2014 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM PEDESTRIAN CIRCULATION AND SAFETY Approved: July 22, 2014 Prepared for the San Francisco County Transportation Authority By San Francisco Municipal Transportation Agency In Coordination with Bay Area Rapid Transit (BART), Department of Public Works, and Peninsula Corridor Joint Powers Board (PCJPB or Caltrain)

Upload: others

Post on 04-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

2014 PROPOS IT ION K

5 -YEAR PR IOR IT IZAT ION PROGRAM

PEDESTRIAN CIRCULATION AND SAFETY

Approved: July 22, 2014 Prepared for the San Francisco County Transportation Authority

By San Francisco Municipal Transportat ion Agency

In Coordination with Bay Area Rapid Transit (BART), Department of Publ ic Works, and

Peninsula Corr idor Joint Powers Board (PCJPB or Caltrain)

Page 2: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

2014 PROP K 5-YEAR PR IORIT IZATION PROGRAM PEDESTRIAN C IRCULATION AND SAFETY

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

Table of Contents

Eligibility

Prioritization Criteria

Stretching Your Prop K Sales Tax Dollars Farther

Table 1 - Prop K Leveraging

Table 2 - Project Delivery Snapshot

Table 3 - Prioritization Criteria and Scoring Table

Table 4 – Prop K 5-Year Project List (FY 2014/15 – FY 2018/19)

Project Information Forms

2009 Prop K 5-Year Prioritization Program – Program of Projects (as adopted)

2009 Prop K 5-Year Prioritization Program – Program of Projects (as amended)

Eligibility

Eligibility as identified in the voter approved Prop K Expenditure Plan is as follows:

“Pedestrian Circulation and Safety: Programmatic improvements to the safety and usability of city streets for pedestrians, prioritized as identified in the Pedestrian Master Plan. Includes flashing pavement reflectors on crosswalks, pedestrian islands in the medians of major thoroughfares, sidewalk bulb-outs, sidewalk widening, and improved pedestrian circulation around BART and Caltrain stations. Includes project development and capital costs. Sponsoring agencies: DPT, MUNI, DPW, BART, PCJPB. The first $23.8 M is Priority 1. The next $1.2 million is Priority 2, and the remainder is Priority 3. Total funding: $69.7 million; Prop K: $52.0 M.”

DPT stands for Department of Parking and Traffic, and MUNI for San Francisco Municipal Railway. DPT and MUNI are now under the San Francisco Municipal Transportation Agency (SFMTA). DPW stands for Department of Public Works, BART for Bay Area Rapid Transit, and PCJPB for Peninsula Corridor Joint Powers Board (Caltrain).

Prioritization Criteria

One of the key required elements of the 5YPPs is a transparent process for how projects get selected. Prop K requires at a minimum that each category include prioritization criteria that address project readiness, community support, and relative level of need or urgency. For this 5YPP update, the Citizens Advisory Committee requested that the Transportation Authority and project sponsors develop a user-friendly, transparent scoring table that could apply to all 5YPPs, and that the scoring prioritize safety and community input highly.

Table 3 shows the new Prioritization Criteria and Scoring Table. Each project can receive a maximum of 20 points, with 10 points allocated programwide criteria and 10 points allocated for category specific criteria.

Page 3: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

2014 PROP K 5-YEAR PR IORIT IZATION PROGRAM PEDESTRIAN C IRCULATION AND SAFETY

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

The Expenditure Plan also requires consideration of geographic equity in terms of project distribution that takes into account the various needs of San Francisco’s neighborhoods.

The projects proposed for the 2014 5YPP are primarily focused on improving pedestrian safety. Most of the projects come from the WalkFirst Investment Strategy (WalkFirst). Based on a data-driven effort, an interagency team has produced a list of capital projects prioritized to achieve the goals of the City’s Pedestrian Strategy. The goal is to reduce serious or fatal pedestrian injuries by 25% by 2016 and 50% by 2021, increasing walkability, and making all neighborhoods safer for pedestrians. WalkFirst further supports the Vision Zero, adopted by the Board of Supervisors, the SFMTA Board, and many other city agencies in 2014, to eliminate traffic deaths by 2024.

In order to invest resources where the problem injuries are most concentrated, WalkFirst focuses on the City’s High Injury Network, which represents 6% of street miles but accounts for 60% of severe and fatal injuries. Because of the City’s geographic inequities in the distribution of pedestrian injuries, the High Injury Network is concentrated in the Northeast quadrant of the City, mostly Districts 3 and 6, which have per mile rates of severe and fatal injuries over twice the citywide rate. However, investments in pedestrian safety improve conditions for all residents, visitors, and employees, and these two districts have the highest employment density in San Francisco. The Network also incorporated additional considerations for the geographic distribution of corridors across the City by increasing the number of miles in Communities of Concern, areas that face particular transportation challenges.

Stretching Your Prop K Sales Tax Dollars Farther

Leveraging Prop K funds against non-Prop K fund sources (e.g., federal, state, other local funds) is necessary to fully fund the Expenditure Plan projects and programs. For the Pedestrian Circulation and Safety category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue spent, it would be leveraged by about $0.34 in non-Prop K funds. The table below compares Prop K Expenditure Plan assumptions with proposed leveraging in the 2014 5-year project lists.

Table 1. Prop K Leveraging1

Category Expected Leveraging (Non-Prop K Funds)

Proposed Leveraging (Non-Prop K Funds)

Pedestrian Circulation and Safety 25% 52% 1 This table compares the expected leveraging assumed in the Expenditure Plan with the proposed leveraging assumed in the 5-

Year Project List.

Page 4: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

Tab

le 2

. Pro

ject

Del

iver

y Sn

apsh

otP

edes

tria

n C

ircu

lati

on/

Safe

ty

Tab

le 2

a. P

rop

K F

un

ds

Allo

cate

d 5-Y

ear

Pri

orit

izat

ion

Pro

gram

(5Y

PP

) P

erio

d

Pro

gram

med

(A

vaila

ble

for

A

lloca

tion

)T

otal

Allo

cate

d a

s of

3/

31/

2014

% A

lloca

ted

2005

5Y

PP

(F

Y 2

004/

05-2

008/

09)

*$3

,704

,493

$2,5

99,5

5970

%20

09 5

YP

P (

FY

200

9/10

-20

13/

14)

*$5

,464

,862

$3,8

62,8

0071

%T

otal

*$6

,462

,359

Tab

le 2

b. P

erce

nt

Com

ple

teT

able

s sh

ow a

lloca

tions

and

per

cent

com

plet

e th

roug

h M

arch

31,

201

4, b

ased

on

proj

ect s

pons

ors'

prog

ress

rep

orts

.

Com

ple

ted

Pro

ject

s/P

roje

ct P

has

es (s

orte

d by

allo

catio

n ye

ar, t

hen

spon

sor,

then

pro

ject

nam

e)

Spon

sor

Fis

cal Y

ear

of

Allo

cati

onP

roje

ct N

ame

Ph

ase(

s) F

un

ded

Tot

al A

lloca

ted

as

of 3

/31

/20

14%

Com

ple

te

as

of

3/31

/20

14SF

MT

A20

04/0

520

05 5

-Yea

r P

riorit

izat

ion

Pro

gram

Dev

elop

men

tP

lann

ing

92,0

00$

10

0%

SFM

TA

2004

/05

Ped

estr

ian

Isla

nds

and

Cro

ssw

alks

Im

prov

emen

tsD

esig

n,

Con

stru

ctio

n21

1,70

7$

10

0%

SFM

TA

2004

/05

Ped

estr

ian

Pro

ject

s -

Ped

estr

ian

Safe

Cur

b B

ulbs

Des

ign

53,0

00$

10

0%

BA

RT

2005

/06

Bal

boa

Par

k St

atio

n W

ests

ide

Ent

ranc

e an

d W

alkw

ayD

esig

n25

,000

$

100%

SFM

TA

2005

/06

Cor

rido

rs: M

arke

t Str

eet C

ross

wal

k R

estr

ipin

g an

d L

imit

Lin

esC

onst

ruct

ion

19,8

60$

10

0%

SFM

TA

2005

/06

Med

ian

and

Cur

b R

amp

Acc

essi

bilit

yD

esig

n,

Con

stru

ctio

n54

,941

$

100%

SFM

TA

2005

/06

Nei

ghbo

rhoo

d -

Phe

lan

Ave

nue

Cro

ssw

alk

Impr

ovem

ents

Env

ironm

enta

l, D

esig

n35

,075

$

100%

SFM

TA

2005

/06

Acc

essi

ble

Pede

stri

an S

igna

ls: C

ityw

ide

Phas

e II

Env

ironm

enta

l, D

esig

n,

Con

stru

ctio

n38

,788

$

100%

*F

unds

pro

gram

med

in th

e 20

09 5

YP

P m

ay in

clud

e pr

ogra

mm

ed b

ut u

nallo

cate

d fu

nds

from

the

2005

5Y

PP

, as

wel

l as

de-

oblig

ated

fun

ds.

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\Pr

ojec

t Del

iver

y\C

hapt

er 3

Pro

ject

Del

iver

y; E

P 4

0Pa

ge 1

of 4

Page 5: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

Tab

le 2

. Pro

ject

Del

iver

y Sn

apsh

otP

edes

tria

n C

ircu

lati

on/

Safe

ty

Com

ple

ted

Pro

ject

s/P

roje

ct P

has

es (s

orte

d by

allo

catio

n ye

ar, t

hen

spon

sor,

then

pro

ject

nam

e)

