ID 1-q;o'I ON3 REPUBLIC, OF THE PHILIPPINES MINISTRY OF PUBLIC HIGHWAYS ANI-LA' BICL RIVER. BASIN DEVELOPMENT PROJECTS SECONDARY A, PEEDER ROAD CAMARINES SUR PACKA E II! MONTHLY CONSTRmTION REPORT SEPTEMBER 'e, UP INTEGFRATED PHILCONSULT INC. CONSULI.NG ENGINEERS PHILiPPINE ..

Upload: lybao

Post on 12-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

ID 1-qoI ON3

REPUBLIC OF THE PHILIPPINES

MINISTRY OF PUBLIC HIGHWAYS ANI-LA

BICL RIVER BASIN DEVELOPMENT PROJECTS

SECONDARY A PEEDER ROAD CAMARINES SUR

PACKAE II

MONTHLY CONSTRmTION REPORT

SEPTEMBER e

UP INTEGFRATED PHILCONSULT INC CONSULING ENGINEERS

PHILiPPINE

TABLE Op CONTENTS

MINALABAC-ANTIPOLOT_UJBO ROAD PROJECT Sub-Project No 4

Figure I Location Plan (For 3 Projects)Progress Report Weather Report a ooaa 1 aEmployment Generation ourvey (ss5) 17

Contractors Staff (Annex A) Polytrade Const 18

Employment Generation Survey (SS53) Inc o 19

Contractors Staff (Genaro Reyes Const) 20 Construction List of Heavy Equipments

21 aConstruction List of Laboratory Equipments (Annex

C) deg

0 23 Schedule of Work (Annex D)

2 o Manpower Schedule Consultants taff forConstruction Supervision (Annex E)

PILI-MATAOROC aOAD PROJECT Sub-Project No 5

Progress Report o o bull bull 1 -

PALISTINA-SAN ANTONIO-MINALABAC ROAD PROJECT Sub-Project No 6

Progress Report Weather Report -Employment Generation Survey 8 a 9Contractors Staff (Annex A)

amp a Construction List of Heavy Equipment

10 13

- 16

- 22

- 26

12

_______

_FIGURE

RICOL RIVER BASIN DEVELOPMENT PROJECT SECONDARY AND FEEDER ROADS

CAMARINES SUR

PACKAGE No I

HU1

TO LUCENA - 1 -u~o

POCOT ~ gteARCELONETA

SAN MIGUEL BAY ALAO

to 4 BALCNGLY op

-t

ALAaL (p

LIAN3A CA -r V t~UANAN~~~C

_S YUWIANP QUIPAYO

- UNING -- -CAW shy

AL AG I AO Ch 6A C NW shy

0~ CAROLIN

MAMSULO NUEVO SAN BATANG4 C_-CAK AW

PAM PLO NASN A LESTINA

DAT AO ALAGGAG D A NAO

NAN JOSE1 -ITOLAN

- oe ISM FER AH

ITOL PA MJKJ shy c

HA COC

M X IWSN ROA DS UVOANGAN

CAANN RAILROADmIsI PROJECT ROADS BAGATAO O

fBicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 32

Minalabac-AntipoloHubo Road Project

Sub-Project No 4

Prepared By Submitted By

ltlsEngr AMA E BANDELARIAes gr Depu Project Manager

PROGRESS REPORT NO 52 September 1981

PROJECT MINALABAC-ANTIPOLOHUBO ROAD

Sub-Project No 4Under Contract byl Polytrade ConstructionInc

1 GENERAL

This project consists of the construction of

a Minalabac-ntipolo-Hubo secondary road from the beginning of the project at the municipality of Minalabac Camarines Sur Sta 0 + 000 to the barrio

of Hubo Minalabac the end of the project at Sta 8 + 83894 oi a length of 883894 kilometers

b Antipolo-Lupi-San Fernando feeder road no 401 Sta 0 + 008 to Sta 5 + 13653 or a length of 512853

c Hubo-Baliwag Nuevo feeder road no 4029 Sta 0 + 00200

to Sta 2 + 62044 or a length of 261844 kms d Hubo-Bagolatao feeder road no 403 Sta 0 + 000 to

Sta 7 + 66174 or a length of 7661 kmc

The total length of the project is 2424765 kms The total amount of the project including approved change

order is P 1444325420

2 WORK P ER__RESS

On Secondary Road asphalt paving work during the month has been limited to only aboujt 3j050 sqm or about 500 lineal meters due to heavy rains caused by typhoon Rubing which struck Bicol Region last September 17 1981 never allowing the ground to become dry Up to this writing the ground is still unwork-

I - 1shy

able more so on asphalt paving work

Suspension orders have been issued to the contractor and until

the present the contractor has been given extensions of + ne due to unwcrkable weather The estimated expiry date of the

contract is now October 10 1981

Weather permitting the contractor has still plenty of time to

finish paving work on about 3050 sqm or about 5C) lincal meters which is the only remaining itam of work to complete the

project

Sta 0 + 785 to Sta 0 + 915 or a length of about 130 linep meters has become an exception due to the construction of a bridge a Post tensioned 90 ft bridge across the cut-off

channel at Minalabac

As built plans have already been prepared and readied for bo)th Secondary and Feeder Roads Due to approved change orders a large volume of Item 107 108 and some riprap on the bridge

approaches have to be incorporated in the as built plans There are also additional lines of RC pipes that were instal-led to suit actual field conditions The contractor is expect

to claim for such (ditional changes

-2 shy

--

- - - - - - - -

--------

----------

- -

------------

- ----

GenralPercn- o ok Acco 1ished

I Minalabac-Antipolo-Hubo Secondary Road - - - 6179 2 401 - Antipclo-Lupi-San Fernando -i----364

3 402 - Hubo-Baliwag Road - - - ------shy

4 403 - lfubo-Bagolatao Road ----------

To t al - - - - --

Percent Time elapsed 9469----

A Secondary Road

(I) Minalabac-Antipolo-Huio Road Sta 0 + 000 to Sta 8

83894

Subgrade shy 85 kms

Subbase - - - kms

Base Course --------- 49 kmo Asphalt shy -- 29890 sqm

B Feeder Roads

(I) Antipolo-LupiSan Fernando (401)

Sta 0 + 000 - Sta 5 + 13653

Subgrade shy 5120 kms

Subbase ---- 30 kms

(2) Hubo-Baliwat (77402) Sta 0 + 000 - Sta 2 + 62044 Subgrade - - - - - - 262 kms

Subbase------------ 23 kms (3) Hubo-Bapolatao (403) Sta 0 + 000 to Sta 7 + 6617

Subgrde 7648 kms

Subba3e 7-------- kms

- 3 shy

7UCIRY OF P7 ILAlL aCOOiPLICjflTS (-Is of Sept-ber 1981) a) Iead Sconary Ror] Peeler Roads

Subgrad e 85 kmis 15388 Jws

Su4 se 85 klas 1420 La-e 49 krms ione

Pavement 19890 r r Wone

The surficin of feerle roars will be the subbase

it-e-f Item 1OC

b) ricrvpes

a) BRoloo BridgeT () spans) - sub-structure vith

super structure

coipleted b) Iato lridge - (one span) -Substruture In supershy

structure completed c) Timber Trestle (3 spans) - subtructure and supershy

s ructutre completed

-4 shy

ACTIVITIES DUR TG T-Ef IOI (August 26 - Sept 25 1981)

Secondry Road

Item 200 - Dase Course

I-Th linl oprearlin[ and compoctinf on the following

Stations Sta 0 + 500 - 0 + 700

Item 302 - ledium Cut-back Asplelt Grade IC for Bituminous

Prime Coat

Delivered - 45 metric tons

Applied - shy - 435 liters

Item 314-1 -rerete 1rterials for 7T

(Hot Asplalt type)

-635 cum

Item 314-3 15-100 Penetr tion Asphalt cement for DST (hot

A plha It Type)

Delivered shy - --100 metric tons

Per kilometer shy 183 metric tons

Paved shy - - 49 ]Ms

Feeder Roads

FR 01 - Antipol6-Lupi-Sen Fermando

1 Road maintenance Haulinp sprealing and comp sing of Ite 107( nd 10

3 Construction of Heac1ralls foi CPs

4 Ditching

FR 402 - Huio-lali1ag Nuevo

1 Road ma inte-ance

9 N uling spreading and compacting of Item 108

-5shy

3 Conctruction of headwalls for RCPs

FR 403 -Hubo-a rohlatao

I Road -maintenance

2 Re--infst-llation of the two () lines of 4810

RCP cn St 1 + 050

3 Construction of headwalls for RCP

SURVEY l0R I95

Checking of horizontal and vertical costrols blue-toppings

cross sectiouing and placing of Invert Elevations for IICP

under supervi-ion by the consultants for both secondary and

feeder roads

LWTERIALS

Field Density Te3ts gradijng of materials P-nd other necess-ary testing of materials were also done by the contrictor beforeas under direct supervision by the consu]itmts on both the seconshy

dary and feeder roads

Erluipment of the contractor are also spot-checked by the consultants to sce if they are still safe and sound for use

in the project

- 6shy

STUSOFLARATORY TESTS

Project Sub-Project No 4 Package -i Secondary RoadMinalabac Cumavrines Su-

4A 2 R A L 8 Tctal esti- Noof TestsNoofTes ant1 -2- On file Blance

105 Ildway di Drah- 15500 cum$ 0GD-

amp P 52 -e -11 Camp P-11 None

y-t a-Vatij)r I D 3 3 ei06 Pxcag Jor ue- 70Q er p 1C 0 IT

I COre P-1

107 D-42 D-318~ D-2Common Borrow 1 02I5OcuC 0 29 1 1C - 176 None

- i 1an

amp 9-86 0 ampP-15110 Fcun-Jiation Ill 50cu - 10 D0- 1 None CGamp F - I CG amp P-1 None

200- gWi- Ease Course 75C cum D- 5 -21 D 9 - 2 CGampP-19i~ C G--6i 1-C-

Abr-ssion Specific

brassion 302 Medjiu cjril

cut-back

usphalt Grade sitP-rime Coat 51MT Q- 5 Q - 5314-3 05-100 pene f

none5 eccznmnt for 7RST I

(1ot Aspal Typo) 110212I 1 I 402i25

- IPre-cas Coc-1 3 96 L M PTC - 1

rete j~ies FTC shy

405 CongClas A 558 cum I9831 bags Q-3 or PTC

None Q - 3 None

Pine Ag 294 cum -I1 -4Coarse Agt I Q-1 G-1 N376 cumq Q-I G-6 I 01oeWater406 Rein Step Cert Cert I None457 5 kg Noon e Q-1 easizel Q-1 easite lone413 Reinf Conc pipes 090jv1 279( LM[ I- I2 -- 411 IRIR -- j11 I2M TP -3500 Grouted riprap

I 55 IR -35_pA arkers 1t011 11 PO 5 a d - 31 fI

l~~rojeo~alaa 0 20f1iol FerndoI I e A I -Lu)i-Sa9n tests~-~2t~~ 14 A T E R I A L S 2otaJl estimatedNo o2 test

oo

of tets

105 Rdway c Draina I 137 0 0cuiu)e D 50 1 D -Excavation IC lC amp P-1 I CG ampP-7 iNone 106 JTcavation for 530 cuui D - I 18 ructure D -I CG P-1I 0 amp P-I Non 107 Coumwon Jorrow - cum I

D 7010 None A - 7)200 cLm D -IJ D - 52C(ourse P - 2 icG amp P-28 NoneDshy

110 Founclation Fill 40 cum D - 1 D - I None CG P-I CCP-1

401 Tirber Trestle I spans IR II I I T R 402-25 le-ca st c onc- Irete piles 168 Lii i1 or PTC I PC-1I 40 2

I i I lone

- 2 5a ornc test c or1ea PI -o- ITone 413 Rein Concpipes I 060H 6L1 1-IR-I I0901I - I16L4 I - IJ - 2 11201i 57L1 Ri -Th - 8 I lR- 3

57L 406 Rfe nf eel

I I I ea si0eO-1 easize loneII I I

51l l RS~ 166ea I I IR _ I - I

JoteArditiot l fiell and Wboratorv tests weeconductes for Item 105 clue to chane (orrier) involume form the princitnl uantity

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 2: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

TABLE Op CONTENTS

MINALABAC-ANTIPOLOT_UJBO ROAD PROJECT Sub-Project No 4

Figure I Location Plan (For 3 Projects)Progress Report Weather Report a ooaa 1 aEmployment Generation ourvey (ss5) 17

Contractors Staff (Annex A) Polytrade Const 18

Employment Generation Survey (SS53) Inc o 19

Contractors Staff (Genaro Reyes Const) 20 Construction List of Heavy Equipments

21 aConstruction List of Laboratory Equipments (Annex

C) deg

0 23 Schedule of Work (Annex D)

2 o Manpower Schedule Consultants taff forConstruction Supervision (Annex E)

PILI-MATAOROC aOAD PROJECT Sub-Project No 5

Progress Report o o bull bull 1 -

PALISTINA-SAN ANTONIO-MINALABAC ROAD PROJECT Sub-Project No 6

Progress Report Weather Report -Employment Generation Survey 8 a 9Contractors Staff (Annex A)

amp a Construction List of Heavy Equipment

10 13

- 16

- 22

- 26

12

_______

_FIGURE

RICOL RIVER BASIN DEVELOPMENT PROJECT SECONDARY AND FEEDER ROADS

CAMARINES SUR

PACKAGE No I

HU1

TO LUCENA - 1 -u~o

POCOT ~ gteARCELONETA

SAN MIGUEL BAY ALAO

to 4 BALCNGLY op

-t

ALAaL (p

LIAN3A CA -r V t~UANAN~~~C

_S YUWIANP QUIPAYO

- UNING -- -CAW shy

AL AG I AO Ch 6A C NW shy

0~ CAROLIN

MAMSULO NUEVO SAN BATANG4 C_-CAK AW

PAM PLO NASN A LESTINA

DAT AO ALAGGAG D A NAO

NAN JOSE1 -ITOLAN

- oe ISM FER AH

ITOL PA MJKJ shy c

HA COC

M X IWSN ROA DS UVOANGAN

CAANN RAILROADmIsI PROJECT ROADS BAGATAO O

fBicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 32

Minalabac-AntipoloHubo Road Project

Sub-Project No 4

Prepared By Submitted By

ltlsEngr AMA E BANDELARIAes gr Depu Project Manager

PROGRESS REPORT NO 52 September 1981

PROJECT MINALABAC-ANTIPOLOHUBO ROAD

Sub-Project No 4Under Contract byl Polytrade ConstructionInc

1 GENERAL

This project consists of the construction of

a Minalabac-ntipolo-Hubo secondary road from the beginning of the project at the municipality of Minalabac Camarines Sur Sta 0 + 000 to the barrio

of Hubo Minalabac the end of the project at Sta 8 + 83894 oi a length of 883894 kilometers

b Antipolo-Lupi-San Fernando feeder road no 401 Sta 0 + 008 to Sta 5 + 13653 or a length of 512853

c Hubo-Baliwag Nuevo feeder road no 4029 Sta 0 + 00200

to Sta 2 + 62044 or a length of 261844 kms d Hubo-Bagolatao feeder road no 403 Sta 0 + 000 to

Sta 7 + 66174 or a length of 7661 kmc

The total length of the project is 2424765 kms The total amount of the project including approved change

order is P 1444325420

2 WORK P ER__RESS

On Secondary Road asphalt paving work during the month has been limited to only aboujt 3j050 sqm or about 500 lineal meters due to heavy rains caused by typhoon Rubing which struck Bicol Region last September 17 1981 never allowing the ground to become dry Up to this writing the ground is still unwork-

I - 1shy

able more so on asphalt paving work

Suspension orders have been issued to the contractor and until

the present the contractor has been given extensions of + ne due to unwcrkable weather The estimated expiry date of the

contract is now October 10 1981

Weather permitting the contractor has still plenty of time to

finish paving work on about 3050 sqm or about 5C) lincal meters which is the only remaining itam of work to complete the

project

Sta 0 + 785 to Sta 0 + 915 or a length of about 130 linep meters has become an exception due to the construction of a bridge a Post tensioned 90 ft bridge across the cut-off

channel at Minalabac

As built plans have already been prepared and readied for bo)th Secondary and Feeder Roads Due to approved change orders a large volume of Item 107 108 and some riprap on the bridge

approaches have to be incorporated in the as built plans There are also additional lines of RC pipes that were instal-led to suit actual field conditions The contractor is expect

to claim for such (ditional changes

-2 shy

--

- - - - - - - -

--------

----------

- -

------------

- ----

GenralPercn- o ok Acco 1ished

I Minalabac-Antipolo-Hubo Secondary Road - - - 6179 2 401 - Antipclo-Lupi-San Fernando -i----364

