partial private circuits

11
Partial Private Circuits Kalpesh Brahmbhatt 31 October 02

Upload: najwa

Post on 11-Jan-2016

30 views

Category:

Documents


1 download

DESCRIPTION

Partial Private Circuits. Kalpesh Brahmbhatt 31 October 02. Local exchange. DMSU. BT core network. Terminating segment. Trunk Segment. Terminating segment. End to end leased line. What are Leased Lines. Leased Lines are used to provide: data/voice/Internet connections for businesses - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Partial Private Circuits

Partial Private Circuits

Kalpesh Brahmbhatt

31 October 02

Page 2: Partial Private Circuits

What are Leased Lines•Leased Lines are used to provide:

– data/voice/Internet connections for businesses

– backbone for mobile networks

– ISP connections to the Internet

•UK leased lines market worth £ 1.3bn (99/00)• An end to end Leased Line compromises of a Trunk & Two Terminating Segments

DMSU Local exchange BT core network

Trunk SegmentTerminating segment

Terminating segment

End to end leased line

Page 3: Partial Private Circuits

Competition Analysis

• Effective Competition review in 2000:

• Competition in prospect at the trunk level

• identified problems in market for terminating segments

• Solution - Partial Private Circuits - provided on cost oriented & non discriminatory T&Cs

Page 4: Partial Private Circuits

Solution

• Partial Private Circuits/ or Part leased lines

End to end leased line

Customer 1

Customer 2

Logical & Physical linking of networks at a point of interconnection

BT’s network providing partial private circuit

OLOs network completing leased line

Page 5: Partial Private Circuits

PPC history

• March 2001- Oftel required BT to negotiate provision of PPCs with 10 operators

• 14 weeks for BT & OLOs to conclude negotiations

• BT launched PPCs 1 August 2001

• 2nd August - received requests for determination from OLOs

Page 6: Partial Private Circuits

PPC history (cont.)

• OLOs migrated approx 40,000 retail circuits to PPCs since launch of product

• 7,000 new PPCs purchased by OLOs• OLOs requested Oftel to determine cost

oriented prices• robust SLA’s• Migration procedures

Page 7: Partial Private Circuits

Phase 1 • Phase 1 Direction - issued 14 June 2002• Mainly dealt with stand alone contractual and technical

issues which were hindering PPC take up.• Included market analysis for leased lines market. • BT has market power Terminating segments• Trunk segments prospectively competitive• More detailed issues on pricing and service levels

deferred to Phase 2

Page 8: Partial Private Circuits

Phase 2

• 10 September 02 Oftel published phase 2 consultation document.

• Main proposals:• connection charges for PPCs will be

reduced typically by 50% and rental charges by 30%.

• reduced charges for migrating retail leased lines to PPCs

Page 9: Partial Private Circuits

Phase 2 (cont)

• savings will be backdated to 1 August 2001, when the products were first introduced by BT

• comprehensive service level agreements - ensuring OLOs provided with same provisioning and repair times as BT retail

• new regime for forecasting penalties

Page 10: Partial Private Circuits

Phase 2 - next steps

• Consultation closed on 8 October. • Final Direction to be issued November 02.• Currently assessing responses. • OLOs broadly supportive. • BT has concerns at calculation of charges

and extent of SLA.

Page 11: Partial Private Circuits

• To address competition concerns in market for terminating segments by encouraging take up of PPCs

• PPC Phase 1 - set out our market analysis - target competition concerns.

• Phase 2 - Applying proportionate regulation to remove obstacles which prohibit OLOs taking up PPCs -e.g. Costs reductions & effective SLAs

• PPCs enable OLOs to compete with BT at Retail level

PPCs - Oftel’s aims