Spon

sor

Fis

cal Y

ear

of

Allo

cati

onP

roje

ct N

ame

Ph

ase(

s) F

un

ded

Tot

al A

lloca

ted

as

of 3

/31

/20

14%

Com

ple

te

as

of

3/31

/20

14

SFM

TA

2005

/06

Ped

estr

ian

Cou

ntdo

wn

Sign

als-

Div

isad

ero

& H

ayes

Env

ironm

enta

l, D

esig

n,

Con

stru

ctio

n17

,082

$

100%

SFM

TA

2005

/06

Ped

estr

ian

Cou

ntdo

wn

Sign

als-

Gea

ry &

Lag

una

Env

ironm

enta

l, D

esig

n,

Con

stru

ctio

n2,

311

$

100%

SFM

TA

2005

/06

Ped

estr

ian

Cou

ntdo

wn

Sign

als-

Van

Nes

sE

nviro

nmen

tal,

Des

ign,

C

onst

ruct

ion

26,1

62$

10

0%

SFM

TA

2005

/06

Ped

estr

ian

Mas

ter

Pla

nE

nviro

nmen

tal

115,

854

$

100%

SFM

TA

2005

/06

Ped

estr

ian

Safe

ty -

Inn

ovat

ive

Dev

ice

Tes

ting/

Adj

ustm

ents

Con

stru

ctio

n13

0,77

6$

10

0%

SFM

TA

2005

/06

Ped

estr

ian

Sign

als

- 1

6th

and

Fol

som

Str

eets

Con

stru

ctio

n20

,816

$

100%

SFM

TA

2005

/06

Ped

Safe

Cur

b B

ulbs

Con

stru

ctio

n1,

403

$

100%

BA

RT

2006

/07

Bal

boa

Par

k St

atio

n W

ests

ide

Ent

ranc

e an

d W

alkw

ayC

onst

ruct

ion

217,

000

$

100%

SFM

TA

2006

/07

3rd

Stre

et L

ight

Rai

l Tra

nsit

Acc

essi

ble

Ped

estr

ian

Sign

als

Env

ironm

enta

l, D

esig

n,

Con

stru

ctio

n19

2,07

4$

10

0%

SFM

TA

2006

/07

Phe

lan

Ave

nue

Ped

estr

ian

Impr

ovem

ents

Pla

nnin

g,

Env

ironm

enta

l, D

esig

n18

,653

$

100%

SFM

TA

2006

/07

Van

Nes

s A

ve. P

edes

tria

n C

ount

dow

n Si

gnal

sC

onst

ruct

ion

92,5

33$

10

0%

SFM

TA

2007

/08

Acc

essi

ble

Pede

stri

an S

igna

lsE

nviro

nmen

tal,

Des

ign

159,

734

$

100%

SFM

TA

2007

/08

Lad

der

Cro

ssw

alks

Mai

nten

ance

Con

stru

ctio

n41

,993

$

100%

SFM

TA

2007

/08

Loc

al M

atch

- G

olde

n G

ate

Par

k P

edes

tria

n an

d B

icyc

le

Impr

ovem

ents

Env

ironm

enta

l, D

esig

n20

,531

$

100%

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\Pr

ojec

t Del

iver

y\C

hapt

er 3

Pro

ject

Del

iver

y; E

P 4

0Pa

ge 2

of 4

Page 6: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

Tab

le 2

. Pro

ject

Del

iver

y Sn

apsh

otP

edes

tria

n C

ircu

lati

on/

Safe

ty

Com

ple

ted

Pro

ject

s/P

roje

ct P

has

es (s

orte

d by

allo

catio

n ye

ar, t

hen

spon

sor,

then

pro

ject

nam

e)

Spon

sor

Fis

cal Y

ear

of

Allo

cati

onP

roje

ct N

ame

Ph

ase(

s) F

un

ded

Tot

al A

lloca

ted

as

of 3

/31

/20

14%

Com

ple

te

as

of

3/31

/20

14

SFM

TA

2008

/09

24th

and

Mis

sion

BA

RT

Sta

tion

Are

a C

urb

Bul

b-O

uts

Pla

nnin

g, D

esig

n,

Con

stru

ctio

n13

0,00

0$

10

0%

SFM

TA

2008

/09

Acc

essi

ble

Ped

estr

ian

Sign

als

Con

stru

ctio

n77

0,20

2$

10

0%SF

MT

A20

08/0

9E

ddy

and

Elli

s Si

dew

alk

Bul

bsC

onst

ruct

ion

50,0

00$

10

0%SF

MT

A20

08/0

9L

adde

r C

ross

wal

ks M

aint

enan

ceC

onst

ruct

ion

62,0

65$

10

0%

SFM

TA

2009

/10

Con

vert

ing

Stan

dard

Cro

ssw

alks

to C

ontin

enta

l C

ross

wal

ksP

lann

ing,

Des

ign,

C

onst

ruct

ion

79,9

89$

10

0%

SFM

TA

2009

/10

Dub

oce

Ave

nue

Ped

estr

ian

Impr

ovem

ents

Con

stru

ctio

n17

3,00

0$

10

0%

SFM

TA

2009

/10

Ped

estr

ian

Cou

ntin

g P

roje

ctP

lann

ing,

P

rocu

rem

ent

54,8

53$

10

0%

SFM

TA

2009

/10

Red

Vis

ibili

ty C

urbs

Pla

nnin

g, D

esig

n,

Con

stru

ctio

n29

,135

$

100%

SFM

TA

2009

/10

Re-

open

ing

Clo

sed

Cro

ssw

alks

Pla

nnin

g, D

esig

n,

Con

stru

ctio

n15

2,52

1$

10

0%

SFM

TA

2009

/10

Scho

ol C

ross

wal

k M

aint

enan

ceC

onst

ruct

ion

74,5

60$

10

0%

SFM

TA

2010

/11

Con

vert

ing

Stan

dard

Cro

ssw

alks

to C

ontin

enta

l C

ross

wal

ksD

esig

n,

Con

stru

ctio

n89

,529

$

100%

SFM

TA

2010

/11

Ped

estr

ian

Cou

ntin

gP

lann

ing

25,0

00$

10

0%

SFM

TA

2010

/11

Red

Vis

ibili

ty C

urbs

Des

ign,

C

onst

ruct

ion

29,7

43$

10

0%

SFM

TA

2010

/11

Scho

ol C

ross

wal

k M

aint

enan

ceP

lann

ing,

C

onst

ruct

ion

69,2

42$

10

0%

SFM

TA

2010

/11

Mar

ina/

Buc

hann

an C

lose

d C

ross

wal

k O

peni

ngC

onst

ruct

ion

-$

10

0%SF

MT

A20

10/1

1N

ew P

edes

tria

n Si

gnal

sD

esig

n15

6,78

4$

10

0%SF

MT

A20

10/1

1N

ew P

edes

tria

n Si

gnal

sE

nviro

nmen

tal

41,6

58$

10

0%

DP

W20

11/1

2U

nion

Squ

are

Pub

lic R

ight

-of-

Way

Acc

essi

bilit

y Im

prov

emen

tsC

onst

ruct

ion

514,

456

$

100%

SFM

TA

2011

/12

Cro

ssw

alk

Mai

nten

ance

Con

stru

ctio

n56

,577

$

100%

SFM

TA

2011

/12

Cro

ssw

alk

Mai

nten

ance

Env

ironm

enta

l14

,397

$

100%

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\Pr

ojec

t Del

iver

y\C

hapt

er 3

Pro

ject

Del

iver

y; E

P 4

0Pa

ge 3

of 4

Page 7: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

Tab

le 2

. Pro

ject

Del

iver

y Sn

apsh

otP

edes

tria

n C

ircu

lati

on/

Safe

ty

Com

ple

ted

Pro

ject

s/P

roje

ct P

has

es (s

orte

d by

allo

catio

n ye

ar, t

hen

spon

sor,

then

pro

ject

nam

e)

Spon

sor

Fis

cal Y

ear

of

Allo

cati

onP

roje

ct N

ame

Ph

ase(

s) F

un

ded

Tot

al A

lloca

ted

as

of 3

/31

/20

14%

Com

ple

te

as

of

3/31

/20

14

SFM

TA

2011

/12

Mis

sion

-Gen

eva

Tra

nsit

and

Ped

estr

ian

Impr

ovem

ents

Con

stru

ctio

n30

9,28

6$

10

0%

SFM

TA

2011

/12

Ped

estr

ian

Ref

uge

Isla

nds

Des

ign

22,1

49$

10

0%SF

MT

A20

12/1

3F

rank

lin S

tree

t Sig

nal U

pgra

des

Des

ign

112,

095

$

100%

SFM

TA

2012

/13

Man

sell

Cor

ridor

Im

prov

emen

tsP

lann

ing

119,

112

$

100%

Pro

ject

s/P

roje

ct P

has

es U

nd

erw

ay (s

orte

d by

allo

catio

n ye

ar, t

hen

spon

sor,

then

pro

ject

nam

e)

Spon

sor

Fis

cal Y

ear

of

Allo

cati

onP

roje

ct N

ame

Ph

ase(

s) F

un

ded

Tot

al A

lloca

ted

as

of 3

/31

/20

14%

Com

ple

te

as

of

3/31

/20

14D

PW

2012

/13

Sloa

t Bou

leva

rd P

edes

tria

n Im

prov

emen

tsD

esig

n33

,552

$

90%

DP

W20

13/1

4Sl

oat B

oule

vard

Ped

estr

ian

Impr

ovem

ents

(EP

40)

Con

stru

ctio

n96

,825

$

0%SF

MT

A20

12/1

320

13 5

-Yea

r P

riorit

izat

ion

Pro

gram

Dev

elop

men

tE

nviro

nmen

tal

19,0

00$

90

%SF

MT

A20

12/1

3C

ontin

enta

l Cro

ssw

alks

and

Red

Vis

ibili

ty C

urbs

Con

stru

ctio

n35

,727

$

30%

SFM

TA

2012

/13

Con

tinen

tal C

ross

wal

ksD

esig

n95

,500

$

25%

SFM

TA

2012

/13

Con

tinen

tal C

ross

wal

ksP

lann

ing

19,5

00$

90

%SF

MT

A20

12/1

3N

ew P

edes

tria

n Si

gnal

sC

onst

ruct

ion

923,

905

$

30%

SFM

TA

2012

/13

O'S

haug

hnes

sy &

Del

Val

e C

ross

wal

kC

onst

ruct

ion

82,0

00$

0%

SFM

TA

2012

/13

O'S

haug

hnes

sy &

Del

Val

e C

ross

wal

kD

esig

n54

,000

$

95%

SFM

TA

2012

/13

Silv

er a

nd A

ugus

ta I

slan

d an

d B

ulb-

out

Con

stru

ctio

n15

3,74

7$

10

%SF

MT

A20

13/1

46t

h St

reet

Im

prov

emen

tsP

lann

ing

142,

228

$

40%

SFM

TA

2013

/14

6th

Stre

et I

mpr

ovem

ents

Env

ironm

enta

l38

,601

$

10%

SFM

TA

2013

/14

Man

sell

Cor

ridor

Im

prov

emen

tE

nviro

nmen

tal

44,1

30$

50

%

For

mor

e in

form

atio

n on

Pro

p K

and

oth

er T

rans

port

atio

n A

utho

rity

fun

ded

proj

ects

, vis

it ht

tp:/

/ww

w.s

fcta

.org

/mys

tree

tsf-

proj

ects

-map

to a

cces

s an

in

tera

ctiv

e m

ap s

how

ing

proj

ects

in y

our

neig

hbor

hood

and

city

wid

e.

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\Pr

ojec

t Del

iver

y\C

hapt

er 3

Pro

ject

Del

iver

y; E

P 4

0Pa

ge 4

of 4

Page 8: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

Tab

le 3

- P

rior

itiz

atio

n C

rite

ria

and

Sco

rin

g T

able

Ped

estr

ian

Cir

cula

tion

/Sa

fety

(E

P 4

0)

Pro

ject

Rea

din

ess

Com

mu

nit

y Su

pp

ort

Tim

e Se

nsi

tive

U

rgen

cySa

fety

Pro

vid

es

Ben

efit

s to

M

ult

iple

U

sers

Hig

h I

nju

ry

Cor

rid

orL

ever

agin

gT

otal

Tot

al P

ossi

ble

Scor

e4

33

33

22

20C

orri

dor

Pro

ject

s6t

h St

reet

Im

prov

emen

ts -

PS&

E4

30

33

20

156t

h St

reet

Im

prov

emen

ts -

CO

N3

30

33

20

147t

h St

reet

Str

eets

cape

33

03

32

216

Fol

low

-th

e-P

avin

gF

ollo

w-t

he-P

avin

g (S

pot I

mpr

ovem

ents

)C

ityw

ide

Ped

estr

ian

Saf

ety

& C

ircu

lati

on I

mp

rove

men

ts

Act

ive

Tra

nspo

rtat

ion

Pro

gram

Loc

al M

atch

Wal

kFir

st P

edes

tria

n Im

prov

emen

ts

Nei

ghbo

rhoo

d T

rans

port

atio

n Im

prov

emen

t P

rogr

am (N

TIP

)

Pri

orit

izat

ion

Cri

teri

a D

efin

itio

ns:

Loc

atio

ns w

ill b

e sc

ored

at t

he ti

me

of a

lloca

tion.

