABN 44 140 292 762
TF
W
RPS Australia East Pty Ltd
rpsgroup.com.au
11/10/2016
11/10/2016
A
PRELIMINARY
IMPORTANT NOTE
1. This plan was prepared for the sole purposes of the client for the specific purpose of
producing a concept plan. This plan is strictly limited to the Purpose and does not
apply directly or indirectly and will not be used for any other application, purpose,
use or matter. The plan is presented without the assumption of a duty of care to any
other person (other than the Client) ("Third Party") and may not be relied on by
Third Party.
2. RPS Australia East Pty Ltd will not be liable (in negligence or otherwise) for any
direct or indirect loss, damage, liability or claim arising out of or incidental to:
a. a Third Party publishing, using or relying on the plan;
b. RPS Australia East Pty Ltd relying on information provided to it by the Client or
a Third Party where the information is incorrect, incomplete, inaccurate,
out-of-date or unreasonable;
c. any inaccuracies or other faults with information or data sourced from a Third
Party;
d. RPS Australia East Pty Ltd relying on surface indicators that are incorrect or
inaccurate;
e. the Client or any Third Party not verifying information in this plan where
recommended by RPS Australia East Pty Ltd;
f. lodgment of this plan with any local authority against the recommendation of
RPS Australia East Pty Ltd;
g. the accuracy, reliability, suitability or completeness of any approximations or
estimates made or referred to by RPS Australia East Pty Ltd in this plan.
3. Without limiting paragraph 1 or 2 above, this plan may not be copied, distributed, or
reproduced by any process unless this note is clearly displayed on the plan.
4. This plan was prepared as a concept plan only and accuracy of all aspects of the plan
have not been verified. No reliance should be placed on the plan and RPS Australia
East Pty Ltd accepts no responsibility for any loss or damage suffered howsoever
arising to any person who may use or rely on this plan.
5. The aerial photography used in this plan has not been rectified. This has been overlay
as a best fit on the boundaries shown and position.
6. Image Source: Google, Aerometer, CNES / Astrium, DNRM.
127729-1-P02
PROPOSED PLAN OF DEVELOPEMENT
(A3)
KELVIN
KOUMALA
CARLISLE
MACKAY REGIONAL COUNCIL
STEWART & SARAH BORG
1:1250 10/10/2016 127729-1
BG 10/10/2016
ST/CS
BG
DCDB
N/A
N/A
PART of LOT 2 on RP719070 & PART of LOT 1 on RP731366133 NORTH INNESTON ROAD, KOUMALA
3 of 41:1000
not permitted. Please contact the author.
Unauthorised reproduction or amendment
COPYRIGHT PROTECTS THIS PLANC
+61 7 4953 3577
+61 7 4953 3622
Mackay QLD 4740
Level 1, 38 Wellington Street
PO Box 1895
ACN 140 292 762
ABN 44 140 292 762
TF
W
RPS Australia East Pty Ltd
rpsgroup.com.au
11/10/2016
11/10/2016
A
IMPORTANT NOTE
1. This plan was prepared for the sole purposes of the client for the specific purpose of producing
a concept plan. This plan is strictly limited to the Purpose and does not apply directly or
indirectly and will not be used for any other application, purpose, use or matter. The plan is
presented without the assumption of a duty of care to any other person (other than the Client)
("Third Party") and may not be relied on by Third Party.
2. RPS Australia East Pty Ltd will not be liable (in negligence or otherwise) for any direct or
indirect loss, damage, liability or claim arising out of or incidental to:
a. a Third Party publishing, using or relying on the plan;
b. RPS Australia East Pty Ltd relying on information provided to it by the Client or a Third
Party where the information is incorrect, incomplete, inaccurate, out-of-date or
unreasonable;
c. any inaccuracies or other faults with information or data sourced from a Third Party;
d. RPS Australia East Pty Ltd relying on surface indicators that are incorrect or inaccurate;
e. the Client or any Third Party not verifying information in this plan where recommended
by RPS Australia East Pty Ltd;
f. lodgment of this plan with any local authority against the recommendation of RPS
Australia East Pty Ltd;
g. the accuracy, reliability, suitability or completeness of any approximations or estimates
made or referred to by RPS Australia East Pty Ltd in this plan.
3. Without limiting paragraph 1 or 2 above, this plan may not be copied, distributed, or
reproduced by any process unless this note is clearly displayed on the plan.
