padid avaran sanaat espadan co. · packing gland for lower burden feeder-bolt& nut , washer 10...
TRANSCRIPT
Padid Avaran Sanaat Espadan Co.
Designer, executor, manufacturer and supplier of parts
and equipment for the steel industry
Introduction
The company has been established in 1389 with the registration number 42858 (PASECO). In the field of
domestic and foreign business activities, supplying and manufacturing of parts and equipment for different
industries has expanded its activities in the following branches:
Design and engineering, Reverse engineering of production projects in the field of steel and various
industries
Manufacturing of parts and equipment during operation, spare and during implementation of indus-
trial projects
Supply, repair, maintenance and optimization of transportation lines and dust collectors
Business services and supply of parts and equipment related to various industries in accordance with
the demands of the employers
Supply of raw material for industrial plants
Since its inception, the company has been cooperating successfully with various companies manufacturing
steel products with the valuable experience of the Founding Board in the field of the above activities.
Commitment and adherence to professional principles, quality promotion, the use of domestic technical
knowledge and the management of affairs through a coherent system has paved the way for achieving the
goals of this company.
Contact Information:
No. 26 Hedayati Alley, Chaharbagh Bala Ave, Isfahan Iran
Tell: +98-31-36662756,57 Fax: +98-31-36660119
Website: www.paseco.ir email: [email protected]
Features and Abilities
Technical capacity - engineering
With the establishment of a strong and efficient engineering team under the title of Supply and Supply
Engineering Unit as well as a technical office, the company is ready to provide engineering services in the
following sectors:
Design of material handling equipment, storage and grading ...
Detailed Engineering Services
Programming and commissioning of automation, electrical and instrumentation systems
Designing specific motor mechanisms Motion simulation Dimension Analysis and Machine Optimization
PASECO is not only the company for installing the equipment and he pay attention to the design and planning, and also attention to engineering details, based on existing industrial standards, programming and design, and to fully automate the process of achieving production, eliminating the maximum operator involvement in the operation of the machine and thus reducing human error is one of the most important goals of the company's progress in implementing An engineering project. In order to achieve this goal, in general, engineering projects in the company are divided into several categories:
1-Executive projects with the provision of technical information from the employer
2- Executing projects by providing technical information from engineering units of the company
3. planning and optimization projects
4– Design and installation of production lines projects
5. Research and development projects
6. Repair of production lines
Features and Abilities
Construction and supply facilities:
Paseco has expanded its activities in the field of manufacturing and supplying equipment, mechanical
components and structure to maximize its own production and has continuously developed quantitatively
and qualitatively based on current commitments. Optimized.
Workshop No. 1: Construction and assembly
Total area of 5000 m² includes:
Indoor workshop (production hall): 3000 square meters
Sandblasting and painting area: 1000 square meters
Warehouse parts made: 700 square meters
Two-floor office building including management, headquarters and technical office: 300 meters underground
Lightweight, heavy metal structure: 300 tons per month
Equipment production capacity: 100 tons per month
Workshop No. 2: Machining and manufacturing of parts and equipment
Total area of 2000 square meters consists of:
Indoor workshop (production hall): 1500 square meters
The warehouse is made of: 500 square meters
Equipment:
CNC milling (Cincinnati)
Lathe 2.5 meters center 80
Radial Drill
Features and Abilities
Foreign Trade
Due to the recent restrictions on the import of certain goods, PASECO has carried out numerous
activities in the field of foreign trade according to the needs of the steel
industry of Iran.
The main objectives of this company are to supply raw materials and
spare parts during the operation required by the steel industry.
Major activities:
The effort to boost domestic production is to expand its presence in the market by providing
each kind of goods, improving the quality of products and providing after-sales services to custom-
ers and satisfying them with the main goals of the company. In order to develop these activities
and to meet the needs of customers in the domestic market, PASECO is working with companies
and offices in Germany, China, India, Dubai and South Korea.
