Page 1: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet
Page 2: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3

Main Channel

Menominee River

0 150 300

Feet

Figure 15AHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 546’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15A - HORIZONTAL SLICE AT 546’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 9:50:20 AM

Legend

State Boundary

20 - 50 ppm

Arsenic Concentrations

Page 3: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3

Main Channel

Menominee River

0 150 300

Feet

Figure 15BHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 548’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15B - HORIZONTAL SLICE AT 548’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 9:52:20 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

Arsenic Concentrations

Page 4: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3

Main Channel

Menominee River

0 150 300

Feet

Figure 15CHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 550’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15C - HORIZONTAL SLICE AT 550’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 9:54:47 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

Arsenic Concentrations

Page 5: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3

Main Channel

Menominee River

0 150 300

Feet

Figure 15DHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 552’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15D - HORIZONTAL SLICE AT 552’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 9:56:59 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

> 500 ppm

Arsenic Concentrations

Page 6: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3

Main Channel

Menominee River

0 150 300

Feet

Figure 15EHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 554’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15E - HORIZONTAL SLICE AT 554’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 9:58:33 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

> 500 ppm

Arsenic Concentrations

Page 7: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3

Main Channel

Menominee River

0 150 300

Feet

Figure 15FHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 556’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15F - HORIZONTAL SLICE AT 556’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 10:12:55 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

> 500 ppm

Arsenic Concentrations

Page 8: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3

Menominee River

For

mer

8th

Str

eet S

lip

0 150 300

Feet

Figure 15GHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 558’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15G - HORIZONTAL SLICE AT 558’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 10:27:43 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

> 500 ppm

Arsenic Concentrations

Page 9: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3

Menominee River

For

mer

8th

Str

eet S

lip

0 150 300

Feet

Figure 15HHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 560’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15H - HORIZONTAL SLICE AT 560’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 10:29:26 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

> 500 ppm

Arsenic Concentrations

Page 10: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3

Menominee River

For

mer

8th

Str

eet S

lip

0 150 300

Feet

Figure 15IHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 562’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15I - HORIZONTAL SLICE AT 562’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 10:32:06 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

> 500 ppm

Arsenic Concentrations

Page 11: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3

Menominee River

For

mer

8th

Str

eet S

lip

0 150 300

Feet

Figure 15JHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 564’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15J - HORIZONTAL SLICE AT 564’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 10:34:48 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

> 500 ppm

Arsenic Concentrations

Page 12: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3

Menominee River

For

mer

8th

Str

eet S

lip

0 150 300

Feet

Figure 15KHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 566’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15K - HORIZONTAL SLICE AT 566’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 10:36:34 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

Arsenic Concentrations

Page 13: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3 South Channel

For

mer

8th

Str

eet S

lip

6th

Str

eet S

lip

0 170 340

Feet

Figure 15LHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 568’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15L - HORIZONTAL SLICE AT 568’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 10:38:02 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

> 500 ppm

Arsenic Concentrations

Page 14: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3 South Channel

For

mer

8th

Str

eet S

lip

6th

Str

eet S

lip

0 170 340

Feet

Figure 15MHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 570’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15M - HORIZONTAL SLICE AT 570’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 10:41:17 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

> 500 ppm

Arsenic Concentrations

Page 15: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3 South Channel

6th

Str

eet S

lip

For

mer

8th

Str

eet S

lip

0 170 340

Feet

Figure 15NHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 572’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15N - HORIZONTAL SLICE AT 572’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 10:42:26 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

> 500 ppm

Arsenic Concentrations

Page 16: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning Basin

Transition Area 1

Transition Area 2

Transition Area 3

Menominee River

South Channel

6th

Str

eet S

lip

For

mer

8th

Str

eet S

lip

0 200 400

Feet

Figure 15OHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 574’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15O - HORIZONTAL SLICE AT 574’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 10:44:28 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

> 500 ppm

Arsenic Concentrations

Page 17: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Turning BasinTransition Area 1