4. This plan was prepared as a concept plan only and accuracy of all aspects of the plan have not
been verified. No reliance should be placed on the plan and RPS Australia East Pty Ltd accepts
no responsibility for any loss or damage suffered howsoever arising to any person who may use
or rely on this plan.
5. The aerial photography used in this plan has not been rectified. This has been overlay as a best
fit on the boundaries shown and position.
6. Image Source: Google, Aerometer, CNES / Astrium, DNRM.
PRELIMINARY
127729-1-P02
PROPOSED PLAN OF DEVELOPEMENT
(A3)
KELVIN
KOUMALA
CARLISLE
MACKAY REGIONAL COUNCIL
STEWART & SARAH BORG
1:2000 10/10/2016 127729-1
BG 10/10/2016
ST/CS
BG
DCDB
N/A
N/A
PART of LOT 2 on RP719070 & PART of LOT 1 on RP731366133 NORTH INNESTON ROAD, KOUMALA
4 of 41:1000
not permitted. Please contact the author.
Unauthorised reproduction or amendment
COPYRIGHT PROTECTS THIS PLANC
+61 7 4953 3577
+61 7 4953 3622
Mackay QLD 4740
Level 1, 38 Wellington Street
PO Box 1895
ACN 140 292 762
ABN 44 140 292 762
TF
W
RPS Australia East Pty Ltd
rpsgroup.com.au
11/10/2016
11/10/2016
A
rpsgroup.com.au
Marklands Feedlot Operation Plan
Managing Manure & Sediment Dam for Water Quality
Prepared by:
RPS AUSTRALIA EAST PTY LTD
1/38 Wellington Street PO Box 1895 MACKAY Q 4740
T: +61 7 4853 3577 F: E: [email protected] Client Manager: barwon Gooch Report Number: 127729-1 Version / Date: Version 1
Prepared for:
STEWART & SARAH BORG
9TMarklands Feedlot Operation Plan 8TManaging Manure & Sediment Dam for Water Quality
127729-1; Version 1 Page ii
IMPORTANT NOTE
Apart from fair dealing for the purposes of private study, research, criticism, or review as permitted under the Copyright Act, no part of this report, its attachments or appendices may be reproduced by any process without the written consent of RPS Australia East Pty Ltd. All enquiries should be directed to RPS Australia East Pty Ltd.
We have prepared this report for the sole purposes of Stewart & Sarah Borg (“Client”) for the specific purpose of only for which it is supplied (“Purpose”). This report is strictly limited to the purpose and the facts and matters stated in it and does not apply directly or indirectly and will not be used for any other application, purpose, use or matter.
In preparing this report we have made certain assumptions. We have assumed that all information and documents provided to us by the Client or as a result of a specific request or enquiry were complete, accurate and up-to-date. Where we have obtained information from a government register or database, we have assumed that the information is accurate. Where an assumption has been made, we have not made any independent investigations with respect to the matters the subject of that assumption. We are not aware of any reason why any of the assumptions are incorrect.
This report is presented without the assumption of a duty of care to any other person (other than the Client) (“Third Party”). The report may not contain sufficient information for the purposes of a Third Party or for other uses. Without the prior written consent of RPS Australia East Pty Ltd:
(a) this report may not be relied on by a Third Party; and
(b) RPS Australia East Pty Ltd will not be liable to a Third Party for any loss, damage, liability or claim arising out of or incidental to a Third Party publishing, using or relying on the facts, content, opinions or subject matter contained in this report.
If a Third Party uses or relies on the facts, content, opinions or subject matter contained in this report with or without the consent of RPS Australia East Pty Ltd, RPS Australia East Pty Ltd disclaims all risk and the Third Party assumes all risk and releases and indemnifies and agrees to keep indemnified RPS Australia East Pty Ltd from any loss, damage, claim or liability arising directly or indirectly from the use of or reliance on this report.
In this note, a reference to loss and damage includes past and prospective economic loss, loss of profits, damage to property, injury to any person (including death) costs and expenses incurred in taking measures to prevent, mitigate or rectify any harm, loss of opportunity, legal costs, compensation, interest and any other direct, indirect, consequential or financial or other loss.
