Environment Monitoring Report Bi-annual Environment Monitoring Report July 2015 PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power Company, Punjab for the Asian Development Bank.

Upload: others

Post on 08-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

Environment Monitoring Report Bi-annual Environment Monitoring Report July 2015

PAK: MFF – Power Distribution Enhancement

Investment Program (Tranche 2)

Prepared by Gujranwala Electric Power Company, Punjab for the Asian Development Bank.

Page 2: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

NOTES

(i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June.

(ii) In this report “$” refer to US dollars. This environment monitoring report is a document of the Borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

Page 1 of 1

L-2727 PDEIP: BAEMRs of FESCO, GEPCO, HESCO, IESCO, LESCO, MEPCO approved for disclosure Safia Shafiq to: Liaqat Ali 27/07/2015 06:06 PM Cc: Adnan Tareen, Zehra Abbas, "Jeffrey Bowyer", Maria Ava Golda A. Destura, Jocelyn M. Cabrera Hide Details From: Safia Shafiq/Consultants/ADB Sort List... To: Liaqat Ali/PRM/ADB@ADB Cc: Adnan Tareen/CWRD/ADB@ADB, Zehra Abbas/CWRD/ADB@ADB, "Jeffrey Bowyer" <[email protected]>, Maria Ava Golda A. Destura/CWRD/ADB@ADB, Jocelyn M. Cabrera/Consultants/ADB@ADB 13 Attachments

L-2727 MEPCO BAEMR (Jan-Jun 2015).pdf L-2727 LESCO BAEMR (Jan-Jun 2015).pdf

L-2727 LESCO BAEMR (Jan-Jun 2015).pdf L-2727 IESCO BAEMR (Jan-Jun 2015).pdf

L-2727 IESCO BAEMR (Jan-Jun 2015).pdf L-2727 HESCO BAEMR (Jan-Jun 2015).pdf

11-

L-2727 GEPCO BAEMR (Jan-Jun 2015).pdf L-2727 GEPCO BAEMR (Jan-Jun 2015).pdf ATTJ4HWL.pdf

L-2727 HESCO BAEMR (Jan-Jun 2015).pdf L-2727 FESCO BAEMR (Jan-Jun 2015).pdf ATTKYIUS.pdf

L-2727 FESCO BAEMR (Jan-Jun 2015).pdf

Dear Liaqat Sb.,

The attached Bi-annual Environmental Monitoring Reports (Jan-Jun 2015) of FESCO, GEPCO,

HESCO, IESCO, LESCO and MEPCO under L-2727 PDEIP are approved for disclosure. Kindly have

them uploaded on ADB website and share the weblinks with me.

Thanks and regards,

Safia Shafiq

Environment Specialist (Consultant)

Pakistan Resident Mission

Asian Development Bank

Level 8, North Wing, Serena Office Complex,

Khayaban-e-Suhrawardy G-5, Islamabad, Pakistan.

Tel: +92-51-2087300, Ext: 344

Fax: +92-51-2087397-8 & 2600365-6

Cell: +92-333-2154462

file:///C:/Users/alt/AppData/Local/Temp/notesBDE916/—web9278.htm 28/07/2015

Page 4: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

Bi-annual Environmental Monitoring Report

Project Number: 2727-PAKJanuary-June- 2015

Islamic Republic of Pakistan

(Power Distribution Enhancement Investment Program-Multi-Tranche

Financing Facility-Tranche-2)

(Financed by the Asian Development Bank)

Prepared By: Assistant Manager (Environment) PMU, GEPCO

Gujranwala Electric Power Company (GEPCO)

PMU Section 565-A Model Town G.T Road Gujranwala, PakistanExecuting Agency (EA) Pakistan Electric Power Company (PEPCO)Implementing Agency (IA) GEPCO

This report does not necessarily reflect the views of ADB or the Government concerned. The ADB and

the Government cannot be held liable for its contents.