3 402 - Hubo-Baliwag Road - - - ------shy

4 403 - lfubo-Bagolatao Road ----------

To t al - - - - --

Percent Time elapsed 9469----

A Secondary Road

(I) Minalabac-Antipolo-Huio Road Sta 0 + 000 to Sta 8

83894

Subgrade shy 85 kms

Subbase - - - kms

Base Course --------- 49 kmo Asphalt shy -- 29890 sqm

B Feeder Roads

(I) Antipolo-LupiSan Fernando (401)

Sta 0 + 000 - Sta 5 + 13653

Subgrade shy 5120 kms

Subbase ---- 30 kms

(2) Hubo-Baliwat (77402) Sta 0 + 000 - Sta 2 + 62044 Subgrade - - - - - - 262 kms

Subbase------------ 23 kms (3) Hubo-Bapolatao (403) Sta 0 + 000 to Sta 7 + 6617

Subgrde 7648 kms

Subba3e 7-------- kms

- 3 shy

7UCIRY OF P7 ILAlL aCOOiPLICjflTS (-Is of Sept-ber 1981) a) Iead Sconary Ror] Peeler Roads

Subgrad e 85 kmis 15388 Jws

Su4 se 85 klas 1420 La-e 49 krms ione

Pavement 19890 r r Wone

The surficin of feerle roars will be the subbase

it-e-f Item 1OC

b) ricrvpes

a) BRoloo BridgeT () spans) - sub-structure vith

super structure

coipleted b) Iato lridge - (one span) -Substruture In supershy

structure completed c) Timber Trestle (3 spans) - subtructure and supershy

s ructutre completed

-4 shy

ACTIVITIES DUR TG T-Ef IOI (August 26 - Sept 25 1981)

Secondry Road

Item 200 - Dase Course

I-Th linl oprearlin[ and compoctinf on the following

Stations Sta 0 + 500 - 0 + 700

Item 302 - ledium Cut-back Asplelt Grade IC for Bituminous

Prime Coat

Delivered - 45 metric tons

Applied - shy - 435 liters

Item 314-1 -rerete 1rterials for 7T

(Hot Asplalt type)

-635 cum

Item 314-3 15-100 Penetr tion Asphalt cement for DST (hot

A plha It Type)

Delivered shy - --100 metric tons

Per kilometer shy 183 metric tons

Paved shy - - 49 ]Ms

Feeder Roads

FR 01 - Antipol6-Lupi-Sen Fermando

1 Road maintenance Haulinp sprealing and comp sing of Ite 107( nd 10

3 Construction of Heac1ralls foi CPs

4 Ditching

FR 402 - Huio-lali1ag Nuevo

1 Road ma inte-ance

9 N uling spreading and compacting of Item 108

-5shy

3 Conctruction of headwalls for RCPs

FR 403 -Hubo-a rohlatao

I Road -maintenance

2 Re--infst-llation of the two () lines of 4810

RCP cn St 1 + 050

3 Construction of headwalls for RCP

SURVEY l0R I95

Checking of horizontal and vertical costrols blue-toppings

cross sectiouing and placing of Invert Elevations for IICP

under supervi-ion by the consultants for both secondary and

feeder roads

LWTERIALS

Field Density Te3ts gradijng of materials P-nd other necess-ary testing of materials were also done by the contrictor beforeas under direct supervision by the consu]itmts on both the seconshy

dary and feeder roads

Erluipment of the contractor are also spot-checked by the consultants to sce if they are still safe and sound for use

in the project

- 6shy

STUSOFLARATORY TESTS

Project Sub-Project No 4 Package -i Secondary RoadMinalabac Cumavrines Su-

4A 2 R A L 8 Tctal esti- Noof TestsNoofTes ant1 -2- On file Blance

105 Ildway di Drah- 15500 cum$ 0GD-

amp P 52 -e -11 Camp P-11 None

y-t a-Vatij)r I D 3 3 ei06 Pxcag Jor ue- 70Q er p 1C 0 IT

I COre P-1

107 D-42 D-318~ D-2Common Borrow 1 02I5OcuC 0 29 1 1C - 176 None

- i 1an

amp 9-86 0 ampP-15110 Fcun-Jiation Ill 50cu - 10 D0- 1 None CGamp F - I CG amp P-1 None

200- gWi- Ease Course 75C cum D- 5 -21 D 9 - 2 CGampP-19i~ C G--6i 1-C-

Abr-ssion Specific

brassion 302 Medjiu cjril

cut-back

usphalt Grade sitP-rime Coat 51MT Q- 5 Q - 5314-3 05-100 pene f

none5 eccznmnt for 7RST I

(1ot Aspal Typo) 110212I 1 I 402i25

- IPre-cas Coc-1 3 96 L M PTC - 1

rete j~ies FTC shy

405 CongClas A 558 cum I9831 bags Q-3 or PTC

None Q - 3 None

Pine Ag 294 cum -I1 -4Coarse Agt I Q-1 G-1 N376 cumq Q-I G-6 I 01oeWater406 Rein Step Cert Cert I None457 5 kg Noon e Q-1 easizel Q-1 easite lone413 Reinf Conc pipes 090jv1 279( LM[ I- I2 -- 411 IRIR -- j11 I2M TP -3500 Grouted riprap

I 55 IR -35_pA arkers 1t011 11 PO 5 a d - 31 fI

l~~rojeo~alaa 0 20f1iol FerndoI I e A I -Lu)i-Sa9n tests~-~2t~~ 14 A T E R I A L S 2otaJl estimatedNo o2 test

oo

of tets

105 Rdway c Draina I 137 0 0cuiu)e D 50 1 D -Excavation IC lC amp P-1 I CG ampP-7 iNone 106 JTcavation for 530 cuui D - I 18 ructure D -I CG P-1I 0 amp P-I Non 107 Coumwon Jorrow - cum I

D 7010 None A - 7)200 cLm D -IJ D - 52C(ourse P - 2 icG amp P-28 NoneDshy

110 Founclation Fill 40 cum D - 1 D - I None CG P-I CCP-1

401 Tirber Trestle I spans IR II I I T R 402-25 le-ca st c onc- Irete piles 168 Lii i1 or PTC I PC-1I 40 2

I i I lone

- 2 5a ornc test c or1ea PI -o- ITone 413 Rein Concpipes I 060H 6L1 1-IR-I I0901I - I16L4 I - IJ - 2 11201i 57L1 Ri -Th - 8 I lR- 3

57L 406 Rfe nf eel

I I I ea si0eO-1 easize loneII I I

51l l RS~ 166ea I I IR _ I - I

JoteArditiot l fiell and Wboratorv tests weeconductes for Item 105 clue to chane (orrier) involume form the princitnl uantity

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 3: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

_______

_FIGURE

RICOL RIVER BASIN DEVELOPMENT PROJECT SECONDARY AND FEEDER ROADS

CAMARINES SUR

PACKAGE No I

HU1

TO LUCENA - 1 -u~o

POCOT ~ gteARCELONETA

SAN MIGUEL BAY ALAO

to 4 BALCNGLY op

-t

ALAaL (p

LIAN3A CA -r V t~UANAN~~~C

_S YUWIANP QUIPAYO

- UNING -- -CAW shy

AL AG I AO Ch 6A C NW shy

0~ CAROLIN

MAMSULO NUEVO SAN BATANG4 C_-CAK AW

PAM PLO NASN A LESTINA

DAT AO ALAGGAG D A NAO

NAN JOSE1 -ITOLAN

- oe ISM FER AH

ITOL PA MJKJ shy c

HA COC

M X IWSN ROA DS UVOANGAN

CAANN RAILROADmIsI PROJECT ROADS BAGATAO O

fBicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 32

Minalabac-AntipoloHubo Road Project

Sub-Project No 4

Prepared By Submitted By

ltlsEngr AMA E BANDELARIAes gr Depu Project Manager

PROGRESS REPORT NO 52 September 1981

PROJECT MINALABAC-ANTIPOLOHUBO ROAD

Sub-Project No 4Under Contract byl Polytrade ConstructionInc

1 GENERAL

This project consists of the construction of

a Minalabac-ntipolo-Hubo secondary road from the beginning of the project at the municipality of Minalabac Camarines Sur Sta 0 + 000 to the barrio

of Hubo Minalabac the end of the project at Sta 8 + 83894 oi a length of 883894 kilometers

b Antipolo-Lupi-San Fernando feeder road no 401 Sta 0 + 008 to Sta 5 + 13653 or a length of 512853

c Hubo-Baliwag Nuevo feeder road no 4029 Sta 0 + 00200

to Sta 2 + 62044 or a length of 261844 kms d Hubo-Bagolatao feeder road no 403 Sta 0 + 000 to

Sta 7 + 66174 or a length of 7661 kmc

The total length of the project is 2424765 kms The total amount of the project including approved change

order is P 1444325420

2 WORK P ER__RESS

On Secondary Road asphalt paving work during the month has been limited to only aboujt 3j050 sqm or about 500 lineal meters due to heavy rains caused by typhoon Rubing which struck Bicol Region last September 17 1981 never allowing the ground to become dry Up to this writing the ground is still unwork-

I - 1shy

able more so on asphalt paving work

Suspension orders have been issued to the contractor and until

the present the contractor has been given extensions of + ne due to unwcrkable weather The estimated expiry date of the

contract is now October 10 1981

Weather permitting the contractor has still plenty of time to

finish paving work on about 3050 sqm or about 5C) lincal meters which is the only remaining itam of work to complete the

project

Sta 0 + 785 to Sta 0 + 915 or a length of about 130 linep meters has become an exception due to the construction of a bridge a Post tensioned 90 ft bridge across the cut-off

channel at Minalabac

As built plans have already been prepared and readied for bo)th Secondary and Feeder Roads Due to approved change orders a large volume of Item 107 108 and some riprap on the bridge

approaches have to be incorporated in the as built plans There are also additional lines of RC pipes that were instal-led to suit actual field conditions The contractor is expect

to claim for such (ditional changes

-2 shy

--

- - - - - - - -

--------

----------

- -

------------

- ----

GenralPercn- o ok Acco 1ished

I Minalabac-Antipolo-Hubo Secondary Road - - - 6179 2 401 - Antipclo-Lupi-San Fernando -i----364

3 402 - Hubo-Baliwag Road - - - ------shy

4 403 - lfubo-Bagolatao Road ----------

To t al - - - - --

Percent Time elapsed 9469----

A Secondary Road

(I) Minalabac-Antipolo-Huio Road Sta 0 + 000 to Sta 8

83894

Subgrade shy 85 kms

Subbase - - - kms

Base Course --------- 49 kmo Asphalt shy -- 29890 sqm

B Feeder Roads

(I) Antipolo-LupiSan Fernando (401)

Sta 0 + 000 - Sta 5 + 13653

Subgrade shy 5120 kms

Subbase ---- 30 kms

(2) Hubo-Baliwat (77402) Sta 0 + 000 - Sta 2 + 62044 Subgrade - - - - - - 262 kms

Subbase------------ 23 kms (3) Hubo-Bapolatao (403) Sta 0 + 000 to Sta 7 + 6617

Subgrde 7648 kms

Subba3e 7-------- kms

- 3 shy

7UCIRY OF P7 ILAlL aCOOiPLICjflTS (-Is of Sept-ber 1981) a) Iead Sconary Ror] Peeler Roads

Subgrad e 85 kmis 15388 Jws

Su4 se 85 klas 1420 La-e 49 krms ione

Pavement 19890 r r Wone

The surficin of feerle roars will be the subbase

it-e-f Item 1OC

b) ricrvpes

a) BRoloo BridgeT () spans) - sub-structure vith

super structure

coipleted b) Iato lridge - (one span) -Substruture In supershy

structure completed c) Timber Trestle (3 spans) - subtructure and supershy

s ructutre completed

-4 shy

ACTIVITIES DUR TG T-Ef IOI (August 26 - Sept 25 1981)

Secondry Road

Item 200 - Dase Course

I-Th linl oprearlin[ and compoctinf on the following

Stations Sta 0 + 500 - 0 + 700

Item 302 - ledium Cut-back Asplelt Grade IC for Bituminous

Prime Coat

Delivered - 45 metric tons

Applied - shy - 435 liters

Item 314-1 -rerete 1rterials for 7T

(Hot Asplalt type)

-635 cum

Item 314-3 15-100 Penetr tion Asphalt cement for DST (hot

A plha It Type)

Delivered shy - --100 metric tons

Per kilometer shy 183 metric tons

Paved shy - - 49 ]Ms

Feeder Roads

FR 01 - Antipol6-Lupi-Sen Fermando

1 Road maintenance Haulinp sprealing and comp sing of Ite 107( nd 10

3 Construction of Heac1ralls foi CPs

4 Ditching

FR 402 - Huio-lali1ag Nuevo

1 Road ma inte-ance

9 N uling spreading and compacting of Item 108

-5shy

3 Conctruction of headwalls for RCPs

FR 403 -Hubo-a rohlatao

I Road -maintenance

2 Re--infst-llation of the two () lines of 4810

RCP cn St 1 + 050

3 Construction of headwalls for RCP

SURVEY l0R I95

Checking of horizontal and vertical costrols blue-toppings

cross sectiouing and placing of Invert Elevations for IICP

under supervi-ion by the consultants for both secondary and

feeder roads

LWTERIALS

Field Density Te3ts gradijng of materials P-nd other necess-ary testing of materials were also done by the contrictor beforeas under direct supervision by the consu]itmts on both the seconshy

dary and feeder roads

Erluipment of the contractor are also spot-checked by the consultants to sce if they are still safe and sound for use

in the project

- 6shy

STUSOFLARATORY TESTS

Project Sub-Project No 4 Package -i Secondary RoadMinalabac Cumavrines Su-

4A 2 R A L 8 Tctal esti- Noof TestsNoofTes ant1 -2- On file Blance

105 Ildway di Drah- 15500 cum$ 0GD-

amp P 52 -e -11 Camp P-11 None

y-t a-Vatij)r I D 3 3 ei06 Pxcag Jor ue- 70Q er p 1C 0 IT

I COre P-1

107 D-42 D-318~ D-2Common Borrow 1 02I5OcuC 0 29 1 1C - 176 None

- i 1an

amp 9-86 0 ampP-15110 Fcun-Jiation Ill 50cu - 10 D0- 1 None CGamp F - I CG amp P-1 None

200- gWi- Ease Course 75C cum D- 5 -21 D 9 - 2 CGampP-19i~ C G--6i 1-C-

Abr-ssion Specific

brassion 302 Medjiu cjril

cut-back

usphalt Grade sitP-rime Coat 51MT Q- 5 Q - 5314-3 05-100 pene f

none5 eccznmnt for 7RST I

(1ot Aspal Typo) 110212I 1 I 402i25

- IPre-cas Coc-1 3 96 L M PTC - 1

rete j~ies FTC shy

405 CongClas A 558 cum I9831 bags Q-3 or PTC

None Q - 3 None

Pine Ag 294 cum -I1 -4Coarse Agt I Q-1 G-1 N376 cumq Q-I G-6 I 01oeWater406 Rein Step Cert Cert I None457 5 kg Noon e Q-1 easizel Q-1 easite lone413 Reinf Conc pipes 090jv1 279( LM[ I- I2 -- 411 IRIR -- j11 I2M TP -3500 Grouted riprap

I 55 IR -35_pA arkers 1t011 11 PO 5 a d - 31 fI

l~~rojeo~alaa 0 20f1iol FerndoI I e A I -Lu)i-Sa9n tests~-~2t~~ 14 A T E R I A L S 2otaJl estimatedNo o2 test

oo

of tets

105 Rdway c Draina I 137 0 0cuiu)e D 50 1 D -Excavation IC lC amp P-1 I CG ampP-7 iNone 106 JTcavation for 530 cuui D - I 18 ructure D -I CG P-1I 0 amp P-I Non 107 Coumwon Jorrow - cum I

D 7010 None A - 7)200 cLm D -IJ D - 52C(ourse P - 2 icG amp P-28 NoneDshy

110 Founclation Fill 40 cum D - 1 D - I None CG P-I CCP-1

401 Tirber Trestle I spans IR II I I T R 402-25 le-ca st c onc- Irete piles 168 Lii i1 or PTC I PC-1I 40 2

I i I lone

- 2 5a ornc test c or1ea PI -o- ITone 413 Rein Concpipes I 060H 6L1 1-IR-I I0901I - I16L4 I - IJ - 2 11201i 57L1 Ri -Th - 8 I lR- 3

57L 406 Rfe nf eel

I I I ea si0eO-1 easize loneII I I

51l l RS~ 166ea I I IR _ I - I

JoteArditiot l fiell and Wboratorv tests weeconductes for Item 105 clue to chane (orrier) involume form the princitnl uantity