See

text

and

Pro

ject

Inf

orm

atio

n F

orm

for

mor

e de

tails

.

Loc

atio

ns w

ill b

e sc

ored

at t

he ti

me

of a

lloca

tion.

See

text

and

Pro

ject

Inf

orm

atio

n F

orm

for

mor

e de

tails

.

Loc

atio

ns w

ill b

e sc

ored

at t

he ti

me

of a

lloca

tion.

See

text

and

Pro

ject

Inf

orm

atio

n F

orm

for

mor

e de

tails

.

Loc

atio

ns w

ill b

e sc

ored

at t

he ti

me

of a

lloca

tion.

See

text

and

Pro

ject

Inf

orm

atio

n F

orm

for

mor

e de

tails

.

PR

OP

K P

RO

GR

AM

-WID

E C

RIT

ER

I A

Tim

e Se

nsi

tive

Urg

ency

: Pro

ject

nee

ds to

pro

ceed

in p

ropo

sed

timef

ram

e to

ena

ble

cons

truc

tion

coor

dina

tion

with

ano

ther

pro

ject

(e.g

., m

inim

ize

cost

s an

d co

nstr

uctio

n im

pact

s); t

o su

ppor

t an

othe

r fu

nded

or

prop

osed

pro

ject

(e.g

. new

sig

nal c

ontr

olle

rs n

eed

to b

e in

stal

led

to s

uppo

rt T

EP

impl

emen

tatio

n); o

r to

mee

t tim

ely

use

of f

unds

dea

dlin

es a

ssoc

iate

d w

ith m

atch

ing

fund

s.

Pro

ject

Rea

din

ess:

Pro

ject

like

ly to

nee

d fu

ndin

g in

fis

cal y

ear

prop

osed

. F

acto

rs to

be

cons

ider

ed in

clud

e ad

equa

cy o

f sc

ope,

sch

edul

e, b

udge

t and

fun

ding

pla

n re

lativ

e to

cur

rent

pro

ject

st

atus

(e.g

. exp

ect m

ore

deta

il an

d ce

rtai

nty

for

a pr

ojec

t abo

ut to

ent

er c

onst

ruct

ion

than

des

ign)

; whe

ther

pri

or p

roje

ct p

hase

s ar

e co

mpl

eted

or

expe

cted

to b

e co

mpl

eted

bef

ore

begi

nnin

g th

e ne

xt p

hase

; and

whe

ther

litig

atio

n, c

omm

unity

opp

ositi

on o

r ot

her

fact

ors

may

sig

nific

antly

del

ay p

roje

ct.

Com

mu

nit

y Su

pp

ort:

Pro

ject

has

cle

ar a

nd d

iver

se c

omm

unity

sup

port

and

/or

was

it id

entif

ied

thro

ugh

a co

mm

unity

-bas

ed p

lann

ing

proc

ess.

An

exam

ple

of a

com

mun

ity-b

ased

pla

n is

a

neig

hbor

hood

tran

spor

tatio

n pl

an, b

ut n

ot a

cou

ntyw

ide

plan

or

agen

cy c

apita

l im

prov

emen

t pro

gram

.T

hree

poi

nts

for

a pr

ojec

t in

an a

dopt

ed c

omm

unity

bas

ed p

lan

with

evi

denc

e of

div

erse

com

mun

ity s

uppo

rt.

Tw

o po

ints

for

a p

roje

ct w

ith e

vide

nce

of s

uppo

rt f

rom

bot

h ne

ighb

orho

od s

take

hold

ers

and

grou

ps a

nd c

ityw

ide

grou

ps.

One

poi

nt f

or a

pro

ject

with

evi

denc

e of

sup

port

fro

m e

ither

nei

ghbo

rhoo

d st

akeh

olde

rs a

nd g

roup

s or

city

wid

e gr

oups

.

CA

TE

GO

RY

SP

EC

IFIC

CR

ITE

RIA

Pro

vid

es B

enef

its

to M

ult

iple

Use

rs: P

roje

cts

rece

ives

one

poi

nt e

ach

for

addr

essi

ng th

e ne

eds

of b

icyc

lists

, mot

oris

ts, a

nd/o

r tr

ansi

t use

rs.

Safe

ty: (

One

poi

nt f

or e

ach)

: Add

ress

es d

ocum

ente

d sa

fety

issu

e; r

educ

es p

oten

tial c

onfli

cts

betw

een

mod

es; a

nd in

crea

ses

secu

rity

.H

igh

In

jury

Cor

rid

or: P

roje

ct is

loca

ted

on a

Wal

kFir

st S

afet

y St

reet

s co

rrid

or.

Lev

erag

ing:

Pro

ject

leve

rage

s no

n-P

rop

K f

unds

.

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

3 Pr

iorit

izat

ion\

2014

5YP

P U

pdat

e (E

P40

Pede

stria

n Ci

rcul

atio

n an

d Sa

fety

) Prio

ritiz

atio

nPa

ge 1

of 1

Page 9: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

2014/15 2015/16 2016/17 2017/18 2018/19

SFMTA 6th Street Improvements (NTIP) PS&E Planned $700,000 $700,000

SFMTA 6th Street Improvements (NTIP) CON Planned $3,000,000 $3,000,000

SFMTA 7th Street Streetscape PS&E Planned $174,000 $174,000

SFMTA Follow-the-Paving (Spot Improvements) PS&E, CON Planned $50,000 $50,000

SFMTA Active Transportation Program Local Match PLAN/CER Planned $10,000 $10,000

SFMTA Active Transportation Program Local Match PS&E Planned $80,000 $80,000

SFMTA Active Transportation Program Local Match CON Planned $594,893 $594,893

SFMTA Active Transportation Program Local Match PS&E Planned $300,000 $300,000

SFMTA Active Transportation Program Local Match CON Planned $300,000 $300,000

SFMTA WalkFirst PLAN/CER Planned $125,000 $125,000

SFMTA WalkFirst PS&E Planned $325,000 $325,000

SFMTA WalkFirst CON Planned $600,000 $600,000

SFMTA WalkFirst PLAN/CER Planned $53,996 $53,996

SFMTA WalkFirst PS&E Planned $110,000 $110,000

SFMTA WalkFirst CON Planned $65,000 $65,000

SFMTA, Any eligible

Neighborhood Transportation Improvement Program (NTIP) placeholder PS&E, CON Planned $800,000 $800,000

SFMTA, other eligible

Neighborhood Transportation Improvement Program (NTIP) placeholder PS&E, CON Planned $800,000 $800,000

$6,408,893 $850,000 $228,996 $300,000 $300,000 $8,087,889$731,781 $750,000 $780,000 $800,000 $850,000 $3,911,781

($5,677,112) ($5,777,112) ($5,226,108) ($4,726,108) ($4,176,108) ($4,176,108)Cumulative Remaining Programming CapacityTotal Programmed in 2013 Strategic Plan Baseline

Citywide Pedestrian Safety & Circulation Improvements

Total Programmed in 5YPP

Corridor Projects

Follow-the-Paving

Agency Project Name Phase StatusFiscal Year

Total

Programming

Table 4 - Prop K 5-Year Project List (FY 2014/15 - 2018/19)Pedestrian Circulation/Safety (EP 40)

P:\Prop K\SP-5YPP\2013 Update\3 5YPPs\EP 40\1 Project List\2013 5YPP Update (EP40 Pedestrian Circulation and Safety) Tab: 06.16.14 Page 1 of 2

Page 10: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

2014/15 2015/16 2016/17 2017/18 2018/19 2019/20

6th Street Improvements (NTIP) PS&E $700,000 $700,000

6th Street Improvements (NTIP) CON $30,000 $1,500,000 $1,470,000 $3,000,000

7th Street Streetscape PS&E $174,000 $174,000

Follow-the-Paving (Spot Improvements) PS&E, CON $50,000 $50,000

Active Transportation Program Local Match PLAN/CER $10,000 $10,000

Active Transportation Program Local Match PS&E $30,000 $50,000 $80,000

Active Transportation Program Local Match CON $41,682 $276,606 $276,605 $594,893

Active Transportation Program Local Match PS&E $150,000 $150,000 $300,000

Active Transportation Program Local Match CON $150,000 $150,000 $300,000

WalkFirst PLAN/CER $125,000 $125,000

WalkFirst PS&E $162,500 $162,500 $325,000

WalkFirst CON $300,000 $300,000 $600,000

WalkFirst PLAN/CER $53,996 $53,996

WalkFirst PS&E $55,000 $55,000 $110,000

WalkFirst CON $32,500 $32,500 $65,000

Neighborhood Transportation Improvement Program (NTIP) placeholder PS&E, CON $400,000 $400,000 $800,000

Neighborhood Transportation Improvement Program (NTIP) placeholder PS&E, CON $400,000 $400,000 $800,000

$1,799,182 $3,313,106 $2,288,101 $237,500 $300,000 $150,000 $8,087,889

($1,799,182) ($5,112,288) ($7,400,389) ($7,637,889) ($7,937,889) ($8,087,889) ($8,087,889)Cumulative Remaining Cash Flow CapacityTotal Cash Flow in 2013 Strategic Plan Baseline

Citywide Pedestrian Safety & Circulation Improvements

Total Cash Flow in 5YPP

Corridor Projects

Follow-the-Paving (Pedestrian Improvements)

Fiscal YearTotalProject Name Phase

Cash Flow ($)

Table 4 - Prop K 5-Year Project List (FY 2014/15 - 2018/19)Pedestrian Circulation/Safety (EP 40)

P:\Prop K\SP-5YPP\2013 Update\3 5YPPs\EP 40\1 Project List\2013 5YPP Update (EP40 Pedestrian Circulation and Safety) Tab: 06.16.14 Page 2 of 2

Page 11: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Year Quarter Year

Planning/Conceptual Engineering (30%) 100% In-house 3 2013/14 4 2013/14

Environmental Studies (PA&ED) 10% In-house 2 2014/15 2 2014/15

Design Engineering (PS&E) 3 2014/15 4 2014/15

R/W Activities/Acquisition

Advertise Construction

Start Construction (i.e. Award Contract) tbd 4 2014/15

End Construction (i.e. Open for Use) tbd 4 2016/17

Start Procurement (e.g. rolling stock)

Project Close-out

Prop K Expenditure Plan Information

C. Street & Traffic Safety

40

2014/15

6th Street between Market and Howard

Project Information

iv. Bicycle and Pedestrian Improvements

6th Street Improvements [NTIP]

c. Pedestrian Circulation/Safety

6

SFMTA has worked with Supervisor Kim's office, WalkSF, other community organizations and business groups, and 6th Street residents to develop the community's preferred street design through two community walks, three community meetings, and two demonstration projects.

San Francisco Municipal Transportation Agency (SFMTA)

Adam Gubser

701-4465

[email protected]

This project will fund detailed design and construction of pedestrian safety improvements on 6th Street from Market to Howard Streets. The 6th Street corridor includes the three intersections (Market, Mission, and Howard) with the highest number of pedestrian collisions in the city between 2005 and 2009. The community's preferred street design option, selected through an extensive outreach process, includes sidewalk widening on both sides of 6th Street, vehicle travel lane reduction, "flex" zone and textured median with raised refuges, pedestrian scale lighting, new street furnishings and tree grates as well as signal retiming.

