pa14-006-3w-0003 tr for navigation aid

28
Doc. Code : Revision No : B1 Date : 17 / 04 / 2014 Page : 1 of 27 BADAMYAR DEVELOPMENT PROJECT TECHNICAL REQUISITION FOR NAVIGATION AID SYSTEM DOC. NO. : BDP-WHP-TR-E-0005 Prepared by Reviewed by Approved by Full name Signature Date

Upload: nautel

Post on 24-Nov-2015

72 views

Category:

Documents


9 download

TRANSCRIPT

  • Doc. Code : Revision No : B1 Date : 17 / 04 / 2014 Page : 1 of 27

    BADAMYAR DEVELOPMENT PROJECT

    TECHNICAL REQUISITION FOR NAVIGATION AID SYSTEM

    DOC. NO. : BDP-WHP-TR-E-0005

    Prepared by Reviewed by Approved by

    Full name

    Signature

    Date

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 2 of 27

    RECORD OF REVISION

    No Date Page Contents Remark

    1 14/04/2014 All Approved for Bid B1

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 3 of 27

    TABLE OF CONTENTS

    1.0 PROJECT DESCRIPTION ........................................................................................ 4 2.0 SCOPE OF WORK / SUPPLY ................................................................................... 6 3.0 TECHNICAL REQUIREMENTS / SPECIFIC INSTRUCTIONS .......................... 8 4.0 DEVIATIONS, ALTERNATIVES AND CLARIFICATIONS................................. 9 5.0 LIST OF APPLICABLE DOCUMENTS ................................................................. 10

    5.2 DATA SHEET(S) ............................................................................................................. 10 5.3 PROJECT DRAWING(S) ................................................................................................ 10 5.4 PROJECT SPECIFICATION(S) ..................................................................................... 10 5.5 OTHERS ......................................................................................................................... 11

    6.0 VENDOR DATA REQUIREMENT LIST VDRL ................................................ 12 7.0 TYPICAL INSPECTION AND TEST PLAN .......................................................... 22 ATTACHMENT 1: TEST AND INSPECTION GENERAL REQUIREMENTS ............ 26 ATTACHMENT 2: DEVIATION / ALTERNATIVE / CLARIFICATION LIST ........... 27 ATTACHMENT 3: SPARE PARTS LIST AND INTERCHANGEABILITY RECORD 28

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 4 of 27

    1.0 PROJECT DESCRIPTION

    COMPANY has developed PM-3 CAA Northern Fields with a Central Processing Platform BO-A located at the Bunga Orkid Field with a series of Well Head Riser Platforms namely BO-B, BO-C & BO-D delivering hydrocarbons from the various field areas to the CPP with Bunga Pakma A as future.

    The project will consider the design, build, installation and commissioning of the BP-A minimum facilities platform for the drilling of 7 initial gas wells with potential of up to 11 future wells. Production evacuation will be through a new export pipeline to BO-D/BO-A.

    Bunga Pakma facilities will have 15 years design life. The current plan date for first gas is 1st Q 2016. The project will also incorporate the required brownfield modifications on BO-D/BO-A required to transport Bunga Pakma production to PM3 CAA Bunga Raya field and onward to the gas export pipelines.

    This project will follow TML Project Delivery System (PDS) guideline. One technically and commercially viable business case will be developed followed by alternative selection process and assurance reviews to select best alternative concept.

    Bunga Pakma presently comprises North Bunga Pakma and Bunga Pakma fields, which are located approximately 10 km from BO-A CPP. The FDP Rev 4 Addendum Update 5 was approved by PETRONAS in March 2005. In the FDP, there is a provision for a future remote wellhead platform in the Bunga Pakma area (BP-A WHRP). BP-A WHRP will act as a gathering point for production from North Bunga Pakma and Bunga Pakma fields.

    The current plan is to have BP-A facility operational by January 2016. This is imperative as it is forecasted that TML gas production from Bunga Orkid field will decline. The Unit Gas Sales Agreement (UGSA) commitment is 270 MMSCF/D net hydrocarbons.

    Bunga Pakma will provide Proven plus Probable (2P) reserves of 35.9 MMBOE (including 180.7 Bscf sales gas) gross over life of field while proven undeveloped reserves of 20.0 MMBOE (including 102.8 Bscf sales gas) gross are expected as of December 31st, 2011. Bunga Pakma will help ensure TML meets its contractual gas sales commitment as per UGSA and 2013 Business Plan.

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 5 of 27

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 6 of 27

    2.0 SCOPE OF WORK / SUPPLY

    VENDORs scope of work and supply shall include but not be limited to design, engi-neering, material procurement, manufacture, inspection, testing, surface preparation & painting, packaging for shipment and delivery of the equipment (as per the required de-livery terms and conditions) in accordance with the table below. The VENDOR shall be responsible for the supply of item(s) in all respects for the safe and reliable operation of the package.