Document Status
Version Purpose of Document Orig Review Review Date
1 State Information Request Response BG BG 22/11/2016
2 Minor amendment – Section 4 BG BG 30/11/2016
Approval for Issue
Name Signature Date
Barwon Gooch 30/11/2016
9TMarklands Feedlot Operation Plan 8TManaging Manure & Sediment Dam for Water Quality
127729-1; Version 1 Page iii
Contents 1.0 INTRODUCTION ...................................................................................................................................... 1
2.0 MANURE MANAGEMENT ...................................................................................................................... 2
2.1 Manure Removal .......................................................................................................................... 2
2.2 Manure Stockpiling ...................................................................................................................... 2 2.3 Soil Fertilising............................................................................................................................... 3
3.0 SEDIMENT DAM MANAGEMENT .......................................................................................................... 4
3.1 Sediment Dam Water Level ......................................................................................................... 4
3.2 Irrigating from Sediment Dam..................................................................................................... 4
4.0 MONITORING WATER QUALITY ........................................................................................................... 5
Appendices Appendix 1: Plan of Proposed Feedlot Complex Appendix 2: DAF Guidelines for Managing the Environmental Impacts of Cattle Feedlots Appendix 3: Mill Map Appendix 4: Catchment Area Plan Appendix 5: Water Quality Reporting Records
9TMarklands Feedlot Operation Plan 8TManaging Manure & Sediment Dam for Water Quality
127729-1; Version 1 Page 1
1.0 Introduction
This is an operational management plan for managing manure & the sediment dam of the proposed Markland Feedlot at Inneston within Mackay Regional Council, to avoid adverse impacts on water quality. It has been prepared based on information provided by our client, who has collaborated with Mitchell Furness of the Department of Agriculture & Fisheries.
This operational management plan has been prepared in response to an information request made by the Department of Infrastructure, Local Government & Planning as referral agency (coastal management) for the Development Application seeking a Development Permit (Material Change of Use) for the 999 head feedlot.
9TMarklands Feedlot Operation Plan 8TManaging Manure & Sediment Dam for Water Quality
127729-1; Version 1 Page 2
2.0 Manure Management
2.1 Manure Removal
In accordance with the Department of Agriculture & Fisheries guidelines for Managing the Environmental Impacts of Cattle Feedlots https://www.daf.qld.gov.au/environment/intensive-livestock/cattle-feedlots/managing-environmental-impacts included in Appendix 2: -
• Remove manure from and clean individual feedlot pens whenever they are emptied of cattle (every 45-120 days depending on the breed and age of cattle in the pen) if not more regularly;
• Remove manure from and clean drains & sediment trap at least after every rainfall event; and
• Remove sediment from sediment dam whenever the dam is empty & dry. The feedlot pens will have a compacted layer of soil and manure about 5cm deep which must not be removed during manure removal and yard cleaning. The average depth of manure above the compacted layer in any pen is expected to be less than 10cm after 120 days. The absolute maximum depth of manure above the compacted layer in any pen is unlikely to exceed 14cm, based on the following assumptions: - o Dry manure removed every 120 days o Maximum 62.5 equivalent 600kg bullocks in a pen o Maximum of 0.67 tonnes of dry manure per bullock every 120 days (based on maximum 2 tonnes per
bullock per year - https://www.daf.qld.gov.au/environment/intensive-livestock/cattle-feedlots/managing-environmental-impacts/manure-production-data)
o Maximum of 41.67 tonnes of total dry manure removed every 120 days o Dry manure has a density of 0.4 tonnes per m3 http://www.aqua-calc.com/page/density-
table/substance/manure o Maximum of 104.17m3 of dry manure removed every 120 days o 756m2 pen o Maximum 13-14cm depth of dry manure removed from a pen every 120 days, which is within the limits
recommended https://www.daf.qld.gov.au/environment/intensive-livestock/cattle-feedlots/managing-environmental-impacts/manure-removal-and-stockpiling
Please refer to the Plan of Proposed Feedlot Complex included in Appendix 1 for location of the feedlot pens, drains, sediment trap and sediment dam.