Start Date End Date

Categorically exempt

Underway

TBD

Environmental Clearance

Comments/Concerns

This project will increase safety and comfort along the 6th Street corridor.

This is a NTIP capital project.

P:\Prop K\SP-5YPP\2013 Update\3 5YPPs\EP 40\2 Project Information Forms\1 2013 5YPP Update (EP40 6th St)1 2013 5YPP Update (EP40 6th St) Page 1 of 2

Page 12: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

157,

228

$

142,

228

$

15

,000

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

38,6

01$

38

,601

$

-$

Des

ign

Eng

inee

ring

(PS&

E)

700,

000

$

700,

000

$

R/W

-$

-

$

-$

Con

stru

ctio

n3,

000,

000

$

3,00

0,00

0$

Pro

cure

men

t (e.

g. r

ollin

g st

ock)

-$

-

$

-$

Tot

al P

roje

ct C

ost

3,89

5,82

9$

3,

880,

829

$

15,0

00$

Per

cen

t of

Tot

al99

.61%

0.39

%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

13/

1414

/15

15/

1616

/17

17/

1818

/19

Tot

al

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

Pro

p K

Allo

cate

d13

/14

142,

228

$

142,

228

$

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

SFM

TA

Ope

ratin

gA

lloca

ted

13/1

415

,000

$

15,0

00$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

Pro

p K

Allo

cate

d13

/14

19,3

00$

19

,301

$

38

,601

$

Des

ign

Eng

inee

ring

(PS&

E)

Pro

p K

Pla

nned

14/1

570

0,00

0$

700,

000

$

Con

stru

ctio

nP

rop

KP

lann

ed14

/15

30,0

00$

1,50

0,00

0$

1,

470,

000

$

3,00

0,00

0$

-$

-$

-$

-$

-$

Tot

al B

y F

isca

l Yea

r17

6,52

8$

74

9,30

1$

1,

500,

000

$

1,

470,

000

$

-

$

-$

3,

895,

829

$

Com

men

ts/

Con

cern

s

6th

Stre

et I

mpr

ovem

ents

[NT

IP]

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

2 Pr

ojec

t Inf

orm

atio

n Fo

rms\

1 20

13 5

YPP

Upd

ate

(EP4

0 6t

h St

)1 2

013

5YPP

Upd

ate

(EP4

0 6t

h St

)Pa

ge 2

of 2

Page 13: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Year Quarter Year

Planning/Conceptual Engineering (30%) 0% In-house 4 2013/14 3 2014/15

Environmental Studies (PA&ED) 0% In-house 3 2014/15 2 2015/16

Design Engineering (PS&E) 0% In-house 2 2015/16 1 2016/17

R/W Activities/Acquisition

Advertise Construction 2 2016/17 3 2016/17

Start Construction (i.e. Award Contract) 0% Both 3 2016/17

End Construction (i.e. Open for Use) 0% Both 2 2017/18

Start Procurement (e.g. rolling stock)

Project Close-out 3 2017/18

2014/15

Project Information

7th Street Streetscape

7th Street between Market and Harrison Streets

6

This request is to implement bicycle and pedestrian improvements along 7th Street between Harrison and Market Streets aligned with the Eastern Neighborhood Transportation Implementing Planning Study (ENTRIPS) streetscape plan but without the higher costing capital improvements listed in the Study (new signals, corner bulbs). The scope will include new striping, a buffered bike lane, traffic lane reduction, safe hit posts and possibly a limited amount of paving. Planning work to refine the scope is underway.

Prop K Expenditure Plan Information

C. Street & Traffic Safety

iv. Bicycle and Pedestrian Improvements

c. Pedestrian Circulation/Safety

40

Environmental Clearance

Categorically exempt

Underway

TBD

Start Date End Date

This project will increase pedestrian and bicyclist safety and comfort along the 7th Street corridor.

The segments of 7th and 8th Streets between Market and Harrison Streets have been prioritized for investment in ENTRIPS because this segment exemplifies many of the challenges that face other South of Market north-south arterials north of the freeways: high rates of pedestrian and bicycle injury collisions, a bare public realm, high volumes of traffic during peak periods, and high vehicle speeds during off-peak periods. Seventh and Eighth Streets were also prioritized for improvement in the Western SOMA Community Plan.

While the community has expressed support for the currently proposed features through the ENTRIPS process, their actual implementation will bring significant changes to the residents and the businesses along the corridor; therefore, their informed support and understanding is essential to the project's success. Outreach to local community leaders and other stakeholders will include two informational meetings to help promote the proposed features in the plan.

San Francisco Municipal Transportation Agency (SFMTA)

Maurice Growney

701-4465

[email protected]

Comments/ConcernsOn May 20, 2014 (Res. 14-79), the Transportation Authority allocated $180,000 in Prop K for Planning/Conceptual Engineering and Environmental Studies for the 7th and 8th Streetscape project.

P:\Prop K\SP-5YPP\2013 Update\3 5YPPs\EP 40\2 Project Information Forms\2 2013 5YPP Update (EP40 7th St)2 2013 5YPP Update (EP40 7th St) Page 1 of 2

Page 14: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

-$

-

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

Des

ign

Eng

inee

ring

(PS&

E)

195,

000

$

174,

000

$

21,0

00$

R/W

-$

-

$

-$

Con

stru

ctio

n1,

125,

750

$

-$

1,

125,

750

$

Pro

cure

men

t (e.

g. r

ollin

g st

ock)

-$

-

$

-$

Tot

al P

roje

ct C

ost

1,32

0,75

0$

17

4,00

0$

1,

146,

750

$

Per

cen

t of

Tot

al13

%87

%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

19T

otal

Des

ign

Eng

inee

ring

(PS&

E)

Pro

p K

Pla

nned

14/1

5-

$

174,

000

$

174,

000

$

Des

ign

Eng

inee

ring

(PS&

E)

IPIC

Pla

nned

14/1

5-

$

21,0

00$

21,0

00$

Con

stru

ctio

nSF

MT

A R

even

ue B

ond

Pro

gram

med

15/1

61,

125,

750

$

1,12

5,75

0$

-$

-$

-$

-$

Tot

al B

y F

isca

l Yea

r-

$

1,32

0,75

0$

-$

-

$

-$

1,

320,

750

$

Com

men

ts/

Con

cern

s

SFM

TA

pro

pose

s to

fun

d th

e de

sign

of

the

8th

Stre

et S

tree

tsca

pe f

rom

the

Pro

p K

EP

38

Tra

ffic

Cal

min

g ca

tego

ry.

IPIC

: Int

erag

ency

Pla

n Im

plem

enta

tion

Com

mitt

ee (d

evel

opm

ent i

mpa

ct f

ees)

.

7th

Stre

et S

tree

tsca

pe

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

2 Pr

ojec

t Inf

orm

atio

n Fo

rms\

2 20

13 5

YPP

Upd

ate

(EP4

0 7t

h St

)2 2

013

5YPP

Upd

ate

(EP4

0 7t

h St

)Pa

ge 2

of 2

Page 15: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Year Quarter Year

Planning/Conceptual Engineering (30%)

Environmental Studies (PA&ED)

Design Engineering (PS&E) In-house 1 2015/16 4 2015/16

R/W Activities/Acquisition

Advertise Construction

Start Construction (i.e. Award Contract) In-house 1 2015/16 4 2015/16

End Construction (i.e. Open for Use)

Start Procurement (e.g. rolling stock)

Project Close-out

This project will enhance pedestrian comfort and safety and mitigate collisions.

TBD

San Francisco Municipal Transportation Agency (SFMTA)

Bridget Smith

415-701-4491

[email protected]

This project includes design and installation for spot treatments in coordination with paving projects. Candidate treatments include the painting of continental crosswalks at high priority locations, and implementing sight distance red zones, with primary focus in the Tenderloin and other high pedestrian injury areas. All construction will be done by SFMTA shops. Design will be concurrent with installations as work orders are prepared and sent to the shops through 2015.

Start Date End Date

Environmental Clearance

Comments/Concerns

Prop K Expenditure Plan Information

C. Street & Traffic Safety

40

2015/16

TBD

Project Information

iv. Bicycle and Pedestrian Improvements

Follow-the-Paving (Spot Improvements)

c. Pedestrian Circulation/Safety

P:\Prop K\SP-5YPP\2013 Update\3 5YPPs\EP 40\2 Project Information Forms\3 2013 5YPP Update (EP40 Follow-the-Paving)3 2013 5YPP Update (EP40 Follow-the-Paving) Page 1 of 2

Page 16: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

-$

-

$

-$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

-$

Des

ign

Eng

inee

ring

(PS&

E)

-$

-

$

-$

R/W

-$

-

$

-$

Con

stru

ctio

n50

,000

$

50,0

00$

-

$

Pro

cure

men

t (e.

g. r

ollin

g st

ock)

-$

-

$

-$

Tot

al P

roje

ct C

ost

50,0

00$

50

,000

$

-$

Per

cen

t of

Tot

al10

0%0%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

19T

otal

Con

stru

ctio

nP

rop

KP

lann

ed15

/16

50,0

00$

50,0

00$

-$

-$

-$

-$

-$

-$

Tot

al B

y F

isca

l Yea

r-

$

-$

-

$

-$

-

$

-$

Com

men

ts/

Con

cern

s

Thi

s is

a p

lace

hold

er f

or d

esig

n an

d co

nstr

uctio

n fu

nds.

SF

MT

A a

ntic

ipat

es f

undi

ng f

utur

e im

prov

emen

ts w

ith th

e V

ehic

le L

icen

se F

ee (t

o be

pro

pose

d).

Fol

low

-the

-Pav

ing

(Spo

t Im

prov

emen

ts)

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

2 Pr

ojec

t Inf

orm

atio

n Fo

rms\

3 20

13 5

YPP

Upd

ate

(EP4

0 Fo

llow

-the

-Pav

ing)

3 20

13 5

YPP

Upd

ate

(EP4

0 Fo

llow

-the

-Pav

ing)

Page

2 o

f 2

Page 17: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location: TBD

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Year Quarter Year

Planning/Conceptual Engineering (30%)

Environmental Studies (PA&ED)

Design Engineering (PS&E)

R/W Activities/Acquisition

Advertise Construction

Start Construction (i.e. Award Contract)

End Construction (i.e. Open for Use)

Start Procurement (e.g. rolling stock)

Project Close-out

These are placeholders for design/construction. Sufficient detail and scoring of proposed project(s) will be required when the allocation request is submitted.

Start Date End Date

Comments/Concerns

415-701-4491

[email protected]

Environmental Clearance

2014/15

Project Information

Active Transportation Program Local Match

TBD

This category will serve as local match for pedestrian circulation and safety improvements to be implemented with Active Transportation Program (ATP) grants. MTA's current ATP application for the Vision Zero Safety project includes the following pedestrian project types: pedestrian lighting, bulbouts, visible colored pavement, and the tools needed to install these devices.

