paragraph 81 project. 2reliability | accountability background ferc march 15, 2012 order regarding...

13
Paragraph 81 Project

Upload: roy-miles

Post on 04-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

Paragraph 81 Project

Page 2: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

2 RELIABILITY | ACCOUNTABILITY

Background

• FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process Paragraph 81 (P81) Opportunity to “…remove from the Commission-approved

Reliability Standards unnecessary or redundant requirements.”

• NERC Standard Process Input Group (SPIG) Recommendation No. 4 “Standards Product Issues: The NERC board is encouraged to

require that the standards development process address: . . . The retirement of standards no longer needed to meet an adequate level of reliability.”

Page 3: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

3 RELIABILITY | ACCOUNTABILITY

Collaboration

• Collaborative effort The North American Electric Reliability Corporation (NERC) The Regional Entity Management Group (Regions) The Trades and their member companies (Industry)

o Edison Electric Institute, American Public Power Association, National Rural Electric Cooperative Association, Large Public Power Council, Electricity Consumers Resource Council, The Electric Power Supply Association and the Transmission Access Policy Study Group

Page 4: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

4 RELIABILITY | ACCOUNTABILITY

Standard Authorization Request (SAR)

• Standards Committee approved the draft SAR for posting during its July 2012 meeting

• The draft SAR: Identifies criteria for retiring or modifying requirements

o The criteria is broad enough to be used in all phases and to capture all Reliability Standard requirements that are unnecessary, redundant or provide little protection to the Bulk Electric System (BES)

Defines phases Includes a suggested list of requirements put together by

NERC, the Regions, and Industry for potential inclusion in the initial phase

Page 5: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

5 RELIABILITY | ACCOUNTABILITY

Phased Approach

• Initial Phase Shall identify for retirement all FERC-approved Reliability

Standard requirements that easily satisfy the criteria set forth in the SAR

• Future Phases Shall identify FERC-approved Reliability Standard

requirements that satisfy the criteria set forth in the SAR, but could not be included in the Initial Phase due to the need for additional analysis or an editing of language

The composition of the Standard Drafting Team (SDT) may need to change in future phases based on the expertise required

Page 6: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

6 RELIABILITY | ACCOUNTABILITY

Relevant Criteria

• The Reliability Standard requirement must satisfy both Criteria A and B, with consideration of Criteria C

Page 7: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

7 RELIABILITY | ACCOUNTABILITY

Criteria A

• In the event no responsible entity performed the FERC-approved Reliability Standard requirement, there would be little or no impact to the protection or reliable operation of the BES

Page 8: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

8 RELIABILITY | ACCOUNTABILITY

Criteria B

• Requirement fits any of the following: Administrative Data Collection/Data Retention Purely Documentation Purely Reporting Periodic Updates Commercial or Business Practice Redundant Hinders the protection or reliable operation of the BES Little, if any, value as a reliability requirement

Page 9: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

9 RELIABILITY | ACCOUNTABILITY

Criteria C

• Was the Reliability Standard requirement part of a FFT filing?• Is the Reliability Standard requirement being reviewed in an

ongoing standards development project?• What is the Violation Risk Factor of the Reliability Standard

requirement?• In which tier of the Actively Monitored Standards does the

Reliability Standard requirement fall?• Would retiring the requirement have any negative impact on

NERC’s published and posted Reliability Principles?• Would retiring the requirement have any negative impact on

the defense-in-depth protection of the BES?• Does the retirement or modification promote results- or

performance-based Reliability Standards?

Page 10: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

10 RELIABILITY | ACCOUNTABILITY

Benefits of the P81 Project

• Responsive to P81 of FERC’s March 15, 2012 order and SPIG Recommendation No. 4

• Requirements submitted for the initial phase appear to be clear candidates and should not require extensive technical research

• The collaborative nature of the project is an example for future work because it advances the project while reducing the impact on stakeholders and NERC staff The project is proposed to be under a tight schedule so it

will not impact resources for an expanded period of time The pace of the project sets an example for future work

Page 11: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

11 RELIABILITY | ACCOUNTABILITY

Benefits of the P81 ProjectContinued

• Furthers the focus on results- and performance-based Reliability Standards May provide a roadmap of what should or should not be a

requirement in future Reliability Standards• Will increase efficiency of the ERO compliance

programs

Page 12: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

12 RELIABILITY | ACCOUNTABILITY

Next Steps

• Process Post draft SAR for comment Complete consideration of comments and finalize the SAR Post the Reliability Standard requirements proposed for

retirement in Phase 1 for a 45-day comment period and initial ballot

10-day recirculation ballot• Schedule

Will be determined based on comments received during the draft SAR posting

Page 13: Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph

13 RELIABILITY | ACCOUNTABILITY

Questions?