    No. Item/

    Tag No. Qty Description

    A EQUIPMENT I Navigation Aid system for LCP Platform shall be detailed in MM-YAD-35-

    TTBE-130006, consist of:

    1 NOBAT 31-2-1 1 lot NiCd Battery and ExeBattery Box, temperature Sensor with accessories

    NOBCB 31-2-1 1 lot Navigation aids battery breaker 2 NOCP-31-2-1 1 EA Central Navigation Aids Control Panel 3 LCP-MNL-W1 1 EA Main Navigation Aids lantern

    4 LCP-MNL-R1 LCP-MNL-R2 2 EA Subsidiary Navigation Aids lantern

    5 LCP-AOL-R1 1 EA Aeronautical Obstruction Light 6 - 1 EA Photocell 7 - 1 lot Control interfacing with PDCS and ICSS system II Navigation Aid system for WP4 Platform shall be detailed in MM-YAD-90-

    TTBE-130006, consist of:

    1 NOBAT-41-2-1 1 lot Battery and Battery Box, temperature Sensor with accessories NOCBC-41-2-1 1 lot Navigation aids battery breaker

    2 NOCP-41-2-1 1 EA Central Navigation Aids Control Panel

    3

    WP4-MNL-W1 WP4-MNL-W2 WP4-MNL-W3 WP4-MNL-W4

    4EA Main Navigation Aids lantern

    4 1EA Helideck Status 5 WP4-FH-1 1 EA Fog horn c/w Fog horn Controller.

    6 WP4-AOL-R1 WP4-AOL-R2 2 EA Aeronautical Obstruction Light c/w accessories

    7 1 EA Photocell 8 1 lot Control interfacing with PDCS and ICSS system B SCOPE OF WORK (applicable for each Navigation Aid System)

    1 - All interconnection cabling between NCCP, marine lanterns, foghorns, photocell, etc, to complete system

    2 - Control, indication, monitoring and communication facilities

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 7 of 27

    3 - Complete system protection and metering facilities

    4 - Any other service as may agree at time of other placement - Factory Acceptance testing I Spare parts and Special Tools 1 1 Lot Spare part for Startup/Commissioning

    2 1 Lot Price list of recommended spare parts for 2 years op-eration

    3 - 1 Lot Special tools for installation , operation and mainte-nance( where required)

    4 - 1 Lot Spreader bars, slings and shackles for installation of the equipment using single point lift c/w with certifi-cate (If applicable)

    II Guarantee and Warranty

    1 - 1 Lot Guarantee and warranty complete for the package and supplied items III Painting, Inspection, Testing and Certification

    1 - Surface preparation and painting(external) as per specifi-cation requirements

    2 - - Inspection, Testing and Certification as per project re-quirements and attachment 1 IV Delivery 1 - - Packing, marking, forwarding and preservation

    2 - - Transportation from the fabrication / assembly location to the point of delivery. 3 - - Shipping/transportation supports (if required). V Documentation

    1 - 1 Lot Documentation as per VDRL and applicable Specifica-tions

    2 - 1 Lot Final documentation e.g. Installation & Operating Manual (IOM), Manufacturers Data Report (MDR) VI Vendor supervision

    1 Vendor supporting for installation, onshore commission-ing, offshore start up and commissioning. (Quote separate-ly, per diem rates)

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 8 of 27

    3.0 TECHNICAL REQUIREMENTS / SPECIFIC INSTRUCTIONS

    3.1 Technical requirements shall be as per the list of documents attached with this requisi-tion.

    3.2 The VENDOR shall submit all the required drawings and documents as per Vendor Da-ta Requirement List (VDRL) available in Section 6.0 of this requisition. The VDRL shall be agreed between the VENDOR and PURCHASER / COMPANY before place-ment of order.

    3.3 Vendor Document Schedule (VDS) Immediately after the award of contract, the VENDOR shall provide Vendor Document Schedule to the PURCHASER as per agreed VDRL. The register shall be in Microsoft excel format and contain the follow-ing data:

    x Company/Purchaser Document / Drawing Number x VDRL Code x Vendor Document / Drawing Number (if applicable) x Document / Drawing title x Latest revision x Planned submission date x Actual 1st submission date of transmittal x Actual Return Date x Drawing/document approval status x Remarks if any x Columns shall be added for subsequent submissions

    3.4 The VENDOR shall provide the list of commissioning and start-up spare parts. Spare

    parts shall be part of main offer.