The Active Transportation Program seeks to increase the proportion of trips accomplished by biking and walking, increase safety and mobility for nonmotorized users, and provide a broad spectrum of projects to benefit many types of active transportation users. Projects funded by this category are meant to improve the safety of streets for people walking and may include implementation of Vision Zero and WalkFirst initiatives.

Prop K Expenditure Plan Information

C. Street & Traffic Safety

iv. Bicycle and Pedestrian Improvements

c. Pedestrian Circulation/Safety

40

San Francisco Municipal Transportation Agency (SFMTA)

Bridget Smith

P:\Prop K\SP-5YPP\2013 Update\3 5YPPs\EP 40\2 Project Information Forms\4 2013 5YPP Update (EP40 Active Transportation Match)4 2013 5YPP Update (EP40 Active Transportation Match) Page 1 of 2

Page 18: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

10,0

00$

10

,000

$

-$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

Des

ign

Eng

inee

ring

(PS&

E)

80,0

00$

80

,000

$

-$

R/W

-$

-

$

Con

stru

ctio

n3,

444,

893

$

1,19

4,89

3$

2,

250,

000

$

Thi

s is

a p

lace

hold

er.

Pro

cure

men

t (e.

g. r

ollin

g st

ock)

-$

-

$

Tot

al P

roje

ct C

ost

3,53

4,89

3$

1,

284,

893

$

2,25

0,00

0$

Per

cen

t of

Tot

al36

%64

%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

1919

/20

Tot

al

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

Pro

p K

Pla

nned

14/1

510

,000

$

10

,000

$

Des

ign

Eng

inee

ring

(PS&

E)

Pro

p K

Pla

nned

14/1

530

,000

$

50

,000

$

80

,000

$

Con

stru

ctio

nP

rop

KP

lann

ed14

/15

41,6

82$

276,

606

$

27

6,60

5$

594,

893

$

Con

stru

ctio

nA

TP

Pla

nned

14/1

589

,447

$

35

7,65

4$

302,

900

$

75

0,00

0$

Con

stru

ctio

nP

rop

KP

lann

ed17

/18

150,

000

$

15

0,00

0$

300,

000

$

Con

stru

ctio

nT

BD

Pla

nned

17/1

837

5,00

0$

375,

000

$

75

0,00

0$

Con

stru

ctio

nP

rop

KP

lann

ed18

/19

150,

000

$

15

0,00

0$

300,

000

$

Con

stru

ctio

nT

BD

Pla

nned

18/1

937

5,00

0$

375,

000

$

75

0,00

0$

Tot

al B

y F

isca

l Yea

r17

1,12

9$

684,

260

$

579,

505

$

525,

000

$

1,05

0,00

0$

525,

000

$

3,53

4,89

3$

Com

men

ts/

Con

cern

s

Act

ive

Tra

nspo

rtat

ion

Pro

gram

Loc

al M

atch

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r

Thi

s is

a p

lace

hold

er f

or d

esig

n an

d/or

con

stru

ctio

n lo

cal m

atch

to A

ctiv

e T

rans

port

atio

n P

rogr

am (A

TP

) gra

nts

(am

ount

est

imat

ed b

ased

on

the

prio

r cy

cle)

. A

lloca

tion

requ

ests

will

nee

d to

dem

onst

rate

ful

l fun

ding

pla

ns a

nd s

uffic

ient

leve

ragi

ng o

f P

rop

K f

unds

.

En

ter

Cas

h F

low

Her

e

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

2 Pr

ojec

t Inf

orm

atio

n Fo

rms\

4 20

13 5

YPP

Upd

ate

(EP4

0 Ac

tive

Tran

spor

tatio

n M

atch

)4 2

013

5YPP

Upd

ate

(EP4

0 Ac

tive

Tran

spor

tatio

n M

atch

)Pa

ge 2

of 2

Page 19: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Year Quarter Year

Planning/Conceptual Engineering (30%) 0% In-house 1 2014/15 2 2014/15

Environmental Studies (PA&ED) 0% In-house 1 2014/15 2 2014/15

Design Engineering (PS&E) 0% In-house 2 2014/15 4 2014/15

R/W Activities/Acquisition

Advertise Construction

Start Construction (i.e. Award Contract) 0% Both 4 2014/15

End Construction (i.e. Open for Use) 0% Both 4 2015/16

Start Procurement (e.g. rolling stock)

Project Close-out

The above schedule is for the FY 14/15 allocation. The FY 16/17 allocation will follow a similar schedule.Comments/Concerns

Environmental Clearance

Categorically exempt

Not yet started

TBD

Start Date End Date

WalkFirst is based on a data-driven analysis to determine the highest needs for pedestrian safety citywide. Implementing the improvements identified through the WalkFirst analysis will increase the safety of the streets for people walking.

From mid-November 2013 through January 2014, the WalkFirst team engaged in a citywide public outreach process to gather feedback about pedestrian safety improvements. The primary method for feedback was the interactive online tool <walkfirst.sfplanning.org>. In addition, the WalkFirst team held a series of ten targeted focus groups to hear from populations and neighborhoods most impacted by pedestrian injuries and fatalities. Members of the public can continue to use the online tool to inform their safety priorities.

SFMTA - Department of Parking and Traffic (DPT)

Oliver Gajda

701.4467

[email protected]

2014/15

Project Information

WalkFirst Pedestrian Improvements

Citywide

Citywide

Phase 1 improvements for WalkFirst, a comprehensive program to improve pedestrian safety, entails planning, design and construction for a suite of improvements, some of which are temporary in nature. These improvements may include (but are not limited to): Advanced stop or yield lines, temporary chokers, continental crosswalks, temporary bulbs, leading pedestrian intervals, red zones, temporary islands, pedestrian scrambles, protected left turns, reduced lane width, signal timing changes, speed humps, and turn prohibitions. Phase 2 improvements, which are not intended to be funded in this specific line item but are part of the larger WalkFirst effort, are more permanent in nature. They may include (but are not limited to): corner bulbs, chokers, pedestrian refuge islands, raised crosswalks, speed tables, traffic circles, flashing beacons, pedestrian countdown signals, roadway safety lighting, turn prohibitions, protected left turns, and leading pedestrian intervals. Both Phase 1 and 2 improvements will be installed at locations on the high injury network identified through the WalkFirst analysis.

See attached the draft list of prioritized Phase 1 and Phase 2 locations and a briefing booklet titled "San Francisco Pedestrian Safety Capital Improvement Program."

Prop K Expenditure Plan Information

C. Street & Traffic Safety

iv. Bicycle and Pedestrian Improvements

c. Pedestrian Circulation/Safety

40

P:\Prop K\SP-5YPP\2013 Update\3 5YPPs\EP 40\2 Project Information Forms\5 2013 5YPP Update (EP40 WalkFirst)5 2013 5YPP Update (EP40 WalkFirst) Page 1 of 2

Page 20: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

218,

996

$

178,

996

$

40

,000

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

-$

Des

ign

Eng

inee

ring

(PS&

E)

935,

000

$

435,

000

$

50

0,00

0$

R/W

-$

-

$

-$

Con

stru

ctio

n4,

759,

428

$

665,

000

$

4,

094,

428

$

Pro

cure

men

t (e.

g. r

ollin

g st

ock)

-$

-

$

-$

Tot

al P

roje

ct C

ost

5,91

3,42

4$

1,

278,

996

$

4,63

4,42

8$

Per

cen

t of

Tot

al22

%78

%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

14/

1515

/16

16/

1717

/18

18/

19T

otal

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

MT

A O

pera

ting

Allo

cate

d14

/15

40,0

00$

40,0

00$

Des

ign

Eng

inee

ring

(PS&

E)

Pro

p K

Pla

nned

14/1

516

2,50

0$

162,

500

$

32

5,00

0$

Con

stru

ctio

nP

rop

KP

lann

ed14

/15

300,

000

$

30

0,00

0$

600,

000

$

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

Pro

p K

Pla

nned

14/1

512

5,00

0$

125,

000

$

Des

ign

Eng

inee

ring

(PS&

E)

TB

DP

lann

ed15

/16

500,

000

$

50

0,00

0$

Con

stru

ctio

nT

BD

Pla

nned

15/1

61,

705,

191

$

1,70

5,19

1$

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

Pro

p K

Pla

nned

16/1

753

,996

$

53

,996

$

Des

ign

Eng

inee

ring

(PS&

E)

Pro

p K

Pla

nned

16/1

755

,000

$

55

,000

$

11

0,00

0$

Con

stru

ctio

nP

rop

KP

lann

ed16

/17

32,5

00$

32,5

00$

65,0

00$

Con

stru

ctio

nT

BD

Pla

nned

16/1

71,

489,

127

$

900,

110

$

2,

389,

237

$

Tot

al B

y F

isca

l Yea

r62

7,50

0$

2,

667,

691

$

1,

630,

623

$

98

7,61

0$

-$

5,

913,

424

$

Com

men

ts/

Con

cern

s

Wal

kFirs

t Ped

estr

ian

Impr

ovem

ents

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r

Wal

kFirs

t is

a co

mpr

ehen

sive

, mul

ti-ph

ased

eff

ort.

As

such

, it w

ill b

e fu

nded

thro

ugh

a va

riety

of

sour

ces

incl

udin

g: p

oten

tial G

ener

al O

blig

atio

n B

onds

and

Gen

eral

F

und

dolla

rs a

s pr

opos

ed f

rom

the

Tra

nspo

rtat

ion

Tas

k F

orce

, SF

MT

A S

tate

of

Goo

d R

epai

r fu

nds,

Cal

iforn

ia P

acifi

c M

edic

al C

ente

r fu

nds,

Pro

p A

A V

ehic

le

Reg

istr

atio

n F

ee d

olla

rs, S

FM

TA

Rev

enue

Bon

ds, o

ther

SF

MT

A O

pera

ting

dolla

rs.

En

ter

Cas

h F

low

Her

e

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

2 Pr

ojec

t Inf

orm

atio

n Fo

rms\

5 20

13 5

YPP

Upd

ate

(EP4

0 W

alkF

irst

)5 2

013

5YPP

Upd

ate

(EP4

0 W

alkF

irst

)Pa

ge 2

of 2

Page 21: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

SA

N F

RA

NC

ISC

O M

UN

ICIP

AL T

RA

NSPO

RT

AT

ION

AG

EN

CY

SFM

TA

| C

APIT

AL F

INA

NC

IAL P

LA

NN

ING

AN

D A

NA

LY

SIS

FIN

AN

CE

AN

D IN

FORM

ATIO

N T

ECH

NO

LOG

Y D

IVIS

ION

Wal

k Fi

rst I

nter

sect

ion

Impr

ovem

ents

and

Nea

r-Te

rm V

isio

n Ze

ro C

apita

l Pro

ject

sN

ote:

Not

all

near

-ter

m c

apita

l pro

ject

s ar

e in

ters

ectio

n sp

ecifi

c, a

nd th

eref

ore

som

e ne

ar-t

erm

cap

ital p

roje

cts

that

ove

rlap

with

the

inte

rsec

tions

bel

ow m

ay n

ot b

e no

ted.

#Street 1

Street 2

Quick / Cost 

Effective

Compreh

ensive

 / Lon

g Term

District

On Vision

 Zero Near‐Term

 Cap

ital Projects List?

