participation of czech industry on the npp projects,...

17
PARTICIPATION OF CZECH INDUSTRY ON THE NPP PROJECTS, OUR QUALIFICATION, CAPABILITIES AND AMBITIONS November 11th, 2018 Radek Trněný 11 th Annual Conference on Nuclear Energy Kaiserstejn Palace, Prague

Upload: others

Post on 29-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

PARTICIPATION OF CZECH INDUSTRY ON THE NPP PROJECTS,

OUR QUALIFICATION, CAPABILITIES AND AMBITIONS

November 11th, 2018

Radek Trněný

11th Annual Conference on Nuclear Energy

Kaiserstejn Palace, Prague

1. Doosan Skoda Power introduction

2. NPPs experience

3. Solution for the new 1200 MW NPP

4. Possible suplliers model

Agenda

3

Heritage of Doosan Škoda Power - top class Steam Turbines

Emil Škoda found the engineering workshop

23 MW Reheating Steam Turbine

220 MW Turboset (Nuclear)

2009 20131869 1966 20061932 19921976

R&D Center of excellence for steam

turbine Doosan Group

1000 MW Turboset (Nuclear)

Doosan acquired Škoda Power

First turbine manufactured as per Škoda design

1914

200 MW Turboset

USC unit 660 MW

1100 MW (LP ST Nuclear)

2014

First turbine as per Škoda licence in Korea

4

Steam turbine& Generator

Completemachine hall

(Turbine Island)

R&D

Design,Engineering,Production

Service,LTSA

1

2

3

Fossil fuel

Cogeneration

Combined cycle

Nuclear

Waste incineration

Biomass

Solar

Doosan Škoda Power provides total solutions for various power generation application,

ranging from design of turbogenerator equipment to supply, erection and post-project

services.

Doosan Škoda Power – 1 100 professionals

5

Doosan Škoda: Complete machine hall competency

Doosan Škoda Power: 50+ worldwide projects

New ST NPPServiceR&M

Felton

0

Red DragonAtacama IIAtacama I

Kelar

EC NovaStalowa Wola

ZabrzeTychyUrsus

SwieciePKN ORLEN

Salalah II

VäroVartanLund

Punta del Tigre

BerlinStendal

Jemalong Vast Solar

Dublin

MatixPioneer

OPG

Termotasajero II

Paco Panama

DunbarMargam

TempleboroughTeesrep

Gardanne

Mochovce

Loviisa

Empalme IEmpalme II

Bandel

HoforLisbjerg

Karabatan

GratiGrati Ad on

Muara Tawar

Ledvice

Meghnaghat

Martinik

SamraZarqa

Fadhili

Tula

Okpai

CengizIstanbul

Huelva

Gardabani

7

Steam Turbine for NPP

Jaslovské Bohunice A1 (1972) 3 x 50 MW

8

Steam Turbines 220 MW for NPPs

Jaslovské Bohunice V1 (1978; 1980) 4 x 220 MW

Jaslovské Bohunice V2 (1984; 1985) 4 x 220 MW

Dukovany (1985; 1986; 1986; 1987) 8 x 220 MW

Mochovce 1,2 (1998; 1999) 4 x 220 MW

Mochovce 3,4 (commissioning) 4 x 220 MW

9

Steam Turbine 1000 MW for NPP

Temelín (supply 1991;1993; grid connection 2000;2002) 2 x 1000 MW

10

Modernization of NPP Dukovany

Modernization of condensers (1999 – 2001)

Modernization of LP parts (2005 – 2008)

Modernization of HP parts (2009 – 2012)

11

Modernization of NPP Temelin

Modernization of HP parts 2006

Modernization of LP parts 2014; 2015

12

NPP Temelin: 2x 1100MW

13

Modernization of NPP Loviisa 1, 2

Modernization of HP parts 2015, 2016, 2017, 2018

14

The new NPP 1200 MW - CZ supply from STG to Turbine Island

Steam Turbine 1200MW

High Pressure Heaters

Feed water Heaters

Condensers

Turbine Island design

Turbine Island engineering

Erection / Commissiong

Life time service

NPP 1200MW in Czech Republic = Czech supliers model

Nuclear Island

supplier

TurbineIsland DSPW

BoP - CZ

Mechanical part

Engineering

Supply CZ

Erection CZ

Electric part

Engineering

Supply CZ

Erection CZ

I&C part

Engineering

Supply CZ

Installation CZ

Civil partEngineering Local civil contractor Local civil contractor

Construction Local civil contractor Local civil contractor Local civil contractor

Licencing

Project management + Concept design

Thank you for your attention

and

please, support CZ champions

while every day is a new chalange

Doosan Škoda Power

Today, 21:00 Viktoria Plzeň x Real Madrid

P.S.

Result for Turbine Island is guaranteed, but football … let‘s enjoy every moment