    3.5 The VENDOR shall also provide the list of recommended spare parts for 2 years opera-tion along with pricing.

    3.6 VENDOR shall provide a firm commitment for the continuous availability with the best terms, prices and conditions for all related special tools, spare parts and maintenance ser-vices necessary for duration of twenty (20) years after the ex-works delivery.

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 9 of 27

    4.0 DEVIATIONS, ALTERNATIVES AND CLARIFICATIONS

    VENDOR shall notify PURCHASERs of any proposed deviations and alternatives from the requirement specified in this requisition and Applicable Documents specified in section 5.0. VENDOR shall submit the deviations and alternatives list together with VENDOR proposal using ATTACHMENT 2.

    VENDOR shall agree that the only deviations, exceptions and alternatives to be consid-ered by PURCHASER shall be limited to those separately specified in a proposed De-viation / Alternative / Clarification Sheet accompanying VENDOR proposal. PURCHASER has no responsibility to discover any deviations, exceptions or alterna-tives entered in other parts of VENDOR proposal than the said Deviation / Alternative / Clarification List.

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 10 of 27

    5.0 LIST OF APPLICABLE DOCUMENTS

    5.2 DATA SHEET(S)

    No. Document Number Document Title Rev

    1 MM-YAD-90-TTBE-130006 Datasheet for Navigation Aids System (WP4 Platform) 00

    2 MM-YAD-35-TTBE-130006 Datasheet for Navigation Aids System (LCP Platform) 00

    5.3 PROJECT DRAWING(S)

    No. Document Number Document Title Rev 1 MM-YAD-90-TTBE-140001 WP4-General Single line Diagram 00

    2 MM-YAD-90-TTBE-140002 WP4- Single line Diagram LV Switchgear 00

    3 MM-YAD-35-TTBE-140001 LCP Platform-General Single line Diagram 01

    4 MM-YAD-35-TTBE-140002 LCP Platform- Single line Diagram-LV nor-mal Switchgear 00

    5 MM-YAD-35-TTBE-140010 LCP Platform- Single line Diagram-LV essen-tial Switchboard 00

    6 MM-YAD-90-TTBE-140005 WP4-Single line diagram for Navigation Aids system 00

    7 MM-YAD-35-TTBE-140005 LCP- Single line diagram for Navigation Aids system 00

    8 MM-YAD-35-TTBE-140008 LCP Platform- Electrical Equipment Layout 00

    5.4 PROJECT SPECIFICATION(S)

    No. Document Number Document Title Rev 1 Exhibit H Quality Management 0 2 Exhibit H - Attachment H1 Scope of Work Certification 0

    3 Exhibit H - Attachment H2 Specification for Equipment and Material Certi-fication 0

    4 Exhibit H - Attachment H3 Minimum Inspection Requirements 0 5 Exhibit J List of Subcontractors and Vendors 0 6 Exhibit J Appendix J1 Approved Vendors List 0 7 GS EP ELE 001 Electrical Design Criteria 08

    8 GS EP ELE 079 Electrical Apparatus for HV & LV Cable Siz-ing 06

    9 GS EP ELE 161 Electrical Cable 05 10 GS EP ELE 221 Electrical Control system 05

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 11 of 27

    11 GS EP ELE 321 Specification for Navigation Aids System 04 12 GS EP ELE 374 Construction site electrical installation 02

    13 GS EP ELE 451 Third party inspection independent verifica-tion of electrical Facilities 03

    14 GS EP ELE 460 Engineering Studies 04 15 GS EP LSO 115 Helideck Specification 01 16 GS EP STR 002 Crane for fixed offshore installation 08 17 GS EP TEL410 Installation Rules 05

    18 MM-YAD-00-TTBE-110001 Electrical Design basic and Operating Phi-losophy 00

    19 MM-YAD-00-TTBE-120008 Specification for Navigation Aid System 01

    20 MM-YAD-00-TTBE-120009 Specification for Earthing and Bonding sys-tem 02

    21 MM-YAD-00-TTBE-120011 Specification for Electrical requirement package 02

    22 MM-YAD-00-TTBE-120013 Specification for Electrical Installation 01

    23 MM-YAD-00-TTBE-130001 Datasheet for Electric Cable 02

    24 MM-YAD-00-TTBE-170001 Electrical Equipment List 01

    5.5 OTHERS

    No. Document Number Document Title Rev 1 2

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 12 of 27

    6.0 VENDOR DATA REQUIREMENT LIST VDRL

    VDRL Code

    (1) Data/Document Description

    With Bid After Purchase Order

    Final Issue

    (9) (11)

    Tick (1P+E)

    (5)

    Tick (3P+E)

    (6)

    Purpose (IFR / Info) (7)

    Issue date (8)

    IFR Tick

    (1P+E) (6)