DISTRICT

 I1

30T

H A

V G

EA

RY

BL

11

1G

eary

Blv

d P

edes

tria

n Im

prov

emen

ts

2G

EA

RY

BL

AR

GU

ELL

O B

L 1

11

Gea

ry B

lvd

Ped

estr

ian

Impr

ovem

ents

3G

EA

RY

BL

6T

H A

V

11

14

GE

AR

Y B

L 15

TH

AV

11

15

GE

AR

Y B

L 33

RD

AV

01

16

PO

INT

LO

BO

S A

V

42N

D A

V

11

17

TU

RK

BLV

D

MA

SO

NIC

AV

11

1DISTRICT

 II1

BE

AC

H S

T

HY

DE

ST

1

12

2D

IVIS

AD

ER

O S

T

SU

TT

ER

ST

11

23

DIV

ISA

DE

RO

ST

LO

MB

AR

D S

T1

12

4F

RA

NK

LIN

ST

GE

AR

Y B

L 1

12

5F

RA

NK

LIN

ST

BU

SH

ST

1

02

6F

RA

NK

LIN

ST

PIN

E S

T1

02

7G

EA

RY

BL

AR

GU

ELL

O B

L1

12

Gea

ry B

lvd

Ped

estr

ian

Impr

ovem

ents

8LO

MB

AR

D S

T

ST

EIN

ER

ST

11

29

LOM

BA

RD

ST

S

CO

TT

ST

0

12

10T

UR

K B

LVD

M

AS

ON

IC A

V

11

211

VA

N N

ES

S A

VC

ALI

FO

RN

IA A

V

11

212

VA

N N

ES

S A

VB

US

H S

T0

12

13V

AN

NE

SS

AV

PIN

E S

T1

12

14V

AN

NE

SS

AV

BR

OA

DW

AY

ST

1

12

15V

AN

NE

SS

AV

PO

ST

ST

11

216

VA

N N

ES

S A

VP

AC

IFIC

AV

11

02

17V

AN

NE

SS

AV

JAC

KS

ON

ST

02

DISTRICT

 III

15T

H S

T

MA

RK

ET

ST

01

3M

arke

t St C

orrid

or Im

prov

emen

ts; 5

th S

t Gre

en S

harr

ows

2B

AY

ST

KE

AR

NY

ST

1

13

3B

RO

AD

WA

Y S

T

SA

NS

OM

E S

T

11

34

BR

OA

DW

AY

ST

B

AT

TE

RY

ST

1

13

5B

US

H S

T

PO

LK S

T

11

3P

olk

Str

eet E

arly

Impl

emen

tatio

n

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

2 Pr

ojec

t Inf

orm

atio

n Fo

rms\

5 20

13 5

YPP

Upd

ate

(EP4

0 W

alkF

irst)

ATT

1 lo

c lis

tPa

ge 1

of 7

Page 22: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

Wal

k Fi

rst I

nter

sect

ion

Impr

ovem

ents

and

Nea

r-Te

rm V

isio

n Ze

ro C

apita

l Pro

ject

sN

ote:

Not

all

near

-ter

m c

apita

l pro

ject

s ar

e in

ters

ectio

n sp

ecifi

c, a

nd th

eref

ore

som

e ne

ar-t

erm

cap

ital p

roje

cts

that

ove

rlap

with

the

inte

rsec

tions

bel

ow m

ay n

ot b

e no

ted.

#Street 1

Street 2

Quick / Cost 

Effective

Compreh

ensive

 / Lon

g Term

District

On Vision

 Zero Near‐Term

 Cap

ital Projects List?

6B

US

H S

T

HY

DE

1

03

7C

ALI

FO

RN

IA S

T

HY

DE

ST

11

38

CA

LIF

OR

NIA

ST

TA

YLO

R S

T

10

39

CO

LUM

BU

S A

VV

ALL

EJO

ST

1

13

Col

umbu

s A

ve. B

ulb

Out

s

10C

OLU

MB

US

AV

BR

OA

DW

AY

ST

10

3C

olum

bus

Ave

. Bul

b O

uts

11C

OLU

MB

US

ST

S

TO

CK

TO

N S

T

01

3C

olum

bus

Ave

. Bul

b O

uts

12E

DD

Y S

T

MA

SO

N S

T1

13

Ped

estr

ian

Inte

rsec

tion

Tre

atm

ents

13G

EA

RY

ST

KE

AR

NY

1

13

Kea

rny

Str

eet P

edes

tria

n Im

prov

emen

ts

14G

EA

RY

ST

LE

AV

EN

WO

RT

H S

T1

13

Ped

estr

ian

Inte

rsec

tion

Tre

atm

ents

15G

EA

RY

ST

T

AY

LOR

ST

1

03

16H

YD

E S

TP

INE

ST

1

03

17K

EA

RN

Y S

T

CLA

Y S

T

11

318

KE

AR

NY

ST

W

AS

HIN

GT

ON

ST

0

13

Kea

rny

Str

eet P

edes

tria

n Im

prov

emen

ts

19M

AR

KE

T S

T4T

H S

T

01

3M

arke

t St C

orrid

or Im

prov

emen

ts

20M

AR

KE

T S

T

2ND

ST

01

32n

d S

t. R

oad

Die

t

21O

FA

RR

ELL

ST

S

TO

CK

TO

N S

T0

13

22O

FA

RR

ELL

ST

P

OW

ELL

ST

0

13

23P

OLK

ST

PIN

E S

T

11

3P

olk

Str

eet E

arly

Impl

emen

tatio

n

24P

OLK

ST

S

UT

TE

R S

T

10

3P

olk

Str

eet E

arly

Impl

emen

tatio

n

25P

OLK

ST

H

EM

LOC

K S

T

11

3P

olk

Str

eet E

arly

Impl

emen

tatio

n

26P

OLK

ST

P

OS

T S

T1

13

Pol

k S

tree

t Ear

ly Im

plem

enta

tion

27S

AC

RA

ME

NT

O S

T

KE

AR

NY

ST

1

13

Kea

rny

Str

eet P

edes

tria

n Im

prov

emen

ts

28S

TO

CK

TO

N S

TJA

CK

SO

N

01

329

ST

OC

KT

ON

ST

P

AC

IFIC

AV

0

13

30S

TO

CK

TO

N S

T

PO

ST

ST

11

331

ST

OC

KT

ON

ST

S

UT

TE

R S

T

11

332

ST

OC

KT

ON

ST

S

AC

RA

EN

TO

ST

11

333

ST

OC

KT

ON

ST

U

NIO

N S

T0

13

34S

UT

TE

R S

T

LAR

KIN

ST

1

03

35S

UT

TE

R S

T

TA

YLO

R S

T

10

3S

utte

r S

tree

t Bul

b O

uts

36T

AY

LOR

ST

N

OR

TH

PO

INT

ST

1

03

37T

AY

LOR

ST

P

INE

ST

1

03

38V

AN

NE

SS

AV

C

ALI

FO

RN

IA A

V

11

339

VA

N N

ES

S A

V

BU

SH

ST

11

340

VA

N N

ES

S A

V

PIN

E S

T

01

3

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

2 Pr

ojec

t Inf

orm

atio

n Fo

rms\

5 20

13 5

YPP

Upd

ate

(EP4

0 W

alkF

irst)

ATT

1 lo

c lis

tPa

ge 2

of 7

Page 23: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

Wal

k Fi

rst I

nter

sect

ion

Impr

ovem

ents

and

Nea

r-Te

rm V

isio

n Ze

ro C

apita

l Pro

ject

sN

ote:

Not

all

near

-ter

m c

apita

l pro

ject

s ar

e in

ters

ectio

n sp

ecifi

c, a

nd th

eref

ore

som

e ne

ar-t

erm

cap

ital p

roje

cts

that

ove

rlap

with

the

inte

rsec

tions

bel

ow m

ay n

ot b

e no

ted.

#Street 1

Street 2

Quick / Cost 

Effective

Compreh

ensive

 / Lon

g Term

District

On Vision

 Zero Near‐Term

 Cap

ital Projects List?

41V

AN

NE

SS

AV

B

RO

AD

WA

Y S

T1

13

42V

AN

NE

SS

AV

P

OS

T S

T1

13

43V

AN

NE

SS

AV

P

AC

IFIC

AV

1

03

44V

AN

NE

SS

AV

JA

CK

SO

N S

T1

03

DISTRICT

 IV1

19T

H A

V

OR

TE

GA

ST

1

14

219

TH

AV

N

OR

IEG

A S

T

11

43

19T

H A

V

JUD

AH

ST

11

44

SU

NS

ET

BL

QU

INT

AR

A S

T

11

4S

unse

t Blv

d. S

peed

Red

uctio

n

5S

UN

SE

T B

L V

ICE

NT

E S

T1

14

Sun

set B

lvd.

Spe

ed R

educ

tion

6T

AR

AV

AL

ST

19

TH

AV

1

04

DISTRICT

 V1

DIV

ISA

DE

RO

ST

S

UT

TE

R S

T

11

52

DIV

ISA

DE

RO

ST

G

EA

RY

BL

10

53

FIL

LMO

RE

ST

G

EA

RY

ST

1

15

4F

RA

NK

LIN

ST

G

EA

RY

BL

11

55

GE

AR

Y B

L W

EB

ST

ER

ST

1

15

Web

ster

Str

eet B

icyc

le a

nd P

edes

tria

n

6IR

VIN

G S

T

7TH

AV

1

15

Irvi

ng S

t. In

ters

ectio

ns

7M

AR

KE

T S

T

GO

UG

H S

T

11

5M

arke

t St.

Cyc

letr

ack

8M

AR

KE

T S

T

VA

NN

ES

S S

T

01

59

MA

SO

NIC

AV

EH

AIG

HT

ST

1

05

10M

CA

LLIS

TE

R S

T

WE

BS

TE

R S

T

11

5W

ebst

er S

tree

t Bic

ycle

and

Ped

estr

ian

11M

CA

LLIS

TE

R S

T

VA

N N

ES

S A

V

11

512

OA

K S

T

MA

SO

NIC

AV

11

05

13O

CT

AV

IA S

T

HA

IGH

T S

T

11

514

PO

ST

ST

W

EB

ST

ER

ST

1

15

Web

ster

Str

eet B

icyc

le a

nd P

edes

tria

n

15T

UR

K B

LVD

M

AS

ON

IC A

V

11

516

TU

RK

ST

W

EB

ST

ER

ST

0

15

Web

ster

Str

eet B

icyc

le a

nd P

edes

tria

n

17V

AN

NE

SS

AV

P

OS

T S

T1

15

18V

AN

NE

SS

AV

G

EA

RY

ST

01

5DISTRICT

 VI

110

TH

ST

M

ISS

ION

ST

1

16

210

TH

ST

H

OW

AR

D S

T

10

6H

owar

d S

tree

t Pilo

t Roa

d D

iet

32N

D S

T

BR

YA

NT

ST

1

06

44T

H S

T

KIN

G S

T

11

64t

h &

Kin

g Le

adin

g P

edes

tria

n In

terv

al

54T

H S

T

BR

AN

NA

N S

T

10

6

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

2 Pr

ojec

t Inf

orm

atio

n Fo

rms\

5 20

13 5

YPP

Upd

ate

(EP4

0 W

alkF

irst)

ATT

1 lo

c lis

tPa

ge 3

of 7

Page 24: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

Wal

k Fi

rst I

nter

sect

ion

Impr

ovem

ents

and

Nea

r-Te

rm V

isio

n Ze

ro C

apita

l Pro

ject

sN

ote:

Not

all

near

-ter

m c

apita

l pro

ject

s ar

e in

ters

ectio

n sp

ecifi

c, a

nd th

eref

ore

som

e ne

ar-t

erm

cap

ital p

roje

cts

that

ove

rlap

with

the

inte

rsec

tions

bel

ow m

ay n

ot b

e no

ted.