Some of the components, equipment and materials that this company is ready to supply are:
Reformer Tubes Repeated Direct Detection Units and Competitive and Cost Effective Prices Specific alloy pipes such as Stainless Steel, Alloy steel, Inconel, Nickel, Titanium Types of special valves and large sizes that can not be manufactured inside the country The raw materials include Ferrosilicon, Ferromanganese Types of Bricks and Refractory Mortar Cable, electrical parts, electronic and instrumentation The Foreign Trade Unit of PASECO, consisting of customs and disposals of goods, is engaged in
international communications of the company in the framework of the commercial policy and the im-
plementation of international tender procedures and the conclusion of necessary contracts.
This unit is ready for any trade negotiations.
Construction of parts during the operation of steel making unit
Employer: Arfa Steel Iron and Steel Co.
Start date: February 2, 1393
End Date: 1393/08/18
Place of construction: Pasco Co. - Isfahan Workshop
Ri- als: 2,500,000,000 Rials
Description: Following the employer's request to provide the
equipment for the offer and its approval, Pasco started to manufacture and deliver the requested parts of the
employer within the specified time period. Some of these pieces include:
Experiences
ROW REQUEST DESCRIPTION QTY
1
EM -0034
LF Central roof cone 2 PCS
2 Ø250 WHEEL 4 SET
3 Ø300 WHEEL 4 SET
4
EM - 0035
SET 8 کاسه لنت جرثقیل مگنت
PCS 4 کاسه لنت جرثقیل اسکرپ 5
VIBRO SHELL 1 SETپایه ویبراتور 6
7 UPPER IOLLE (Ø430), UPPER SMALL(Ø300)PALLY
6 PCS
8 UPPER PULLY SHAFT 4 PCS
9
EM - 0033
SET 2 تن 111قلاب
10 LF CHUTE 6 PCS
11 Guide Wheel of Transfer Car 6 SET
PCS 1 شفت شماره یک 12
13 EM - 0032 2 گهواره الکترود و شل کوره SET
14 EM - 0031
PCS 6 2کاور سیلندر شماره
PCS 6 3کاور سیلندر شماره 15
Construction of parts during the operation of steel
making unit
Employer: Arfa Steel Iron and Steel Co.
Place of construction: Pasco Co. - Isfahan Workshop
Rials: 3,000,000,000 Rials
نام كالا كد كالا رديفشماره
درخواست
1 F801000691 Tundish car support ساپورت نگهدارنده
ناوداني هاي تانديش كار3788
2 F801000359 3786 شوت فروآلياژ
3 F801000524 كاور تانديش قسمت مياني
3789 4 F801000525 كاور تانديش قسمت سمت چپ(NO.1)
5 F801000526 ( كاور تانديش قسمت سمت راستNO.2)
6 F801000681 هوک الکترودLF 3787
7 F801000392 كلمپ ماشين برش راست 3783
8 F801000393 كلمپ ماشين برش چپ
9 F801000432 3780 درب سرباره طرح لوله اي
10 F801000591 3812 گهواره تک الکترود كوره
11 F801000481 3551 پيووت فلپ
12 F801000482 3552 فلپ
13 F801000741 3625 051*051فلنج زير كاست قالب
Experiences
Manufacture of parts during operation of the direct reduction unit
Employer: Arfa Steel Iron and Steel Co.