Transition Area 2

Transition Area 3

Menominee River

South Channel

6th

Str

eet S

lip

For

mer

8th

Str

eet S

lip

0 250 500

Feet

Figure 15PHorizontal Slice of Project Area, Arsenic ConcentrationsElevation 576’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\HORIZONTAL SLICE\FIGURE 15P - HORIZONTAL SLICE AT 576’ SHOWING ARSENIC.MXD JHANSEN1 10/7/2011 10:43:50 AM

Legend

State Boundary

20 - 50 ppm

50 - 500 ppm

> 500 ppm

Arsenic Concentrations

Page 18: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Fo

rmer

8th

Str

eet

Slip

TransitionArea 2

TransitionArea 1

TransitionArea 3

Turning Basin

Main Channel

SD551

SD502

SD503

SD504

SD505

SD506HSA

SD506VC

SD552

SD507

SD508

SD512

SD513

SD516

SD520

SD560

SD574

SD527

SD561

SD554

SD514

SD509

SD501

SD553

SD518

SD522

SD525

SD558

SD576

SD531

SD534

SD541

SD544

SD530

SD559

SD562

SD563

SD536

SD555

SD517SD556

SD515

SD577

SD519SD510

SD500

SD511

SD566

SD557SD523HSA

SD523VC

SD521

SD524

SD532

SD539

SD540

SD543

SD533

SD575

SD535

SD528

SD526

SD542

6

5

5’ 6’

1’

1

2

3

3’

2’

4

4’South Channel

0 150 300

Feet

Figure 16Cross-Section LocationTyco Fire Products LP FacilityMarinette, WI

Legend

2010 Sample Locations

Cross-Section Location

E:\TYCO\MAPFILES\DELIVERABLE_101411\FIGURE 16 - CROSS SECTION LOCATIONS.MXD JHANSEN1 10/7/2011 11:00:45 AM

Page 19: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

575’

565’

555’

545’

585’

LOW WATER DATUM = 577.5SD503

SOFT SEDIMENT

SOFT SEDIMENT

SD512 SD509 SD515 SD577 SD522

SEMI-CONSOLIDATED

SANDSAND SILTS

41.3

144

182

310

1960013000

80908640

4.139.9

328

182525

1200011900

67603650

3.32.73.34.3

22.124694.6332

692631522

262152

48.8

3.83.22.5

2.5

3.0

4.84.66.9

3.3

2.82.02.3

2.42.02.2

2.51.83.32.2

7.54.74.7

5.97.1

7.24.6

4.67.3

21.5’ 19.8’ 20.4’

7.6’

.8’ .1’

BEDROCKGLACIAL TILL

1 1’

EASTWEST

EXISTING SHEETPILING

TYCO FACILITY

NAVIGATIONAL CHANNEL

APPROXIMATEDREDGE CUT

APPROXIMATEDREDGE CUT

4

1

Figure 17ACross-section 1-1’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\FIGURE 17A - CROSS SECTION 1-1.MXD JHANSEN1 10/7/2011 11:12:32 AM

Arsenic

> 500 PPM

50 - 500 PPM

20 - 50 PPM

NOTES:1. VERTICAL DATUM IS NAVD88-FT2. ARSENIC CONCENTRATION IN PARTS PER MILLION

3. - WATER DEPTH AT SAMPLE LOCATION REFERENCED TO LOW WATER DATUM4. ELEVATIONS AND WATER DEPTH IN FEET5. BEDROCK DEPICTION IS APPROXIMATE6. BLUE HIGHLIGHTED SAMPLE POINTS ARE RESULTS BELOW 20 PPM7. THE 3-DIMENSIONAL SOFTWARE EXTRAPOLATES BETWEEN DATA POINTS, AS SUCH, THE INTERPRETATION OF CONCENTRATIONS AND LITHOLOGY BETWEEN DATA POINTS ARE APPROXIMATE

19.8’

APPROXIMATE HORIZONTAL SCALEFeet

0 60 120

Legend

Approximate Dredge Cut

Page 20: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

570’

565’

555’

545’

575’