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 4: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

fBicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 32

Minalabac-AntipoloHubo Road Project

Sub-Project No 4

Prepared By Submitted By

ltlsEngr AMA E BANDELARIAes gr Depu Project Manager

PROGRESS REPORT NO 52 September 1981

PROJECT MINALABAC-ANTIPOLOHUBO ROAD

Sub-Project No 4Under Contract byl Polytrade ConstructionInc

1 GENERAL

This project consists of the construction of

a Minalabac-ntipolo-Hubo secondary road from the beginning of the project at the municipality of Minalabac Camarines Sur Sta 0 + 000 to the barrio

of Hubo Minalabac the end of the project at Sta 8 + 83894 oi a length of 883894 kilometers

b Antipolo-Lupi-San Fernando feeder road no 401 Sta 0 + 008 to Sta 5 + 13653 or a length of 512853

c Hubo-Baliwag Nuevo feeder road no 4029 Sta 0 + 00200

to Sta 2 + 62044 or a length of 261844 kms d Hubo-Bagolatao feeder road no 403 Sta 0 + 000 to

Sta 7 + 66174 or a length of 7661 kmc

The total length of the project is 2424765 kms The total amount of the project including approved change

order is P 1444325420

2 WORK P ER__RESS

On Secondary Road asphalt paving work during the month has been limited to only aboujt 3j050 sqm or about 500 lineal meters due to heavy rains caused by typhoon Rubing which struck Bicol Region last September 17 1981 never allowing the ground to become dry Up to this writing the ground is still unwork-

I - 1shy

able more so on asphalt paving work

Suspension orders have been issued to the contractor and until

the present the contractor has been given extensions of + ne due to unwcrkable weather The estimated expiry date of the

contract is now October 10 1981

Weather permitting the contractor has still plenty of time to

finish paving work on about 3050 sqm or about 5C) lincal meters which is the only remaining itam of work to complete the

project

Sta 0 + 785 to Sta 0 + 915 or a length of about 130 linep meters has become an exception due to the construction of a bridge a Post tensioned 90 ft bridge across the cut-off

channel at Minalabac

As built plans have already been prepared and readied for bo)th Secondary and Feeder Roads Due to approved change orders a large volume of Item 107 108 and some riprap on the bridge

approaches have to be incorporated in the as built plans There are also additional lines of RC pipes that were instal-led to suit actual field conditions The contractor is expect

to claim for such (ditional changes

-2 shy

--

- - - - - - - -

--------

----------

- -

------------

- ----

GenralPercn- o ok Acco 1ished

I Minalabac-Antipolo-Hubo Secondary Road - - - 6179 2 401 - Antipclo-Lupi-San Fernando -i----364

3 402 - Hubo-Baliwag Road - - - ------shy

4 403 - lfubo-Bagolatao Road ----------

To t al - - - - --

Percent Time elapsed 9469----

A Secondary Road

(I) Minalabac-Antipolo-Huio Road Sta 0 + 000 to Sta 8

83894

Subgrade shy 85 kms

Subbase - - - kms

Base Course --------- 49 kmo Asphalt shy -- 29890 sqm

B Feeder Roads

(I) Antipolo-LupiSan Fernando (401)

Sta 0 + 000 - Sta 5 + 13653

Subgrade shy 5120 kms

Subbase ---- 30 kms

(2) Hubo-Baliwat (77402) Sta 0 + 000 - Sta 2 + 62044 Subgrade - - - - - - 262 kms

Subbase------------ 23 kms (3) Hubo-Bapolatao (403) Sta 0 + 000 to Sta 7 + 6617

Subgrde 7648 kms

Subba3e 7-------- kms

- 3 shy

7UCIRY OF P7 ILAlL aCOOiPLICjflTS (-Is of Sept-ber 1981) a) Iead Sconary Ror] Peeler Roads

Subgrad e 85 kmis 15388 Jws

Su4 se 85 klas 1420 La-e 49 krms ione

Pavement 19890 r r Wone

The surficin of feerle roars will be the subbase

it-e-f Item 1OC

b) ricrvpes

a) BRoloo BridgeT () spans) - sub-structure vith

super structure

coipleted b) Iato lridge - (one span) -Substruture In supershy

structure completed c) Timber Trestle (3 spans) - subtructure and supershy

s ructutre completed

-4 shy

ACTIVITIES DUR TG T-Ef IOI (August 26 - Sept 25 1981)

Secondry Road

Item 200 - Dase Course

I-Th linl oprearlin[ and compoctinf on the following

Stations Sta 0 + 500 - 0 + 700

Item 302 - ledium Cut-back Asplelt Grade IC for Bituminous

Prime Coat

Delivered - 45 metric tons

Applied - shy - 435 liters

Item 314-1 -rerete 1rterials for 7T

(Hot Asplalt type)

-635 cum

Item 314-3 15-100 Penetr tion Asphalt cement for DST (hot

A plha It Type)

Delivered shy - --100 metric tons

Per kilometer shy 183 metric tons

Paved shy - - 49 ]Ms

Feeder Roads

FR 01 - Antipol6-Lupi-Sen Fermando

1 Road maintenance Haulinp sprealing and comp sing of Ite 107( nd 10

3 Construction of Heac1ralls foi CPs

4 Ditching

FR 402 - Huio-lali1ag Nuevo

1 Road ma inte-ance

9 N uling spreading and compacting of Item 108

-5shy

3 Conctruction of headwalls for RCPs

FR 403 -Hubo-a rohlatao

I Road -maintenance

2 Re--infst-llation of the two () lines of 4810

RCP cn St 1 + 050

3 Construction of headwalls for RCP

SURVEY l0R I95

Checking of horizontal and vertical costrols blue-toppings

cross sectiouing and placing of Invert Elevations for IICP

under supervi-ion by the consultants for both secondary and

feeder roads

LWTERIALS

Field Density Te3ts gradijng of materials P-nd other necess-ary testing of materials were also done by the contrictor beforeas under direct supervision by the consu]itmts on both the seconshy

dary and feeder roads

Erluipment of the contractor are also spot-checked by the consultants to sce if they are still safe and sound for use

in the project

- 6shy

STUSOFLARATORY TESTS

Project Sub-Project No 4 Package -i Secondary RoadMinalabac Cumavrines Su-

4A 2 R A L 8 Tctal esti- Noof TestsNoofTes ant1 -2- On file Blance

105 Ildway di Drah- 15500 cum$ 0GD-

amp P 52 -e -11 Camp P-11 None

y-t a-Vatij)r I D 3 3 ei06 Pxcag Jor ue- 70Q er p 1C 0 IT

I COre P-1

107 D-42 D-318~ D-2Common Borrow 1 02I5OcuC 0 29 1 1C - 176 None

- i 1an

amp 9-86 0 ampP-15110 Fcun-Jiation Ill 50cu - 10 D0- 1 None CGamp F - I CG amp P-1 None

200- gWi- Ease Course 75C cum D- 5 -21 D 9 - 2 CGampP-19i~ C G--6i 1-C-

Abr-ssion Specific

brassion 302 Medjiu cjril

cut-back

usphalt Grade sitP-rime Coat 51MT Q- 5 Q - 5314-3 05-100 pene f

none5 eccznmnt for 7RST I

(1ot Aspal Typo) 110212I 1 I 402i25

- IPre-cas Coc-1 3 96 L M PTC - 1

rete j~ies FTC shy

405 CongClas A 558 cum I9831 bags Q-3 or PTC

None Q - 3 None

Pine Ag 294 cum -I1 -4Coarse Agt I Q-1 G-1 N376 cumq Q-I G-6 I 01oeWater406 Rein Step Cert Cert I None457 5 kg Noon e Q-1 easizel Q-1 easite lone413 Reinf Conc pipes 090jv1 279( LM[ I- I2 -- 411 IRIR -- j11 I2M TP -3500 Grouted riprap

I 55 IR -35_pA arkers 1t011 11 PO 5 a d - 31 fI

l~~rojeo~alaa 0 20f1iol FerndoI I e A I -Lu)i-Sa9n tests~-~2t~~ 14 A T E R I A L S 2otaJl estimatedNo o2 test

oo

of tets

105 Rdway c Draina I 137 0 0cuiu)e D 50 1 D -Excavation IC lC amp P-1 I CG ampP-7 iNone 106 JTcavation for 530 cuui D - I 18 ructure D -I CG P-1I 0 amp P-I Non 107 Coumwon Jorrow - cum I

D 7010 None A - 7)200 cLm D -IJ D - 52C(ourse P - 2 icG amp P-28 NoneDshy

110 Founclation Fill 40 cum D - 1 D - I None CG P-I CCP-1

401 Tirber Trestle I spans IR II I I T R 402-25 le-ca st c onc- Irete piles 168 Lii i1 or PTC I PC-1I 40 2

I i I lone

- 2 5a ornc test c or1ea PI -o- ITone 413 Rein Concpipes I 060H 6L1 1-IR-I I0901I - I16L4 I - IJ - 2 11201i 57L1 Ri -Th - 8 I lR- 3

57L 406 Rfe nf eel

I I I ea si0eO-1 easize loneII I I

51l l RS~ 166ea I I IR _ I - I

JoteArditiot l fiell and Wboratorv tests weeconductes for Item 105 clue to chane (orrier) involume form the princitnl uantity

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 5: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

PROGRESS REPORT NO 52 September 1981

PROJECT MINALABAC-ANTIPOLOHUBO ROAD

Sub-Project No 4Under Contract byl Polytrade ConstructionInc

1 GENERAL

This project consists of the construction of

a Minalabac-ntipolo-Hubo secondary road from the beginning of the project at the municipality of Minalabac Camarines Sur Sta 0 + 000 to the barrio

of Hubo Minalabac the end of the project at Sta 8 + 83894 oi a length of 883894 kilometers

b Antipolo-Lupi-San Fernando feeder road no 401 Sta 0 + 008 to Sta 5 + 13653 or a length of 512853

c Hubo-Baliwag Nuevo feeder road no 4029 Sta 0 + 00200

to Sta 2 + 62044 or a length of 261844 kms d Hubo-Bagolatao feeder road no 403 Sta 0 + 000 to

Sta 7 + 66174 or a length of 7661 kmc

The total length of the project is 2424765 kms The total amount of the project including approved change

order is P 1444325420

2 WORK P ER__RESS

On Secondary Road asphalt paving work during the month has been limited to only aboujt 3j050 sqm or about 500 lineal meters due to heavy rains caused by typhoon Rubing which struck Bicol Region last September 17 1981 never allowing the ground to become dry Up to this writing the ground is still unwork-

I - 1shy

able more so on asphalt paving work

Suspension orders have been issued to the contractor and until

the present the contractor has been given extensions of + ne due to unwcrkable weather The estimated expiry date of the

contract is now October 10 1981

Weather permitting the contractor has still plenty of time to

finish paving work on about 3050 sqm or about 5C) lincal meters which is the only remaining itam of work to complete the

project

Sta 0 + 785 to Sta 0 + 915 or a length of about 130 linep meters has become an exception due to the construction of a bridge a Post tensioned 90 ft bridge across the cut-off

channel at Minalabac

As built plans have already been prepared and readied for bo)th Secondary and Feeder Roads Due to approved change orders a large volume of Item 107 108 and some riprap on the bridge

approaches have to be incorporated in the as built plans There are also additional lines of RC pipes that were instal-led to suit actual field conditions The contractor is expect

to claim for such (ditional changes

-2 shy

--

- - - - - - - -

--------

----------

- -

------------

- ----

GenralPercn- o ok Acco 1ished

I Minalabac-Antipolo-Hubo Secondary Road - - - 6179 2 401 - Antipclo-Lupi-San Fernando -i----364

3 402 - Hubo-Baliwag Road - - - ------shy

4 403 - lfubo-Bagolatao Road ----------

To t al - - - - --

Percent Time elapsed 9469----

A Secondary Road

(I) Minalabac-Antipolo-Huio Road Sta 0 + 000 to Sta 8

83894

Subgrade shy 85 kms

Subbase - - - kms

Base Course --------- 49 kmo Asphalt shy -- 29890 sqm

B Feeder Roads

(I) Antipolo-LupiSan Fernando (401)

Sta 0 + 000 - Sta 5 + 13653

Subgrade shy 5120 kms

Subbase ---- 30 kms

(2) Hubo-Baliwat (77402) Sta 0 + 000 - Sta 2 + 62044 Subgrade - - - - - - 262 kms

Subbase------------ 23 kms (3) Hubo-Bapolatao (403) Sta 0 + 000 to Sta 7 + 6617

Subgrde 7648 kms

Subba3e 7-------- kms

- 3 shy

7UCIRY OF P7 ILAlL aCOOiPLICjflTS (-Is of Sept-ber 1981) a) Iead Sconary Ror] Peeler Roads

Subgrad e 85 kmis 15388 Jws

Su4 se 85 klas 1420 La-e 49 krms ione

Pavement 19890 r r Wone

The surficin of feerle roars will be the subbase

it-e-f Item 1OC

b) ricrvpes

a) BRoloo BridgeT () spans) - sub-structure vith

super structure

coipleted b) Iato lridge - (one span) -Substruture In supershy

structure completed c) Timber Trestle (3 spans) - subtructure and supershy

s ructutre completed

-4 shy

ACTIVITIES DUR TG T-Ef IOI (August 26 - Sept 25 1981)

Secondry Road

Item 200 - Dase Course

I-Th linl oprearlin[ and compoctinf on the following

Stations Sta 0 + 500 - 0 + 700

Item 302 - ledium Cut-back Asplelt Grade IC for Bituminous

Prime Coat

Delivered - 45 metric tons

Applied - shy - 435 liters

Item 314-1 -rerete 1rterials for 7T

(Hot Asplalt type)

-635 cum

Item 314-3 15-100 Penetr tion Asphalt cement for DST (hot

A plha It Type)

Delivered shy - --100 metric tons

Per kilometer shy 183 metric tons

Paved shy - - 49 ]Ms

Feeder Roads

FR 01 - Antipol6-Lupi-Sen Fermando

1 Road maintenance Haulinp sprealing and comp sing of Ite 107( nd 10

3 Construction of Heac1ralls foi CPs

4 Ditching

FR 402 - Huio-lali1ag Nuevo

1 Road ma inte-ance

9 N uling spreading and compacting of Item 108

-5shy

3 Conctruction of headwalls for RCPs

FR 403 -Hubo-a rohlatao

I Road -maintenance

2 Re--infst-llation of the two () lines of 4810

RCP cn St 1 + 050

3 Construction of headwalls for RCP

SURVEY l0R I95

Checking of horizontal and vertical costrols blue-toppings

cross sectiouing and placing of Invert Elevations for IICP

under supervi-ion by the consultants for both secondary and

feeder roads

LWTERIALS

Field Density Te3ts gradijng of materials P-nd other necess-ary testing of materials were also done by the contrictor beforeas under direct supervision by the consu]itmts on both the seconshy

dary and feeder roads

Erluipment of the contractor are also spot-checked by the consultants to sce if they are still safe and sound for use

in the project

- 6shy

STUSOFLARATORY TESTS

Project Sub-Project No 4 Package -i Secondary RoadMinalabac Cumavrines Su-

4A 2 R A L 8 Tctal esti- Noof TestsNoofTes ant1 -2- On file Blance

105 Ildway di Drah- 15500 cum$ 0GD-

amp P 52 -e -11 Camp P-11 None

y-t a-Vatij)r I D 3 3 ei06 Pxcag Jor ue- 70Q er p 1C 0 IT

I COre P-1

107 D-42 D-318~ D-2Common Borrow 1 02I5OcuC 0 29 1 1C - 176 None

- i 1an

amp 9-86 0 ampP-15110 Fcun-Jiation Ill 50cu - 10 D0- 1 None CGamp F - I CG amp P-1 None

200- gWi- Ease Course 75C cum D- 5 -21 D 9 - 2 CGampP-19i~ C G--6i 1-C-

Abr-ssion Specific

brassion 302 Medjiu cjril

cut-back

usphalt Grade sitP-rime Coat 51MT Q- 5 Q - 5314-3 05-100 pene f

none5 eccznmnt for 7RST I

(1ot Aspal Typo) 110212I 1 I 402i25

- IPre-cas Coc-1 3 96 L M PTC - 1

rete j~ies FTC shy

405 CongClas A 558 cum I9831 bags Q-3 or PTC

None Q - 3 None

Pine Ag 294 cum -I1 -4Coarse Agt I Q-1 G-1 N376 cumq Q-I G-6 I 01oeWater406 Rein Step Cert Cert I None457 5 kg Noon e Q-1 easizel Q-1 easite lone413 Reinf Conc pipes 090jv1 279( LM[ I- I2 -- 411 IRIR -- j11 I2M TP -3500 Grouted riprap