Place of construction: Pasko Co. - Isfahan Workshop Approximate size:
9,000,000,000 Rials
Description: The parts made and delivered in this section include:
Row Description
Required
Q.T.Y
Row Description
Required
Q.T.Y
Q.T.Y Unit Q.T.Y Unit
2 Reformer Tubes Accessory - Split Ring Flange 960 Pcs 84 Segment For UBF Shaft 1 Set
5 Reformer Tubes Accessory - Dog Leg Bung 840 Pcs 89 Segment For MBF Shaft 1 Set
20 Packing Gland For Lower Burden Feeder 2 Set 50 Segment For LBF Shaft 5 Pcs
21 Packing Gland For Lower Burden Feeder-Bolt& Nut ,
Washer 10 Set 51 Restriction Orifice Plate DN 65 10 Set
22 Lantern Ring For Lower Burden Feeder 2 Set 59 Belt shaker For CV - XF24 1 Set
23 Packing Gland For Middle Burden Feeder 6 Set 68 Riffler For Charge Hopper 1 Set
28 Lantern Ring For Middle Burden Feeder 6 Set 65 charge hopper Riffler (grizzly) Arc Break 1 Set
25 Packing Gland For Middle Burden Feeder-Bolt& Nut ,
Washer 20 Set 66 Stainless Steel Grating For Top Gas Scrubber 1 Set
26 Lantern Ring For Upper Burden Feeder 6 Set 66 Stainless Steel Grating For Cooling Gas Scrubber 1 Set
38 Upper Seal Leg For Shaft Furnace 1 Set 64 Stainless Steel Grating For Reformed Gas Cooler 1 Set
35 Lower Seal Leg For Shaft Furnace 1 Set 69 Stainless Steel Grating For Seal Gas Cooler 1 Set
36 Venturi For Furnace Dust Collection Systems 1 Set 63 Plate For furnace Discharge Feeder 1 Set
39 Seal gas inlet cone 1 Set 68 Plate For Day Bin Discharge Feeder 1 Set
83 Slide Plate For Day Bin Discharge Gate 1 Set 64 Screen Mats With Rectanguier Perforation Material =
Polyurethane & net opening = 8.4*36.2mm 1 Set
88 Slide Plate For Oxide Screen Feeder Discharge Gate 1 Set 69 Screen Mats With Rectanguier Perforation Material =
Polyurethane & net opening = 8.4*36.2mm 1 Set
85 Shaft Furnace Discharge Gate 1 Set 40 Screen Mats With Square Perforation Material = Polyure-
thane & net opening = 50*50 & 30*30mm 1 Set
Experiences
Supplying the required items to different factory units
Employer: Arfa Steel Iron and Steel Co.
Approximate volume: 1,200,000,000 ریال
Description: The items required in this section are supplied and delivered on demand by the desired quality
and demanded quality of the employer, including various types of valves and pumps, and so on.
Experiences
Making Exhaust Fan Bafgh Agglomeration Plant
Client: ICIOC
Place of construction: Pasco Co. - Isfahan Workshop
Description: PASECO, during one of its executive projects in ICIOC, after stopping corporation of the subcon-
tractor of the automation, PASECO was asked from ICIOC to continue and finish the previouse subcontractors
job. PASECO used his experts to repair and finished the equipment during one year.
Experiences
Manufacturing of Zarand Iranians (ZISCO)
Employer: Zarand Iran Steel Co
Place of construction: Pasco Co. - Isfahan Workshop
Description: Construction of various parts including Coal Pit Hopper, Steel Frame Bag Filter Equipment,
Transmission Pipes, Power Line Equipment, Boiler Input and Output Shots, Circular Shapes, Coke Dust and
Coal
Experiences
Supplying the Parker Pumps to the Steelmaking Unit
Employer: Arfa Steel Iron and Steel Co.
Approximate estimate: 900,000,000 Rials
Description: AXIAL PISTON PUMP
Experiences
Provision of the secondary processing of the direct recovery unit
Client: Sirjan Steel Company Iran
Estimated Approximately 850,000,000 Rials
Description: Manufacturing and supplying a secondary processor according to the plans provided by employer
(all parts of the equipment are 308 steel)
Experiences
Pre-assembly, installation and coloring of mechanical equipment for electric arc fur-
nace arc furnaces in Bardsir steel mill melting hall
Employer: Tom Iran Khodro Co.