LOW WATER DATUM = 577.5

SOFT SEDIMENT

SOFT SEDIMENT

SD504 SD513 SD519

SEMI-CONSOLIDATEDSANDS AND SILTS72

4.8

4.3

2.6

787

740

394

543

44.7

52.6

103

108

3.62.4

1.8

4.6

1410

95.7

326

694993

34945.1

2

1.6

1.52.3

1.72.3

30.96.9

44133

61.7

42.5

2.31.6

61.9

6.31.8

2.52.4

2.63

8.78.5

3.12.5

2.62.3

19.6’

10.9’

.9’

BEDROCK GLACIAL TILL

2 2’

580’

560’

550’

4.2

82.6

83.7

24.4

106394

WEST EAST

APPROXIMATEDREDGE CUT

EXISTING SHEETPILING

NAVIGATIONAL CHANNEL

APPROXIMATEDREDGE CUT

14

Figure 17BCross-section 2-2’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\FIGURE 17B - CROSS SECTION 2-2.MXD JHANSEN1 10/7/2011 11:07:45 AM

Arsenic

> 500 PPM

50 - 500 PPM

20 - 50 PPM

NOTES:1. VERTICAL DATUM IS NAVD88-FT2. ARSENIC CONCENTRATION IN PARTS PER MILLION

3. - WATER DEPTH AT SAMPLE LOCATION REFERENCED TO LOW WATER DATUM4. ELEVATIONS AND WATER DEPTH IN FEET5. BEDROCK DEPICTION IS APPROXIMATE6. BLUE HIGHLIGHTED SAMPLE POINTS ARE RESULTS BELOW 20 PPM7. THE 3-DIMENSIONAL SOFTWARE EXTRAPOLATES BETWEEN DATA POINTS, AS SUCH, THE INTERPRETATION OF CONCENTRATIONS AND LITHOLOGY BETWEEN DATA POINTS ARE APPROXIMATE

19.8’

APPROXIMATE HORIZONTAL SCALEFeet

0 70 140

Legend

Approximate Dredge Cut

Page 21: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

570’

560’

550’

3’

11000

12100

14800

5.93.54.3

5.66.8

575’

565’

555’

545’

580’LOW WATER DATUM = 577.5SD500

SOFT SEDIMENT

SD505 SD510 SD516 SD520

SEMI-CONSOLIDATEDSANDS AND SILTS

111

612

520

884554

3000

28.2

12.5

18377.1

367

4.59.6

111

273

28.6

217513

493

751

1000

1310

959

66.5

60.3

211

297

251

253

210

247275

414

490

17.7

2.9

17.58.6

3.92.1

5.2’

18.8’15.1’

1.1’

BEDROCK

GLACIAL TILL

3 3’

APPROXIMATEDREDGE CUT

MATERIAL LEFT IN PLACE TO SUPPORT EXISTING SHEET PILING NEAR FORMER 8TH

STREET SLIP

WEST EAST

NAVIGATIONAL CHANNEL

GLACIAL TILL

EXISTINGSHEETPILING

Figure 17CCross-section 3-3’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\FIGURE 17C - CROSS SECTION 3-3.MXD JHANSEN1 10/7/2011 12:05:06 PM

Arsenic

> 500 PPM

50 - 500 PPM

20 - 50 PPM

NOTES:1. VERTICAL DATUM IS NAVD88-FT2. ARSENIC CONCENTRATION IN PARTS PER MILLION

3. - WATER DEPTH AT SAMPLE LOCATION REFERENCED TO LOW WATER DATUM4. ELEVATIONS AND WATER DEPTH IN FEET5. BEDROCK DEPICTION IS APPROXIMATE6. BLUE HIGHLIGHTED SAMPLE POINTS ARE RESULTS BELOW 20 PPM7. THE 3-DIMENSIONAL SOFTWARE EXTRAPOLATES BETWEEN DATA POINTS, AS SUCH, THE INTERPRETATION OF CONCENTRATIONS AND LITHOLOGY BETWEEN DATA POINTS ARE APPROXIMATE

19.8’