I 55 IR -35_pA arkers 1t011 11 PO 5 a d - 31 fI

l~~rojeo~alaa 0 20f1iol FerndoI I e A I -Lu)i-Sa9n tests~-~2t~~ 14 A T E R I A L S 2otaJl estimatedNo o2 test

oo

of tets

105 Rdway c Draina I 137 0 0cuiu)e D 50 1 D -Excavation IC lC amp P-1 I CG ampP-7 iNone 106 JTcavation for 530 cuui D - I 18 ructure D -I CG P-1I 0 amp P-I Non 107 Coumwon Jorrow - cum I

D 7010 None A - 7)200 cLm D -IJ D - 52C(ourse P - 2 icG amp P-28 NoneDshy

110 Founclation Fill 40 cum D - 1 D - I None CG P-I CCP-1

401 Tirber Trestle I spans IR II I I T R 402-25 le-ca st c onc- Irete piles 168 Lii i1 or PTC I PC-1I 40 2

I i I lone

- 2 5a ornc test c or1ea PI -o- ITone 413 Rein Concpipes I 060H 6L1 1-IR-I I0901I - I16L4 I - IJ - 2 11201i 57L1 Ri -Th - 8 I lR- 3

57L 406 Rfe nf eel

I I I ea si0eO-1 easize loneII I I

51l l RS~ 166ea I I IR _ I - I

JoteArditiot l fiell and Wboratorv tests weeconductes for Item 105 clue to chane (orrier) involume form the princitnl uantity

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 6: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

able more so on asphalt paving work

Suspension orders have been issued to the contractor and until

the present the contractor has been given extensions of + ne due to unwcrkable weather The estimated expiry date of the

contract is now October 10 1981

Weather permitting the contractor has still plenty of time to

finish paving work on about 3050 sqm or about 5C) lincal meters which is the only remaining itam of work to complete the

project

Sta 0 + 785 to Sta 0 + 915 or a length of about 130 linep meters has become an exception due to the construction of a bridge a Post tensioned 90 ft bridge across the cut-off

channel at Minalabac

As built plans have already been prepared and readied for bo)th Secondary and Feeder Roads Due to approved change orders a large volume of Item 107 108 and some riprap on the bridge

approaches have to be incorporated in the as built plans There are also additional lines of RC pipes that were instal-led to suit actual field conditions The contractor is expect

to claim for such (ditional changes

-2 shy

--

- - - - - - - -

--------

----------

- -

------------

- ----

GenralPercn- o ok Acco 1ished

I Minalabac-Antipolo-Hubo Secondary Road - - - 6179 2 401 - Antipclo-Lupi-San Fernando -i----364

3 402 - Hubo-Baliwag Road - - - ------shy

4 403 - lfubo-Bagolatao Road ----------

To t al - - - - --

Percent Time elapsed 9469----

A Secondary Road

(I) Minalabac-Antipolo-Huio Road Sta 0 + 000 to Sta 8

83894

Subgrade shy 85 kms

Subbase - - - kms

Base Course --------- 49 kmo Asphalt shy -- 29890 sqm

B Feeder Roads

(I) Antipolo-LupiSan Fernando (401)

Sta 0 + 000 - Sta 5 + 13653

Subgrade shy 5120 kms

Subbase ---- 30 kms

(2) Hubo-Baliwat (77402) Sta 0 + 000 - Sta 2 + 62044 Subgrade - - - - - - 262 kms

Subbase------------ 23 kms (3) Hubo-Bapolatao (403) Sta 0 + 000 to Sta 7 + 6617

Subgrde 7648 kms

Subba3e 7-------- kms

- 3 shy

7UCIRY OF P7 ILAlL aCOOiPLICjflTS (-Is of Sept-ber 1981) a) Iead Sconary Ror] Peeler Roads

Subgrad e 85 kmis 15388 Jws

Su4 se 85 klas 1420 La-e 49 krms ione

Pavement 19890 r r Wone

The surficin of feerle roars will be the subbase

it-e-f Item 1OC

b) ricrvpes

a) BRoloo BridgeT () spans) - sub-structure vith

super structure

coipleted b) Iato lridge - (one span) -Substruture In supershy

structure completed c) Timber Trestle (3 spans) - subtructure and supershy

s ructutre completed

-4 shy

ACTIVITIES DUR TG T-Ef IOI (August 26 - Sept 25 1981)

Secondry Road

Item 200 - Dase Course

I-Th linl oprearlin[ and compoctinf on the following

Stations Sta 0 + 500 - 0 + 700

Item 302 - ledium Cut-back Asplelt Grade IC for Bituminous

Prime Coat

Delivered - 45 metric tons

Applied - shy - 435 liters

Item 314-1 -rerete 1rterials for 7T

(Hot Asplalt type)

-635 cum

Item 314-3 15-100 Penetr tion Asphalt cement for DST (hot

A plha It Type)

Delivered shy - --100 metric tons

Per kilometer shy 183 metric tons

Paved shy - - 49 ]Ms

Feeder Roads

FR 01 - Antipol6-Lupi-Sen Fermando

1 Road maintenance Haulinp sprealing and comp sing of Ite 107( nd 10

3 Construction of Heac1ralls foi CPs

4 Ditching

FR 402 - Huio-lali1ag Nuevo

1 Road ma inte-ance

9 N uling spreading and compacting of Item 108

-5shy

3 Conctruction of headwalls for RCPs

FR 403 -Hubo-a rohlatao

I Road -maintenance

2 Re--infst-llation of the two () lines of 4810

RCP cn St 1 + 050

3 Construction of headwalls for RCP

SURVEY l0R I95

Checking of horizontal and vertical costrols blue-toppings

cross sectiouing and placing of Invert Elevations for IICP

under supervi-ion by the consultants for both secondary and

feeder roads

LWTERIALS

Field Density Te3ts gradijng of materials P-nd other necess-ary testing of materials were also done by the contrictor beforeas under direct supervision by the consu]itmts on both the seconshy

dary and feeder roads

Erluipment of the contractor are also spot-checked by the consultants to sce if they are still safe and sound for use

in the project

- 6shy

STUSOFLARATORY TESTS

Project Sub-Project No 4 Package -i Secondary RoadMinalabac Cumavrines Su-

4A 2 R A L 8 Tctal esti- Noof TestsNoofTes ant1 -2- On file Blance

105 Ildway di Drah- 15500 cum$ 0GD-

amp P 52 -e -11 Camp P-11 None

y-t a-Vatij)r I D 3 3 ei06 Pxcag Jor ue- 70Q er p 1C 0 IT

I COre P-1

107 D-42 D-318~ D-2Common Borrow 1 02I5OcuC 0 29 1 1C - 176 None

- i 1an

amp 9-86 0 ampP-15110 Fcun-Jiation Ill 50cu - 10 D0- 1 None CGamp F - I CG amp P-1 None

200- gWi- Ease Course 75C cum D- 5 -21 D 9 - 2 CGampP-19i~ C G--6i 1-C-

Abr-ssion Specific

brassion 302 Medjiu cjril

cut-back

usphalt Grade sitP-rime Coat 51MT Q- 5 Q - 5314-3 05-100 pene f

none5 eccznmnt for 7RST I

(1ot Aspal Typo) 110212I 1 I 402i25

- IPre-cas Coc-1 3 96 L M PTC - 1

rete j~ies FTC shy

405 CongClas A 558 cum I9831 bags Q-3 or PTC

None Q - 3 None

Pine Ag 294 cum -I1 -4Coarse Agt I Q-1 G-1 N376 cumq Q-I G-6 I 01oeWater406 Rein Step Cert Cert I None457 5 kg Noon e Q-1 easizel Q-1 easite lone413 Reinf Conc pipes 090jv1 279( LM[ I- I2 -- 411 IRIR -- j11 I2M TP -3500 Grouted riprap

I 55 IR -35_pA arkers 1t011 11 PO 5 a d - 31 fI

l~~rojeo~alaa 0 20f1iol FerndoI I e A I -Lu)i-Sa9n tests~-~2t~~ 14 A T E R I A L S 2otaJl estimatedNo o2 test

oo

of tets

105 Rdway c Draina I 137 0 0cuiu)e D 50 1 D -Excavation IC lC amp P-1 I CG ampP-7 iNone 106 JTcavation for 530 cuui D - I 18 ructure D -I CG P-1I 0 amp P-I Non 107 Coumwon Jorrow - cum I

D 7010 None A - 7)200 cLm D -IJ D - 52C(ourse P - 2 icG amp P-28 NoneDshy

110 Founclation Fill 40 cum D - 1 D - I None CG P-I CCP-1

401 Tirber Trestle I spans IR II I I T R 402-25 le-ca st c onc- Irete piles 168 Lii i1 or PTC I PC-1I 40 2

I i I lone

- 2 5a ornc test c or1ea PI -o- ITone 413 Rein Concpipes I 060H 6L1 1-IR-I I0901I - I16L4 I - IJ - 2 11201i 57L1 Ri -Th - 8 I lR- 3

57L 406 Rfe nf eel

I I I ea si0eO-1 easize loneII I I

51l l RS~ 166ea I I IR _ I - I

JoteArditiot l fiell and Wboratorv tests weeconductes for Item 105 clue to chane (orrier) involume form the princitnl uantity

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 7: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

--

- - - - - - - -

--------

----------

- -

------------

- ----

GenralPercn- o ok Acco 1ished

I Minalabac-Antipolo-Hubo Secondary Road - - - 6179 2 401 - Antipclo-Lupi-San Fernando -i----364

3 402 - Hubo-Baliwag Road - - - ------shy

4 403 - lfubo-Bagolatao Road ----------

To t al - - - - --

Percent Time elapsed 9469----

A Secondary Road

(I) Minalabac-Antipolo-Huio Road Sta 0 + 000 to Sta 8

83894

Subgrade shy 85 kms

Subbase - - - kms

Base Course --------- 49 kmo Asphalt shy -- 29890 sqm

B Feeder Roads

(I) Antipolo-LupiSan Fernando (401)

Sta 0 + 000 - Sta 5 + 13653

Subgrade shy 5120 kms

Subbase ---- 30 kms

(2) Hubo-Baliwat (77402) Sta 0 + 000 - Sta 2 + 62044 Subgrade - - - - - - 262 kms

Subbase------------ 23 kms (3) Hubo-Bapolatao (403) Sta 0 + 000 to Sta 7 + 6617

Subgrde 7648 kms

Subba3e 7-------- kms

- 3 shy

7UCIRY OF P7 ILAlL aCOOiPLICjflTS (-Is of Sept-ber 1981) a) Iead Sconary Ror] Peeler Roads

Subgrad e 85 kmis 15388 Jws

Su4 se 85 klas 1420 La-e 49 krms ione

Pavement 19890 r r Wone

The surficin of feerle roars will be the subbase

it-e-f Item 1OC

b) ricrvpes

a) BRoloo BridgeT () spans) - sub-structure vith

super structure

coipleted b) Iato lridge - (one span) -Substruture In supershy

structure completed c) Timber Trestle (3 spans) - subtructure and supershy

s ructutre completed

-4 shy

ACTIVITIES DUR TG T-Ef IOI (August 26 - Sept 25 1981)

Secondry Road

Item 200 - Dase Course

I-Th linl oprearlin[ and compoctinf on the following

Stations Sta 0 + 500 - 0 + 700

Item 302 - ledium Cut-back Asplelt Grade IC for Bituminous

Prime Coat

Delivered - 45 metric tons

Applied - shy - 435 liters

Item 314-1 -rerete 1rterials for 7T

(Hot Asplalt type)

-635 cum

Item 314-3 15-100 Penetr tion Asphalt cement for DST (hot

A plha It Type)

Delivered shy - --100 metric tons

Per kilometer shy 183 metric tons

Paved shy - - 49 ]Ms

Feeder Roads

FR 01 - Antipol6-Lupi-Sen Fermando

1 Road maintenance Haulinp sprealing and comp sing of Ite 107( nd 10

3 Construction of Heac1ralls foi CPs

4 Ditching

FR 402 - Huio-lali1ag Nuevo

1 Road ma inte-ance

9 N uling spreading and compacting of Item 108

-5shy

3 Conctruction of headwalls for RCPs

FR 403 -Hubo-a rohlatao

I Road -maintenance

2 Re--infst-llation of the two () lines of 4810

RCP cn St 1 + 050

3 Construction of headwalls for RCP

SURVEY l0R I95

Checking of horizontal and vertical costrols blue-toppings

cross sectiouing and placing of Invert Elevations for IICP

under supervi-ion by the consultants for both secondary and

feeder roads

LWTERIALS

Field Density Te3ts gradijng of materials P-nd other necess-ary testing of materials were also done by the contrictor beforeas under direct supervision by the consu]itmts on both the seconshy

dary and feeder roads

Erluipment of the contractor are also spot-checked by the consultants to sce if they are still safe and sound for use

in the project

- 6shy

STUSOFLARATORY TESTS

Project Sub-Project No 4 Package -i Secondary RoadMinalabac Cumavrines Su-

4A 2 R A L 8 Tctal esti- Noof TestsNoofTes ant1 -2- On file Blance

105 Ildway di Drah- 15500 cum$ 0GD-

amp P 52 -e -11 Camp P-11 None

y-t a-Vatij)r I D 3 3 ei06 Pxcag Jor ue- 70Q er p 1C 0 IT

I COre P-1

107 D-42 D-318~ D-2Common Borrow 1 02I5OcuC 0 29 1 1C - 176 None

- i 1an

amp 9-86 0 ampP-15110 Fcun-Jiation Ill 50cu - 10 D0- 1 None CGamp F - I CG amp P-1 None

200- gWi- Ease Course 75C cum D- 5 -21 D 9 - 2 CGampP-19i~ C G--6i 1-C-

Abr-ssion Specific

brassion 302 Medjiu cjril

cut-back

usphalt Grade sitP-rime Coat 51MT Q- 5 Q - 5314-3 05-100 pene f

none5 eccznmnt for 7RST I

(1ot Aspal Typo) 110212I 1 I 402i25

- IPre-cas Coc-1 3 96 L M PTC - 1

rete j~ies FTC shy

405 CongClas A 558 cum I9831 bags Q-3 or PTC

None Q - 3 None

Pine Ag 294 cum -I1 -4Coarse Agt I Q-1 G-1 N376 cumq Q-I G-6 I 01oeWater406 Rein Step Cert Cert I None457 5 kg Noon e Q-1 easizel Q-1 easite lone413 Reinf Conc pipes 090jv1 279( LM[ I- I2 -- 411 IRIR -- j11 I2M TP -3500 Grouted riprap

I 55 IR -35_pA arkers 1t011 11 PO 5 a d - 31 fI

l~~rojeo~alaa 0 20f1iol FerndoI I e A I -Lu)i-Sa9n tests~-~2t~~ 14 A T E R I A L S 2otaJl estimatedNo o2 test

oo

of tets

105 Rdway c Draina I 137 0 0cuiu)e D 50 1 D -Excavation IC lC amp P-1 I CG ampP-7 iNone 106 JTcavation for 530 cuui D - I 18 ructure D -I CG P-1I 0 amp P-I Non 107 Coumwon Jorrow - cum I

D 7010 None A - 7)200 cLm D -IJ D - 52C(ourse P - 2 icG amp P-28 NoneDshy

110 Founclation Fill 40 cum D - 1 D - I None CG P-I CCP-1

401 Tirber Trestle I spans IR II I I T R 402-25 le-ca st c onc- Irete piles 168 Lii i1 or PTC I PC-1I 40 2

I i I lone

- 2 5a ornc test c or1ea PI -o- ITone 413 Rein Concpipes I 060H 6L1 1-IR-I I0901I - I16L4 I - IJ - 2 11201i 57L1 Ri -Th - 8 I lR- 3

57L 406 Rfe nf eel

I I I ea si0eO-1 easize loneII I I

51l l RS~ 166ea I I IR _ I - I

JoteArditiot l fiell and Wboratorv tests weeconductes for Item 105 clue to chane (orrier) involume form the princitnl uantity

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 8: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

7UCIRY OF P7 ILAlL aCOOiPLICjflTS (-Is of Sept-ber 1981) a) Iead Sconary Ror] Peeler Roads

Subgrad e 85 kmis 15388 Jws

Su4 se 85 klas 1420 La-e 49 krms ione

Pavement 19890 r r Wone

The surficin of feerle roars will be the subbase

it-e-f Item 1OC

b) ricrvpes

a) BRoloo BridgeT () spans) - sub-structure vith

super structure

coipleted b) Iato lridge - (one span) -Substruture In supershy

structure completed c) Timber Trestle (3 spans) - subtructure and supershy

s ructutre completed

-4 shy

ACTIVITIES DUR TG T-Ef IOI (August 26 - Sept 25 1981)

