BHABHA ATOMIC RESEARCH CENTRE
ADVANCED HEAVY WATER REACTOR
QUALITY ASSURANCE PLAN FOR BRASS TUBE FITTING
AHWR/60411/QAP/60001/P0
Date: Aug, 2014 Page 1 of 5
S.NoCOMPONENT/OPERATION
CHARACTERISTIC
TYPE OFCHECK
CLASSIFICATION
QUANTUMOF CHECK
REFERENCEDOCUMENT
ACCEPTANCENORMS
FORMATOF
RECORDS
AGENCYREMARKS
P W V
1.0 RAW MATERIAL
1.1Chemical
CompositionChemicalAnalysis
MA
Sample
from
each
batch
Applicable
standards
Applicable
Standards
Test
Report3 2 1
To be done
in NPC
Approved
Lab
1.2
Material for
body, nut ,
washers &compression
ring
Physicalproperties
Tensile
Strength
Hardness
Test
MA
Sample
from
each
batch
Applicable
standards
Applicable
Standards
Test
Report3 2 1
To be done
in NPC
Approved
Lab
1.3IN PROCESS/
ROUTINE TEST
1.4 Body Threads Gauging MA 100%
NPCIL
Approved
document /
drawings
NPCIL
Approved
document /
drawings
IQC
Records2 2 1
1.5 Body Dimensions Measurement MA 100%
NPCIL
Approveddocument /
drawings
NPCIL
Approveddocument /
drawings
IQC
Records2 2 1
1.6Nut /
CompressionringDimensions Measurement MA 100%
NPCIL
Approveddocument /
drawings
NPCIL
Approveddocument /
drawings
IQC
Records2 2 1
-
8/10/2019 Pc e 099 Cable Glands
2/5
BHABHA ATOMIC RESEARCH CENTRE
ADVANCED HEAVY WATER REACTOR
QUALITY ASSURANCE PLAN FOR BRASS TUBE FITTING
AHWR/60411/QAP/60001/P0
Date: Aug, 2014 Page 2 of 5
S.NoCOMPONENT/OPERATION
CHARACTERISTIC
TYPE OFCHECK
CLASSIFICATION
QUANTUMOF CHECK
REFERENCEDOCUMENT
ACCEPTANCENORMS
FORMATOF
RECORDS
AGENCYREMARKS
P W V
1.7 Washers Dimensions Measurement MA 100%
NPCILApproveddocument /drawings
NPCILApproveddocument /drawings
IQC
Records2 2 1
1.8 Sealing Ring Dimensions Measurement MA 100%
NPCILApproveddocument /drawings
NPCILApproved
document /drawings
IQCRecords
2 2 1
2.0
FINISHED
PRODUCT A)ROUTINE
TESTS
2.1 Glands
Dimension
(overall)
ferrule ID,
nut IDand
finish
Measurement MA
10% of
each size
fromeach lot
NPCILApproveddocument /drawings
NPCILApproveddocument /drawings
Test
Report2 1 1
2.2 Glands
NPT
threadsMetric
thread
Gauging MA 100%
NPCIL
Approveddocument /drawings
NPCIL
Approveddocument /drawings
TestReport 2 1 1
3.0 GlandsAxial pull
test
Strength/
Material
Integrity
MAAs per
NPCIL
approved test
Test
Report2 1 1
-
8/10/2019 Pc e 099 Cable Glands
3/5
BHABHA ATOMIC RESEARCH CENTRE
ADVANCED HEAVY WATER REACTOR
QUALITY ASSURANCE PLAN FOR BRASS TUBE FITTING
AHWR/60411/QAP/60001/P0
Date: Aug, 2014 Page 3 of 5
S.NoCOMPONENT/OPERATION
CHARACTERISTIC
TYPE OFCHECK
CLASSIFICATION
QUANTUMOF CHECK
REFERENCEDOCUMENT
ACCEPTANCENORMS
FORMATOF
RECORDS
AGENCYREMARKS
P W V
procedures
3.1 GlandsRe-
Assembly
Pull Test
Re- assembly MA
As perNPCIL
approved test
procedures
As per PC-E-100
Test Report 2 1 1
3.2
IDENTIFI-
CATION &
PACKING
Adequacy
of
Identificati
on and
packing
Visual MA 100%
As per
NPCIL
Approved
procedures
Approved
procedure2 1 1
3.3
3.4
3.5
3.6
3.7
4.0
-
8/10/2019 Pc e 099 Cable Glands
4/5
BHABHA ATOMIC RESEARCH CENTRE
ADVANCED HEAVY WATER REACTOR
QUALITY ASSURANCE PLAN FOR BRASS TUBE FITTING
AHWR/60411/QAP/60001/P0
Date: Aug, 2014 Page 4 of 5
S.NoCOMPONENT/OPERATION
CHARACTERISTIC
TYPE OFCHECK
CLASSIFICATION
QUANTUMOF CHECK
REFERENCEDOCUMENT
ACCEPTANCENORMS
FORMATOF
RECORDS
AGENCYREMARKS
P W V
4.1
4.2
LEGEND:
MAMAJOR MIMINOR PPERFORMANCE
WWITNESSED VVERIFIED ISS - INSTRUEMTN SPECIFICATION SHEET
CHP - CUSTOMER HOLD POINT
1PURCHASER 2 - PRIME SUPPLIER 3 - SUB VENDOR / EXTERNAL LABORATORY
NOTE:
1.
Test reports on the bought out components for all the NPCIL specified tests shall be obtained from the manufacturers and submitted for the
verification of BARC.
2.
The purpose of QAP is to streamline BARC Quality Surveillance activities and identifying CHP on un-ambiguous terms.
3.
All test reports, the certificates and inspection reports shall be reviewed by Prime Supplier/Sub-Vender/Manufacturer, before submitting
the same to verification by purchaser.
-
8/10/2019 Pc e 099 Cable Glands
5/5
BHABHA ATOMIC RESEARCH CENTRE
ADVANCED HEAVY WATER REACTOR
QUALITY ASSURANCE PLAN FOR BRASS TUBE FITTING
AHWR/60411/QAP/60001/P0
Date: Aug, 2014 Page 5 of 5
S.NoCOMPONENT/OPERATION
CHARACTERISTIC
TYPE OFCHECK
CLASSIFICATION
QUANTUMOF CHECK
REFERENCEDOCUMENT
ACCEPTANCENORMS
FORMATOF
RECORDS
AGENCYREMARKS
P W V
4. History docket/End documents prepared by Prime Supplier/Sub-vendor shall be submitted to Purchasers Representative for verification
and checking for its completeness.
5.
Calibrated instruments shall be used during inspection, examination & testing.
6. Quality surveillance carried out by purchasers representative at any stage of manufacturing of product shall not absolve manufacturer of
their responsibility to ensure quality neither shall it preclude subsequent rejection by purchaser.
7. Prime supplier/Sub-vendor shall establish and maintain documented quality system/documented procedures. They should address the
above as a minimum in their documented Quality system/documented procedures.
8.
Control of manufacturing process, control of non-conforming product, corrective and preventive action, document control, control onpurchasing, control on calibration of instruments, control on inspection & test and test status.
9. To verify the establishment and correct implementation of quality system of Prime supplier/Sub-vendor, BARC reserves the right to audit
Prime supplier/Sub-vendors quality system before or after execution of BARC jobs and carry out follow-up audit if any non-conformance
observed during the audit.