Page 5: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

Table of Contents

Sr. # Brief Description Page #

1- PART-1 INTRODUCTION

1.1 About GEPCO

1.2 About project management unit (PMU)

1.3 Brief detail of the sub-projects

1.4 Objectives of the sub-projects

1.5 Scope of work

1.6 Estimated project cost

1.7 Construction activities & project progress during past 6

months

1.8 Changes in project organization and environmentmanagement team

2-7

2

3

3

4

4

4-6

6-7

7

2- PART-II ENVIRONMENTAL MONITORING

2.1 Environmental measurement/ testing of noise,

vibration, water/ air quality and flora/ fauna

monitoring

2.2 Recommendations required showing any

exceedences will be prevented in future

7-8

7

8

3- PART-III ENVIRONMENTAL MANAGEMENT

3.1 Site inspections at sub-project sites

3.2 Consultation and complaints

3.3 Implementation report on EIA/IEE mitigation

Requirements

8-108

9

10

4- ANNEXURES

4.1 Organogram of PMU Section (Annexure-A)

4.2 Photographs taken during execution of civil works

(Annexure-B)

4.3 Current progress status of civil works (Annexure-C)

4.4 Non-compliances/ Observations raised during environmental

monitoring (Annexure-D)

4.5 Corrective actions taken against reported non-compliances/

Observations (Annexure-E)

11-63

11

12-16

17-18

19-29

30-45

46-63

Page 6: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power
Page 7: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

2

1.1-About GEPCO

Part I-Introduction

1. Gujranwala Electric Power Company Ltd. GEPCO is a Public Limited Utility Company, established in

1998 under Companies Ordinance 1984 and is responsible for distribution of Electric Power within its

territorial jurisdiction and presently serving approximately 2.5 Million Customers (Domestic, Commercial,

Agricultural, Industrial and others) in the six districts of Province Punjab (Gujranwala, Narowal, Gujrat,

Hafizabad, Sialkot and Mandi.B.Din).

GEPCO Area of Jurisdiction

1.2-About Project Management Unit (PMU)

2. To effectively plan, execute and monitor the Power Distribution Enhancement Investment

Program (Tranche-2), a Project Management Unit (PMU) has been established under Chief

Engineer (Development) comprising of four sections i.e. Planning, Scheduling & Coordination,

Procurement, Finance, Environmental and Social Safeguard along with Project Director (GSC).

Updated Organogram of PMU/ Development Directorate is placed at Annexure-A.

Page 8: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

3

3

1.3- Brief Detail of Sub-projects

3. Existing conditions of the GEPCO power distribution and transmission system are inadequate

to meet rapidly growing demand for electrical power. To cope with this situation, the existing

power infrastructure has to be improved and upgraded. The overall contribution of power

infrastructure requires institutional arrangements, capacity building that support strategic

management of the sector, planning and management of investments.

The basic information/ data about the loan is as under:-

Loan Number:-ADB-2727 PAK

Project Title:-Power Distribution Enhancement Investment Program_Multi-tranche

financing facility (PDEP_MFF_Tranche_2 (STG)

Location of the Project:-06 No. of Districts in the serving territory of GEPCO i.e.

Gujranwala, Sialkot, Narowal, Gujrat, Hafizabad and Mandi-Bahawal-din.

Borrower:-GOP/ GEPCO

Executing Agency:-PEPCO

Implementing Agency:-GEPCO

Date of Signing Agreement:-28-01-2011

Date of Effectiveness:-29-03-2011 (After 60 days of Signing the Agreement)

Date of Loan Closing:-31-03-2015

Date of Last ADB Review Mission:-May, 2015

Amount of Loan:-48.55 Million US$ 1.4-

Objectives of the Project

4. GEPCO through GOP has undergone a Project Financing agreement with Asian Development

Bank for:-

Strengthening the capacity of Power Distribution and Transmission networks

To meet the increasing electricity demand in the selected areas more efficiently

To upgrade the existing power infrastructure.

Page 9: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

4

1.5-Scope of Work

5. There are 16 No. of GEPCO proposed projects under ADB Tranche-2. Its detail is here asunder:

I. Construction of 05 No. New 132kV Transmission Lines

II. Construction of 04 No. New 132kV Grid Substations

III. Conversion of 02 No. Grid Substations from 66kV to 132kV along withassociated 132kV Transmission Lines

IV. 05 No. Extensions/ Augmentations

Overall the proposed MFF has been designed to address both investment and institutional

aspects in electric power sector. Development Objectives/ Project Purpose will be fully achieved

after completion of the proposed Sub-projects.