#Street 1

Street 2

Quick / Cost 

Effective

Compreh

ensive

 / Lon

g Term

District

On Vision

 Zero Near‐Term

 Cap

ital Projects List?

64T

H S

TB

RY

AN

T1

06

75T

H S

T

MA

RK

ET

ST

0

16

Mar

ket S

t Cor

ridor

Impr

ovem

ents

; 5th

St G

reen

Sha

rrow

s

86T

H S

T

HO

WA

RD

ST

1

16

Ped

estr

ian

Impr

ovem

ents

; How

ard

Str

eet P

ilot R

oad

Die

t

96T

H S

T

ST

EV

EN

SO

N S

T

01

610

6TH

ST

T

EH

AM

A S

T

01

611

6TH

ST

M

ISS

ION

ST

01

612

8TH

ST

H

OW

AR

D S

T

01

6H

owar

d S

tree

t Pilo

t Roa

d D

iet

139T

H S

T

MA

RK

ET

ST

0

16

14E

DD

Y S

T

PO

LK S

T

11

6P

olk

Str

eet E

arly

Impl

emen

tatio

n

15E

DD

Y S

T

MA

SO

N S

T

11

616

ED

DY

ST

JO

NE

S S

T

10

617

EM

BA

RC

AD

ER

O

SO

UT

H H

OW

AR

D S

T

11

618

FO

LSO

M S

T

6TH

ST

01

619

GE

AR

Y S

T

LEA

VE

NW

OR

TH

ST

1

16

20G

EA

RY

ST

T

AY

LOR

ST

1

06

21G

EA

RY

ST

LA

RK

IN S

T

01

622

GO

LDE

N G

AT

E A

V

HY

DE

ST

1

16

23G

OLD

EN

GA

TE

AV

JO

NE

S S

T1

16

Gol

den

Gat

e R

oad

Die

t

24G

RO

VE

ST

H

YD

E S

T0

16

25H

AR

RIS

ON

ST

3RD

ST

1

06

26H

OW

AR

D S

T

9TH

ST

1

06

How

ard

Str

eet P

ilot R

oad

Die

t

27H

OW

AR

D S

T

5TH

ST

1

06

How

ard

Str

eet P

ilot R

oad

Die

t; 5t

h S

t Gre

en S

harr

ows

28H

YD

E S

T

GE

AR

Y S

T

10

629

JON

ES

ST

E

LLIS

ST

1

16

30JO

NE

S S

T

TU

RK

ST

0

16

31LA

RK

IN S

T

GO

LDE

N G

AT

E

10

632

LEA

VE

NW

OR

TH

st

ED

DY

ST

1

06

33M

AR

KE

T S

T

GO

LDE

N G

AT

E A

V

01

634

MA

RK

ET

ST

G

OU

GH

ST

1

16

Mar

ket S

t. C

ycle

trac

k

35M

AR

KE

T S

T

VA

NN

ES

S S

T0

16

36M

AR

KE

T S

T

4TH

ST

01

6M

arke

t St C

orrid

or Im

prov

emen

ts

37M

AR

KE

T S

T

2ND

ST

0

16

Mar

ket S

t Cor

ridor

Impr

ovem

ents

; 2nd

St.

Roa

d D

iet

38M

AR

KE

T S

T

7TH

ST

0

16

Mar

ket S

t Cor

ridor

Impr

ovem

ents

39M

CA

LLIS

TE

R S

T

VA

N N

ES

S A

V

11

640

MIS

SIO

N S

T

8TH

ST

0

16

Mis

sion

St.

Inte

rsec

tions

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

2 Pr

ojec

t Inf

orm

atio

n Fo

rms\

5 20

13 5

YPP

Upd

ate

(EP4

0 W

alkF

irst)

ATT

1 lo

c lis

tPa

ge 4

of 7

Page 25: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

Wal

k Fi

rst I

nter

sect

ion

Impr

ovem

ents

and

Nea

r-Te

rm V

isio

n Ze

ro C

apita

l Pro

ject

sN

ote:

Not

all

near

-ter

m c

apita

l pro

ject

s ar

e in

ters

ectio

n sp

ecifi

c, a

nd th

eref

ore

som

e ne

ar-t

erm

cap

ital p

roje

cts

that

ove

rlap

with

the

inte

rsec

tions

bel

ow m

ay n

ot b

e no

ted.

#Street 1

Street 2

Quick / Cost 

Effective

Compreh

ensive

 / Lon

g Term

District

On Vision

 Zero Near‐Term

 Cap

ital Projects List?

41M

ISS

ION

ST

1S

T S

T

11

642

MIS

SIO

N S

T

MIN

T S

T

01

643

MIS

SIO

N S

T

9TH

ST

1

06

44M

ISS

ION

ST

11

TH

ST

1

06

45M

ISS

ION

ST

D

UB

OC

E A

V

10

646

MIS

SIO

N S

T

7TH

ST

0

16

47M

ISS

ION

ST

S

OU

TH

VA

N N

ES

S

01

648

MIS

SIO

N S

T

5TH

ST

0

16

5th

St G

reen

Sha

rrow

s

49M

ISS

ION

ST

N

EW

MO

NT

GO

ME

RY

S

T

10

650

OF

AR

RE

LL S

T

JON

ES

ST

1

16

51O

FA

RR

ELL

ST

P

OLK

ST

1

16

Pol

k S

tree

t Ear

ly Im

plem

enta

tion

52P

OLK

ST

T

UR

K S

T

11

6P

olk

Str

eet E

arly

Impl

emen

tatio

n

53P

OLK

ST

G

EA

RY

ST

1

16

Pol

k S

tree

t Ear

ly Im

plem

enta

tion

54P

OS

T S

T

PO

LK S

T

11

6P

olk

Str

eet E

arly

Impl

emen

tatio

n

55T

AY

LOR

ST

ELL

IS S

T

11

656

TA

YLO

R S

TE

DD

Y S

T

10

657

TU

RK

ST

T

AY

LOR

ST

1

06

58T

UR

K S

T

HY

DE

ST

0

16

59T

UR

K S

T

LEA

VE

NW

OR

TH

ST

0

16

60V

AN

NE

SS

AV

G

EA

RY

ST

01

6DISTRICT

 VII

119

TH

AV

O

RT

EG

A S

T

11

72

19T

H A

V

NO

RIE

GA

ST

1

17

319

TH

AV

JU

DA

H S

T

11

74

19T

H A

V

JUN

IPE

RO

SE

RR

A B

L 0

17

5C

IRC

ULA

R A

VE

B

AD

EN

ST

01

76

OC

EA

N A

V

PLY

MO

UT

H A

V

10

77

OC

EA

N A

V

MIR

AM

AR

AV

1

17

8T

AR

AV

AL

ST

19

TH

AV

1

07

DISTRICT

 VIII

116

TH

ST

G

UE

RR

ER

O S

T

11

82

18T

H S

T

GU

ER

RE

RO

ST

1

18

3B

OS

WO

RT

H S

T

DIA

MO

ND

ST

1

08

4C

AS

TR

O S

T

18T

H S

T1

08

5M

AR

KE

T S

T

14T

H S

T

10

8

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

2 Pr

ojec

t Inf

orm

atio

n Fo

rms\

5 20

13 5

YPP

Upd

ate

(EP4

0 W

alkF

irst)

ATT

1 lo

c lis

tPa

ge 5

of 7

Page 26: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

Wal

k Fi

rst I

nter

sect

ion

Impr

ovem

ents

and

Nea

r-Te

rm V

isio

n Ze

ro C

apita

l Pro

ject

sN

ote:

Not

all

near

-ter

m c

apita

l pro

ject

s ar

e in

ters

ectio

n sp

ecifi

c, a

nd th

eref

ore

som

e ne

ar-t

erm

cap

ital p

roje

cts

that

ove

rlap

with

the

inte

rsec

tions

bel

ow m

ay n

ot b

e no

ted.

#Street 1

Street 2

Quick / Cost 

Effective

Compreh

ensive

 / Lon

g Term

District

On Vision

 Zero Near‐Term

 Cap

ital Projects List?

6M

AR

KE

T S

T

CH

UR

CH

ST

1

08

DISTRICT

 IX1

16T

H S

T

HA

RR

ISO

N S

T

11

92

17T

H S

T

SO

UT

H V

AN

NE

SS

1

19

322

ND

ST

S

OU

TH

VA

N N

ES

S

11

94

24T

H S

T

PO

TR

ER

O A

V1

09

Pot

rero

Ave

. Str

eets

cape

5B

AC

ON

ST

S

AN

BR

UN

O A

V

11

96

BA

Y S

HO

RE

BL

PA

UL

AV

1

19

7C

ES

AR

CH

AV

EZ

ST

M

ISS

ION

ST

1

19

8M

ISS

ION

ST

23

RD

ST

1

19

Mis

sion

St.

Inte

rsec

tions

9M

ISS

ION

ST

16

TH

ST

0

19

10M

ISS

ION

ST

19

TH

ST

11

9M

issi

on S

t. In

ters

ectio

ns

11M

ISS

ION

ST

V

IRG

INIA

AV

1

19

12M

ISS

ION

ST

22

ND

ST

1

19

Mis

sion

St.

Inte

rsec

tions

13M

ISS

ION

ST

18

TH

ST

1

19

14M

ISS

ION

ST

14

TH

ST

1

19

15M

ISS

ION

ST

D

UB

OC

E A

V

10

916

MIS

SIO

N S

T

29T

H S

T

10

917

MIS

SIO

N S

T

21S

T S

T

01

918

SA

N B

RU

NO

AV

S

ILV

ER

AV

1

19

19S

OU

TH

VA

N N

ES

S

AV

E16

TH

ST

11

9DISTRICT

 X1

24T

H S

T

PO

TR

ER

O A

V

10

10P

otre

ro A

ve. S

tree

tsca

pe

23R

D S

T

PA

LOU

AV

0

110

3B

AY

SH

OR

E B

L P

AU

L A

V

11

10

4B

AY

SH

OR

E B

LVD

B

AC

ON

ST

/EG

BE

RT

A

VE

11

105

BA

YS

HO

RE

BL

SIL

VE

R A

V

11

106

BA

YS

HO

RE

BL

AR

LET

A A

V

11

107

ES

QU

INA

DR

G

EN

EV

A A

V

11

108

GE

NE

VA

AV

B

RO

OK

DA

LE A

V

11

10P

edes

tria

n In

ters

ectio

n T

reat

men

ts

9W

ES

T P

OIN

T R

DM

IDD

LE P

OIN

T R

D

11

1010

WIL

LIA

MS

AV

3R

D S

T

11

10DISTRICT

 XI

119

TH

AV

JU

NIP

ER

O S

ER

RA

BL

01

11

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

2 Pr

ojec

t Inf

orm

atio

n Fo

rms\

5 20

13 5

YPP

Upd

ate

(EP4

0 W

alkF

irst)

ATT

1 lo

c lis

tPa

ge 6

of 7

Page 27: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

Wal

k Fi

rst I

nter

sect

ion

Impr

ovem

ents

and

Nea

r-Te

rm V

isio

n Ze

ro C

apita

l Pro

ject

sN

ote:

Not

all

near

-ter

m c

apita

l pro

ject

s ar

e in

ters

ectio

n sp

ecifi

c, a

nd th

eref

ore

som

e ne

ar-t

erm

cap

ital p

roje

cts

that

ove

rlap

with

the

inte

rsec

tions

bel

ow m

ay n

ot b

e no

ted.