Secondry Road

Item 200 - Dase Course

I-Th linl oprearlin[ and compoctinf on the following

Stations Sta 0 + 500 - 0 + 700

Item 302 - ledium Cut-back Asplelt Grade IC for Bituminous

Prime Coat

Delivered - 45 metric tons

Applied - shy - 435 liters

Item 314-1 -rerete 1rterials for 7T

(Hot Asplalt type)

-635 cum

Item 314-3 15-100 Penetr tion Asphalt cement for DST (hot

A plha It Type)

Delivered shy - --100 metric tons

Per kilometer shy 183 metric tons

Paved shy - - 49 ]Ms

Feeder Roads

FR 01 - Antipol6-Lupi-Sen Fermando

1 Road maintenance Haulinp sprealing and comp sing of Ite 107( nd 10

3 Construction of Heac1ralls foi CPs

4 Ditching

FR 402 - Huio-lali1ag Nuevo

1 Road ma inte-ance

9 N uling spreading and compacting of Item 108

-5shy

3 Conctruction of headwalls for RCPs

FR 403 -Hubo-a rohlatao

I Road -maintenance

2 Re--infst-llation of the two () lines of 4810

RCP cn St 1 + 050

3 Construction of headwalls for RCP

SURVEY l0R I95

Checking of horizontal and vertical costrols blue-toppings

cross sectiouing and placing of Invert Elevations for IICP

under supervi-ion by the consultants for both secondary and

feeder roads

LWTERIALS

Field Density Te3ts gradijng of materials P-nd other necess-ary testing of materials were also done by the contrictor beforeas under direct supervision by the consu]itmts on both the seconshy

dary and feeder roads

Erluipment of the contractor are also spot-checked by the consultants to sce if they are still safe and sound for use

in the project

- 6shy

STUSOFLARATORY TESTS

Project Sub-Project No 4 Package -i Secondary RoadMinalabac Cumavrines Su-

4A 2 R A L 8 Tctal esti- Noof TestsNoofTes ant1 -2- On file Blance

105 Ildway di Drah- 15500 cum$ 0GD-

amp P 52 -e -11 Camp P-11 None

y-t a-Vatij)r I D 3 3 ei06 Pxcag Jor ue- 70Q er p 1C 0 IT

I COre P-1

107 D-42 D-318~ D-2Common Borrow 1 02I5OcuC 0 29 1 1C - 176 None

- i 1an

amp 9-86 0 ampP-15110 Fcun-Jiation Ill 50cu - 10 D0- 1 None CGamp F - I CG amp P-1 None

200- gWi- Ease Course 75C cum D- 5 -21 D 9 - 2 CGampP-19i~ C G--6i 1-C-

Abr-ssion Specific

brassion 302 Medjiu cjril

cut-back

usphalt Grade sitP-rime Coat 51MT Q- 5 Q - 5314-3 05-100 pene f

none5 eccznmnt for 7RST I

(1ot Aspal Typo) 110212I 1 I 402i25

- IPre-cas Coc-1 3 96 L M PTC - 1

rete j~ies FTC shy

405 CongClas A 558 cum I9831 bags Q-3 or PTC

None Q - 3 None

Pine Ag 294 cum -I1 -4Coarse Agt I Q-1 G-1 N376 cumq Q-I G-6 I 01oeWater406 Rein Step Cert Cert I None457 5 kg Noon e Q-1 easizel Q-1 easite lone413 Reinf Conc pipes 090jv1 279( LM[ I- I2 -- 411 IRIR -- j11 I2M TP -3500 Grouted riprap

I 55 IR -35_pA arkers 1t011 11 PO 5 a d - 31 fI

l~~rojeo~alaa 0 20f1iol FerndoI I e A I -Lu)i-Sa9n tests~-~2t~~ 14 A T E R I A L S 2otaJl estimatedNo o2 test

oo

of tets

105 Rdway c Draina I 137 0 0cuiu)e D 50 1 D -Excavation IC lC amp P-1 I CG ampP-7 iNone 106 JTcavation for 530 cuui D - I 18 ructure D -I CG P-1I 0 amp P-I Non 107 Coumwon Jorrow - cum I

D 7010 None A - 7)200 cLm D -IJ D - 52C(ourse P - 2 icG amp P-28 NoneDshy

110 Founclation Fill 40 cum D - 1 D - I None CG P-I CCP-1

401 Tirber Trestle I spans IR II I I T R 402-25 le-ca st c onc- Irete piles 168 Lii i1 or PTC I PC-1I 40 2

I i I lone

- 2 5a ornc test c or1ea PI -o- ITone 413 Rein Concpipes I 060H 6L1 1-IR-I I0901I - I16L4 I - IJ - 2 11201i 57L1 Ri -Th - 8 I lR- 3

57L 406 Rfe nf eel

I I I ea si0eO-1 easize loneII I I

51l l RS~ 166ea I I IR _ I - I

JoteArditiot l fiell and Wboratorv tests weeconductes for Item 105 clue to chane (orrier) involume form the princitnl uantity

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 9: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

ACTIVITIES DUR TG T-Ef IOI (August 26 - Sept 25 1981)

Secondry Road

Item 200 - Dase Course

I-Th linl oprearlin[ and compoctinf on the following

Stations Sta 0 + 500 - 0 + 700

Item 302 - ledium Cut-back Asplelt Grade IC for Bituminous

Prime Coat

Delivered - 45 metric tons

Applied - shy - 435 liters

Item 314-1 -rerete 1rterials for 7T

(Hot Asplalt type)

-635 cum

Item 314-3 15-100 Penetr tion Asphalt cement for DST (hot

A plha It Type)

Delivered shy - --100 metric tons

Per kilometer shy 183 metric tons

Paved shy - - 49 ]Ms

Feeder Roads

FR 01 - Antipol6-Lupi-Sen Fermando

1 Road maintenance Haulinp sprealing and comp sing of Ite 107( nd 10

3 Construction of Heac1ralls foi CPs

4 Ditching

FR 402 - Huio-lali1ag Nuevo

1 Road ma inte-ance

9 N uling spreading and compacting of Item 108

-5shy

3 Conctruction of headwalls for RCPs

FR 403 -Hubo-a rohlatao

I Road -maintenance

2 Re--infst-llation of the two () lines of 4810

RCP cn St 1 + 050

3 Construction of headwalls for RCP

SURVEY l0R I95

Checking of horizontal and vertical costrols blue-toppings

cross sectiouing and placing of Invert Elevations for IICP

under supervi-ion by the consultants for both secondary and

feeder roads

LWTERIALS

Field Density Te3ts gradijng of materials P-nd other necess-ary testing of materials were also done by the contrictor beforeas under direct supervision by the consu]itmts on both the seconshy

dary and feeder roads

Erluipment of the contractor are also spot-checked by the consultants to sce if they are still safe and sound for use

in the project

- 6shy

STUSOFLARATORY TESTS

Project Sub-Project No 4 Package -i Secondary RoadMinalabac Cumavrines Su-

4A 2 R A L 8 Tctal esti- Noof TestsNoofTes ant1 -2- On file Blance

105 Ildway di Drah- 15500 cum$ 0GD-

amp P 52 -e -11 Camp P-11 None

y-t a-Vatij)r I D 3 3 ei06 Pxcag Jor ue- 70Q er p 1C 0 IT

I COre P-1

107 D-42 D-318~ D-2Common Borrow 1 02I5OcuC 0 29 1 1C - 176 None

- i 1an

amp 9-86 0 ampP-15110 Fcun-Jiation Ill 50cu - 10 D0- 1 None CGamp F - I CG amp P-1 None

200- gWi- Ease Course 75C cum D- 5 -21 D 9 - 2 CGampP-19i~ C G--6i 1-C-

Abr-ssion Specific

brassion 302 Medjiu cjril

cut-back

usphalt Grade sitP-rime Coat 51MT Q- 5 Q - 5314-3 05-100 pene f

none5 eccznmnt for 7RST I

(1ot Aspal Typo) 110212I 1 I 402i25

- IPre-cas Coc-1 3 96 L M PTC - 1

rete j~ies FTC shy

405 CongClas A 558 cum I9831 bags Q-3 or PTC

None Q - 3 None

Pine Ag 294 cum -I1 -4Coarse Agt I Q-1 G-1 N376 cumq Q-I G-6 I 01oeWater406 Rein Step Cert Cert I None457 5 kg Noon e Q-1 easizel Q-1 easite lone413 Reinf Conc pipes 090jv1 279( LM[ I- I2 -- 411 IRIR -- j11 I2M TP -3500 Grouted riprap

I 55 IR -35_pA arkers 1t011 11 PO 5 a d - 31 fI

l~~rojeo~alaa 0 20f1iol FerndoI I e A I -Lu)i-Sa9n tests~-~2t~~ 14 A T E R I A L S 2otaJl estimatedNo o2 test

oo

of tets

105 Rdway c Draina I 137 0 0cuiu)e D 50 1 D -Excavation IC lC amp P-1 I CG ampP-7 iNone 106 JTcavation for 530 cuui D - I 18 ructure D -I CG P-1I 0 amp P-I Non 107 Coumwon Jorrow - cum I

D 7010 None A - 7)200 cLm D -IJ D - 52C(ourse P - 2 icG amp P-28 NoneDshy

110 Founclation Fill 40 cum D - 1 D - I None CG P-I CCP-1

401 Tirber Trestle I spans IR II I I T R 402-25 le-ca st c onc- Irete piles 168 Lii i1 or PTC I PC-1I 40 2

I i I lone

- 2 5a ornc test c or1ea PI -o- ITone 413 Rein Concpipes I 060H 6L1 1-IR-I I0901I - I16L4 I - IJ - 2 11201i 57L1 Ri -Th - 8 I lR- 3

57L 406 Rfe nf eel

I I I ea si0eO-1 easize loneII I I

51l l RS~ 166ea I I IR _ I - I

JoteArditiot l fiell and Wboratorv tests weeconductes for Item 105 clue to chane (orrier) involume form the princitnl uantity

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 10: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

3 Conctruction of headwalls for RCPs

FR 403 -Hubo-a rohlatao

I Road -maintenance

2 Re--infst-llation of the two () lines of 4810

RCP cn St 1 + 050

3 Construction of headwalls for RCP

SURVEY l0R I95

Checking of horizontal and vertical costrols blue-toppings

cross sectiouing and placing of Invert Elevations for IICP

under supervi-ion by the consultants for both secondary and

feeder roads

LWTERIALS

Field Density Te3ts gradijng of materials P-nd other necess-ary testing of materials were also done by the contrictor beforeas under direct supervision by the consu]itmts on both the seconshy

dary and feeder roads

Erluipment of the contractor are also spot-checked by the consultants to sce if they are still safe and sound for use

in the project

- 6shy

STUSOFLARATORY TESTS

Project Sub-Project No 4 Package -i Secondary RoadMinalabac Cumavrines Su-

4A 2 R A L 8 Tctal esti- Noof TestsNoofTes ant1 -2- On file Blance

105 Ildway di Drah- 15500 cum$ 0GD-

amp P 52 -e -11 Camp P-11 None

y-t a-Vatij)r I D 3 3 ei06 Pxcag Jor ue- 70Q er p 1C 0 IT

I COre P-1

107 D-42 D-318~ D-2Common Borrow 1 02I5OcuC 0 29 1 1C - 176 None

- i 1an

amp 9-86 0 ampP-15110 Fcun-Jiation Ill 50cu - 10 D0- 1 None CGamp F - I CG amp P-1 None

200- gWi- Ease Course 75C cum D- 5 -21 D 9 - 2 CGampP-19i~ C G--6i 1-C-

Abr-ssion Specific

brassion 302 Medjiu cjril

cut-back

usphalt Grade sitP-rime Coat 51MT Q- 5 Q - 5314-3 05-100 pene f

none5 eccznmnt for 7RST I

(1ot Aspal Typo) 110212I 1 I 402i25

- IPre-cas Coc-1 3 96 L M PTC - 1

rete j~ies FTC shy

405 CongClas A 558 cum I9831 bags Q-3 or PTC

None Q - 3 None

Pine Ag 294 cum -I1 -4Coarse Agt I Q-1 G-1 N376 cumq Q-I G-6 I 01oeWater406 Rein Step Cert Cert I None457 5 kg Noon e Q-1 easizel Q-1 easite lone413 Reinf Conc pipes 090jv1 279( LM[ I- I2 -- 411 IRIR -- j11 I2M TP -3500 Grouted riprap

I 55 IR -35_pA arkers 1t011 11 PO 5 a d - 31 fI

l~~rojeo~alaa 0 20f1iol FerndoI I e A I -Lu)i-Sa9n tests~-~2t~~ 14 A T E R I A L S 2otaJl estimatedNo o2 test

oo

of tets

105 Rdway c Draina I 137 0 0cuiu)e D 50 1 D -Excavation IC lC amp P-1 I CG ampP-7 iNone 106 JTcavation for 530 cuui D - I 18 ructure D -I CG P-1I 0 amp P-I Non 107 Coumwon Jorrow - cum I

D 7010 None A - 7)200 cLm D -IJ D - 52C(ourse P - 2 icG amp P-28 NoneDshy

110 Founclation Fill 40 cum D - 1 D - I None CG P-I CCP-1

401 Tirber Trestle I spans IR II I I T R 402-25 le-ca st c onc- Irete piles 168 Lii i1 or PTC I PC-1I 40 2

I i I lone

- 2 5a ornc test c or1ea PI -o- ITone 413 Rein Concpipes I 060H 6L1 1-IR-I I0901I - I16L4 I - IJ - 2 11201i 57L1 Ri -Th - 8 I lR- 3

57L 406 Rfe nf eel

I I I ea si0eO-1 easize loneII I I

51l l RS~ 166ea I I IR _ I - I

JoteArditiot l fiell and Wboratorv tests weeconductes for Item 105 clue to chane (orrier) involume form the princitnl uantity

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 11: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

STUSOFLARATORY TESTS

Project Sub-Project No 4 Package -i Secondary RoadMinalabac Cumavrines Su-

4A 2 R A L 8 Tctal esti- Noof TestsNoofTes ant1 -2- On file Blance

105 Ildway di Drah- 15500 cum$ 0GD-

amp P 52 -e -11 Camp P-11 None

y-t a-Vatij)r I D 3 3 ei06 Pxcag Jor ue- 70Q er p 1C 0 IT

I COre P-1

107 D-42 D-318~ D-2Common Borrow 1 02I5OcuC 0 29 1 1C - 176 None

- i 1an

amp 9-86 0 ampP-15110 Fcun-Jiation Ill 50cu - 10 D0- 1 None CGamp F - I CG amp P-1 None

200- gWi- Ease Course 75C cum D- 5 -21 D 9 - 2 CGampP-19i~ C G--6i 1-C-

Abr-ssion Specific

brassion 302 Medjiu cjril

cut-back

usphalt Grade sitP-rime Coat 51MT Q- 5 Q - 5314-3 05-100 pene f

none5 eccznmnt for 7RST I

(1ot Aspal Typo) 110212I 1 I 402i25

- IPre-cas Coc-1 3 96 L M PTC - 1

rete j~ies FTC shy

405 CongClas A 558 cum I9831 bags Q-3 or PTC

None Q - 3 None

Pine Ag 294 cum -I1 -4Coarse Agt I Q-1 G-1 N376 cumq Q-I G-6 I 01oeWater406 Rein Step Cert Cert I None457 5 kg Noon e Q-1 easizel Q-1 easite lone413 Reinf Conc pipes 090jv1 279( LM[ I- I2 -- 411 IRIR -- j11 I2M TP -3500 Grouted riprap

I 55 IR -35_pA arkers 1t011 11 PO 5 a d - 31 fI

l~~rojeo~alaa 0 20f1iol FerndoI I e A I -Lu)i-Sa9n tests~-~2t~~ 14 A T E R I A L S 2otaJl estimatedNo o2 test

oo

of tets

105 Rdway c Draina I 137 0 0cuiu)e D 50 1 D -Excavation IC lC amp P-1 I CG ampP-7 iNone 106 JTcavation for 530 cuui D - I 18 ructure D -I CG P-1I 0 amp P-I Non 107 Coumwon Jorrow - cum I

D 7010 None A - 7)200 cLm D -IJ D - 52C(ourse P - 2 icG amp P-28 NoneDshy

110 Founclation Fill 40 cum D - 1 D - I None CG P-I CCP-1

401 Tirber Trestle I spans IR II I I T R 402-25 le-ca st c onc- Irete piles 168 Lii i1 or PTC I PC-1I 40 2

I i I lone

- 2 5a ornc test c or1ea PI -o- ITone 413 Rein Concpipes I 060H 6L1 1-IR-I I0901I - I16L4 I - IJ - 2 11201i 57L1 Ri -Th - 8 I lR- 3