1.6- Estimated Project Cost:

6. The estimated cost of the sub-projects has been determined. Its detail is here asunder:-

6.1 Construction of 132kV Transmission Lines

Sr. No Sub-projects Estimated Cost

Pak Rs. US$

1- In& Out of existing 132kV Hafizabad RoadGujranwala Therisanci T/Line at 132kVSwitchyard of 500kV Nokhar G/S

139.5 Million 1.395 Million

2- 132kV Nokhar-Hafizabad-II Tr./Line (AlternateFeed for Hafizabad-II G/S)

250.515 Million 2.505 Million

3- 132kV Sahuwala-Pasrur Transmission Line 383.49 Million 3.834 Million

4- In& Out for Hafizabad-II G/S from the existingNokhar-Hafizabad T/Lin e (C.C.T No. 1)

139.428 Million 1.394 Million

5- In& Out for Garhi G/S from the proposed Nokhar-Therisanci T/Line (Feed for Garhi)

139.5 Million 1.395 Million

TOTAL ESTIMATED PROJECT COST 1053 Million 10.53 Million

Page 10: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

5

5

6.2 Construction of 132kV Grid Stations

Sr.

No

Sub-Projects Name Location Estimated Cost

In Pak. Rs. US$

1- Construction of Khiali-Bypass

G/S 132kV

GJRW. 244 Million 2.44 M

2- Construction of Sheranwala-

Bagh G/S 132Kv

GJRW. 302 Million 3.02 M

3- Construction of Godhpur G/S

132kV and Sahuwala-Godhpur

132kV TL

Sialkot 341 Million 3.41 M

4- Construction of New Daska

G/S 132kV

Sialkot 263 Million 2.63 M

Total Estimated Cost 1150Million 11.50 M

6.3 Conversion of 02 No. Grid Stations (from 66kV to 132kV)

Sr.

NoSub-projects Name Location Estimated Cost

PAK Rs. US$

1- Conversion of Jalalpur-Nau G/S (from

66kV to 132kV) along with 132kV

Hafizabad II_Kolu-Tarrar T/Line

Hafizabad 325.6 M 3.25M

2- Conversion of Kolu-Tarrar G/S (from

66kV to 132kV) along with 132kV Kolu-

Tarrar Jalalpur-Nau T/Line

Hafizabad 393 M 3.93M

Total Estimated Cost 718.6 M 7.186M

Page 11: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

6

6.4 05 Nos. of Augmentation/ Extensions

Sr.No.

Sub-projects Name Estimated Cost

PAK Rs. US$

1- Therisanci 78 Million 0.78

2- Sialkot Cantt 78 Million 0.78

3- Hafizabad Road Grw. 78Million 0.78

4- Gujrat-1 78Million 0.78

5- Gujranwala Cantt 78Million 0.78

TOTAL SUB-PROJECT COST 390 Million 3.9 M

TOTAL ESTIMATED PROJECT COST: 3311.6 Million Rs. (33.12 Million US$)

1US$ = 100 PAK. Rs.

1.7-Construction activities and project progress during previous 6 months

7. The civil work activities in progress of new 02 No. 132kV grid stations Khiali-bypass &

Sheranwala-bagh in Gujranwala while construction work of remaining 04 No. of grid

stations Jalalpur-Nau, Kolu-Tarrar in Hafizabad and New Daska & Godhpur had been

completed and energized.

03 No. Contractors engaged by GEPCO to execute civil work activities at sub-project

sites. Following civil work activities have been carried out

(Photographs of civil works attached at Annexure-B):-

7.1-M/S Siemens-Pak. Pvt. Ltd

Work Scope:-i-Construction work of 02 No. 132kV GS (Daska, Godhpur) civil

works completed while construction work of Godhpur 132kV Tr/line is in

progress

ii-Conversion of 02 No. existing 66kV Grid Stations (Jalalpur-Nau & Kolu-

Tarrar) civil works are completed

7.2-M/S ABB-Pakistan Pvt Ltd

Work Scope:-i-Construction of 02 No. 132kV GS Khiali-bypass, Sheranwala bagh;Civil work of Khiali Bypass in progress while testing & commissioning workon going at Sheranwala Bagh Grid Station.

