    BHABHA ATOMIC RESEARCH CENTRE

    ADVANCED HEAVY WATER REACTOR

    QUALITY ASSURANCE PLAN FOR BRASS TUBE FITTING

    AHWR/60411/QAP/60001/P0

    Date: Aug, 2014 Page 1 of 5

    S.NoCOMPONENT/OPERATION

    CHARACTERISTIC

    TYPE OFCHECK

    CLASSIFICATION

    QUANTUMOF CHECK

    REFERENCEDOCUMENT

    ACCEPTANCENORMS

    FORMATOF

    RECORDS

    AGENCYREMARKS

    P W V

    1.0 RAW MATERIAL

    1.1Chemical

    CompositionChemicalAnalysis

    MA

    Sample

    from

    each

    batch

    Applicable

    standards

    Applicable

    Standards

    Test

    Report3 2 1

    To be done

    in NPC

    Approved

    Lab

    1.2

    Material for

    body, nut ,

    washers &compression

    ring

    Physicalproperties

    Tensile

    Strength

    Hardness

    Test

    MA

    Sample

    from

    each

    batch

    Applicable

    standards

    Applicable

    Standards

    Test

    Report3 2 1

    To be done

    in NPC

    Approved

    Lab

    1.3IN PROCESS/

    ROUTINE TEST

    1.4 Body Threads Gauging MA 100%

    NPCIL

    Approved

    document /

    drawings

    NPCIL

    Approved

    document /

    drawings

    IQC

    Records2 2 1

    1.5 Body Dimensions Measurement MA 100%

    NPCIL

    Approveddocument /

    drawings

    NPCIL

    Approveddocument /

    drawings

    IQC

    Records2 2 1

    1.6Nut /

    CompressionringDimensions Measurement MA 100%

    NPCIL

    Approveddocument /

    drawings

    NPCIL

    Approveddocument /

    drawings

    IQC

    Records2 2 1

  • 8/10/2019 Pc e 099 Cable Glands

    2/5

    BHABHA ATOMIC RESEARCH CENTRE

    ADVANCED HEAVY WATER REACTOR

    QUALITY ASSURANCE PLAN FOR BRASS TUBE FITTING

    AHWR/60411/QAP/60001/P0

    Date: Aug, 2014 Page 2 of 5

    S.NoCOMPONENT/OPERATION

    CHARACTERISTIC

    TYPE OFCHECK

    CLASSIFICATION

    QUANTUMOF CHECK

    REFERENCEDOCUMENT

    ACCEPTANCENORMS

    FORMATOF

    RECORDS

    AGENCYREMARKS

    P W V

    1.7 Washers Dimensions Measurement MA 100%

    NPCILApproveddocument /drawings

    NPCILApproveddocument /drawings

    IQC

    Records2 2 1

    1.8 Sealing Ring Dimensions Measurement MA 100%

    NPCILApproveddocument /drawings

    NPCILApproved

    document /drawings

    IQCRecords

    2 2 1

    2.0

    FINISHED

    PRODUCT A)ROUTINE

    TESTS

    2.1 Glands

    Dimension

    (overall)