    IOM/

    MDR (1P+1CD)

    (10)

    1 Commercial/Contractual

    C01 Vendor Document Index & Schedule IFR +2W -- --

    C02 Engineering, Procurement, Manufacturing and Test Schedule

    IFR +4W -- --

    C03 Sub Contract Work Proposal

    C04 Delivery, Handling and Packing Proposals

    C05 Exception and Non-Conformity Form IFR +4W MDR

    C06 Vendors Sub-Orders (Un-Priced copy) -- IFR +4W -- MDR

    C07 Warranty/Guarantee Confirmation IFR +4W MDR

    C08 Vendor/Sub-Vendor List IFR +4W MDR

    C09 Project Management Organisation

    C10 Progress Reports (Weekly and Monthly) -- IFR Bi-

    Monthly -- --

    C11 Proven Design and Manufacturing Experi-ence List

    IFR +4W -- --

    C12 Schedule of Nozzle Pricing

    2 Process / Mechanical / Piping / Structural

    M01 Foundation Load and Anchor Bolt Loca-tion

    M02 Drive Assembly Details

    M03 Equipment Design Calculations including Transportation

    M04 Structural Design Calculations

    M05 Pipe Stress Calculations

    M06 Process Flow Diagrams including Heat and Mass Balance

    M07 Piping and Instrument Diagrams

    M08 Process Sizing Calculations

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 13 of 27

    VDRL Code

    (1) Data/Document Description

    With Bid After Purchase Order

    Final Issue

    (9) (11)

    Tick (1P+E)

    (5)

    Tick (3P+E)

    (6)

    Purpose (IFR / Info) (7)

    Issue date (8)

    IFR Tick

    (1P+E) (6)

    IOM/

    MDR (1P+1CD)

    (10)

    M09 Exchanger Thermal Rating Calculations

    M10 Hydraulic Calculations

    M11 Thermal Growth Calculations

    M12 Utility Calculations

    M13 Flare/Relief System Calculations

    M14 Flare Dispersion Calculations

    M15 Reliability/Availability Data and Calcula-tions

    -- IFR +6W MDR

    M16 Lube and Seal Oil System Sizing Calcula-tions

    M17 Anti Surge Valve Sizing Calculations

    M18 Line List

    M19 Equipment Data Sheet including speciality items

    IFR +4W MDR/ IOM

    M20 Prime Mover Data Sheets (Motor/ Diesel engine/ Gas Engine/ Turbine)

    M21 Weight Data Sheet

    M22 Noise Level Data Sheets -- IFR +6W MDR

    M23 General Arrangement Drawings IFR +4W MDR/ IOM

    M24 Detail / Assembly / Fabrication Drawings

    M25 Cross Section Drawing / Exploded View Drawings

    -- IFR +4W IOM/MDR

    M26 Internals Drawings / Miscellaneous Draw-ings

    -- IFR +4W IOM/MDR

    M27 Mechanical Seal Drawings

    M28 Shaft Alignment Drawings

    M29 Bill of Material IFR +8W MDR/ IOM

    M30 Centre of Gravity Sketch

    M31 Installation & Dismantling Drawings / Procedures (As Applicable)

    -- IFR +8W MDR/IOM

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 14 of 27

    VDRL Code

    (1) Data/Document Description

    With Bid After Purchase Order

    Final Issue

    (9) (11)

    Tick (1P+E)

    (5)

    Tick (3P+E)

    (6)

    Purpose (IFR / Info) (7)

    Issue date (8)

    IFR Tick

    (1P+E) (6)

    IOM/

    MDR (1P+1CD)

    (10)

    M32 Lifting / transportation Drawings

    M33 Name Plate Drawings -- IFR +8W MDR/ IOM

    M34 HVAC Schematic and Flow Diagrams

    M35 Skid/Module GA and Detail Drawings

    M36 Lifting Lug Details / Calculations

    M37 Allowable Nozzle Load Calculations

    M38 Weight and Centre of Gravity Calculations -- IFR +4W IOM/MDR

    M39 Lifting Equipment Calculations

    M40 Lateral Critical Speed Calculations

    M41 Torsional Critical Speed Calculations

    M42 Bearing Life Calculations

    M43 Thrust Bearing sizing Calculations

    M44 Pulsation Dampener Design Calculations

    M45 Rotor/Shaft system Unbalanced Response Analysis

    M46 Coupling Selection Calculations

    M47 Dynamic Characteristics: Lateral & Tor-sional Analysis

    M48 Foundation Load Calculations

    M49 HVAC Calculations

    M50 Vibration Calculations

    M51 Miscellaneous Calculations

    M52 Skid Piping GA Drawings

    M53 Pipe Work Support Details

    M54 Valve List

    M55 Piping Isometrics

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 15 of 27

    VDRL Code

    (1) Data/Document Description

    With Bid After Purchase Order

    Final Issue

    (9) (11)

