painting rate analysis 15.10.11
DESCRIPTION
I have worked for Painting Rate analysis need few inputs & valuable suggestion for improving the same. The suggestion can be forwarded on email id [email protected]TRANSCRIPT
Basic Material Cost
Sl No ElementLast update 1-Aug-11
Unit Rate1 Cement Bags 300.002 White Cement Bags 700.003 River Sand Cum 1,236.004 Manufactured sand Cum 900.005 Gravel Cum 300.006 Murrum / Earth Cum 150.007 12 mm Aggregate Cum 918.008 20 mm Aggregate Cum 989.009 40 mm Aggregate Cum 847.00
10 Filter media stone aggregate Cum 500.0011 Soling Cum 500.0012 Quarry Dust Cum 450.0013 Bricks Nos 7.0014 Table mould Bricks Nos 8.0015 Wire cut Bricks Nos 16.0016 Brick bat 25 to 100mm Cum 500.0017 Cinder ballast Cum 300.0018 4" Solid Block Nos 21.0019 6" Solid Block Nos 28.0020 8" Solid Block Nos 39.0021 4" Hallow Block Nos 19.0022 6" Hallow Block Nos 25.0023 8" Hallow Block Nos 32.0024 Size stone 20X20X25cms Nos 8.0025 Size stone dressing [2 line] Nos 12.0026 Bond stones 20X20X45cms Nos 15.0027 Stone slab 10-12cm thk Sqm 250.0028 Granite stone slab fine dressed 40mm thk Sqm 1,000.0029 Lime Kgs 15.0030 Chicken mesh Sqm 30.0031 Arpitha Mesh Rmt 25.0032 Nails Kgs 50.0033 Reinforcement steel MT 42,200.0034 Structural steel MT 50,000.0035 Weld mesh75mm X 25mm of 6g X 10g Sqm 250.0036 AC sheet 6mm thk semi corrugated Sqm 200.0037 AC sheet 6mm thk semi corrugated Sqm 250.0038 Ridges (AC sheet) Pair 250.0039 12mm thk pre laminated board (Novapan) exterior grade Sqm 650.00
40 Plywood 12mm thk (Commercial) Sqm 400.0041 Plywood 19mm thk (Commercial) Sqm 700.0042 Plywood 25mm thk (Commercial) Sqm 800.0043 Sheet 6mm thk (Commercial) Sqm 300.0044 Plain Particle Board Sqm 450.0045 Cobble stone 60mm thk Sqm 250.0046 Cobble stone 75mm thk Sqm 350.0047 Chequered Cement concrete tiles Sqm 200.0048 Mosaic tiles - Light shade Sqm 350.0049 Vitrified tiles 10mm thk 600X600mm Granolite finish Sqm 600.0050 Grout for vitrtfied tiles Kgs 55.0051 Spacers for vitifried tiles No 1.5052 Ceramics tiles 300 X 300 mm Sqm 300.0053 Ceramics tiles 150 X 150 mm Sqm 250.0054 Colour glazed tiles 150 X 150 mm 10mm thk Each 8.0055 Colour glazed tiles 150 X 150 mm 10mm thk anti skid Each 9.0056 White glazed tiles 150 X 150 mm 6mm thk Each 7.0057 White glazed tiles 150 X 150 mm 10mm thk Each 8.0058 Yelahanka tiles 250 X 250mm Each 5.0059 Mangalore tiles & special tiles for ridge & hips No 15.0060 Cuddapah slab 25-40mm thk Sqm 250.0061 Shahabad slab 25-40mm thk Sqm 300.0062 Tandur blue slab 25-40mm thk Sqm 225.0063 Marble slab 20mm thk Sqm 650.0064 Machine cut Granite stone slab 40mm thk Sqm 400.0065 Machine polished Granite stone slab 20mm thk Sqm 650.0066 Hassan green granite 20mm thk Sqm 1,500.0067 Grey granite 20mm thk Sqm 800.0068 Preploshied Grey granite 20mm thk Sqm 1,000.0069 Preploshied water cut grey granite Sqm 1,000.0070 Ruby red granite 20mm thk Sqm 1,300.0071 Shiva gold granite 20mm thk Sqm 1,600.0072 Black granite 20mm thk Sqm 1,100.0073 Preploshied Black granite 20mm thk Sqm 1,200.0074 Plaster of paris Kgs 25.00