    ferrule ID,

    nut IDand

    finish

    Measurement MA

    10% of

    each size

    fromeach lot

    NPCILApproveddocument /drawings

    NPCILApproveddocument /drawings

    Test

    Report2 1 1

    2.2 Glands

    NPT

    threadsMetric

    thread

    Gauging MA 100%

    NPCIL

    Approveddocument /drawings

    NPCIL

    Approveddocument /drawings

    TestReport 2 1 1

    3.0 GlandsAxial pull

    test

    Strength/

    Material

    Integrity

    MAAs per

    NPCIL

    approved test

    Test

    Report2 1 1

  • 8/10/2019 Pc e 099 Cable Glands

    3/5

    BHABHA ATOMIC RESEARCH CENTRE

    ADVANCED HEAVY WATER REACTOR

    QUALITY ASSURANCE PLAN FOR BRASS TUBE FITTING

    AHWR/60411/QAP/60001/P0

    Date: Aug, 2014 Page 3 of 5

    S.NoCOMPONENT/OPERATION

    CHARACTERISTIC

    TYPE OFCHECK

    CLASSIFICATION

    QUANTUMOF CHECK

    REFERENCEDOCUMENT

    ACCEPTANCENORMS

    FORMATOF

    RECORDS

    AGENCYREMARKS

    P W V

    procedures

    3.1 GlandsRe-

    Assembly

    Pull Test

    Re- assembly MA

    As perNPCIL

    approved test

    procedures

    As per PC-E-100

    Test Report 2 1 1

    3.2

    IDENTIFI-

    CATION &

    PACKING

    Adequacy

    of

    Identificati

    on and

    packing

    Visual MA 100%

    As per

    NPCIL

    Approved

    procedures

    Approved

    procedure2 1 1

    3.3

    3.4

    3.5

    3.6

    3.7

    4.0

  • 8/10/2019 Pc e 099 Cable Glands

    4/5

    BHABHA ATOMIC RESEARCH CENTRE

    ADVANCED HEAVY WATER REACTOR

    QUALITY ASSURANCE PLAN FOR BRASS TUBE FITTING

    AHWR/60411/QAP/60001/P0

    Date: Aug, 2014 Page 4 of 5

    S.NoCOMPONENT/OPERATION

    CHARACTERISTIC

    TYPE OFCHECK

    CLASSIFICATION

    QUANTUMOF CHECK

    REFERENCEDOCUMENT

    ACCEPTANCENORMS

    FORMATOF

    RECORDS

    AGENCYREMARKS

    P W V

    4.1

    4.2

    LEGEND:

    MAMAJOR MIMINOR PPERFORMANCE

    WWITNESSED VVERIFIED ISS - INSTRUEMTN SPECIFICATION SHEET

    CHP - CUSTOMER HOLD POINT

    1PURCHASER 2 - PRIME SUPPLIER 3 - SUB VENDOR / EXTERNAL LABORATORY

    NOTE:

    1.

    Test reports on the bought out components for all the NPCIL specified tests shall be obtained from the manufacturers and submitted for the

    verification of BARC.

    2.

    The purpose of QAP is to streamline BARC Quality Surveillance activities and identifying CHP on un-ambiguous terms.

    3.

    All test reports, the certificates and inspection reports shall be reviewed by Prime Supplier/Sub-Vender/Manufacturer, before submitting

    the same to verification by purchaser.

  • 8/10/2019 Pc e 099 Cable Glands

    5/5

    BHABHA ATOMIC RESEARCH CENTRE

    ADVANCED HEAVY WATER REACTOR

    QUALITY ASSURANCE PLAN FOR BRASS TUBE FITTING

    AHWR/60411/QAP/60001/P0

    Date: Aug, 2014 Page 5 of 5

    S.NoCOMPONENT/OPERATION

    CHARACTERISTIC

    TYPE OFCHECK

    CLASSIFICATION

    QUANTUMOF CHECK

    REFERENCEDOCUMENT

    ACCEPTANCENORMS

    FORMATOF

    RECORDS

    AGENCYREMARKS

    P W V

    4. History docket/End documents prepared by Prime Supplier/Sub-vendor shall be submitted to Purchasers Representative for verification

    and checking for its completeness.

    5.

    Calibrated instruments shall be used during inspection, examination & testing.

    6. Quality surveillance carried out by purchasers representative at any stage of manufacturing of product shall not absolve manufacturer of

    their responsibility to ensure quality neither shall it preclude subsequent rejection by purchaser.

    7. Prime supplier/Sub-vendor shall establish and maintain documented quality system/documented procedures. They should address the

    above as a minimum in their documented Quality system/documented procedures.

    8.

    Control of manufacturing process, control of non-conforming product, corrective and preventive action, document control, control onpurchasing, control on calibration of instruments, control on inspection & test and test status.

    9. To verify the establishment and correct implementation of quality system of Prime supplier/Sub-vendor, BARC reserves the right to audit

    Prime supplier/Sub-vendors quality system before or after execution of BARC jobs and carry out follow-up audit if any non-conformance

    observed during the audit.