    Tick (1P+E)

    (5)

    Tick (3P+E)

    (6)

    Purpose (IFR / Info) (7)

    Issue date (8)

    IFR Tick

    (1P+E) (6)

    IOM/

    MDR (1P+1CD)

    (10)

    M56 Non-Actuated Valve Torque Calculations

    M57 Tie-in Schedule

    M58 Pulsation Analysis

    M59 Relief Valves Calculations and Sizing

    M60 Lifting Lug / Trunnion Calculations

    M61 Structural Skid / Support Calculations

    M62 Tank Tress Calculation

    3 Instrument/Electrical

    J01 Package Electrical Termination Drawings -- IFR +6W MDR

    J02 Panel Layout and Details -- IFR +6W IOM/MDR

    J03 Panel Wiring Diagrams

    J04 Instrument / Fire and Gas Location Plans / Cable Layouts

    J05 Instrument / Fire and Gas Installation De-tails / Hook-ups

    J06 Loop Diagrams

    J07 Cause & Effect Charts

    J08 Alarm / Trip Set Point List

    J09 Electrical Wiring Diagrams -- IFR +6W MDR

    J10 Electrical Schematic Diagrams -- IFR +6W MDR

    J11 Electrical Single Line Diagrams -- IFR +6W IOM/MDR

    J12 Sequence and Logic Diagrams, Cause and Effect Diagrams

    -- IFR +8W MDR

    J13 Instrument/Electrical [ISA] Data Sheets IFR +6W MDR/ IOM

    J14 Instrument schematics and control diagram -- IFR +8W MDR

    J15 Functional Design Specifications -- IFR +8W MDR

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 16 of 27

    VDRL Code

    (1) Data/Document Description

    With Bid After Purchase Order

    Final Issue

    (9) (11)

    Tick (1P+E)

    (5)

    Tick (3P+E)

    (6)

    Purpose (IFR / Info) (7)

    Issue date (8)

    IFR Tick

    (1P+E) (6)

    IOM/

    MDR (1P+1CD)

    (10)

    J16 Cable block diagram, SR Data link Ad-dress & Screen Graphics

    -- IFR +6W MDR

    J17 Instrument Calculations including Safety Valves, Control Valves, FE's, RO's, etc.

    J18 Instrument Index

    J19 I/O Schedules -- IFR +6W MDR

    J20 VDU Screen Display Graphics

    J21 Control and Shutdown Philosophy

    J22 Cable Schedule -- IFR +6W MDR

    J23 Junction Box - Specification and Drawings

    J24 Electronic Cable detail

    J25 Panel Test Procedure -- IFR +6W MDR

    J26 Type Test Procedure -- IFR +6W MDR

    J27 Tie-in Schedule

    J28 Protection relay coordination & setting study report

    -- IFR +6W MDR

    4 General

    G01 Descriptive Literature and Catalogue In-formation

    Info +4W MDR

    G02 Sub Vendor Data Sheets / Manuals Info +6W MDR

    G03 Recommended Spare Parts For 2 Year Operation, Priced

    Info +4W IOM

    G04 Recommended Spare parts for Start-up & Commissioning, Priced

    IFR +4W IOM

    G05 List of Special Tools, where applicable Info +4W IOM

    G06 Utility Requirements Power / Air / Water / Other

    G07 Consumables list including lubrication

    G08 Loading, Transport and Unloading Details

    G09 Preservation and Storage Procedure -- IFR -2W BD MDR/ IOM

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 17 of 27

    VDRL Code

    (1) Data/Document Description

    With Bid After Purchase Order

    Final Issue

    (9) (11)

    Tick (1P+E)

    (5)

    Tick (3P+E)

    (6)

    Purpose (IFR / Info) (7)

    Issue date (8)

    IFR Tick

    (1P+E) (6)

    IOM/

    MDR (1P+1CD)

    (10)

    G10 Hazardous Area Dossier

    G11 Hardware Standard Software Documenta-tion

    G12 Material Safety Data Sheet

    G13 Packing List -- IFR -1W BD MDR/ IOM

    G14 All Approved "As-Built" - Drawings and Data Sheets

    -- Info -3W BD MDR/ IOM

    G15 Preparation for Shipment Procedure

    5 Performance

    P01 Performance and Test Procedure -- IFR +8W IOM

    P02 Performance Curves and Data (Pump, Compressor, Gas Turbine, Motor, Engine, Fan, Vessel Internals, etc)