2.2 Manure Stockpiling
In accordance with the Department of Agriculture & Fisheries guidelines for Manure Removal https://www.daf.qld.gov.au/environment/intensive-livestock/cattle-feedlots/managing-environmental-impacts/manure-removal-and-stockpiling included in Appendix 2: -
• stockpile manure & sediment on the manure pad for drying and composting
The Manure Pad has been sized to be able to accommodate all manure generated by the feedlot for a year, which is expected to be in the order of 3750m3 manure (a depth of 1.8m if spread evenly across the pad), based on the based on the following assumptions
o 1000 equivalent head of cattle/year o Maximum animal weight - 600kg per bullock https://www.daf.qld.gov.au/environment/intensive-
livestock/cattle-feedlots/managing-environmental-impacts/manure-production-data) o Maximum 2 tonne of dry manure per year per animal https://www.daf.qld.gov.au/environment/intensive-
livestock/cattle-feedlots/managing-environmental-impacts/manure-production-data) o Maximum 2000 tonne of dry manure per year for 1000 head o 0.4 tonne per m3 of dry manure http://www.aqua-calc.com/page/density-table/substance/manure o Maximum 5000m3 of dry manure per year o 2025m2 (45m x 45m) manure storage pad
9TMarklands Feedlot Operation Plan 8TManaging Manure & Sediment Dam for Water Quality
127729-1; Version 1 Page 3
o If a year’s supply of manure had to be stored on the pad, the maximum height of the mound at its apex would be approx 7m.
Please refer to the Plan of Proposed Feedlot Complex included in Appendix 1 for location and size of the manure pad.
2.3 Soil Fertilising
• Remove the composted manure and sediment from the Manure Pad and spread and turn into the soil of fallow cane paddocks, during every dry period when cane paddocks are fallow.
Of the 267ha of assigned cane on the farm shown on the Mill Map included in Appendix 3, typically 60-80 hectares of the farm’s cane paddock are fallow each season and will be fertilised with compost following cutting during the crush from July to Christmas. The 3750m3 annual volume of dry manure equates to a depth of 0.5-1cm over the area of the ‘fallow’ paddocks and is only a small proportion of the total fertiliser required.
9TMarklands Feedlot Operation Plan 8TManaging Manure & Sediment Dam for Water Quality
127729-1; Version 1 Page 4
3.0 Sediment Dam Management
3.1 Sediment Dam Water Level
• Every effort is to be made to maintain the sediment dam water level as low as possible by irrigating from the sediment dam whenever it is dry enough to do so without causing any runoff
During dry periods, water can be applied across the assigned cane on the farm to a depth of 50ml without causing any runoff. While the driest periods are between August and January each year, there will be opportunities to irrigate during dry periods between rainfall events all year round when the soil is not saturated. The sediment dam has been designed with sufficient capacity to store the equivalent of 3 consecutive 8 inch rainfall events.
3.2 Irrigating from Sediment Dam
• Sediment dam water is to be pumped by pipe from the sediment dam to the farm irrigation system for dispersal
The sediment dam has been designed to include an ‘irrigation pad’ to house a pump. Ultimately, underground piping will connect the pump to the farm irrigation system. However, temporary aboveground piping will be used, while underground piping is constructed in stages as finances dictate. The existing farm irrigation system includes high pressure hard hoses and low pressure centre pivots. Please refer to the Plan of Proposed Feedlot Complex included in Appendix 1 for location and size of the irrigation pad.
9TMarklands Feedlot Operation Plan 8TManaging Manure & Sediment Dam for Water Quality
127729-1; Version 1 Page 5
4.0 Monitoring Water Quality
• The quality of water on the subject land in Catchments 1, 2 & 3 (shown on Catchment Area Plan 127729-1-P04 included in Appendix 4) shall continue to be monitored on an annual basis for comparison with records of pre-feedlot water quality.
Water quality monitoring has been undertaken on the subject land by the land owner at designated sites within Catchments 1, 2 & 3 on the subject land. Please refer to recent water quality monitoring records included in Appendix 5. The total area of Catchments 1, 2 & 3 is over 2810ha. Catchment 1 (Cab Creek) has an area of at least 1670ha and is characterised by vegetated hillsides at the top of the catchment which make way for grazing properties, then cane farms with scattered residences, local roads, the Bruce Highway, the North Coast Railway and finally the ponded pasture /wetlands on the subject land controlled by Ponded Pasture Bank 1. During flood events, Catchment 1 overflows the ponded pasture bank and drains into Catchment 2. The assigned caneland in Catchment 1 to be fertilized and irrigated by the feedlot all drain into farm dams before entering the ponded pasture/wetlands controlled by Ponded Pasture Bank 1. Catchment 2 (Running Creek) has an area of at least 815ha (+ Catchment 1 area) and is characterised by vegetated hillsides at the top of the catchment which make way for grazing properties, then cane farms with scattered residences, local roads, the Bruce Highway, the North Coast Railway and finally the ponded pasture/wetlands on the subject land controlled by Ponded Pasture Bank 2. During major flood events, Catchment 2 overflows the ponded pasture bank and drains into Catchment 3. The assigned caneland in Catchment 2 to be fertilized and irrigated by the feedlot all drain into the ponded pasture/wetlands controlled by Ponded Pasture Bank 2. The feedlot itself is located in Catchment 2 and any release of water from the sediment dam during major flood events would drain into the ponded/pasture/wetlands controlled by Ponded Pasture Bank 2. Catchment 3 has an area of 325ha (+Catchment 1 & 2 areas) and is characterised by ponded pasture/wetlands on the subject land controlled by Ponded Pasture Bank 3. During major flood events, Catchment 3 overflows the ponded pasture bank and drains into the natural wetland areas of Plumb Tree Creek & Cherry Tree Creek.