Legend

Manage with Chemical Isolation Layer

Approximate Dredge Cut

APPROXIMATE HORIZONTAL SCALEFeet

0 50 100

Page 22: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

570’

560’

550’

SD5603.6’

0’ .1’1.4’ 2.2’ 1.9’

523

237

10.8

13.2 5.94.1 10.728.6

50.2

322

230577

305101

33.352.7

305141

3.38.7 5.46.6 19.317

1.96.63.96.7

9.4 21.933.9

16.217.3

15.113.924.3 33.2

9.4

3.43.4

6.1 5861.1

57.6

2.71.9

3.23.915.520.942.5

8.7

418

1.4

77.1

19.84

25.8139

89.5

3.51.7

2.9

WEST EAST

EXISTING 8TH STREETSLIP SHEET PILING

APPROXIMATEDREDGE CUT

APPROXIMATEDREDGE CUT

575’

565’

555’

545’

580’ LOW WATER DATUM = 577.5SD526

SOFT SEDIMENT

SD558 SD531 SD534 SD541 SD544

SEMI-CONSOLIDATEDSANDS AND SILTS

26.16.2 3.51.8

1.7

1.5’

BEDROCKGLACIAL TILL

4 4’

MATERIAL LEFT IN PLACE TO SUPPORT EXISTING SHEETPILING NEAR FORMER 8TH

STREET SLIP

4

1

Figure 17DCross-section 4-4’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\FIGURE 17D - CROSS SECTION 4-4.MXD JHANSEN1 10/7/2011 11:22:07 AM

Arsenic

> 500 PPM

50 - 500 PPM

20 - 50 PPM

NOTES:1. VERTICAL DATUM IS NAVD88-FT2. ARSENIC CONCENTRATION IN PARTS PER MILLION

3. - WATER DEPTH AT SAMPLE LOCATION REFERENCED TO LOW WATER DATUM4. ELEVATIONS AND WATER DEPTH IN FEET5. BEDROCK DEPICTION IS APPROXIMATE6. BLUE HIGHLIGHTED SAMPLE POINTS ARE RESULTS BELOW 20 PPM7. THE 3-DIMENSIONAL SOFTWARE EXTRAPOLATES BETWEEN DATA POINTS, AS SUCH, THE INTERPRETATION OF CONCENTRATIONS AND LITHOLOGY BETWEEN DATA POINTS ARE APPROXIMATE

19.8’

APPROXIMATE HORIZONTAL SCALEFeet

0 80 160

Legend

Manage with Chemical Isolation Layer

Approximate Dredge Cut

Page 23: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

580’

575’

565’

555’

545’

570’

560’

550’

SD502 LOW WATER DATUM = 577.5SD503

SOFT SEDIMENT

SD504 SD505 SD506HSA

SEMI-CONSOLIDATEDSANDS AND SILTS

41.3

2.6

740

543

72

12100

15.1

20.7

12.1

14800

45.9

11000

53.7

1710

2870

189

39.8

26.2

37.7

160

24.1’21.5’

19.6’ 18.8’

5.2’

BEDROCKGLACIAL TILL

5 5’

APPROXIMATEDREDGE CUT

EXISTING SHEETPILING

DREDGE CUTNEAR SHEETPILING STILL

BEINGEVALUATED

APPROXIMATEDREDGE CUT

CONCRETE, RUBBLE,AND MISCELLANEOUS

FILL DEBRIS

NORTH SOUTH

NAVIGATIONAL CHANNEL

Figure 17ECross-section 5-5’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\FIGURE 17E - CROSS SECTION 5-5.MXD JHANSEN1 10/10/2011 12:24:43 PM

Arsenic

> 500 PPM

50 - 500 PPM

20 - 50 PPM

NOTES:1. VERTICAL DATUM IS NAVD88-FT2. ARSENIC CONCENTRATION IN PARTS PER MILLION

3. - WATER DEPTH AT SAMPLE LOCATION REFERENCED TO LOW WATER DATUM4. ELEVATIONS AND WATER DEPTH IN FEET5. BEDROCK DEPICTION IS APPROXIMATE6. BLUE HIGHLIGHTED SAMPLE POINTS ARE RESULTS BELOW 20 PPM7. THE 3-DIMENSIONAL SOFTWARE EXTRAPOLATES BETWEEN DATA POINTS, AS SUCH, THE INTERPRETATION OF CONCENTRATIONS AND LITHOLOGY BETWEEN DATA POINTS ARE APPROXIMATE