57L 406 Rfe nf eel

I I I ea si0eO-1 easize loneII I I

51l l RS~ 166ea I I IR _ I - I

JoteArditiot l fiell and Wboratorv tests weeconductes for Item 105 clue to chane (orrier) involume form the princitnl uantity

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 12: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

l~~rojeo~alaa 0 20f1iol FerndoI I e A I -Lu)i-Sa9n tests~-~2t~~ 14 A T E R I A L S 2otaJl estimatedNo o2 test

oo

of tets

105 Rdway c Draina I 137 0 0cuiu)e D 50 1 D -Excavation IC lC amp P-1 I CG ampP-7 iNone 106 JTcavation for 530 cuui D - I 18 ructure D -I CG P-1I 0 amp P-I Non 107 Coumwon Jorrow - cum I

D 7010 None A - 7)200 cLm D -IJ D - 52C(ourse P - 2 icG amp P-28 NoneDshy

110 Founclation Fill 40 cum D - 1 D - I None CG P-I CCP-1

401 Tirber Trestle I spans IR II I I T R 402-25 le-ca st c onc- Irete piles 168 Lii i1 or PTC I PC-1I 40 2

I i I lone

- 2 5a ornc test c or1ea PI -o- ITone 413 Rein Concpipes I 060H 6L1 1-IR-I I0901I - I16L4 I - IJ - 2 11201i 57L1 Ri -Th - 8 I lR- 3

57L 406 Rfe nf eel

I I I ea si0eO-1 easize loneII I I

51l l RS~ 166ea I I IR _ I - I

JoteArditiot l fiell and Wboratorv tests weeconductes for Item 105 clue to chane (orrier) involume form the princitnl uantity

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 13: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

____

STATUS OF IADOLAT JiY TESTS

Project Sub-Project No 4 IIubo-3alplusmny_ 1oad 02

No of Testsii A RII I A L S ostimatedIloof test On BwileP llance

106 Excavation fort D -1 - D - 1 structures 2)0 cun QampP - 1 - C I amp P- 1

107 Comon orrow 226 -0 D - 79 D - 72 D - 7 cuI1 ~ CG~P-I6 C)P - 16 None

108 AJ su ase 131cum D - 21 D -10 I D - 11 C P -11 CCP-2 CIGP - 9

110 Foundation Fill 20cum D - 1 - D - 1 SCG amp Pshy

413 Reinf concrete I

pies 3ILi 1 IR-2 - I - 2 060M 09011 6121 I 2IR - 2 IR -4

510 Ra-I t 60 ea I IR - 1I IR - 1 1 t

-9 shy

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 14: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

SA US0P LABAT0m_ TBSTS

Cc trOlc50 OJ 3 Ru b o -ala taeo

- - - cT t-- C o + st

- uaM T -

-

i d tr -tesi e f Balanc e

I | I

Ri i7id ay i - 249 f - 2 NoneBx-vatior O0 72CcumCampp - $Gamp - 50 CGampP-1O

I

106 Excavatio fo 570 cum ) - 2 - 2 C 2amp-1 I Cp amp P-II I

106 Ag subbLse D -t350ztmD - 49 1D - 1 C --3 C -27 CG ampP-4I I

110- Found-ntioi i h - i - D - 1 - 1 - P-1

413 Reinf Coacr-c pipes

0691 2L 1-Li-2 - 1 1--IR-2

0 ) 0 LIM 4il-IR-6 -)

120 M 150 L- -1-3-6 4-I-5

466 Reiiiforced teell - Q-1 ea I None I Size

510 ROW Markers IR - IR

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 15: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

C0141ESGr7 STRENIGTHT eIr ) shy

1Rrt tuc-Conresive I Date Salipled ures derc- 21re-th R B A R K 3

t genteel I I

1 - 10 - 79 TCP 60F 3i0 3 stfctorv - 1)o - --(10- 2070 ichiled

-do- -do- 5070 Saqi sactoy 1 - 22 - 79 RCOP 900 322 -doshy

-do- -do- 3241 -elshy-do- -do- 256i1ailed

2-3-79 HcP 90 3077 Satisfatory -do- -do- 3672 -doshy-do- -do- 3345 tisfa tory

2--2-79 RCP 600 41(11 -doshy-do-- -do- 3675 -doshy-do- -do- 3444

2-21-79 11CP 600 3907 -doshy-do- -do- 3703 -doshy-do- -3o- 3553 -doshy

3- 1i-79 ULgP 60$ 2674 Failed -do- -do- 3001 Satisfacotry -do- -rlo- 3271 --doshy

7-4-79 RC13C Bottom SabA4260 Passed -do- -do- 307b -doshy

7-9-79 30705 Gidewi -doshy-do- -do- 2494 Failed -do- -do- 3016 Passed -do- -o- 4882 Iased

7-16-79 Top Slab 3107 Passed -do- -do-- 2733 Failedshy-do- Center wall 3825 Passed

-do- -do- 2581 Fsailed

8-31-79 RCBC Sidewall 3895 PLised -do- -do- 4447 Passed

9-1-79 -do- 3838 Passed -do- -do- 4097 Passed

9-22-79 RCBC Top Slab 3195 Pssed -do- -do- 3135 Passed

10-18-79 Sidewall 2480 Failed- -do-- -do- 2534 Failed -do- -do- 3141 Passed

10-25-80 RCBC Top Slab 3281 Passed -do- -do- 2728 Failed -do- -do- 3576 Passed

11-8-79 RCP 1200 2421 Fail ed 11-10-79 -do- 2922 Fai1ed

i1-21-79 -do- 2309 Failed 11-26-7 RCP 60$ 3055 Passed

-do- -do- 2340 Fni] ed -do- -do- 3506 Passed -do- -do- 3397 Passed

11-21-79 RCBC Wingwall 3506 Passed

- 11 shy

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 16: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

11-21-79 11-26-79

-do-11-28-79

-do-4-14-80 -do--do-

3-25-CO0 -do-

3-31-80 -do-

3-27-80 -do--do-4-21-80

-do--do-4-22-80 -do--do-5-3-80 do--do-

Compressive

7-16-79

-do-8-17-79 -do-

R-18-79 -do-

-8_30-79

RCBC Wingwall RCBC Apron

-do-RCBC Wingwall

-do-Pier Balogo Bridge

-do--do-

Coping Abut A -do-

Coping Abut B -do-

Backwall Abut A -do--do-

4089 2922 2962 2630 3840 3801 5677 1842 3094 3172 3545 2814 2387 1943 2457

Coping Abut Mata Bridge 2806

-do- 2612 -do- 3055

Backwall AbutBMata BR2783 -do- 3055 -do- 3358

Girdr Balogo Bridge 3529 -do--do-

Strength

RCP 36

-do-RCP 240

-do-HCP 36

-do--do-

2861 _ ]

Passed Failed Failed Passed Passed Passed compresive strength requi 1 -doshy-doshy-doshy-doshy-do-

Failure Failure FailureO

Failure Failed- Failed- Passed compressive strength requir(d -doshy-doshy-doshy

-doshy

(Feeder Road Nos 401402403)

4664

4567 2736 294 3763 4555 4224

Passed

Passed Failed Failed Passed Passed Passed

-12shy

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 17: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

DRAINAGE amp EROSION WORK

Secondary Road (Minalabac-Antipolo-Hubo)

AS SCHEDULED ACCOMPLISHEDio si zoc Size o s of LM Sta 0 +450 240 14 - wheadwal] Sta 0 + 600 240 16 Sta 0 + 987C24 13 Sta 1 + 04767480 18 480 18 18LM wheadwal Sta 1+17052 48$ 18 480 18 18L14 -do-Sta 1+47500 36$ 10 36t 10 17LM -do-Sta 1+87500 24$ 17 360 17 17LM -do-Sta 2+14382 2410 18 241 18 18LM -do-Sta 2+65212 2 4 1 13 240 13 13LM -do-Sta 2+5372 240 15 24 15 15LM -do- Sta 2+90000 241 14 240 14 14LM -do-Sta 3+11144 360 15 36 15 15LM --do-Sta 3+38945 241A 12LM -doshy2 4 0 12 12 Sta 3+32500 - - 36 12 12LM -do-Sta 3+78700 3610 13 -Jo- 13 13Lv -do-Sta 3+91000 -do- 13 -do- 13 13LM -do-Sta 4+14413 2ii 1$ 13 241 13 13LP -do-Sta 4+36902 -do- 13 -do- 13 13LM -do-Sta 4+85415 - - do- 13 13LM -do-Sta 4+92500 360 15 360 15 15LN -do-Sta 5+18315 - - 24 0 12 12 LM -40-Sta 5+22500 241 16 241 16 16LM -do-Sta 6+42500 241o 15 24110 15 15LM -do-Sta 6+67700 4 15 -do- 15 15LM -do-Sta 6+75530 361 16 36 16 16LM -doshysta 7+25000 480 18 48 18 18LM -do-Sta 8+05500 240 14 240 14 14LM -do-Sta 8+06600 36 15 360 15 15LI -do-Sta [+07230 e4 0 15 24$ 15 15LM -do-Sta 8+22200 24110 13 240 13 15LN -do-Sta 8+45900 24V 12 240 12 12LM -do-Sta 8+65000 2410 1 24 14 _4LM -doshy

-13shy

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 18: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

FEEDER RIQdCI 01 - flntiplo Lrnnd ST TI I

0 + 175

0 + 425

0 + 713

S+ 075

1 + 357

1 + r5087

2 + 051

2 + 32660

2 + 53950

2 + 675

3 + 0555

3 + 325

3 + 675

4 + 848

4 + 087 A5

4 + 24470

4 590

4 8+

AS SCH-Si-e

210

3610

4811

1

30

4 0

360

360

Z0

4

48V

4i0

4 0

48

43

-180

40

-

DUL ED e

1212

11

34

9

12

12

22

10

30

11

24

24

13

7

6

4

14scedule

14 shy

tC SI LIC DCE iz7_Lf [CS Of

1 12L1

36 11 IL

481 34-2 lines 24rL

48P 15 191

36 12 12Lii

48 22-2 lit 2 22L

360 12 12Li

36 22--2 lines

2212

10 1OW

480 39-) lines --iu

0 0 11 11 LE

48i 24-2 lines 24W

--do- 411

4UWj 13 1 31di

480 7(extenriled )7Li

18 6 (e-tenled )6L

4 4(exterded )4LI

8 pc 8Lif

eaIwe a dwa l1l1S Ill

Completed

Completed

Complet ed

Completed

Completd

Comiplted

Complecd

Comple 6ed

Completed

Copeted

Complete1

Conpleted

Copletec

Completed

Completed

Completed

Completed

Not in

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 19: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

FEEDER RAD N102 - Hubo-Thliwag

AS 717-7p STATIOt - Si-e ~rotpcs Sie

0 + 37380 360 22 360

0 + 84630 36 36 36 0

0 + 96800 3610 12 36NO

1 + 20230 24V 12 24 0

1 - 59800 240 12 2+10

1 + 77010 24 12 24

2 + 125 - 240

2 + 40354 Extsting 1-30 251fx RCP

2 + 32300 3611 12 36liO

2 + 55000 24+ 4 20

C I _

of P

2-21ines

36 -31ines

12

12

12

12

12

to remain

12

14

_ __7

i _oHeadwall

22LIf Completed

36I1 -doshy

12L -shy doshy

12ul -oshy

12I -do-shy

12LH -doshy

12111 o0shy

-d oshy

1212 -d oshy

14L oshy

-15shy

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 20: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

FEi 1T RQ D 403 H-Iubo-Bagolato

TI T-- _Q nSdegCULCDSioe ACCaPLi o IMD of pc 1eadwall~Qofs 1 nSie 0 + 13700 30480 4O 30-21ines 30LI1 Completed 0 + 30000 16 480 16 16LI -doshy0 + 50601 plio 4 D E L E T E D 0 + 82500 4(10 22 4810 26 -21ines2611 Completed 1 + 14380 480 24 Re-installed with

2 lines RCP -d10shy1 + 20000 241 11 24V 11 11L -oshy1 + 40000 260 6 36 6 6I -d oshy1 + 601O 36 12 36H 12 12LI -1oshy1 +79134 48y0 16 48 10 lOLT -Completed 1 + 93900 48V 14 48V 10 1OU

Ib- 4 pcs completed1 + 99SI 11 36r-0 12 360 12 1O I Completea

4 + 59363 36$ 17 360 16 16TwJ --]oshy5 + 09700 3610 15 360 14 1411 -doshy5 + 29948 240 11 241O 11 11114 - oshy5 + 75968 3610 13 36 13 1311 -doshy6 + 05000 3610 16 D E L E T E D shy6 + 31500 36 3617 16 16LI-I -doshy

22_16 22 22WComoleted

- 16 shy

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 21: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

--------

-TIR August 26 to

1 Au REPORT Sept 2581

PRMOECT H2 IJiALAIC~TIPOLO KiO lOrD Sub-Project To- 4

eWeather Time ExtensionReMrIcs Recommended Aug 26 Cloudy to fa ir Workable27 Fhir None

WorIo ble28 NoneFair29 Iorka bleFair None

fork1a30 Cloudy to f - le Done orkable31 Fair None

Sept 1 forksbleFair with JTone2 Fa ir R light hower orkable Nonr2 onFa ir to coriza air to cloudy ble Noneworoble

4+ Ncne5 FairCloudy W -1 light showerto cloudy orlcble None1Iorchle6 Cloudy None1orkoble7 Coudy w NoneP light shower Iorks ble8Cloudy w Fri None

9 light shower lorable NoneHeavy rain to cloudy Unworkable10 1oucly lit cTounds still One (1) day11 t Un-orlble One (I) dayCloudy but (owuds still wet12 Unor]mbleAll shower to cloudiy One (I) day

Unhorkable13 One (I)F ir to cloudy dayWorkable

15g tlorIm ble None

14 Cloudy toClou13r fair Work- DieWorlm ble NoneNoneNone16 17

F-ir -w R light shower UorimbleI Lo NoneinTclouqy (Typhoon Rubing)Unworkabe18 Int rain One (I)day19 RPiny Unworble One (1) dayto int rain Unorkale20 Int rain One (I) day

UnNorklhle21 Cloud One (I) dayto int rain Univorkable22 Cloudy but --rounds still wet One (I) day

23 Unworkable One (I)Int rain to dayfair UnoI6j24 Cloudv but Cground- still wet 1) One (1) day

Unworl25 Cloudy to int rain ble One (I) day

Unvlor1able fe (1) dyTOTALTOTAL -Iojv07 TEI flICEIL T REWLn)O TII1IN (1 IT --TOTL EXTEJIO1 0 - TiP IOTQ- - 13 daysTV J] P]C0 rJDEP- PAVIOUSLY - - _214 days

G11i]D TGYPAL-----227 days

- 17 shy

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 22: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

BICCI01 ampnr

-~~ A rT T~ EII FQlse Fiji CamariL-ies Sur

K~~ir~~ m rr----- ------- - _ _ __ _ _

Tjj

STF cJ a_

TOTAL

T-2

TE~TA

21 2

1 0I

2 Em uccn e rOz -a~v e

T 1 TT red l y

Lject j~LeM-CIACWTTO4yF ~r

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 23: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

Name

Perez Teodoro

Espeso Leonardo

Saltco Peeo

Cruz Nestor

Manuel Aguila

Perpetuo Avila

Reyes Efren

Tragante Frisco

Pellosis Eduardo

Asis Leoncio

Luna Freddie

Caisip Rogelio

Leon Luis de

Adao Numeriano

Balong Rodelio

Balonzo Jolito

POLYTRADE CONSTRUCTION INC Minalabac Camarines Sur

LIST OF PEiRSO NN

PoSitCaion

Project Manager

Project Supervisor

Shop S-opervjior

Administrative Officer

CE Draftsman

Lab Tihohnician

Comptroller

Watchman

-do-

-do-

Miechani-c

-do-

Lab Aide

Driver

-do-

DD Operator

Fronoisco Gracjianc Toadcr 0porltor

L ifi ca ilon

Cii Engineer

-do-

Exporienced

B S B A

Civil Engineer

Experienced

-doshy

-doshy

-doshy

-cioshy

-doshy

-doshy

-doshy

-doshy

- oshy

-doshy

-doshy

9 shy

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 24: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

BICOL RITVER 2ASfl San~- j )ce plusmn-Ii

D LpiiJr

rCararines

P5EC

Szur

- LTshy

04

ADplusmn

~A~ TTA 7Ap 10

rj fir

1 0 3

1

----X 17 20

EM-10 yees resiciinr Ijitj

~Local Hireed only

h h~ae

(SGD) A17T0olUo

Project

DA-jZcF

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 25: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

