p1_offshore installations -oct 2011- 02
DESCRIPTION
Texto UniversitarioTRANSCRIPT
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
OFFSHORE INSTALLATIONS
Manuel Moreu
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivajacket we were no having enough safety concernsamount of members, before this installation no drilling before, the first well developed with this derrickthey had confidence oil below
RY50167Nota adhesivaperforming in fantastic areas, move installations
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivadecided before taking decisions, perform exploration drilling, perhaps no commercial oil
RY50167Nota adhesivathe 1st submersible drilling units
RY50167Nota adhesivato ensure waves not hitting the equipment, esta operacion tiene riesgo, flowters stable altough
RY50167Nota adhesivaauxiliare pontoums floating, bartch resting @ bottom
RY50167Nota adhesivahinged solutions to ensure operations propperly
RY50167Nota adhesivacables o wires, recovery moment produced by wires, able to silk structure with the help of winches
RY50167Nota adhesivacolumns advantage to have inercia, stability equation, today most of submersible units are bottle, today an artifitial island enough freewar, distance water & depth
RY50167Nota adhesivaa much bigger water depth
RY50167Nota adhesivaa larger draft, it was not needed such a big inercia
RY50167Nota adhesivaallowed to have smaller columns & we are stable
RY50167Nota adhesivacharacteristic of submersible unit, bottle & its neck
RY50167Nota adhesivabottle neck above water, no problem
RY50167Nota adhesivabottle neck is not above water, tenemos que lidiar coon esto
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivadepth big enogh,survive ice conditions, artifitial it's a convenient solution
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivadevelope 2nd family of exploration units, the first jack-up, we can balance down or above waves of water, waves increasing, columns rather tan cilinders, we are having trnasparen 3D structure
RY50167Nota adhesivadesing auxiliary units
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivajack-ups 3 or 4 legs
RY50167Nota adhesivatesting, 2 flers, fixed position, allowed to fler parlovento sotabento, burning smthing, care wind will not burn installations
RY50167Nota adhesivaanother fler in this side
RY50167Nota adhesivaaqui se le llama windward
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivaleabird
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivastep by step
RY50167Nota adhesivahydralic
RY50167Nota adhesivabartch clamped
RY50167Nota adhesivasupporter
RY50167Nota adhesivalifted to the position, cilinder underforce
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivamost of the jacket systems are rack and pinion
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivaproduction
RY50167Nota adhesivawellhead platform
RY50167Nota adhesivaloads bigger, bigger structure
RY50167Nota adhesivacantiliber
RY50167Nota adhesivaexploration units may perform production
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesiva3rd family of exploration units
RY50167Nota adhesiva1st driilling unit, those units floaters havin' a derrick capacity to perform samples not so big
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivamooring lines connected to the table
RY50167Nota adhesivavessel always rotate
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivapropelers
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivadrill 2 wells without suplying boat
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
Drillmar at transit draft
RY50167Nota adhesivasmaller draft, best transient spread
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
Drillmar at operation draft
RY50167Nota adhesivawhen we have to drill, we balance the right, 16 meters draft, motions very gentle, motions 20 seconds
RY50167Nota adhesivaperformances in this es fantastico, en el anterior en cambio no
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivahuge towing require
RY50167Nota adhesiva4 columns & 2 catamarans
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivasketch of typical deepwater jacket
RY50167Nota adhesivaabove the botton till the botton
RY50167Nota adhesivaouter legs are those with battering
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivaIn feet
RY50167Nota adhesivaconventional having the batteru
RY50167Nota adhesivawe designed the last for stable conditions
RY50167Nota adhesivafabrication of loads
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivasecond family of production units
RY50167Nota adhesivato store oil
RY50167Nota adhesivalifted above 20 mts
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
Harding
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
Siri
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
Siri
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivatoroidal swivel
RY50167Nota adhesivaTurret mured, reducing enviromental forces allow to install in large reas of the zone, west of sealand, hardest conditions so far, design wave was 36 meters of mximum wave.Risers hanging from turret, production from swivel through the vessel
RY50167Nota adhesivaexternal part of the swivel
RY50167Nota adhesivallega al esquema
RY50167Nota adhesivadedicated to electrical power
RY50167Nota adhesivalateral forces to wheels
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivabecause of the forces, spread more
RY50167Nota adhesivaturret moorspread moor
RY50167Nota adhesivaturret moorturret forward
RY50167Nota adhesivavessel is no rather weight
RY50167Nota adhesivayoke is a system not very used today
RY50167Nota adhesivaa lot of the spread moured or turret moured
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
Distribution of FPSO worldwide
RY50167Nota adhesivathe most common one
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
Distribution of FPSO worldwide
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
Distribution of FPSO worldwide
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivaconnected to the bottom, provides liftin' force, cheap method
RY50167Nota adhesivasurface xmas tree, wellhead
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivazinc anodesaluminum: galvanic potential larger than the steel, negative electrons
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
Tanana, Catherine Knutsen conversion
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
Offshore oil production and total
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
World OPEC and non-OPEC oil production life cycles
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
RY50167Nota adhesivafor small recoverable resource, there's no amount of gas; the only way is by having a connection, wellheads connected to existing platform, when the capacity increase, distance quite large, CMI or PSO, we would be looking for high units, si la distance es large, we mantain connection to the existing jacket
RY50167Nota adhesivawhen the recoverable reserves are bigger, the next question is the water depth, smaller, think have a jacket, the larger production, the larger water depth, we'll install a jacket. Operation cost of a jacker is small than the floater, si el water is just 500, estaremos en el floater range
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS
-
OFFSHORE COURSE
1. OFFSHORE INSTALLATIONS