19.8’

APPROXIMATE HORIZONTAL SCALEFeet

0 50 100

Legend

Approximate Dredge Cut

Page 24: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

550’

545’

580’

4

1

570’

565’

560’

555’

575’

LOW WATER DATUM = 577.5SD508

SOFTSEDIMENT

SOFT SEDIMENT

SD512 SD513 SD516

SEMI-CONSOLIDATEDSANDS AND SILTS

42.2326

4.6

993

694

95.7

45.1

1410

349

787

28.6

273

217

513

394

493

751

1000

106

24.4

44.7

959

1310

52.6

490

414

275

83.7

103

82.6

1084.2

23.9’

19.8’

10.9’

1.1’

BEDROCK

GLACIAL TILL

6 6’

8640

8090

13000

19600

310

182

144

247

253

210

297

251

211

66.5

60.3

5.93.5

4.35.6

6.8

NORTH SOUTH

MATERIAL LEFT IN PLACE TOSUPPORT EXISTING SHEET

PILING NEAR FORMER8TH STREET SLIP

NAVIGATIONAL CHANNELEXTENDS APPROXIMATELY 60’

NORTH OF SD508NAVIGATIONAL CHANNEL

EXISTING SHEETPILING

Figure 17FCross-section 6-6’Tyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\FIGURE 17F - CROSS SECTION 6-6.MXD JHANSEN1 10/7/2011 11:16:39 AM

Arsenic

> 500 PPM

50 - 500 PPM

20 - 50 PPM

NOTES:1. VERTICAL DATUM IS NAVD88-FT2. ARSENIC CONCENTRATION IN PARTS PER MILLION

3. - WATER DEPTH AT SAMPLE LOCATION REFERENCED TO LOW WATER DATUM4. ELEVATIONS AND WATER DEPTH IN FEET5. BEDROCK DEPICTION IS APPROXIMATE6. BLUE HIGHLIGHTED SAMPLE POINTS ARE RESULTS BELOW 20 PPM7. THE 3-DIMENSIONAL SOFTWARE EXTRAPOLATES BETWEEN DATA POINTS, AS SUCH, THE INTERPRETATION OF CONCENTRATIONS AND LITHOLOGY BETWEEN DATA POINTS ARE APPROXIMATE

19.8’

APPROXIMATE HORIZONTAL SCALEFeet

0 40 80

Legend

Approximate Dredge Cut

Manage with Chemical Isolation Layer

Page 25: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

ES092110023938MKE Figure18A_RemediationSequence_v7.ai 10.10.11 sls

FIGURE 18A Remediation Sequence 2012Tyco Fire Products FacilityMarinette, WI

0 200 400

Feet

9:26:57 AM

$

Form

er 8

th S

tree

t S

lip

Menominee River

Wisconsin State Boundary

Michigan State Boundary

Stan

ton

Stre

et

Main PlantArea

FormerSalt Vault

WetlandsArea

Turning Basin

TransitionArea 3

6th Street Slip

South Channel

TransitionArea 1

TransitionArea 2

Main Channel

Legend

Sub-Areas

Phase IMechanical Dredge Soft Sediment – 2012

Phase IIMechanical Dredge Semi-Consolidated Materials – 2012

USACE Project Limits for Federal Navigation Channel

Navigation ChannelNavigation Channel

Page 26: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

ES092110023938MKE Figure18B_RemediationSequence_v4.ai 10.10.11 sls

FIGURE 18B Remediation Sequence 2013Tyco Fire Products FacilityMarinette, WI

0 200 400

Feet

9:26:57 AM

$

Form

er 8

th S

tree

t S

lip

Menominee River

Wisconsin State Boundary

Michigan State Boundary

Stan

ton

Stre

et

Main PlantArea

FormerSalt Vault

WetlandsArea

TransitionArea 3

6th Street Slip

South Channel

TransitionArea 1

TransitionArea 2

Main Channel

Legend

Sub-Areas

Phase IIIDry Excavation Soft Sediment – 2013

Phase IVDry Excavation Semi-Consolidated Materials – 2013

Phase VMechanical Dredge Semi-Consolidated Materials at Temporary Sheet Piling – 2013