Cement Primer Ltr75 Distemper Primer Ltr 70.0076 Dry Distemper Kgs 70.0077 Aluminium Paint Primer (Red Oxide) Ltr 100.0078 Aluminium Paint Ltr 200.0079 Anticorrosive bitumastic paint Ltr 150.0080 Enamel Primer Ltr 100.0081 Enamel metal paint Ltr 350.00
82 Plastic emulsion paint Ltr 200.0083 Red Oxide Kgs 90.0084 Varnish Ltr 120.0085 Water proof cement paint Kgs 40.0086 Oil bound distemper Kgs 70.0087 Turpentine oil Ltr 40.0088 Thinner Ltr 150.0089 Anodized M R F Painting Sqm 350.0090 Melamine patty Kgs 200.0091 Synthetic enamel paint Ltr 180.00
Textured Paint LtrAcrylic Exterior Paint LtrEpoxy Paint LtrOil type Wood preservatitive LtrFire Retradant Paint LtrCoal Tar LtrAcid Proof Paint Ltr
92 Road Marking paint Ltr 275.0093 Bitumen Grade 80/100 MT 37,620.0094 Bitumen Grade 60/70 MT 38,600.00
Latest rate can be obtained from www.anytimeproperty.com
RMC Lowest quoted rateGrade of concrete Unit Rate/Cum
35 M10 Cum 3,200.00 M15 Cum 3,350.00 M20 Cum 3,450.00 M25 Cum 3,650.00
26 M30 Cum 3,850.00 28 M35 Cum 4,100.00 24 M40 Cum 4,300.00
M45 Cum 4,500.00
Shuttering Sqm 325
APCOAPCOAPCOAPCOAPCOAPCO
Labour wages
Sl no ItemLast Update 1-Aug-11
Unit Rate1 Foreman/Supervisor Nos 1,000.00 2 Mason [1st Class] Nos 550.00 3 Mason [2nd Class] Nos 450.00 4 Male cooli Nos 300.00 5 Female cooli Nos 250.00 6 Bhisti Nos 250.00 7 Bar bender Nos 450.00 8 Helper Nos 300.00 9 Carpenter Nos 450.00
10 Helper Nos 300.00 11 Gas / Electric welder Nos 500.00 12 Plumber Nos 500.00 13 Stone cutter Nos 500.00 14 Painter Nos 450.00
Rate Analysis for Painting 1 SQM
Materials (A )
Item
Unit
Lim
e K
g
New Work
Whitewash with lime (2 - 3 coats) Sqm 0.30
Sqm 0.30
Dry Distemper incl priming (2 - 3 coats) Sqm 0.01 0.15
Sqm 0.07 0.15
Sqm 0.15
Cement Primer 01 coat Sqm 0.07
Water proof cement paints (2 - 3 coats) Sqm 0.38
Sqm 0.22
Sqm 0.22
Aluminium Primer Sqm 0.075
Sqm 0.054
Second Coat Sqm 0.036
Sqm 0.075
Sqm 0.084
Sqm
Fire retradant paint 2coats Sqm
Coal Tarring 2coats Sqm
Plastic Emulsion Paint (2 - 3 coats) Sqm
Synthetic Enamel Paint (2 - 3 coats) Sqm
Aluminium Enamel Paint (2 - 3 coats) Sqm
Acid Proof Paint (2 - 3 coats) Sqm
Sqm
Cem
ent
Pri
mer
(Kg)
Alu
min
ium
Pri
mer
(Ltr
s)
Red o
xid
e
pri
mer
(Ltr
s)
Dry
Dis
tem
per
(Kg)
Oil
Bound
Dis
tem
per
(Kg)
Wate
r Pro
of
Cem
ent
pain
t (K
g)
Colour wash with base coat of white wash with lime (2 - 3 coats)
Oil bound washable distemper incl cement primer (2 - 3 coats)
1st Quality Acrylic washable distemper (2 - 3 coats)
Texture exterior paint over water proof cement paint (2 - 3 coats)
Acrylic exterior paint over water proof cement paint (2 - 3 coats)
Red Oxide Zinc Chromate primer over steel works