Contract subject: Installation of 800 tons of equipment for furnace, LF and EAF
Location: Bardsir Steel Plant, Kerman
Experiences
Installation of Stacker & Reclaimer Machines and Related Rail Rails Zarand Iranian Steel Complex Employer: Ghaem Reza Industries Co.
Volumes and quantities: installation of mechanical and electrical equipment and commissioning weighing 1,700 tons, carrying out 300-ton reloading operations
Experiences
Material Supply, Construction and Installation of Housing Sheds in
Stock House Area Furnace of Zarand Iran Steel Project
Employer: Ghaem Reza Industries Co.
Volumes and values: Implementation of all activities related to the construction, installation
and coloring of 12 hull sub-units of the Stock House with a weight of approximately 750 tons
related to the furnace area
Experiences
Installation of mechanical and electrical equipment in the ESP region of
Zarand Iran Steel Project
Volumes and quantities: Implementation of all activities related to pre-assembly, installation,
welding, unloading, mechanical equipment and drowning electrodes, straightening, electrical
equipment, cold testing and unloading, and attending the hot start up of the Electrostatic equip-
ment Precipitator (Main ESP) The agglomeration region weighs approximately 1400 tons
Experiences
Installation and installation of mechanical equipment for the Material Handling Zone of Iran Zarand Steel Project Employer: Ghaem Reza Industries Co.
Location: Zarand Iran Steel Plant
Experiences
Implementation of automation, monitoring, commissioning of the Bafgh agglomeration
plant with a capacity of 800 thousand tons per year
Providing Iranian supervisor for final installation, installation of instrumentation and automation equip-
ment, programming of PLC
Pre-commissioning and commissioning hot and cold graphs
Provide a fueling plan to the burning furnaces and provide a graph of drying and cooking furnace heating
Inspection and presentation of operating procedures for dripping systems and the provision of solutions
to achieve acceptable environmental standards.
Inspection and control of laboratory equipment. Quality control of raw materials and products and
presentation of operating instructions
Inspection and control of operator instructions of all mechanical and electrical equipment of the factory
Analyzing test production parameters in order to optimize the operating conditions
Correction of electric planes, instrumentation, control and positioning of signs, cable paths
Software Testing and Complete Project Launch
Experiences
Execution of Cavil's operations, installing, supplying materials, and attending the installation of a dry coke extinguishing plant (CDQ) with a capacity of 100 t / h and a 15 MW power plant
Location: proximity to the factory of Keshazi Zarand Iranians
Employer: SDM Corporation of China - Zarand Iran Co. Steel Co.
Execution of Seychelles operations in an approximate amount of 14,000 cubic meters
Installation of mechanical and electrical equipment weighing 3500 tons
Construction and installation of metal skeleton of 1500 tons
Supply of domestic equipment weighing 500 tons
Execution of 1,500 tons of non-refractory products
Supply and implementation of piping about 65,000 inches in diameter
Supply cable and cable trays, and run them about 150 km
Experiences
Bardsir Steel Plant Launch Project
Performing all maintenance and repair services during the initial and pilot start-up and hot test and
cold test periods. Performed tests are expected to reach the expected capacity, including a 140-
tonne Furnace, 140 Ton LF , 800,000 expected capacity, cranes, Oxygen Workshop, cauldron Re-
pair, Refractory Furnaces, DEDUSTING, MHP, WATER CIRCULATION SYSTEM,
Experiences
Energy project to CDQ unit
Project execution in the form of EPC,
Project volume includes 1000 cubic meters of concrete, 100 tons of metal equipment, cabling of
about 3 km, piping's about 10,000 inches in diameter
Experiences
Records and projects
Project of installation of boiler unit of CDQ Steel Zarand
Installation of a boiler with a weight of 590 tons and testing its implementation in the project
of 15 MW steel plant Zarand Iranians
Implementation of building projects
The project for building of turbine generator and control room belonging to the CDQ project
were carried out.
Experiences
Certificates
Certificates
Satisfaction