Phase VIChemical Isolation Layer near 8th Street Slip Sheet Piling – 2013

Temporary Sheet PilingFor Dry Excavation – 2013

USACE Project Limits for Federal Navigation Channel

Turning Basin

Navigation ChannelNavigation Channel

Page 27: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Fo

rmer

8th

Str

eet

Slip

TransitionArea 2

Transition Area 1

South Channel

Menominee River

Wisconsin State Boundary

Michigan State Boundary

Water Street

Sta

nton

Str

eet

Main Street

Main PlantArea

FormerSalt Vault

WetlandsArea

A

A’

BB’

Sheet piling northwest of this lineis supported with tie back anchorsand sheet piling southeast of this lineis cantilever supported.

Main Channel

Turning Basin

TransitionArea 3

6th Street Slip

0 400 800

Feet

Figure 19Sheet Piling AssessmentCross Section LocationsTyco Fire Products LP FacilityMarinette, WI

Legend

Steel Sheet Pile Wall

Approximate Location of Slurry Wall

Approximate Area Previously Dredged to Bedrock

USACE Project Limits for Federal Navigation Channel

Approximate Property Boundary

Sub-Areas

E:\TYCO\MAPFILES\DELIVERABLE_101411\FIGURE 19 - SHEET PILING ASSESSMENT.MXD JHANSEN1 10/7/2011 11:20:20 AM

Page 28: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

0.5” Bottom Margin

0.5” Top Margin

0.75 pt line, black

0.75 pt line, black

1/8” air from baseline to rule

space = height of logo

From the Toolset:EXHIBIT NUMBER - Arial Narrow, all caps, bold, 9/12Exhibit Title - Arial Narrow, initial caps, 10/12Exhibit Caption or Project Name - Arial Narrow, initial caps, italics, 10/12

Use this North arrow if working with GIS.

Arial, 6 pt

Arial 8 pt/auto

Arial 8 pt, all caps

0.25 pt line, 1/16” (4.5 pt) high

0.5” Left

Margin

1.25” Binding Edge Right Margin

Footer, or Slugline: Arial Narrow, 7 pt, all caps. Will ALWAYS include the JMS number and FileName. X=Business Group, LOC=Office Location

4.25” from edge of paper

X002005000LOC FILENAME

EXHIBIT X Descriptive Title Here Project Name

North

0 1,000 500

Approximate scale in feet

LEGEND

Bh

Kitsap Series (formed on glacial lacustrine deposits)

Kitsap silt loam

No

Norma Series (formed on alluvium)

Norma sandy loam

Study Area

0.75 pt line, black

0.75 pt line, black

1/8” air from baseline to rule

space = height of logo

From the Toolset:EXHIBIT NUMBER - Arial Narrow, all caps, bold, 9/12Exhibit Title - Arial Narrow, initial caps, 10/12Exhibit Caption or Project Name - Arial Narrow, initial caps, italics, 10/12

0.5” Bottom Margin

0.5” Top Margin

0.5” Right Margin

1.25” Binding Edge

Left Margin

Footer, or Slugline: Arial Narrow, 7 pt, all caps. Will ALWAYS include the JMS number and FileName. X=Business Group, LOC=Office Location

3.5” from edge of paper

ES092110023938MKE 20a_Tyco_FireProducts_X-section_A-A'_v2.ai

FIGURE 20A Sheet Piling AssessmentCross Section A-A’Tyco Fire Products Facility

Uncontaminated soft sediment (<50 mg/kg arsenic)

Contaminated semi-consolidated sands and silts (>50 mg/kg arsenic)