Epoxy Coat incl Primer on steel work (2 - 3 coats)
Epoxy Coat incl Primer on Concrete work (2 - 3 coats)
Oil Type Wood Preservative (2 - 3 coats)
Black anti-corrosive bitumastic paint (2 - 3 coats)
Materials (A )
Coal Tar
(Ltr
s)
0.33
0.17
0.13
0.12
0.10
0.57
0.28 0.05
0.12
0.12
0.08
0.12
Textu
red P
ain
t (L
trs)
Acr
ylic
Exte
rior
Pain
t (L
trs)
Epoxy P
ain
t (L
trs)
Oil
type w
ood
pre
serv
ata
tive
(Ltr
s)
Fir
e R
etr
adant
Pain
t (L
trs)
Kero
sene O
il (L
trs)
Pla
stic
Em
uls
ion P
ain
t (L
trs)
Synth
eti
c Enam
el Pain
t (L
trs)
Alu
min
ium
Enam
el Pain
t (L
trs)
Aci
d P
roof
Pain
t (L
trs)
Materials (A ) Labour cost (B) Tools & Tackles (C )
Pain
ter
Cost
Male
cooli
Cost
Bhis
ti
Cost
Sca
ffold
ing
0.02 9.00 0.01 3.00 - 12.00 0.25 81.25
0.03 13.50 0.01 3.00 - 16.50 0.25 81.25
0.08 36.00 0.04 12.00 - 48.00 0.25 81.25
0.10 45.00 0.05 15.00 - 60.00 0.25 81.25
0.04 18.00 0.05 13.80 - 31.80 0.25 81.25
0.04 18.00 0.02 6.00 - 24.00 0.25 81.25
0.05 20.70 0.02 6.90 0.01 2.50 30.10 0.25 81.25
0.06 27.00 0.03 9.00 0.01 1.25 37.25 0.25 81.25
0.01 2.70 0.03 9.00 0.01 1.25 12.95 0.25 81.25
0.03 11.25 0.03 7.50 - 18.75 0.25 81.25
0.02 10.80 0.02 7.20 - 18.00 0.25 81.25
0.01 5.40 0.01 3.60 - 9.00 0.25 81.25
0.08 35.55 0.08 23.70 - 59.25 0.25 81.25
0.08 35.55 0.08 23.70 - 59.25 0.25 81.25
0.02 6.75 0.02 4.50 - 11.25 0.25 81.25
0.05 24.30 0.05 16.20 - 40.50 0.25 81.25
- 0.04 12.90 - 12.90 0.25 81.25
0.05 24.30 0.05 16.20 - 40.50 0.25 81.25
0.05 24.30 0.05 16.20 - 40.50 0.25 81.25
0.05 24.30 0.05 16.20 - 40.50 0.25 81.25
0.05 24.30 0.05 16.20 - 40.50 0.25 81.25
0.10 0.05 24.30 0.05 16.20 - 40.50 0.25 81.25
Anti
Corr
osi
ve
Bit
um
ast
ic (
Ltrs
)
Tota
l M
ate
rial
Cost
Tota
l Lab
ou
r C
ost
Cost
of
Sca
ffold
ing
Tools & Tackles (C ) D E F
Tota
l A
+B
+C
WC
T @
4%
On D
Gra
nd
Tota
l
1.87 0.93 96.05 3.84 19.98 119.90 9.00
1.96 0.98 100.68 4.03 20.94 125.70 10.00
2.59 1.29 133.13 5.33 27.69 166.10 13.00
2.83 1.41 145.49 5.82 30.26 181.60 14.00
2.26 1.13 116.44 4.66 24.22 145.30 11.00
2.11 1.05 108.41 4.34 22.55 135.30 11.00
2.23 1.11 114.69 4.59 23.86 143.10 11.00
2.37 1.19 122.06 4.88 25.39 152.30 12.00
1.88 0.94 97.03 3.88 20.18 121.10 10.00
2.00 1.00 103.00 4.12 21.42 128.50 10.00
1.99 0.99 102.23 4.09 21.26 127.60 10.00
1.81 0.90 92.96 3.72 19.34 116.00 9.00
2.81 1.41 144.72 5.79 30.10 180.60 14.00
2.81 1.41 144.72 5.79 30.10 180.60 14.00
1.85 0.93 95.27 3.81 19.82 118.90 9.00
2.44 1.22 125.40 5.02 26.08 156.50 12.00
1.88 0.94 96.97 3.88 20.17 121.00 10.00
2.44 1.22 125.40 5.02 26.08 156.50 12.00
2.44 1.22 125.40 5.02 26.08 156.50 12.00
2.44 1.22 125.40 5.02 26.08 156.50 12.00
2.44 1.22 125.40 5.02 26.08 156.50 12.00
2.44 1.22 125.40 5.02 26.08 156.50 12.00
2%
Sundri
es,
bru
shes,
putt
y
etc
Wate
r C
harg
es
@ 1
%
Over
head
s &
Pro
fits
@ 2
0%
on D
& E
Rate
in
Sft
excl W
CT,
OH
&
Pro
fit