Page 12: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

7

7

7.3-M/S ICC (Pvt) Ltd.

Work scope:-Construction of 05 No. New 132kV Tr. Lines (127 KMs)

Civil work of Nokhar-Hafizabad 132kV T/ line (Hafizabad); In& Out for Hafizabad-II G/Sfrom the existing Nokhar-Hafizabad T/line (C.C.T No. 1) and In& Out for Garhi G/S fromthe proposed Nokhar-Therisanci T/Line (Feed for Garhi) are completed. Now, the civilworks remaining for 01 No. 132kV Sahuwala Pasrur Tr. Line delayed due to ROW issues.

Detail Progress Status of Civil works provided in log sheet (at Annexure-C)

1.8- Changes in Project Organization and Environmental Management Team

8. Mr. Ashraf Bhatti taken over the charge for post of Manager (P.S&C) while Mr. Anar Khan

retried from services on 23-06-2015. Mr. Junaid Akhtar taken over charge for the post of Chief

Engineer Development. Now, a post of Manager (Procurement) is lying vacant in GEPCO. Mr. M.

Fiaz again posted in PMU and taken over the charge of Manager Finance GEPCO.

Relationship with Contractors, owner and lender etc.

GEPCO PMU team has excellent relationship with the Contractors, Owner, lender etc.

(Part II)-Environmental Monitoring

9. PMU, GEPCO conducted environment and safeguard site inspections at sub-projects in

Gujranwala and Hafizabad. (GEPCO-draft notice on Non-compliances, Observations raised,

recorded and reported to concerned Project Manager (Constructions) (Copies attached at

Annexure-D)

Environmental Measurement/ Testing of Noise and Vibration, Water Quality, Air

Quality and Flora/ Fauna Monitoring

10. Earlier, GEPCO sent draft to all concern project managers’ construction (ABB-Pak, ICC-

Pak and Siemens-Pak) to conduct and submit latest/ last quarter laboratory test results of

noise, water and air quality. In compliance, ABB-Pak, Siemens-Pak and ICC-Pak had

submitted environmental testing/ analysis result/ reports of this quarter that comply with

NEQS.

Recommendations required showing how any exceedences will be prevented in

the future

12. The Environmental Monitoring and Management Plan (EMMP) enlisted in EIA

Reports have been made part of the bidding documents of civil works (Turnkey Project)

and the contractors are made bound to quote specified amount (0.1 million US$) has

been reserved) in the BOQs for implementation of EMMP.

Page 13: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

8

Part-III Environmental Management

13. The Environmental Monitoring& Management Plan (EM&MP) along with respective

EIA/ IEE Reports of sub-projects have been made part of the bidding documents of civil

works (turnkey projects). The Environment Management Plan (EMP) has been

translated, typed/ edited into Urdu; approval received from the C.E.O (GEPCO) for its

implementation at all sub-project sites as well as uploaded/ posted on GEPCO official

website (www.GEPCO.com.pk/pmu). Assist. Manager (PMU) GEPCO conducted training

program on EMP at all GEPCO sub-project sites.

14. The contractors have been made bound to quote specified amount (0.1M US$ that

has been allocated) in the BOQs for the implementation of EM&MP. Earlier, PMU

GEPCO asked all 03 Contractors to share with GEPCO all HSE Budget

expenditures/spent till to date. In compliance M/s ABB, Siemens & ICC had all shared

detail report on HSE implementation at work sites.

Site Inspections at Sub-project sites

15. PMU, GEPCO conducted environment and safeguard inspections at sub-project

sites in Gujranwala, Sialkot and Hafizabad.

Non-Compliance Notices–Summaries the details on the number of notices given out

and the issues covered Summaries the ranking of issues

16. The Detail of raised Non-compliance, Observations with corrective actions request were

sent to all Project Manager (Construction) for compliance. (Copy attached at Annexure-E)

Corrective Action Plans-Report on timeliness of preparation and Completion

17. The pointed Non-Conformities/ Observations have been recorded and reported to all

concern Project Manager’s Construction for compliance. All corrective actions have

been taken as desired. (Corrective actions taken enclosed at Annexure-F)

Consultation and Complaints – Report on any consultation undertaken and list

any complaints received

18. Environmental & Social Complaint Register both in English and Urdu versions have

already been communicated and implemented by the Project Director (GSC), XENs TLC/

T&G at respective project sites. So far, No affected person/ household has logged/ filed

any Complaint in PMU/ GSC Office.