Appendix 1
Plan of Proposed Feedlot Complex
127729-1-P02
PROPOSED PLAN OF DEVELOPEMENT
(A3)
KELVIN
KOUMALA
CARLISLE
MACKAY REGIONAL COUNCIL
STEWART & SARAH BORG
1:25000 10/10/2016 127729-1
BG 10/10/2016
ST/CS
BG
DCDB
N/A
N/A
PART of LOT 2 on RP719070 & PART of LOT 1 on RP731366133 NORTH INNESTON ROAD, KOUMALA
1 of 41:1000
not permitted. Please contact the author.
Unauthorised reproduction or amendment
COPYRIGHT PROTECTS THIS PLANC
+61 7 4953 3577
+61 7 4953 3622
Mackay QLD 4740
Level 1, 38 Wellington Street
PO Box 1895
ACN 140 292 762
ABN 44 140 292 762
TF
W
RPS Australia East Pty Ltd
rpsgroup.com.au
11/10/2016
PRELIMINARY
11/10/2016
IMPORTANT NOTE
1. This plan was prepared for the sole purposes of the client for the specific purpose of producing
a concept plan. This plan is strictly limited to the Purpose and does not apply directly or
indirectly and will not be used for any other application, purpose, use or matter. The plan is
presented without the assumption of a duty of care to any other person (other than the Client)
("Third Party") and may not be relied on by Third Party.
2. RPS Australia East Pty Ltd will not be liable (in negligence or otherwise) for any direct or
indirect loss, damage, liability or claim arising out of or incidental to:
a. a Third Party publishing, using or relying on the plan;
b. RPS Australia East Pty Ltd relying on information provided to it by the Client or a Third
Party where the information is incorrect, incomplete, inaccurate, out-of-date or
unreasonable;
c. any inaccuracies or other faults with information or data sourced from a Third Party;
d. RPS Australia East Pty Ltd relying on surface indicators that are incorrect or inaccurate;
e. the Client or any Third Party not verifying information in this plan where recommended
by RPS Australia East Pty Ltd;
f. lodgment of this plan with any local authority against the recommendation of RPS
Australia East Pty Ltd;
g. the accuracy, reliability, suitability or completeness of any approximations or estimates
made or referred to by RPS Australia East Pty Ltd in this plan.
3. Without limiting paragraph 1 or 2 above, this plan may not be copied, distributed, or
reproduced by any process unless this note is clearly displayed on the plan.
4. This plan was prepared as a concept plan only and accuracy of all aspects of the plan have not
been verified. No reliance should be placed on the plan and RPS Australia East Pty Ltd accepts
no responsibility for any loss or damage suffered howsoever arising to any person who may use
or rely on this plan.
5. The aerial photography used in this plan has not been rectified. This has been overlay as a best
fit on the boundaries shown and position.
6. Image Source: Google, Aerometer, CNES / Astrium, DNRM.
7. Based on or contains data provided by the State of Queensland (Department of NaturalResources and Mines) [2015]. In consideration of the State permitting use of this data youacknowledge and agree that the State gives no warranty in relation to the data (includingaccuracy, reliability, completeness, currency or suitability) and accepts no liability (includingwithout limitation, liability in negligence) for any loss, damage or costs (including consequentialdamage) relating to any use of the data. Data must not be used for direct marketing or be usedin breach of the privacy laws.