Distance between inner

and outer sheet pile

6’

Toe of outer sheet pile (552’)

Existing inner sheet pile

Top (582’)

Toe of inner sheet pile (547’)

Uncontaminated glacial till (<50 mg/kg arsenic)

Bedrock

579’ (Water elevation)

577’ (Top of soft sediment)

574’ (Top of semi-consolidated sands and silts)

548’ (Top of bedrock)

549’ (Top of glacial till)

Sand and gravel fill

in between sheet piles

Tyco FireProducts Facility

A A’

Existing outer sheet pile

Page 29: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

0.5” Bottom Margin

0.5” Top Margin

0.75 pt line, black

0.75 pt line, black

1/8” air from baseline to rule

space = height of logo

From the Toolset:EXHIBIT NUMBER - Arial Narrow, all caps, bold, 9/12Exhibit Title - Arial Narrow, initial caps, 10/12Exhibit Caption or Project Name - Arial Narrow, initial caps, italics, 10/12

Use this North arrow if working with GIS.

Arial, 6 pt

Arial 8 pt/auto

Arial 8 pt, all caps

0.25 pt line, 1/16” (4.5 pt) high

0.5” Left

Margin

1.25” Binding Edge Right Margin

Footer, or Slugline: Arial Narrow, 7 pt, all caps. Will ALWAYS include the JMS number and FileName. X=Business Group, LOC=Office Location

4.25” from edge of paper

X002005000LOC FILENAME

EXHIBIT X Descriptive Title Here Project Name

North

0 1,000 500

Approximate scale in feet

LEGEND

Bh

Kitsap Series (formed on glacial lacustrine deposits)

Kitsap silt loam

No

Norma Series (formed on alluvium)

Norma sandy loam

Study Area

0.75 pt line, black

0.75 pt line, black

1/8” air from baseline to rule

space = height of logo

From the Toolset:EXHIBIT NUMBER - Arial Narrow, all caps, bold, 9/12Exhibit Title - Arial Narrow, initial caps, 10/12Exhibit Caption or Project Name - Arial Narrow, initial caps, italics, 10/12

0.5” Bottom Margin

0.5” Top Margin

0.5” Right Margin

1.25” Binding Edge

Left Margin

Footer, or Slugline: Arial Narrow, 7 pt, all caps. Will ALWAYS include the JMS number and FileName. X=Business Group, LOC=Office Location

3.5” from edge of paper

ES092110023938MKE 20b_Tyco_FireProducts_X-section_B-B'_v2.ai

FIGURE 20BSheet Piling AssessmentCross Section B-B’Tyco Fire Products Facility

Contaminated soft sediment (>50 mg/kg arsenic)

Contaminated semi-consolidated sands and silts (>50 mg/kg arsenic)

Toe of sheet pile (544’)

Glacial till

Bedrock

579’ (Water elevation)

574’ (Top of soft sediment)

570’ (Top of semi-consolidated sands and silts)

545’ (Top of bedrock)

546’ (Top of glacial till)

Tyco FireProducts Facility

555’ (Top of uncontaminated semi-consolidated sands and silts)

Uncontaminated semi-consolidated sands and silts (<50 mg/kg arsenic)

B B’

Distance between inner

and outer sheet pile

6’

Toe of outer sheet pile (552’)

Existing inner sheet pile

Top (582’)

Sand and gravel fill

in between sheet piles

Existing outer sheet pile

Page 30: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

From the Toolset:EXHIBIT NUMBER - Arial Narrow, all caps, bold, 9/12Exhibit Title - Arial Narrow, initial caps, 10/12Exhibit Caption or Project Name - Arial Narrow, initial caps, italics, 10/12

Use this North arrow if working with GIS.