Page 14: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

9

9

Implementation Report on EIA/IEE Mitigation Requirements

Reference Requirement Action to date ActionRequired/Comment

Compliance of EIA/ IEEReport during Execution ofProject Civil Work

Inclusion of EIA/ IEEReport in BiddingDOC’s

EIA/ IEE Reports alongwith EM&MP have beenincluded/ made part ofthe Bidding DOC’s

DONE

Compliance of EnvironmentMonitoring & ManagementPlan during execution ofProject Civil Work

Urdu translation, typing/editing of EMP into Urduand its posting/ uploading atGEPCO official website

Inclusion of EM&MPin Bidding DOC’s

Inclusion of EMP inEIA/IEE Reports aswell as in BiddingDOC’s

EM&MP draft Docshave been included/made part of theBidding DOC’s

NOC’s/ EnvironmentalApproval received byGEPCO from EPA,Lahore

DONE

DONE

0.1 Million Budget forEM&MP Implementation

Allocation of budgetby Contractor

Rs. 0.1 Million US$ hasbeen allocated forimplementation ofaforesaid plan

DONE

Implementation/ InternalMonitoring of EM&MP at allsub-project sites

Capacity buildingprograms on EM&MPat all sub-projectsites

Capacity building/training conducted byGEPCO at all sub-project sites

DONE

Compliance of siterestoration/ landscapingworks at completedsubstations

Allocation & approvalof budget amountingto Rs. 1.6 Million byPMU to O/o P.D(GSC) GEPCO

Work order issued byO/o P.D (GSC) tocontractor

In last week ofJuly 2015

Page 15: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

ANNEXURE-A

UPDATED PMU ORGANOGRAM

Page 16: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

3

ANNEXURE-B

Civil Work Activities

Nokhar-Hafizabad II 132kV Tr. Line

132kV Nokhar Therisansi Tr. Line (Feed for Ghari)

Page 17: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

3

3

Godhpur grid station (landscaping work)

Erection work at 132 kV Nokhar-Hafizabad –II Tr.line

Page 18: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

ANNEXURE-C

Progress Status of GEPCO Grid Stations Under ADB Funded Tranche # 2

Sr.# Name of T/Line Contract No.

Name of

Contractor/Sub-

Contractor

Commencement

of Civil Works

Civil &

Electrical

Work

Target

DateRemarks

1Conversion of Kolu-TararGS from 66KV to 132 KV

ADB-2727-GEPCO-05

SIEMENS/NETRACON

31/07/2012 100% Energized on 17-04-2014

2Conversion of Jalalpur-Nau GS from 66KV to132 KV

-do- -do- 31/07/2012 100% Energized on 19-05-2014

3Construction of Godhpur132 KV GS

ADB-2727-GEPCO-03

SIEMENS/PENSIC

31/07/2012 100%Testing and

Commissioning

4Construction of NewDaska 132 KV GS

-do- -do- 31/07/2012 100% Energized on 28-11-2014

5Construction of Khiali-Bypass 132 KV GridStation

ADB-2727-GEPCO-04

ABB/NETRACON

31/07/2012 80%Aug-

15Work inProgress

6Construction ofSheranwala Bagh 132 KVGrid Station

-do- -do- 31/07/2012 90%Testing and

Commissioning

Page 19: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

2

Progress of GEPCO 132 kV T/Lines Under ADB Funded Tranche # 2

Sr.No Name of Tr./Lines Contract No.Commencement

of Civil Works

Length

(Km)

No. of

Towers

No. of

Foundations

Completed

No. of

Erected

Towers

Length of

Stringing

completed

(Km)

