parker drilling company – calik enerji company turkmenistan presentation
TRANSCRIPT
Parker Drilling Company – Calik Enerji Company
Turkmenistan Presentation
Parker DrillingParker Drilling
Vision Statement We aspire to be the industry leader, providing
innovative drilling and rental tool services in our strategic markets by exceeding the expectations of our customers, shareholders, and employees.
HSE Commitment Statement We aspire to be the safest oil service company in the
world.
ISO 9001:2002 Registered Quality Management System
HSE CommitmentHSE Commitment
0
0.5
1
1.5
2
2.5
3
3.5
4
1999 2000 2001 2002
Parker IADC
TRIR (Total Recordable Incidence Rate)
Parker Drilling vs. IADC Member Average
Parker Drilling’s HSE Record “People are the most valuable resource the company has,
so keeping them safe remains a top priority.”
Committed to maintaining the safest work environment in the industry
Rig LocationsRig Locations
Gulf of Gulf of MexicoMexicoGulf of Gulf of MexicoMexico
ColombiColombiaaColombiColombiaa
PerPeruuPerPeruu
BoliviBoliviaaBoliviBoliviaa
NigeriaNigeriaNigeriaNigeria
ChadChadChadChad
KazakhstanKazakhstan
RussiRussiaa
SakhaliSakhalinn
ChinaChina
DubaDubaiiKuwaitKuwait
IndonesiaIndonesia
New New ZealandZealand
Papua Papua New New GuineaGuinea
Rig KeyRig Key
LandLand PlatformPlatform
JackupJackup Project Project
BargeBarge ManagementManagement
Russian Federation - Major ActivityRussian Federation - Major Activity
ENL - YastrebENL - Yastreb
SEIC – Labor
Contract
White NightsWhite NightsXavier –
Labor ContractXavier –
Labor Contract
Rig 236 – TotalFinaElf
Rig 230 – Komi Arctic Oil
Rig 230 – Komi Arctic Oil
Conoco Polar Lights
Conoco Polar Lights
Russian FederationRussian Federation
Business dealings in Russia since 1991 Representative offices in:
Moscow Yuzhno-Sakhalinsk Nizhnevartovsk Usinsk Nenets Autonomous Okrug
Russian FederationRussian Federation
ExxonMobil Neftegaz Ltd., 2002 Design and Construction of Drilling Rig and Camp
(Sakhalin Island) Operations and Management Contract. Currently rigging
up on Sakhalin Island
TotalFinaElf, 2000 to present Provision of Drilling Rig and Camp in Khariaga (Nenets).
Currently Drilling
Tyumen Oil Company (TNK), 2001 to present Joint venture formed to operate and manage TNK-owned
drilling rigs, mobile equipment, and support services. Currently negotiating Y2003 work scope
Kazakhstan and Turkmenistan – Major ActivityKazakhstan and Turkmenistan – Major Activity
KazakhstanKazakhstan
Cas
pia
n S
ea
Cas
pia
n S
ea
RussiaRussia
IranIran
Turkmenistan
Turkmenistan
Uzbekistan
Uzbekistan
Azer.Azer.
ChinaChina
AralAral SeaSea
TengizTengiz
KarachaganakKarachaganak
KorpedjeKorpedje
KazakhstanKazakhstan
KPO – Drilling and Workover Rigs (SaiPar), Karachaganak, 2000 to present
AgipKCO – Barge Rig North Caspian Sea, Kashagan, 1999 to present
Tengizchevroil – Drilling and Workover Rigs, Labor Contract, Drilling Base Management, 1993 to present
Offices in: Almaty Aksai Tengiz Atyrau
TurkmenistanTurkmenistan
Current Operations
2003 – Calik Enerji – Korpedje Field Commencing operations with 2 rigs and related services
Fiftieth country where Parker has performed drilling operations
Utilization of Local InfrastructureUtilization of Local Infrastructure
Parker philosophy on the value of local content Local personnel Local services Cooperation with local
firms
Personnel Development PlanPersonnel Development Plan
HSE Training
Permit to work training Job safety analysis training Incident identification and analysis Safety in Motion training
Personnel Development PlanPersonnel Development Plan
HSE Training DuPont STOP Basic and advanced first aid Fire fighting Fire team training H2S survival
Personnel Development PlanPersonnel Development Plan
Technical Skills Training BOPE testing and maintenance English language / Local Language Basic rig math Preventative maintenance Bits and bottomhole assemblies Downhole tools and tests
Personnel Development PlanPersonnel Development Plan
Technical Skills Training Stuck pipe Drill string management Mud conditioning equipment Well control (WellCap and IWCF)
Rig 230Rig 230
Drawworks – Continental Emsco D-3
Mast – Continental Emsco 800,000 lb 142ft
Pumps – Continental Emsco FB-1300 (2ea)
Power – Caterpillar D-399 diesel generators and Ross Hill Model 1400 SCR System
Mud Plant – 1200 bbl active with Derrick shale shakers, desilter and desander
Well Control Equipment – 21-1/4” 2,000 psi and 13-5/8” 10,000 psi
Rig 247Rig 247
Drawworks – Gardner Denver Model 1100E
Mast – Pyramid 1.3 million lb 142ft
Pumps – Gardner Denver PZ-10 1300 hp (2ea)
Power – Caterpillar D-399 diesel generators and Ross Hill Model 1400 SCR System
Mud Plant – 1400 bbl active with Derrick shale shakers, desilter and desander
Well Control Equipment – 21-1/4” 2,000 psi and 13-5/8” 10,000 psi
Parker / Calik – Goal in TurkmenistanParker / Calik – Goal in Turkmenistan
We intend to utilize our hard won knowledge of the drilling business to bear on the projects in Turkmenistan
as our desire is to work long and successfully in Turkmenistan and to
be a productive part of the Turkmenistan oil & gas industry.