    P03 Trial Assembly Report

    P04 Performance Test Reports

    P05 Noise Reports -- Info +2W AT IOM

    P06 FAT Reports -- Info +2W AT IOM

    P07 Commissioning and Site Acceptance Test Results

    -- Info +2W AT IOM

    P08 Vibration Reports -- Info +2W AT IOM

    P09 Acoustic Analysis

    P10 Crane Failure Mode Analysis

    P11 Heat Emission Calculations

    P12 Battery Charge/Discharge Curves -- IFR +6W MDR

    P13 Electrical Relay Characteristics

    P14 Pulsation Study -- IFR +6W MDR / IOM

    6 QA/Certification/Reports

    Q01 QA Accreditation Certification -- -- -- -- --

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 18 of 27

    VDRL Code

    (1) Data/Document Description

    With Bid After Purchase Order

    Final Issue

    (9) (11)

    Tick (1P+E)

    (5)

    Tick (3P+E)

    (6)

    Purpose (IFR / Info) (7)

    Issue date (8)

    IFR Tick

    (1P+E) (6)

    IOM/

    MDR (1P+1CD)

    (10)

    Q02 Contract Quality Plan -- -- -- -- --

    Q03 Welding Procedures & Qualification Test Reports

    -- Info +8W MDR

    Q04 Inspection and Test Plan IFR +6W MDR

    Q05 Inspection and Test Reports -- IFR +2W AT MDR

    Q06 Calibration Procedures & Results

    Q07 Hydro Test / Pneumatic Test Procedures

    Q08 Hydro Test/ Pneumatic Test Reports

    Q09 Material Mill Test Certification -- Info As

    Reqd MDR

    Q10 Electrical Type Test Certificates -- Info As

    Reqd MDR

    Q11 Approval of Relevant Authorities

    Q12 Statement of Code Compliance

    Q13 Hazardous Area Certification -- IFR +8W MDR/ IOM

    Q14 Heat Treatment Records, where applicable

    Q15 Charpy Impact Tests, where applicable

    Q16 Vendor Concession Request

    Q17 Surface Preparation for Painting and Inter-nal Coating Procedure

    -- IFR +6W MDR

    Q18 NDE Procedure & NDE Location Plan

    Q19 Manufacturing Procedures including Heat Treatment

    Q20 Pre-Commissioning / Commissioning / Site Acceptance Test Procedure

    -- IFR +8W MDR/ IOM

    Q21 Factory Acceptance Test Procedure -- IFR +8W MDR

    Q22 Weighing Procedure

    Q23 Post Weld Heat Treatment Procedures

    Q24 Non-Conformance Report (NCR) Procedure

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 19 of 27

    VDRL Code

    (1) Data/Document Description

    With Bid After Purchase Order

    Final Issue

    (9) (11)

    Tick (1P+E)

    (5)

    Tick (3P+E)

    (6)

    Purpose (IFR / Info) (7)

    Issue date (8)

    IFR Tick

    (1P+E) (6)

    IOM/

    MDR (1P+1CD)

    (10)

    Q25 Erection & Installation Procedure

    Q26 Weld Location Plans

    Q27 Repair Procedures -- IFR +8W MDR

    Q28 Weight Certificate (equipment > 50 kg) -- IFR +8W MDR

    Q29 Lifting Equipment Certification

    Q30 Dimensional Control Report -- IFR +8W MDR

    Q31 Welder Performance Qualification Rec-ords/Certificates

    Q32 NDE Operator Qualifications & Certifi-cates

    Q33 Production Test Results (Including weld-ing)

    Q34 NDE Reports

    Q35 Material Traceability Records (Location Drawing)

    Q36 Certificate of Compliance -- Info -2W BD MDR

    Q37 Painting/Insulation Inspection Reports -- IFR +8W MDR

    Q38 Inspection Release Certificate

    Q39 Photographs/Videos (i.e. Boroscope)

    Q40 Weld Overlay/Cladding Procedures, where applicable

    Q41 Cleaning and Flushing Procedures

    Q42 PMI Procedures and PMI Location Plan

    Q43 Pickling and Passivation Procedures

    Q44 Tube to Tube sheet Joint Mock-Up Test Procedure

    Q45 Tube to Tube sheet Mock-Up Test Results

    Q46 Pitting and Crevice Corrosion Resistance Test Procedure (ASTM G48)

    Q47 Intergranular Corrosion Test Procedure

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 20 of 27

    VDRL Code

    (1) Data/Document Description

    With Bid After Purchase Order

    Final Issue

    (9) (11)

    Tick (1P+E)

    (5)

    Tick (3P+E)

    (6)

    Purpose (IFR / Info) (7)

    Issue date (8)

    IFR Tick

    (1P+E) (6)

    IOM/

    MDR (1P+1CD)