Namne

Antonio Banzon

Jaime Tamundong

Marcos Galban

Maximo Maiedoza

Nenita Avila

Armando Bidania

Susan Ovenza

Rolando Dacuzan

Dominador Sabado

Leonardo Valentin

Elpedio Mauricio

Macario Lang-ay

Bernardo Castiljo

Jose Canada

Ruben Jacobe

Ricardo irevalo

Pedro Suyat

GEIUAO G PLEYES CONSTRUCTION

Minalabap Camarines Sur

LIS3T OF PERT3OENEL

Position

Project ianager

Project Ennecr

Roadway Foreman

Structural Foreman

Comptroller

Instrumrnz man

ProDsrty Costudian

Survey Aide

BD Operator

BD Operator

Loader Operator

Roller Operator

Roller Operator

Driver

-do-

-ao-

Overseer

Civil Jngineer

-doshy

Expezjenced

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

-doshy

- 21 shy

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 26: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

Dlniel Santia jo

Tacjo Dulado

Yeiiip DI11a

Peciro flenlki

Rome-o Asada

Andres~ T-enleno

1e NuJLii

Faustino Aburlio~

Eruinwent fHclixtr preo

Mechanic 0

-00shy -do-

L5 I)crer -doshy

-do

40- -0shy

-0 0- o

-d oshy

-22

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 27: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

Secondary Rou

A Dump rucks

2 Ford (6-wheeler)

1 Isuu (6-whelcer)

24 Loader

1 irvu-u Loacur

C Grader

I uit raterll]ar

D Rollers

1 Pneiatic - oler

2 Tandes

E Tater

I it on top of 6 wheeler truck F AsphLted Distriutor

Feeder Roudr

A Diim Truch

1 unit 10-heeler Isuu

2 units 6 -wheeler Isuu

D Rolle r

I Tandemn

1 Pneuatic RoLier

- 23 shy

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 28: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

0 Loader

1 unit Cater)illar

D Grar er

1 unit aterrilJar

ip 1 unit Cater- liar

L Or JYTICE E A

Typewriter 191 carriaue (ADLER) 1 ea

Ilocden Ojce Des 3 pCs

ilple wOoer chair 5 pos Typ~ng pound hJe 1 po

Dra tiir ThbJe 1 po

LX OF LA IT~q EIImET

S- inch orass i~s 4 1 po0

S- inch 3razs iish 317 1 Pc

o - Lnch DrasJ -1hI c

8 - inch Brass iesh ]34 1 po

S- inch Brass ifesh 3amp 1 Ia

- LnLzass csh IU 1 pc

-PC408- inch IBrass iiesu No 18~ 1 pc

- inch iie 16Crac io 1 pc

8- inch lBrass Iesh IHo 50O 1 pc

- inchl plusmnr-33 iCS 11es o 4 1pc

amp - inch iBrass [clJ NO C 1 pc

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 29: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

-inch Brass HCsh Ho 60

inch Bra-- fe sh IToL100

-inco Lrasss TOol N-o 200

jU1

Te~lv7 cluwbY 20 tico 3-nce 20 Y cip 0cWaC i i111QD

Triple Dea

I

l ce sea

VoluluAetric Xlaiii 350 l

Liqui(7 Li-nit Deviceryroovj j tool

P~austic Lvjt

Cenror-a balajncc 001 cea

cct~-U1-Uar -Dn 11x 4 101

Sq~uare P~m 24 2ii

c~ctioll Mold

HodifieJ Comiinactjon flgt 5ls j

WIasij 1o-Lle 1000 ijil

Field Density Set

iFieilA Bucketu

CO-2jCieC 11113-

Oven Eiectric 11euiiert 7601t90

Ilarvarr~l Trip I3 x-c OhuLe

-ich 3racri 2eve No 4 Zpri Eilaiice 12 lilo Cap

Ccuaction Uo]ct 110 cilft

1 PC

1 PC

set

1 -Jpt

1

set

set

1 set

1 set

1 C0

1 pcC

1 PC

1 PC

1 PC

PC

1 il

1 uit

1 seU

1 ui

1 ui

1 set

- 25shy

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 30: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

FryLi7 Pan 18 x 18

Wire la sket

Cylincl er Told

8 - inch Sieve Dss Pon

6

1

2

1

pcs

pC

pc

pc

8 - inch Pan Jrags Cover w ring 1 Pc Sdmp cone w tamperin rod

Iork tble i20 x 2 Om

1

1

pc

ea Simple wooden chair

Corenter w GI sink

5

1

pcs

set

looden filin cbinet 1 ea ota pler

1 ea

Punchel 1 ea

- 26 shy

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 31: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

ITEM NO DES C RIPTION 160-2 Provide and Maintain Office and Laboratory for the Engineer1603 Provide one(I) Unit Four Wheel Drive for the Engineer1604 Provide one(l) Unit Utility Vehicle for the Engineer1605 Laboratory and Office Equipment for the Engineer (as listed)100 Clearing and Grubbing 103-1 (Fr40) Removal of Bridge

105 (Sec) Roadway and Drainage Excavation 105(Fr401402) Roadway Drainageand Excavation 105 (Fr 403) Roadway and Drainage Excavation 105-4 Excavation of Unsuitable Materials 106 (Sec) Excavation for Structures

106(Fr401402403) Excavation for Structures 107 (Sec) Borrow

107(Fr401402) Borrow 108 (Sec) Aggregate Sub-base

108Fr401A02403) Aggregate Sub-base 110bull Foundation IIl IOverhaul (300 m Free haul) 200 IAggregate Base Course302 Medium Curing Cut-Back Asphalt Grade MC-I for Bit Prime Coat314-1 Aggregate Material for BST ( Hot Asphalt Type )314-3 85-100 Penetration Asphalt Cement for BST (Hot Asphalt Type)401- (Fr 401) Timber (Detour) Trestle (Superstructure only on Concrete Pile Bent)402-25 Precast Concrete Piles 402-25a Concrete Test Piles (Furnish and Drive)403 Concrete Railings405 Concrete Class A (Miscellaneous) 405-1( concrete Clas

i

405-1 (Fr 401) Concrete Class A (Bridge) 406 (Sec) Reinforcing Steel

40 (Fr404024103 Reinforcing Steel 413-1(Sec) 030 M0 Reinforced Concrete Pipe

--413 -I (Fr 401) 030 M0 Reinforced Concrete Pipe413-2 060 M 0 Reinforced Concrete Pipe413-3 (sec) 090 M0 Reinforced Concrete Pipe

413-3(FW424 Q90M0 Renoad Concrt Pipe413-4 120 M0 Reinforced Concrete Pipe 500 Riprap and Grouted 510 Right- of - Way Markers

TOTAL

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 32: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

FEBRUARY 771979 S~AR~ OFCONTIRA T TI

W ESTI MAT1ED4 ~ i ~ RROUEC fl~EM DQUANTITYUNI OTAON

0 ~-9IS MALIHE I8iii24NOT4~00 A~0~~i98tOCCOMPS~ ~ ~ ~ ~ m 2Qi00

0985O WSii 7 00OO a E ~101 ~ 45 0I5I00O0

t25O00Zj6~L~16 100 21O 2I~~~33 210 m(Y4Su9~m r

2~~~I~~~7e45~~~ 810I~6~u W 45 I90

5116A 4 501cUm -4 03Iloo3 10 90- 4 0

0r0501976 26 43357250050 01~5-L99449- 14 341 m200s aA807 030

0~4I460~ ~ 1000 7 000I~~ 1990- ~ GQo~7~00 0 1 00 4800 013213 1u 72A - -10 -5 12 0000 4PN5 40 0

AM 1500--00~65406d4 ltsect5- 3 f aI7~ 3 IL0750 ~ 3- 30~ 25310 7~I~54q6o2~gt~948 9uma shy

00~02~ A2~ 6100~ - c9m7 j5I689230)84 + 4 1 740 19 Aq-73A4A

-I2~D41~ Qq9 A 56 54u 08 I705ro200

00 i~~ 20~A- 9~ d7 00lA

21300V 0032~2 ~ - 9 L~M - 60~ 600A Q5C

2i36I~~~~~~~~05 t~~2~14~~~~0b39~~ 70A90D093I00000IQO

U2 49 5uii 1902 127000 4)0Q~

254551266 0 7265 947Lcm ~ 6900 433030v00

610 14 cumt 740 JO-RKOZ4

1 2 2576 kg68 7 = 10 o 105______________230___

TOA 0UUATVAMOUNT70- 0

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 33: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

MINAA BA - AN IN

r A

F

r0

14a~

43 Lz

4~~~OT 4 1 A 31~w~ 3 v- ~p 31 NOV~ 30

4k

44tIA444

44~4 4 t444 ~ 206 ~ $ ~ 4 ~ ~ 44~ 442974

4 i4 4 4 ~

-

f iY4 111-shy 1

5 5~- 3 8 -1 5

5a ZO 5 ~5 2~~7 64- 5-g 9 I 7 6 8 2 5 2~ 5

53l e49O 0 1IO57 9484 0 9~~~~~~~~~~~~~ 9~~~~8206 o 21 3 ~7 9 g5 5 ~ 4 9 9~5 0sI 3 2

543

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 34: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

4475206

-MINAiLAACANIO -3C L 31 AtfG- EPLI3iSEamp 30OCT 131 _NOV 30DE3

23 27_ 29 328UM

lkS mym

ME~~shy

z ~~

77 U ltUl Ai

17 6 1- 14d 6 ~4

9959 62 1004

~I Z--

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 35: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

1~~ P- 0 -wNo -

NTlPL -H S ROA APK A31 ~~31 DEC31 JAN31 tFB 9 MAR31 AR3 A3

V

-4 -i~ -3 - - M t

- - -t- pshy

A-9-

-

i4t

-----------shy

- - - shy -

1-t43

3lt

4

--shy

t --

53 C58r-

50206-22

31

-5

5

61334

8 5

3-

06 344~~

57

644 igt

3shy

8 Z

~344378i 4 X ~ tt

62

1977

084

09 0 j

82 996

71892)t~~b~i~St5 36f-46 3tJ~S

65 70

- t 3

~t$4tt3-89 49 387

7

-9-4~ IM3

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 36: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

30 OCT 31 NV30MAY 1 JN~3JW~3lSEP AY33

-shy

4 2 4 379 02+2 442-68222$F5561954 2 8$-

8 09222 2 2 I V 2 2 2~ $ AI2 ~ ~

8 0 t7 6

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 37: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

NO3O

~ 1

~3

DE~3

PREVOUS CCOMPIIEN

PRGRESS THIS RPR

SCHEDULED WORK -SCHEUED ACOPLISHMT

ME-ATALA-OPLSMET17NAUE

JN~I EB28 MA~3 AR~O

RESET

A~i

EN TATr

IR

A AP W t3

64 75 8~14c

t A A~ A A

~ ~ ~A ~(t t A AA A A VA777~

-t-------------=

AT AmAT ~ 4 ~A

A Ism

A A~ AA752AA

2 5286 24j72 95-8136 7O 11 1861G

34 6547 I2 9ls 34096393 T3 656 1IO7 131285269239 940 4~Q39

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 38: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

SC ED ED ORESE

SCHEDULEDcA~OPI HMENT 4-A~~UALAccMPLSHMNT

3 E ~PY AET

AUTGU~ 598 ENAdE EXYJfDATE -2namp Revsion

FE8~2MAR~I APR3O i~AW3IJNW3O JUIi

IT _M$

- 7~

62 ~~~ ~ 51107 ~ 2474 ~1 01611 ~8 ~ t

10 4 2 6

31t5 44amp9 6j801I ~ j5269 3 14 04 80 9 1 434LS 43

7 77777

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 39: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

OOF~R118E~ ~ ~ ~liVE 1 WI I~IIYDT

GUS198 5 y EEXPIRY DAT 2nARevision

43 W -OCr Io ACCOM D

- -

9~ ___ ___ ____

VF ____ -

60-1

SSC6 42 4-954 I i102

4-2 644 5254O 2 60 -75 ~~~ 52 ~ 1430 ~ 14gVrifl514ie9443~ ~ ~ gt+

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 40: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