Arial, 6 pt

Arial 8 pt/auto

Arial 8 pt, all caps

0.25 pt line, 1/16” (4.5 pt) high

North

0 1,000 500

Approximate scale in feet

LEGEND

Bh

Kitsap Series (formed on glacial lacustrine deposits)

Kitsap silt loam

No

Norma Series (formed on alluvium)

Norma sandy loam

Study Area

From the Toolset:EXHIBIT NUMBER - Arial Narrow, all caps, bold, 9/12Exhibit Title - Arial Narrow, initial caps, 10/12Exhibit Caption or Project Name - Arial Narrow, initial caps, italics, 10/12

Footer, or Slugline: Arial Narrow, 7 pt, all caps. Will ALWAYS include the JMS number and FileName. X=Business Group, LOC=Office Location

ES092110023938MKE 21_Tyco_FireProducts_ChemIso_v1.ai 09.08.11 jls

FIGURE 21Proposed Chemical Isolation LayerTyco Fire Products FacilityMarinette, WI

12" small riprap (~6" dia.)

3" gravel

6" sand

18" clean soft sediment

Page 31: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

Water Treatment System AreaExisting 480 V / 3 P Power Drop

Bldg. 59

0 200 400

Feet

Figure 22Temporary Water Treatment System Equipment Layout AreaTyco Fire Products LP FacilityMarinette, WI

E:\TYCO\MAPFILES\DELIVERABLE_101411\FIGURE 22 - TEMPORARY WATER TREATMENT SYSTEM EQUIPMENT LAYOUT AREA.MXD JHANSEN1 10/7/2011 11:40:07 AM

Legend

Water Treatment System Area

Approximate Property Boundary

Page 32: Part 3 Maps of Preliminary Design Approach, Assumptions, and … · 2018-05-17 · Turning Basin Transition Area 1 Transition Area 2 Transition Area 3 Main Channel er 0 150 300 Feet

0.5” Bottom Margin

0.5” Top Margin

0.75 pt line, black

0.75 pt line, black

1/8” air from baseline to rule

space = height of logo

From the Toolset:EXHIBIT NUMBER - Arial Narrow, all caps, bold, 9/12Exhibit Title - Arial Narrow, initial caps, 10/12Exhibit Caption or Project Name - Arial Narrow, initial caps, italics, 10/12

Use this North arrow if working with GIS.

Arial, 6 pt

Arial 8 pt/auto

Arial 8 pt, all caps

0.25 pt line, 1/16” (4.5 pt) high

0.5” Left

Margin

1.25” Binding Edge Right Margin

Footer, or Slugline: Arial Narrow, 7 pt, all caps. Will ALWAYS include the JMS number and FileName. X=Business Group, LOC=Office Location

4.25” from edge of paper

X002005000LOC FILENAME

EXHIBIT X Descriptive Title Here Project Name

North

LEGEND

Bh

Kitsap Series (formed on glacial lacustrine deposits)

Kitsap silt loam

No

Norma Series (formed on alluvium)

Norma sandy loam

Study Area

0 1,000 500

Approximate scale in feet

0.75 pt line, black

0.75 pt line, black

1/8” air from baseline to rule

space = height of logo

From the Toolset:EXHIBIT NUMBER - Arial Narrow, all caps, bold, 9/12Exhibit Title - Arial Narrow, initial caps, 10/12Exhibit Caption or Project Name - Arial Narrow, initial caps, italics, 10/12

Use this North arrow if working with GIS.

Arial, 6 pt

Arial 8 pt/auto

Arial 8 pt, all caps

0.25 pt line, 1/16” (4.5 pt) high

0.5” Bottom Margin

0.5” Top Margin

0.5” Right Margin

1.25” Binding Edge

Left Margin

Footer, or Slugline: Arial Narrow, 7 pt, all caps. Will ALWAYS include the JMS number and FileName. X=Business Group, LOC=Office Location

3.5” from edge of paper

ES092110023938MKE Figure_23_v1.ai

FIGURE 23Preliminary Water Quality Sampling Locations During DredgingTyco Fire Products LP FacilityMarinette, WI

LEGEND

Dry Excavation Area

Mechanical Dredging Area

North

0 495 990

Approximate scale in feet

Preliminary Water Quality Sample

Sample Location 2 = 500' downstream of dredging

Sample Location1 = 500' upstream of dredging

Sample Location 3 = Near mouth of river