A
PRELIMINARY
IMPORTANT NOTE
1. This plan was prepared for the sole purposes of the client for the specific purpose of producing
a concept plan. This plan is strictly limited to the Purpose and does not apply directly or
indirectly and will not be used for any other application, purpose, use or matter. The plan is
presented without the assumption of a duty of care to any other person (other than the Client)
("Third Party") and may not be relied on by Third Party.
2. RPS Australia East Pty Ltd will not be liable (in negligence or otherwise) for any direct or
indirect loss, damage, liability or claim arising out of or incidental to:
a. a Third Party publishing, using or relying on the plan;
b. RPS Australia East Pty Ltd relying on information provided to it by the Client or a Third
Party where the information is incorrect, incomplete, inaccurate, out-of-date or
unreasonable;
c. any inaccuracies or other faults with information or data sourced from a Third Party;
d. RPS Australia East Pty Ltd relying on surface indicators that are incorrect or inaccurate;
e. the Client or any Third Party not verifying information in this plan where recommended
by RPS Australia East Pty Ltd;
f. lodgment of this plan with any local authority against the recommendation of RPS
Australia East Pty Ltd;
g. the accuracy, reliability, suitability or completeness of any approximations or estimates
made or referred to by RPS Australia East Pty Ltd in this plan.
3. Without limiting paragraph 1 or 2 above, this plan may not be copied, distributed, or
reproduced by any process unless this note is clearly displayed on the plan.
4. This plan was prepared as a concept plan only and accuracy of all aspects of the plan have not
been verified. No reliance should be placed on the plan and RPS Australia East Pty Ltd accepts
no responsibility for any loss or damage suffered howsoever arising to any person who may use
or rely on this plan.
5. The aerial photography used in this plan has not been rectified. This has been overlay as a best
fit on the boundaries shown and position.
6. Image Source: Google, Aerometer, CNES / Astrium, DNRM.
7. Based on or contains data provided by the State of Queensland (Department of NaturalResources and Mines) [2015]. In consideration of the State permitting use of this data youacknowledge and agree that the State gives no warranty in relation to the data (includingaccuracy, reliability, completeness, currency or suitability) and accepts no liability (includingwithout limitation, liability in negligence) for any loss, damage or costs (including consequentialdamage) relating to any use of the data. Data must not be used for direct marketing or be usedin breach of the privacy laws.
127729-1-P02
PROPOSED PLAN OF DEVELOPEMENT
(A3)
KELVIN
KOUMALA
CARLISLE
MACKAY REGIONAL COUNCIL
STEWART & SARAH BORG
1:3000 10/10/2016 127729-1
BG 10/10/2016
ST/CS
BG
DCDB
N/A
N/A
PART of LOT 2 on RP719070 & PART of LOT 1 on RP731366133 NORTH INNESTON ROAD, KOUMALA
2 of 41:1000
not permitted. Please contact the author.
Unauthorised reproduction or amendment
COPYRIGHT PROTECTS THIS PLANC
+61 7 4953 3577
+61 7 4953 3622
Mackay QLD 4740
Level 1, 38 Wellington Street
PO Box 1895
ACN 140 292 762
ABN 44 140 292 762
TF
W
RPS Australia East Pty Ltd
rpsgroup.com.au
11/10/2016
11/10/2016
A
PRELIMINARY
IMPORTANT NOTE
1. This plan was prepared for the sole purposes of the client for the specific purpose of
producing a concept plan. This plan is strictly limited to the Purpose and does not
apply directly or indirectly and will not be used for any other application, purpose,
use or matter. The plan is presented without the assumption of a duty of care to any
other person (other than the Client) ("Third Party") and may not be relied on by
Third Party.
2. RPS Australia East Pty Ltd will not be liable (in negligence or otherwise) for any
direct or indirect loss, damage, liability or claim arising out of or incidental to:
a. a Third Party publishing, using or relying on the plan;
b. RPS Australia East Pty Ltd relying on information provided to it by the Client or
a Third Party where the information is incorrect, incomplete, inaccurate,
out-of-date or unreasonable;
c. any inaccuracies or other faults with information or data sourced from a Third
Party;
d. RPS Australia East Pty Ltd relying on surface indicators that are incorrect or
inaccurate;
e. the Client or any Third Party not verifying information in this plan where
recommended by RPS Australia East Pty Ltd;
f. lodgment of this plan with any local authority against the recommendation of
RPS Australia East Pty Ltd;
g. the accuracy, reliability, suitability or completeness of any approximations or
estimates made or referred to by RPS Australia East Pty Ltd in this plan.