    (10) (ASTM 262)

    Q48 Coupon Test Procedure

    Q49 Continuity Test Procedure and Results required for all internal Coatings

    Q50 Weld Repair Report(if applicable)

    Q51 P.M.I Test Certificate for WO Cladding

    Q52 Hardness Test Procedure

    Q53 Hardness Test Certificate

    Q54 Impact Test Record Q55 NPSH / Acceleration head Test Procedure

    Q56 NPSH / Acceleration head Test Report

    Q57 Ingress protection rating certificates -- IFR +8W MDR Q58 Electrical short circuit test record -- IFR +8W MDR Q59 Electrical equipment heat run test record -- IFR +8W MDR Q60 Inpulse voltage test record -- IFR +8W MDR

    7 Manuals & Indices

    R01 Installation Operation and Maintenance Manual (IOM)

    -- -- -- -- IOM

    R02 Manufacturers Data Report (MDR) -- -- -- -- MDR

    R03 Training Manuals (Operation and Mainte-nance)

    -- -- -- -- IOM

    R04 Installation Operation and Maintenance Manual (IOM) Index

    -- IFR +8W IOM

    R05 Manufacturers Data Report (MDR) Index -- IFR +8W MDR

    8 Miscellaneous

    TBA TBA -- -- -- -- -- --

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 21 of 27

    VDRL Code

    (1) Data/Document Description

    With Bid After Purchase Order

    Final Issue

    (9) (11)

    Tick (1P+E)

    (5)

    Tick (3P+E)

    (6)

    Purpose (IFR / Info) (7)

    Issue date (8)

    IFR Tick

    (1P+E) (6)

    IOM/

    MDR (1P+1CD)

    (10)

    NOTES: (1) * = Priority documents subject to penalization in term of payment. (2) All documents shall be in English language. (3) All documents returned to Vendor with comments shall be re-issued after implementing

    comments. (4) Vendor Quality Assurance: The Vendor shall submit (a) ISO 9001-2000 Official Certifi-

    cation (b) Quality Manual (c) Project Quality Plan. (5) 3 prints of documents along with electronic file shall be submitted where tick marked

    With Bid. (6) P = Print, E = Electronic file, CD = CD ROM. After Purchase Order, 1 prints of docu-

    ments shall be submitted where tick marked. Other than prints, documents shall also be delivered electronically.

    (7) Purpose; IFR = Issue for review and comments, Info = Issue for information. (8) Issue Date; number of D = Days / W = Weeks / M = Months after purchase order effec-

    tive date (unless otherwise specified) (9) Final Issue; Document without comments (10) P = Print, CD = CD ROM. 1prints + 1CDs of IOM/MDR shall be submitted. (11) Native files of all calculations and drawings shall also be submitted. (12) MDR: Data/Documents due 2 weeks after delivery. (13) IOM: Data/Documents due 4 weeks before delivery. (14) Definitions:

    IOM - Installation and Operation Manual MDR - Manufacturers Data Report NDE Non Destructive Examination VDS Vendor Data Schedule BD Before Delivery BT Before Test AT After Test

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 22 of 27

    7.0 TYPICAL INSPECTION AND TEST PLAN

    SI. No. Activities

    Gov-erning

    QA/QC Proce-dure

    Ac-ceptance/ Rejection Criteria

    Inspecting Parties

    Ven-dor

    Company / Purchaser

    Third Party

    1 Pre-Inspection Meeting 2 Documents:

    Specifications / Data

    Sheets

    Drawings (comment-

    ed copies and status of follow-up actions)

    Technical Queries /

    Concession Requests (approved)

    QC System Manual

    Inspection and Test

    Plan (ITP)

    Welding Procedure Specifications (WPS) & Procedure Qualifi-cation Record (PQR)

    Welder Qualification

    record

    Welding repair pro-

    cedures

    NDE procedures

    NDE personnel quali-

    fication records

    Cladding procedure

    (where applicable).

    Material test reports/

    certificates

    3 Material verification

    4 Positive Material Identifi-cation

    5 Components /Parts In-spection (Visual, Dimen-sions)

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 23 of 27

    SI. No. Activities

    Gov-erning

    QA/QC Proce-dure

    Ac-ceptance/ Rejection Criteria

    Inspecting Parties

    Ven-dor

    Company / Purchaser

    Third Party

    Pumps Instrumentation Electrical Panel Supports External attachments

    6 Fabrication/ Assembly Inspection

    7 Preliminary dimensional & orientation check

    8 Welding Inspection

    Welding material ver-

    ification

    Fit-Up/Joint prepara-

    tion

    Visual & Dimension-

    al element

    Cladding (where ap-

    plicable)