Progress

Status (%)Target Date Remarks

1132KV Hafizabad -II Kolu-Tarar T/L

ADB-2727-GEPCO-05

31/07/2012 29.5 47 47 47 29.5 100% Energized on 17-04-2014

2132KV Kolu Tarar-JalalpurNau

-do- 31/07/2012 19.75 62 62 62 19.75 100% Energized on 19-05-2014

3Sahowala-Godhpur 132 KVT/L

ADB-2727-GEPCO-03

31/07/2012 9.7 54 44 32 Nill 80% Sep-15 ROW

4

In & Out for Hafizabad-IIGS from the existing NokharHafizabad T/L (C.C.T No.1)(D)

ADB-2727-GEPCO-06

1/10/2012 15.4 60 60 60 15.4 100% Energized on 27-02-2014

5

In & Out for Garhi GS fromthe proposed Nokhar-Therisanci T/L (Feed forGarhi) (E)

-do- 1/10/2012 15.6 77 77 77 15.6 100% Energized on 28-08-2014

6

132 KV Nokhar-Hafizabad-II T/L (Alternate Feed forHafizabad-II GS) (C )

-do- 1/10/2012 28.7 144 144 68 0.074 60% Sep-15

Erectionof Towersunderprogress

7132KV Sahowala - PasrurTransmission Line (B)

-do- 1/10/2012 41.2 212 175 Nill Nill 60% Oct-15 ROW

8

In & Out of existing 132KVHafizabad Rd. GujranwalaTherisanci T/L at 132 KVSwitchyard of 500KVNokhar (A)

-do- 1/10/2012 23.3 114 114 144 23.3 100%Testing of Transmission

Line under Progress

Page 20: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

Annexure-D

Non-Compliance/ Observations found at Khiali Bypass & Sheranwala-Bagh GS

Page 21: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

2

U p;pt_"'()

utd;0 -0 t

1t.XIAI.u:t:ri</CIQ 1w:Klnw.KNY.uwn:n

!SISIS-A MOOEL TOWN G.T ROAO GUJRANWALA

Phone•OSS 9200s:t6PI.'IX OS.S..92005H) 2'6JtA..'( •OSS-9200594

Memo No: S ,.;, -"'!> 1/f'("'\A

11'1 Mf'nO t Prqje« (Cott1ttrurtion)I CC P\•t.l..l•J

QF’F’JC£ OY THBCffJEP' f!.XB:.CUT1Vt- OPPJCER

O£.PCO, ClVJR.ANWA\.A

DIUCd ..L(/Oif liS

Sllb;- Envi.ronme:nta.t •uu1 satep•rd lAoiiP4C:U(>n At Uod.•u· Co.n.euuetton Bahu-'-• -b.tQl(.J'WUp- QE.:E>co mb-Pnlf.s;i pgndad ••na’l,£1" .!4FY Truel•c-2

lfel' - PM Q

d :Onl(lrrtJ with SMEC IADB Can.ultanu.J vialtto •ubjC(lt(l4 "-IH1011 Fridny- 01&:

l.h111na ti'UJpe(llf(W) and rne.:oting .....nh loolll Aff tee't At t Ubicx: •ite J. follo\\ingOi»eii’Yadot’llil ’"’’C’C u(I{Qc.l:-

1. Nn O.,tllet>tl &ro:-t;y Offiu-r/Supervioo• lwnd Mt we>rk fi,U.,

2 l.IJC..I NJtcteeo Wtlre compl!Uning 51-baut lml)tOJ'ICr' bE<O:.kfi.lliog c.b.s. wn..os carried outrllllitll1 lho f'XOCUtion of eivil worn 111 loun tl¢on fllAe . En.liU.I"e' proper 111!eU!Uilion er the complcorioh nr el\•11 wod<.s

3.. ltHcnlliJ/ Tn-bouaoc- lr.unms t o.t1 nre li&bUJig_ ftrll:lcdd ..nd OOil:UIIUnic:able dlt ¢ b¢

W'l'Md 111 wurk 11.ite ar.d fol'lllQJ , wpy <.>r rrainmg n:cord to bolh <;.&PCO oi.Ud::JMEC

'"""'"'"'" IP pjlioe .."""'"'"· Iumlr!

15d,.,..