3. Without limiting paragraph 1 or 2 above, this plan may not be copied, distributed, or
reproduced by any process unless this note is clearly displayed on the plan.
4. This plan was prepared as a concept plan only and accuracy of all aspects of the plan
have not been verified. No reliance should be placed on the plan and RPS Australia
East Pty Ltd accepts no responsibility for any loss or damage suffered howsoever
arising to any person who may use or rely on this plan.
5. The aerial photography used in this plan has not been rectified. This has been overlay
as a best fit on the boundaries shown and position.
6. Image Source: Google, Aerometer, CNES / Astrium, DNRM.
127729-1-P02
PROPOSED PLAN OF DEVELOPEMENT
(A3)
KELVIN
KOUMALA
CARLISLE
MACKAY REGIONAL COUNCIL
STEWART & SARAH BORG
1:1250 10/10/2016 127729-1
BG 10/10/2016
ST/CS
BG
DCDB
N/A
N/A
PART of LOT 2 on RP719070 & PART of LOT 1 on RP731366133 NORTH INNESTON ROAD, KOUMALA
3 of 41:1000
not permitted. Please contact the author.
Unauthorised reproduction or amendment
COPYRIGHT PROTECTS THIS PLANC
+61 7 4953 3577
+61 7 4953 3622
Mackay QLD 4740
Level 1, 38 Wellington Street
PO Box 1895
ACN 140 292 762
ABN 44 140 292 762
TF
W
RPS Australia East Pty Ltd
rpsgroup.com.au
11/10/2016
11/10/2016
A
IMPORTANT NOTE
1. This plan was prepared for the sole purposes of the client for the specific purpose of producing
a concept plan. This plan is strictly limited to the Purpose and does not apply directly or
indirectly and will not be used for any other application, purpose, use or matter. The plan is
presented without the assumption of a duty of care to any other person (other than the Client)
("Third Party") and may not be relied on by Third Party.
2. RPS Australia East Pty Ltd will not be liable (in negligence or otherwise) for any direct or
indirect loss, damage, liability or claim arising out of or incidental to:
a. a Third Party publishing, using or relying on the plan;
b. RPS Australia East Pty Ltd relying on information provided to it by the Client or a Third
Party where the information is incorrect, incomplete, inaccurate, out-of-date or
unreasonable;
c. any inaccuracies or other faults with information or data sourced from a Third Party;
d. RPS Australia East Pty Ltd relying on surface indicators that are incorrect or inaccurate;
e. the Client or any Third Party not verifying information in this plan where recommended
by RPS Australia East Pty Ltd;
f. lodgment of this plan with any local authority against the recommendation of RPS
Australia East Pty Ltd;
g. the accuracy, reliability, suitability or completeness of any approximations or estimates
made or referred to by RPS Australia East Pty Ltd in this plan.
3. Without limiting paragraph 1 or 2 above, this plan may not be copied, distributed, or
reproduced by any process unless this note is clearly displayed on the plan.
4. This plan was prepared as a concept plan only and accuracy of all aspects of the plan have not
been verified. No reliance should be placed on the plan and RPS Australia East Pty Ltd accepts
no responsibility for any loss or damage suffered howsoever arising to any person who may use
or rely on this plan.
5. The aerial photography used in this plan has not been rectified. This has been overlay as a best
fit on the boundaries shown and position.
6. Image Source: Google, Aerometer, CNES / Astrium, DNRM.
PRELIMINARY
127729-1-P02
PROPOSED PLAN OF DEVELOPEMENT
(A3)
KELVIN
KOUMALA
CARLISLE
MACKAY REGIONAL COUNCIL
STEWART & SARAH BORG
1:2000 10/10/2016 127729-1
BG 10/10/2016
ST/CS
BG
DCDB
N/A
N/A
PART of LOT 2 on RP719070 & PART of LOT 1 on RP731366133 NORTH INNESTON ROAD, KOUMALA
4 of 41:1000
not permitted. Please contact the author.
Unauthorised reproduction or amendment
COPYRIGHT PROTECTS THIS PLANC
+61 7 4953 3577
+61 7 4953 3622
Mackay QLD 4740
Level 1, 38 Wellington Street
PO Box 1895
ACN 140 292 762
ABN 44 140 292 762
TF
W
RPS Australia East Pty Ltd
rpsgroup.com.au
11/10/2016
11/10/2016
A