    Production Test

    Piece & Testing

    NDE & Other exami-

    nation (prior to heat treatment)

    NDE activities

    (RT/UT/MPI/DPI)

    Hardness test Impact test

    NDE & Other exami-

    nation (after heat treatment)

    Post Weld Heat

    Treatment (PWHT) (where applicable)

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 24 of 27

    SI. No. Activities

    Gov-erning

    QA/QC Proce-dure

    Ac-ceptance/ Rejection Criteria

    Inspecting Parties

    Ven-dor

    Company / Purchaser

    Third Party

    PWHT procedure PWHT

    9 Final Dimensions & Ori-entation Check

    10 Testing: Test procedures Hydrostatic test Pneumatic test

    High pressure N2/

    Helium tests (where applicable)

    Performance test Control panel test

    Test Reports /Test

    Certificates

    11 Cleaning/Pickling Inspec-tion

    12 Cleaning Internal (etc)

    13 Surface Preparation & Painting

    Coating Procedure

    Surface Prepara-tion/Primer Coat (thickness) visual, etc)

    Intermediate Coats

    (thickness, visual, etc)

    Topcoat (thickness, visual, adhesion, hol-iday detection, finish colour)

    14 Nameplate / Code Stamp-ing

    15 Final Inspection 16 Certificate of Compliance

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 25 of 27

    SI. No. Activities

    Gov-erning

    QA/QC Proce-dure

    Ac-ceptance/ Rejection Criteria

    Inspecting Parties

    Ven-dor

    Company / Purchaser

    Third Party

    17 Spare parts 18 Data skid

    19 Preparation for shipment

    Preservation Shipped loose items

    Two year operation

    spares

    Commissioning and

    start-up spares

    20 Release for shipment

    21 Site welding repair (where applicable)

    W - Witness: Witnessing is mandatory. Intimation should be sent to all relevant party at least 2 weeks before due date. O - Observe: relevant inspector will be informed of time and location of testing at least 15 days advance. However work may proceed without the presence of inspector at the inspector's discretion. R - Check of certificates and/or documents with approved procedures, specifications and ac-ceptance criteria. C - Check has been performed and certificate issued O - Documentation only.

  • TECHNICAL REQUISITION FOR NAVIGATION AID BDP-WHP-TR-E-0005 Effective Date: 10/03 /2014

    Revision : D1 Page 26 of 27

    ATTACHMENT 1: TEST AND INSPECTION GENERAL REQUIREMENTS

    1 VENDOR shall refer to Appendix H3 to Exhibit H to comply the Inspection Mini-

    mum Requirements. The inspection and test shall be performed in accordance with the Applicable Documents listed in this Requisition

    2 The VENDOR shall submit inspection procedures and Inspection and Test Plan show-ing the details, timing and acceptance criteria of inspection and test to PURCHASER for approval prior to any testing or inspection.

    3 PURCHASER, COMPANY and/or third party reserve the right to witness or audit the

    VENDORs quality control at VENDORs facilities when necessary.

    4 At each witness inspection and test, the VENDOR shall submit to the PURCHASER and/or third partys inspector the inspection and test record/certificate for both wit-nessed and non-witnessed at his visit.

    5 The VENDOR shall provide all test equipment and facilities required for the witness in-

    spection and test at his cost.

    6 The VENDOR shall furnish the suitable number of assistants to execute the inspection and/or test at his cost.

    7 VENDOR shall submit the final Test Report confirming that the Equipment/Materials

    are inspected and tested in accordance with and meet the relevant Requisition and Ap-plicable Documents.

    8 PURCHASERs witnessed inspections and document reviews do not relieve the

    VENDOR of his responsibility for the final quality.

    9 Shop witness shall be carried out in accordance with the documents approved by PURCHASER.

    10 The attached table summarizes the planned inspection and test items to be conducted by

    PURCHASER, OWNER and/or Third Party.

  • TECHNICAL REQUISITION FOR LOW VOLTAGE SWITCHGEAR Effective Date:10 /03 /2014

    Revision : D1 Page 27 of 27

    ATTACHMENT 2: DEVIATION / ALTERNATIVE / CLARIFICATION LIST

    DEVIATION / ALTERNATIVE / CLARIFICATION LIST

    Requisition No. : Equipment No. : VENDOR Name:

    Referenced Specification No. Project Requirement Mark* Deviation / Alternate / Clarification PURCHASER's Disposition Mark * A = Alternative, D = Deviation, C = Clarification

  • TECHNICAL REQUISITION FOR LOW VOLTAGE SWITCHGEAR Effective Date:10 /03 /2014

    Revision : D1 Page 28 of 27

    ATTACHMENT 3: SPARE PARTS LIST AND INTERCHANGEABILITY RECORD