J Mr.AdnM 'factt11 IPrv)t.’ct lmp!crnenw.bon Otru:er A1Jt:l) , tQr lnron uu.. on plMa. lhlt Stvdi(J (EluVU"OnruenUll Spca.lili!11J ADB, lnr khHI infOf'mM.iOn pl"eoc

:l P.O !C.Sq OEPCO. frn b.itf kind infe>rn':llltion and c:a.:mpUunee of .toe: $1u\'1" (.llt-1•toe

Page 22: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

3

t bor •ndcr lI ,....,,.vf /,OEwiU•u..A- Cf11C:

child labor found ta sheranwala bagh grid station

Trench cover not provided

Page 23: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

4

Open DB penal without log out / tag out

Rigger found without safety helm l& shoes

Page 24: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

5

5

No area barricading for crane operation

Page 25: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

6

ANNEXURE-E

Corrective Actions taken against Recorded and Reported Non-Conformities/

Observations at sub-project sites

Page 26: PAK: MFF – Power Distribution Enhancement Investment ...€¦ · PAK: MFF – Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Gujranwala Electric Power

7

7

ropDror

•••

...

,,.I'l­l

ICC (Pvt) LimitedPHOHE.((Iollpt11S1Ul·1A • fWC: W •"l 31!1'2 3Gn.J1161

Rer.361SIS"34.J• URI. -.r.qM-Citl’"’"

Januay 10,2015

Chief Engneer (Development••GEPCO,565-A MO<Ief TOWl'!,

G.T Road.Gujtanwala

Subject: CONTRACT NO. ADB-2727-GEPC0-06Procurement Of Aant. Oeslgn, Supply ArwJinsta!!atlon Of 06 Nos- 132 k.V Transml&.slonLines (l27 l<rn) OitfC(enl Cin:uitS InGEPCO Atoa"ENV1RONMENTAL & SAFEGUARD INSPECnON A.T UNDER CONSTRUCTK>N

SAH\JWALA·PASRUR tUNE

Dear Sir,

Please refer to your email dated 9-01-2015 regarding obseNations noted durlnQ PMU GEPCO OlfiQnaoct S.MEC {AOBCon$ul1ants) vi$lt 10: $Ubjoe1 $iiAt on Ftldoy dl)tOCI 02 01·2Q1S Our po.nl by polnt reply10

yourobe«Va!lons Isnfollov..a:

No.Reply

No<Sodlca!.ed Safety Officet/SupeMSor Mr. Shah FaiSal. AE I& nomtnated HSE Officer atat work site. worksiteandwasor.ailabloduringnid1/b:il

imp er backfilling andS$l£t

r.c.t.$,I tion &.nor CQmplctiQn of cMI

Founda:ion aciNity al&ubject mer.l!oned TILine wmcom-pleted on :l7JII Fel)tuAtf 2014. AJI tt!tntllnlng

locations are under RCW probtems since then . Wemwo don4t propor bQ,ckfiJing altor (.C)mpiotiOn 01l®nd 1lon$. But due lO h vy rains nnd ltooG duringlest season 50me locaUons were damaged The!le

wm Oe ll!Paired b9fora bandmg over lhe line

3Trainings on Flro F,ghtJng, Fnt ld

\’\ andCommunicabledsseases

\.

We are conducting trainings alwm slta’olfice after

regd.at -.IOI’VOI$ Now, we oro p!jt\liing to condUC:Clnforma!lon, Education and COMulla!lonQOmmlrication campaign (tEC) on Sel!Valyir(tn5mi11.ed disease$ (SlOs) Md St)x\UllyTr.:I0$0’1Uod lnfoc::tiorni (STis}and HSEl.s$uo&.fn ltlolast v.l!ek orJ<nJary 201S, Training rda shallfurnlshod to both GEPCO 01 C.

Thank&,

Yo.nlruty,For)CC (PVT) Umllod.

Atlque H. lmet_.. Chief Conlt&c:U. Etlglneer

I

I(AMC:Hl O J'IC:l'tTl! rt.OO ""OGitUSIYilt S.QUA"It I'I!C:t!-S. ltiAHIIAH ·I·f'AI,,-t.POeOJ. tHttfiAtitACt1J•U4tiiPAICtSfAN1\·m.•ll lo:cCJq<ba<n•t.f'• • f'HONE;Jd•U·20·2'l tt•AaJt) •rAX :,_.!ISlt...