---

NAMES AMADO EBANDELARIA

ECFOiITA LEZ

~~~ RRSLO

RMRALk

-ML-SNEAN

T T ~ ~~ ~ ~

J

R4 E R

SATAO 2-L

G-A UT L R

EERR MABNE

amp APWER SCELE OFCONSULT

71 8RO Sl 1~1

POiT N EBMMA YJYg~c DEPUTY PROJECT MGR -f SRHIGHWAY ENGINEER~ SR BRIDGE ENGR1 RE

ENGRC R(H Y

RMATS ENGR-

CLERKTrYPIST

SA~~1~~ JNTR FSBAAER

RE ~ ~ ~ ~ uB PROJECTefn~~~~ NO4

4TORRABAALS tNR -c I 4R4k

ENGRAINSP H~ W

RKTPS

JAIO MESSNGE

LABORERv

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 41: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

II

MW m

(OD IGMONEOrS GHE)UE F ONULA~3S~ SU7IS

FYf

4714

B-PROJECT N 4 MINALABAC -ANTIPOLO -HUBO~ ROAD

( 4lt

U ~E[N EY A ff F )

44g -- -- --~

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 42: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

---------------

VEL~PMENT PRIECT

TAFFO GNT INSUPERVG ISION

I9-8 0

1 ~ 11A _I~1819 201 2I 2223 - 256 7 2~ 9~~A 1 MEN ~

2

BACANTIPOLO-I 2IUBO ROADKf_

31

T O-T A-2 L- ro

3

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 43: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

Bicol River Basin Development Project

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT No 36

Pili-Mataoroc Road Project 5

P ---ed y

DAN LOV7-Actg Resident Engr

Sibmitte

AMADO E Deputy P

BANDELARIA ject Manage

T

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 44: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

PROGRESS REPORT NO 36

September 1981

PROJECT PILI-MATAOROC ROAD PROJECT (Secondary and Feeder Roads Sub-Project No 5)

GENERAL

This projet consists of the construction of the following

1 Secondary Road - 8988 kms from sta 0 + 000 to

sta 9 + 144070 This road begins from the end of

the 2 kms concrGte road intersecting with the Manila

South Road at about Az km from Pili going to Naga

Its end is at Baliwag Viejo Mialabac Camarines Sur

a barrio dependent in water transportation via Bicol

Rivc- before this project came to reality As per

plan the entire Secondary Road shall be asphalted with

610 meters wide pavement Drainago structures conshy

sist of HCPs of different sizes at different stations

one (1) span 10m RCDG at sta 3 + 39871 and 4-080 x

080 m RCBCs

2 Mataoroc-Mana -a-Baliwg FeedeRoad50 - 7135 kms

from sta 0 + 00305 tco sta 7 + 24663 The beginning

of the project is at sta 1 + 950 of the Secondary Road

and ends at the end of same Secondary Road A gravel

road sUtrfa6r 400m wide width 100m shoulders is to be

done which raverses mostly ricefields This feeder

-1Ishy

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 45: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

road has the most number of drainage structures which

consist of RCPs of different sizes at different stashy

tions two-three span one (1) single span and one-17

span timber trestle bridges

3 ada-a FIseeder Roa5 - 2056 kms from

sta 0 + 02905 to sta 2 + 08496 with its beginning

at sta 3 + 572 of the Secondary Road and ends at

barrio San Isidro Bula Camarines Sur joining with

another road project A gravel road surface 400m

wide with 100m shoulder is to be done which traverses

ricefields This feeder road has five lines of RCPs

1-080 x 080m RCBC and 1-3 span timber trestle bridge

4 Manaao-Malitbo Feeder Road -1518 kms from

sta 0 + 077 to sta 1 + 59475 with its beginning at

sta 3 + 884 of Feeder Road 501 and is the only road

that does not join with another road project although

its cnd is adjacent to one A gravel road surface

400r wide with 1O0m shoulders is to be constructed

which passes through ricefields Drainage structures

consist of RCPs of different sizes at different stashy

tions and 1-080 x 080m and 210 RCBCs

5 San Jose-San RPgn Feeder Road504 - 1961 kms from sta 0 + 11409 to sta 1 + 99827 with its beginning

at sta 6 + 70 at the Secondary Road and ends at Barrio

San Ramon BuLa Camarines Sur joining with another

Road Projecc A gravel road surface 400P wide with

-2 shy

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 46: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

100m shoulders is to be constructed wLieh also passes

through ricefields Drainage structures consist of

RCPs of different sizes at different stations 1-080

x 080 RCBC and 1-2 span timber trestle bridge

I PROGRESS

The re-uot of AB Aguinaldo Cornst Inc for the termination

of Pili-Mataoroc Road Project after having been favorably inshy

dorsed by the consultant and the PMO Naga City was approved

without prejudice on the part of the contractor last July 8

1981

The necessary papers needed for bidding or negotiation were

already submitted to the MPH Based on reliable information

the negotiation with ARMS Contractors for the construction of

the remaining items of work is now being processed at the

Ministry of Public Highways Central Office

Road Accompli shed to Date Secondary Road 4531 Mataoroc-Manapao-Baliwag Fr 501 3211

Mana~o-San Isidro Fr 502 594

Manapao-Malitbog Fr 503 a 511 San Jose-San Ramon Fr 504 a 475

-3shy

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 47: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

II SU11ARY OF PHTYSICAL

a Roads

Subgrade

Subbase

Base

Surfacing

b Bridges

Substructure

Superst-cture

ACCOMPLISMIENT TO

Secondar__Road

8988 km

8200 km

5365 km

None

DATE

Feeder Road

12263 km

9538 km

None

Yone

10 LI RC

10 LM RCDG

180 LM RC

108 LM TbTe

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 48: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

T ( ROAD I

ABANDELARIA EC- FORTALEZ

ELog

tDEPUTY PROJ MANAGER SR H IG WAY NGNER

ENOINE

J TORRLA R-R6 ALES

LYDIA PJampSE

~TS -SABABAN

-M LS 6NE A7M OFt] CEKiYP~

JAW ITRMESSENGER

E F CUISON SR HIGWA N2IEM R

2

B-M DELFIN ~4 D ~ ~ VNGIOR

E Lh REY ES A P E SP-O 42

shy2~YBARO LA22 VA2LVAR EZ ~

LI VLLAREY~A

2 S B JEREMIASi

W~ATERIALSENGINEER INSPEOt R(HWY)

ENGRJ SPECTOR CBR) SURVEYOR-DRAFSMAN~

AtORY TECH CLEWK TYPIST

fIIVYANIOR SEGRr~

LABORER ij22wp22

~

t

7shy

2

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 49: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

- - - - -- - - - - - -

-0 PROJECTi RI RBASIN DELMEN

(R0kDCO MP0N Er+7S FONSLTAJT STR Q ONSTIUCTION~ SU IERYV1

APACKAGEI11~A

ESUB

SU B PROJECTNo57 PILIV MATAORIOC ROAD~~

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 50: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

NTRUCT SPERVS

1t4s~i164~ h98G

IZi~sI928 O3I~ 33 198 3534~

3C

SU60rA7~2~

-1C L 1t

~

W-1

3

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 51: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

Bicol River Basin Development Projects

Secondary and Feeder Road

PACKAGE II

MONTHLY CONSTRUCTION REPORT

No 23

Palistina-San Antonio-Minalabac Ro ad Project

Sub-Project No 6

Prepared By Submit dB

ZAO AMADO I] BANDELARIAde En ineer N Deputy Loject Manager

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 52: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

PROGRESS REPORT NO 22 August 1981

PROJECT PAL ISTINA-SAN ANTONIO-MINALAB2iC ROAD SUB - PROJECT NO 6

1 GENERAL

This project under construction consist of national Secondary road and one Feeder Road The length of the nationalmsecondary

road is 8121681 kilometers and the first 425 kilometers of which will be paved with Double Bituminous Surface Treatment

(DBST) Item 314 the rest bein- gravel base surface Item 108 together with the feeder road which has leng th of 514754 kiloshy

meters

As to its location the secondary road lies in between Naga City and Pili extending from Palistina passing through San Antonio Mydaso and ending at Bico) River A bridge sppining the Bicol River will enable an easy access to Minalabac town proper The feeder road will serve the barangays of Maydaso Tatirik Malitbog and Baras thus forming a loop from Maydaso

to the end of Secondary Road

The secondary and feeder road has a 600 meters and 400 meters roadway respectively with shoulders at 100 meter on both sides

Drainage structures on the secondary road consist of RCPs different stations and one three span RCDG bridge (Sta 5 + 2017- Sta 5 + 232) over J4alitbog creek On the feeder

road drainage structures consist of seven (7) spans over

-1shy

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 53: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

Taririk creek and another timber trestle of three (3) spans

over Baras creek

The topography of the vicinity is generally plain and the

road project is traversing a large truck of cultivated riceshy

land The existing road within the locality just spans from

Palistina up to Maydaso and were made poor surfacing thus rendshy

ering non passable to vehicle during rainy days

Farm produce from Maydaso were transported manually and the

farmers were obligated to pay a large amount just for transshy

porting of their products

Accompolishment during the first quarter of the year which

coincides with the first harvest season proves to be of great

help to both farmers and dwellers of the place Transportation

cost of farm products were greatly minimized

It has been assured that the completion of Fllistina-San Antonio-

Minalabac road project sub-project no 6 will make a dream

become reality

-2shy

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 54: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

2 PROGRESS

Work activities were mostly concentrated on the secondary road

at Sta 0 + 000 to sta 5 + 200 Hereunder are the activities

on the secondary road

1 Hauling spreading and compacting with common borrow

(Itmml07) from Sta 2 + 900 to Sta 5 + 200

2 Subbase materials (Item 108) continued hauling on

various sections of the roads even during rainy days

as long as their quarry is accessible

3 Extensions with single barrel (RCBC) was completed

160 m x 100 m x 5 m length left lane sta 2 + 68193

4 Cdnstruction of hand laid rock embankment (Item 501)

is in progress Sta 3 + 562 to Sta 3 + 612

5 Checking and restating with elevation for Item 107

and 104 were undertaken by the survey team of the

construction Also placing with elevation for hand

laid rock embankment (Item 501)

Preparation of coconut piles and formwork for detour

bridges and pile driving

Ac SECONDARY

1 Earthwork Sub-rade Item i03)

h ta 2 + 900 to Sta 3 + 800

b Sta 4 + 650 to Sta 3 + 100

-3shy

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 55: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

2 Aggregate Subbase (Item 108)

a Sta 0 + 000 to Sta 0 + 100

b Sta 0 + 300 to Sta 0 + 450

3 Structures

a Construction of hand laid rock embankment iH

in progress

b Extension with single barrel (RCBC) was completed

160 m x 100 x 3 m length left lane Sta 2 + 68193

4 Survey

Checking and restating of elevation for Item 107 and

108 also placing with elevation for hand laid rock

embankment (Item 501) Sta 3 + 562 to Sta 612

SUMMARY OP PHYSICAL ACCOMPLISHMENT

Road Accomplished to Date

Secondary 27

Feeder 00

T o t a 1 27

-4shy

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 56: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

ITEM

105

105-4

106

107

108

110

405

Materials Testing and Control

Tabulated herebelow are the various tests performed for

the project

Palistina-San Antonio -Minalabac Road

San JuanQaarry

Secondary Road

KIND OF TEST Prey Mo This Mo Total Rem-ks

Grading PL amp LL

8 8

0 0

8 8

Along ROW

Compaction Field Density

16 35

0 0

1 35

Grading PL amp LL Compaction Field Density

14 14 14 20

0 0 0 0

14 14 14 20

Grading PL amp LL Compaction Field Density

2 2 2 3

0 0 0 0

2 2 2 3

Grading 52 1 53 PL amp LL 52 1 53Soil Class 24 1 25Compaction 24 1 25 Field Density 131 1 132

Grading 53 1 54 VictoriatzarrPL amp LL 53 1 54 Compaction 19 1 20 Field Density 58 1 59 i

Grading 2 1 3 PL amp LL 2 1 3 Compaction 2 1 3Field Density 3 1 4 I

Grading 0 1 1 Coarse amp Fine Aggregate Design Mix 0 1 1

-5shy

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 57: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

105 Gradin FL amp LIOomip ctUi n

22

0 0 0)

2 22

Along right

of- way

105-4

4Ld Dtnisity

Trud-

2

2

0

0

2

2

0 I 0 2 FiVi De si ty 22 0 22

J06

Soil c r

Gtir L IL

Covgpatiri t

2

1

1

0

0

C

2

1 1

Alonp right oC

way

207

JJ Density

Gad inr tPi LL

pa-~io

2

17 1i

-

0

0

0

2

1717 5

Maydasc Quaarry

Fld - 7 0 17 Soil Class 12 0 12

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 58: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

COMMENTS AND RECOMMENDATIONS

As of this cut off date 25th of September the contract document for the construction of Palistina-Minalabac Road Sub-Project No 6 is not yet approved in Manila The contractor is proceeding in their construction under their own risk However the work is progressing fair enough With the present number of hauling equipments in the proshyject five dump truck one bulldozer one loader one grader and one road roller hauling of item 107 for the conptructshy

ion of embankment is going on so of item 108

Construction of extension of concrete box culvert at sta 2+ 68193 and headwalls of RCPC along the secondary road is going on Materials for falsework for the construction

of RCDG over Malitbog creek are already in the bridge site The following are expected to be delivered soon the crane Delmag and the concrete piles from Manila

The contractor has also informed the consultant that some of the equipment are ready for shipment to the project site

-7shy

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 59: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

WEATHER REPORT

As of September 1981

ate Weather

August26 Sunny27 Fair28 Fair29 Fair30 Fair

31 September Fair

1 Fair 2 Fair 3 Fair 4 Fair 5 Fair6 Fair 7 8

Fair to cloudy Fair

9 Fair10 Fair12 Fair 12 Fair 13 Fair 14 Fair 15 Fair16

Fair 17 Rainy Signal No 18 Stormy Rubing)Signal No I

(Typhoon Rubing)19 Rainy and stormy signal no2

(Typhoon Rubing)20 Rainy21 Fair 22 23

Fair in the am scattered shower in pm

Fair24 Fair 25 Rainy signal no1

Typhoon Saling)

Remarks

Workable Workable Workable Workable Workable

Workable

Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable Workable

Tie Extension Recommended

None None None None None

NoneNone

None None None None None None None None None None None None None None None

w(Typhoonon

Uworkable

Unworkable

Unworkable Unworkable Wcrkable

Workable

Workable Workable

Unworkable

OneS(r) dSy

One () day

One (1) dayOne ( day

None

None

None None

None

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 60: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

BICOL RIVER BASIP D-TELOPPINT FROJECT

San Jose Fill Camrarines Su3

EELOY7EITGEiJERATOI SU-V-EY (SS3)

NA-E OF C0FriyCT EOUT-HI TORiSTIS ENTpRXPRISE

0 7ThE N CC__ 0 September _ __ 1981_2

- ADCTiTTIST-ApT P-iGTEERTN(gt SKILLED LDIISKLL Si -E TECLNICA

T LTT-==D1 1 5 16 7 OCAL- D 2 5 22

T 0- _ 1_

7 21 29

iJ Inclues permnent employees

2 734p loyees residin- within the Basin Area

iocal fired Only

SU3MITTED BY

(STD) EFREN P NORANTE SINME Constru-tion ianager

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 61: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

SOUTH MOTORISTS ENTERPRISE

MAYDASO MILAOR CAIARINES SUR

LTST OF PERSONNEL

NAM1E

1 Efren P Mor-ante

2 Francisco P Eusebio

3 Renato 0 Magisa

4 Bernardo H Tejada

5 icardo Reyes

6 Cir4co Baduya

7 Jaime Tosoc

8 Domingec Salvador

0 Juanito Portoria

10 Eduardo Trajico

11 Andres Logarto

12 Willy rangalan

13 Vloises Gavina

14 Alberto iTarral

15 Enrique J rabante

16 Rolando Laron

17 Ricardo Giron

18 Benvienido Bien

19 Lucricio Carancay

20 Renato Belayre

21 uillerno aetumban

722 IPaustino Xaleon

- 10

POS ITION

Construction Manager

Mechanical Engineer

Project Engineer

Hvy Equipt amp Operation Head

Accountant

Equipment Supervis6v

Instrument Man

Hvy Equipt amp Trucking Head

Bridge Foreman

Roadway Foreman

Dozer Operator

Grader Operator

Graer Operator

Loader Operator

oller Operator

Tvy Equipment Mechanic

NechanicWelder

Mechanic

Piechanic

Driver

Diver

Driver

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 62: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

23 Eduardo de Ocampo

24 Leovigildo Cantillano

25 Felimon Ationza

26 Eutiquio Batardo

27 Pedro Espejon

28 Rogelio Roy

29 Enrique Mendoza

30 Josie Ermina

31 Jose Camin

32 Benjamin Bautista

33 Godofrtdo Albo

34 Roque Tosoc

35 Macario Gavino

36 Inocentes Galona

37 Xbse Banday

38 Enesto Osoc

39 Anatalio Cado

40 Leonardo Tipones

41 Vito Euste

42 Hilarion Guinoo

43 Alberto Arreda

44 Jose Breguildo

45 Felipe Cea

46 Luis Clarianes

47 Pastor Clarianes

48 Donato Calona

49 Eduardo Hunat

-ll1-

Driver

Driver

Dr~ver

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

Truck Helper

TimekeeperWarehouse Keeper

Carpenter

Carpenter

Carpenter

Carpenter

Carpenter

Survey Helper

Survey Helper

Survey Helper

Survey Helper

Helper

Helper

Helper

Helper

Helper

Helper

Helper

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 63: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

50 Ubaldo Osoc Jr Helper

51 Eddie Pago Helper

52 Norman Pago Helper

53 Fernando Penis Helper

54 Roberto Ramirez Helper

55 Romeo Tinoy Helper

56 Roberto Guinoo 1elper

57 Anancio Galona Watchman

58 Antonio Galona Watchman

SUBMITTED BY

(0- SIGNED)

EFREN P MORANTE S14E Construction Manager

- 12

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 64: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

SOUTH MOTORISTS ENTIERFRISE

MAYDASO MILAOR CAMARINES SUrR

LIST OF P ENT -)UIfPETT

NUMBER

1

1

1

1

3

2

DEHOR IPTI ON

Road Grader

fRoad Roller 10 Ton

Bulldozer D-8

Payloader 275 cy yd

Dump Trucks 10 cu m

Cargo Trucks 9 cum

SUBMITTED BY

(Orig Signed)EFREN P MORANTE

SME Conotruction Manager

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 65: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

BIGL RIVER BASIN D~~0MITP~ JEC

MANP0WEk- SGHEDULE i -F CNSULTANTSS

AMADQ EBANDELARA EtC FORTALEZA

I J$AToSR JATRRAL84A

F RCOSAL ES L p Jos

A iK STSABAf

DUTYj PROq MANAGER SR HIGHWAY-ENGINEER

I SR BRIDGE ENGINEER LOG ENGIER~~

RMTLS ENGI~EE -iI4M~OFFICER~

Or~iLERK r ISm J ANITOR MESSENGER

SUB PROJECT NO 6 PALtSTINA SAN ANTONIO -I A1 ICEN TE B ZANO RESIDENT ENGINEER

C MOLINA R NUN EZ -

~ ~YJ1ltB A BAUTiSTA AAM M41DLA5-

~ CD DELFINlt lt~ V- dCI CLARID 1

-C DANItLA

HWY ErGR INSPECTOR BRIDGE~ENGR INSP

f ATERIALS t NG SURVEYORDRAFTSM IN

LABORATORY TECHI -K CLERKTYIPIST ~~~

JANTO MESEN jP F SABA2 ABO~RR ~

A A

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 66: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

ANTS STAFFF PACKAGE

t~56T~7qifl9Th 44 112 113114 15lP~~l72 l2231241

~ 24

24

24

- gtur185

ONtO -MINALABACG- 4-4~-

~ 24

24-1 A-

i2012

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 67: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

BICOL RIVER BASIN DEVELOPMENT PROGRAM OFFICE San Jose Pili Camarines Sur

EMPLOY11ENT GEERATION SURVEY (SS3) NAME OF CONSULTANT INTEGRATED PHILCONSULT INC

FOR THE MONTH OF September 1981

Administrative Engineering Finance Technical Skilled Unskilled

Manila-Based 1 4

Local-Hired 2 5 17 8

Sub-Contractors 3

T o t a 1 5 21 8

4 Includes permanent employees Employees residing within the basin area3 Local Hired only

Submi 4d y

AMAIDO BANDELARIA Deputy roject Manager

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager

Page 68: pdf.usaid.govpdf.usaid.gov/pdf_docs/PDAAI822.pdfTABLE Op CONTENTS . MINALABAC-ANTIPOLOT _.UJBO . ROAD PROJECT Sub-Project . No. 4 Figure . I, Location Plan (For 3 . Projects) Progress

September 25 1981

C E R T I F I C TI 0 N

This is to certify that this Monthly Construction

Progress Report submitted to the Ministry of Public

Highways in compliance with paragraph 302 Article II

of the Contract for Engineering Services are the actual

accomplishment of the respective contractors and other

information included thereat ar true rid correct

ADADO rBANELARIA Deputy reject Manager