pdw tripura r&b sor2011 - morter

2
SH:03/MORTAR file:///home/website/convert/temp/convert_html/55cf99b1550346d0339eb094/documen /Schedule SH:03-Page:2 SUB HEAD : 3.0 MORTAR Note: Description Unit 3.1 Cement Mortar 3.1.1 Cement Mortar 1 : 1 (1 cement : 1 fine sand) cum 3.1.2 Cement Mortar 1 : 2 (1 cement : 2 fine sand) cum 3.1.3 Cement Mortar 1 : 3 (1 cement : 3 fine sand) cum 3.1.4 Cement Mortar 1 : 4 (1 cement : 4 fine sand) cum 3.1.5 Cement Mortar 1 : 5 (1 cement : 5 fine sand) cum 3.1.6 Cement Mortar 1 : 6 (1 cement : 6 fine sand) cum 3.2 Cement Stone Dust Mortar 3.2.1 Cement Stone Dust Mortar 1 : 2 (1 cement : 2 Stone dust) cum 3.3 Cement Marble Dust Mortar 3.3.1 Cement Marble Dust Mortar 1 : 2 (1 cement : 2 Marble dust) cum 3.3.2 Cement Marble Dust Mortar 1 : 5 (1 cement : 5 Marble dust) cum 3.4 White Cement Marble Dust Mortar 3.4.1 cum 3.4.2 cum 3.4.3 cum 3.5 Mud Mortar cum Note: These rates are exclusive of water charges, overheads & contractor's profit. 1. Sand can be either coarse or fine as required/available. Here, provision of fine sand due to non-availability of coarse sand in Tripura. However, if design of mortar dictate sand, then seperate analysis may be made as per site condition. 2. Mixing of Cement and sand is considered manually. Thus the cost towards labour a mixer is not considered. Only cost of material is taken. 3. Add extra @ 5% for labour charges & hire charges, water charges, sundries and conti mechanical mixing of mortar. 4. Ordinary cement 43 grade may be used. 5. Weight of 1 cum of cement considered = 1.44 t Code No. White Cement Marble Dust Mortar 1 : 2 (1 White cement : 2 Marble dust) White Cement Marble Dust Mortar 1 : 3 (1 White cement : 3 Marble dust) White Cement Marble Dust Mortar 1 : 5 (1 White cement : 5 Marble dust) Add extra @ 5% for labour charges & hire charges, water charges, sundries and contingencies in case of mechanical mixing of mortar.

Upload: arup-debnath

Post on 31-Dec-2015

9 views

Category:

Documents


0 download

DESCRIPTION

3. Building Works_mortar

TRANSCRIPT

Page 1: PDW Tripura R&B SOR2011 - Morter

SH:03/MORTAR

file:///tt/file_convert/55cf99b1550346d0339eb094/document.xls/Schedule SH:03-Page:2

SUB HEAD : 3.0MORTAR

Note:

Description Unit Rate

3.1 Cement Mortar

3.1.1 Cement Mortar 1 : 1 (1 cement : 1 fine sand) cum R 6215.50

3.1.2 Cement Mortar 1 : 2 (1 cement : 2 fine sand) cum R 4330.69

3.1.3 Cement Mortar 1 : 3 (1 cement : 3 fine sand) cum R 3371.42

3.1.4 Cement Mortar 1 : 4 (1 cement : 4 fine sand) cum R 2619.43

3.1.5 Cement Mortar 1 : 5 (1 cement : 5 fine sand) cum R 2214.51

3.1.6 Cement Mortar 1 : 6 (1 cement : 6 fine sand) cum R 1867.43

3.2 Cement Stone Dust Mortar

3.2.1 Cement Stone Dust Mortar 1 : 2 (1 cement : 2 Stone dust) cum R 7043.68

3.3 Cement Marble Dust Mortar

3.3.1 cum R 7471.18

3.3.2 cum R 5751.69

3.4 White Cement Marble Dust Mortar

3.4.1 cum R 13832.38

3.4.2 cum R 11651.60

3.4.3 cum R 8634.69

3.5 Mud Mortar cum R 555.19

Note:

These rates are exclusive of water charges, overheads & contractor's profit.1. Sand can be either coarse or fine as required/available. Here, provision of fine sand is considered only due to non-availability of coarse sand in Tripura. However, if design of mortar dictates for use of coarse sand, then seperate analysis may be made as per site condition.2. Mixing of Cement and sand is considered manually. Thus the cost towards labour and hire charges of mixer is not considered. Only cost of material is taken. 3. Add extra @ 5% for labour charges & hire charges, water charges, sundries and contingencies in case of mechanical mixing of mortar.4. Ordinary cement 43 grade may be used.5. Weight of 1 cum of cement considered = 1.44 t

Code No.

Cement Marble Dust Mortar 1 : 2 (1 cement : 2 Marble dust)

Cement Marble Dust Mortar 1 : 5 (1 cement : 5 Marble dust)

White Cement Marble Dust Mortar 1 : 2 (1 White cement : 2 Marble dust)

White Cement Marble Dust Mortar 1 : 3 (1 White cement : 3 Marble dust)

White Cement Marble Dust Mortar 1 : 5 (1 White cement : 5 Marble dust)

Add extra @ 5% for labour charges & hire charges, water charges, sundries and contingencies in case of mechanical mixing of mortar.