#Street 1

Street 2

Quick / Cost 

Effective

Compreh

ensive

 / Lon

g Term

District

On Vision

 Zero Near‐Term

 Cap

ital Projects List?

2A

LEM

AN

Y B

L N

IAG

AR

A A

V

01

113

GE

NE

VA

AV

B

RO

OK

DA

LE A

V

11

114

GE

NE

VA

AV

M

ISS

ION

ST

01

115

MIS

SIO

N S

T

PE

RS

IA A

V1

111

6M

ISS

ION

ST

E

XC

ELS

IOR

AV

1

111

7M

ISS

ION

ST

S

AN

TA

RO

SA

AV

1

111

8M

ISS

ION

ST

A

CT

ON

ST

1

111

9S

AG

AM

OR

E

ST

/SIC

KLE

S A

VE

S

AN

JO

SE

AV

1

111

10S

AN

JO

SE

AV

F

AR

ALL

ON

ES

ST

0

111

11S

ILV

ER

AV

M

ISS

ION

ST

10

11M

issi

on a

t Silv

er T

rans

it B

ulb

P:\P

rop

K\SP

-5YP

P\20

13 U

pdat

e\3

5YPP

s\EP

40\

2 Pr

ojec

t Inf

orm

atio

n Fo

rms\

5 20

13 5

YPP

Upd

ate

(EP4

0 W

alkF

irst)

ATT

1 lo

c lis

tPa

ge 7

of 7

Page 28: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San Francisco Pedestrian Safety Capital Improvement Program:

A Step Towards Vision ZeroMarch 5, 2014

Page 29: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets
Page 30: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

The First StepsIn APrIl 2013, MAyor lee ISSued The PedeSTrIAn STrATegy whICh

dIreCTed CITy dePArTMenTS To IMPleMenT SoluTIonS ThAT would

reduCe SerIouS or FATAl PedeSTrIAn InjurIeS by 25 PerCenT by

2016 And by 50 PerCenT by 2021, InCreASe The wAlkAbIlITy oF SAn

FrAnCISCo And MAke All neIghborhoodS SAFer For PeoPle wAlkIng.

AS PArT oF ThIS eFForT, wAlkFIrST wAS InITIATed To PrIorITIze CAPITAl

IMProveMenTS needed over The nexT 5 yeArS To MAke SAn FrAnCISCo

A SAFer PlACe To wAlk.

WalkFirst proposes this Pedestrian Safety Capital Improvement Program (CIP), a set of projects and programs that San Francisco will implement over the next five years to help achieve these goals. Projects address pedestrian safety issues on the City’s High Injury Network, streets and intersections that represent just six percent of San Francisco’s street miles but account for 60 percent of severe and fatal injuries. These programs and projects further support the recently San Francisco Municipal Transportation Agency-adopted “Vision Zero” – a vision of zero traffic deaths by 2024 which builds on the Mayor’s commitment to build safer, more walkable streets for everyone.

The WalkFirst Pedestrian Safety CIP anticipates $50 million of targeted funding over the next five fiscal years. This amount defines how many WalkFirst recommendations can be pursued, and estimates will evolve as new funding sources are made available or anticipated sources are not realized.

While $50 million can fund many pedestrian improvements and will help the City achieve some of the Mayor’s Pedestrian Strategy goals, this amount does not cover the entire set of projects identified through the WalkFirst planning process. The fiscally constrained WalkFirst CIP prioritizes projects at locations with a strong history of severe and fatal injuries and projects that can be implemented with available funding sources.

$50Mestimated available

over next five fiscal years

$240M needed to implement all

walkFirst projects and programs

1

Page 31: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

outreach highlightsFrom November 2013 to February 2014, over 3,700 people visited the WalkFirst website and 400 more provided direct feedback through focus groups and an online survey to share their thoughts about the pedestrian improvements that they would like to see the City implement.

what we heard from San FranciscansSan Franciscans told us to prioritize:

80%of respondents wanted SFMTA

to first fix the intersections and corridors where the most

collisions occurred

85%of respondents think

pedestrian safety is getting worse in the City

75%of respondents would

support a ballot measure if it included increased funding for

pedestrian safety

2

The vast majority of all walkFirst participants want SFMTA to act quickly and implement temporary measures that are cost effective.In general, San Franciscans want:

• Locations with seniors, children, and people with disabilities to be prioritized for safety improvements

• Solutions that recognize the diversity of neighborhoods and have community support

• Complex intersections to be made safer and less confusing for people who walk

leading Pedestrian Intervals

Pedestrian Countdown Signals

Automated Speed enforcement

Page 32: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

data AnalysisHealth researchers, planners and engineers looked at five years of police collision data, existing evidence, and surrounding land use and environmental data. These were used to develop profiles – patterns of frequently occurring collision types – to guide the recommendations for each intersection.

what we learned from pedestrian safety dataFindings showed that:

Total annual health- related

economic costs are much higher.

Left turns disproportionately contribute to injuries.

Motorists often are not yielding to pedestrians,Failure to yield accounts for 41% of the 64% total.

High vehicle speeds kill.

Medical costs alone are very high.

Each year in San Francisco,

Pedestrian injuries/death are concentrated in specific areas.

we’re a walkable City. All trips in San Francisco begin and end with walking.

Seniors are particularly vulnerable.

3

*Injury statistics based on analysis of California Highway Patrol SWITRS data, 2007-2011, by SFDPH.

YIE

LD

Streets

Left turns were the movement preceding collision in 28% of injuries

fatalities at 40 mph

fatalities at 25 mph

$564M

annual medical costs related to ped injuries

motorists at fault

And walking is the primary mode for 17% of all trips.

17 %At least

Seniors have a higher fatal injury rate than younger adults

Severe and fatal Injuries

STreeT 28%

Page 33: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

exAMPle loCATIon

23rd Street at Mission Street

CollISIon ProFIleS

Vehicle Red Light RunningPedestrian Outside CrosswalkVehicle Unsafe Speed

PoTenTIAl CounTerMeASureS*

EnforcementRadar Speed Display SignsSpeed Tables

exAMPle loCATIon

Mission Street at Excelsior Avenue

CollISIon ProFIleS

Vehicle Right Turns Vehicle Left Turns

PoTenTIAl CounTerMeASureS*

Leading Pedestrian IntervalTurn ProhibitionsTemporary Bulbouts

exAMPle loCATIon

Kearny Street at Sacramento Street

CollISIon ProFIleS

Vehicle Right Turns

PoTenTIAl CounTerMeASureS*

Leading Pedestrian IntervalTemporary Bulbout

walkFirst Funded ProjectsThis map shows where pedestrian safety projects will be implemented over the next five years. Some of these are already underway or will be implemented through on-going related programs. Example locations are potential near-term projects that are informed by the data collection and analysis performed through WalkFirst. As previously stated, there is a far greater need than identified funding availability, with an additional $50M needed to fully implement all recommended WalkFirst improvements.

* This is the result of our preliminary analysis. As the design phase progresses, alternative measures may be implemented.

!(!(

!(

!(

!(

!(

!(

!( !( !(

!(

!(!(

!( !(

!(

!( !(

!(!(

!(!(!(

!(!(!(

!(

!(

!(!(

!(

!(!(

!(

!(

!(

!(

!( !(

!(!(

!(!(!(!(

!(!(

!(!(

!(!(!(!(!(!(!(!(!(!(

!(

!(!(

!(!(

!(

!(

!(!(

!(!(!(

!(!(!(

!(!(

!(

!(!(

!( !(

!(

!(

!( !(

!(!(!(

!(!(

!(

!(

!(!(!(

!(!(

!(!(

!(!(!(

!(

!(

!(!(

!(!(!(

!(

!(

!(

!(!(

!(

!(

!(!(

!(

!(

!(!(

!(!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !( !( !(

!(

!(

!(

!( !(

!(

!( !( !(

!( !(!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(!(

!(

!(!(

!(!(

!(!(

!(

!(!(!( !(

!(

!(!(

!( !(

!(!(

!(

!(!(

!(!(

!(

!(!(

!(!(

!( !(

!(

!(

!(

!(!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!(!(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

16TH

TURK

VALENCIA

SAN

JOSE

GEARY

DIVISADERO

GENEVA

GEARY

19TH

19TH

SUNS

ET

LOMBARD

MISSIO

N

OCEAN

TARAVAL

WEBSTER

MASONIC

COLUMBUS

18TH

24TH

POTRERO

PALOU

SAN BRUNO BAYSHORE

MISSION

BAY

WalkFirst Capital Improvement Program

!(Comprehensive/Long TermProject Locations

!(Quick/Cost-Effective ProjectLocations

High Injury Corridors

´0 1½ Miles

3RD

Tenderloin

4

Page 34: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

exAMPle loCATIon

19th Avenue at Judah Street

CollISIon ProFIleS

Vehicle Right Turns Vehicle Unsafe Speed

PoTenTIAl CounTerMeASureS*

No Right Turn on RedSignal Timing ChangesAdvance Stop Bars

exAMPle loCATIon

Golden Gate Avenue at Hyde Street

CollISIon ProFIleS

Vehicle Left TurnsSeniors Involved in Collisions

PoTenTIAl CounTerMeASureS*

Turn ProhibitionsSignal Timing ChangesLeading Pedestrian Intervals

exAMPle loCATIon

30th Avenue at Geary Boulevard

CollISIon ProFIleS

Vehicle Unsafe SpeedChildren Involved in Collisions

PoTenTIAl CounTerMeASureS*

Pedestrian Countdown SignalsRadar Speed Display SignsLeading Pedestrian Interval

EFFECTIVENESS: 68%of severe/fatal injuries on High Injury Network targeted by WalkFirst Pedestrian Safety CIP

COST: $50Mfor implementation of WalkFirst Pedestrian Safety CIP

TIMEFRAME: years 1–5for implementation of WalkFirst Pedestrian Safety CIP

!(

!(

!(

!(

!(!(

!(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(!(

!(

!(!(

!(

!(!( !(

!(!(

!(

!(

!(

!( !(!(!(

!(

!(

!(!(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(!(

!( !(

!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!( !(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!( !(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !( !(

!(

!(

!(

BUSHJONES

MISSION

GRANTKEARNY

SUTTER

HOWARD

MCALLISTER

CALIFORNIA

MASON

TAYLOR

TURK

HYDE

STOCKTON

POLK

PINE

GOLDEN GATE

POWELL

GROVE

BROADWAY

MARKET

POST

EDDYELLIS

VAN NESS4TH

6TH

9TH

LARKIN

Tenderloin

5

Page 35: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

walkFirst CountermeasuresVarious pedestrian safety countermeasures will be installed to improve pedestrian safety. WalkFirst Countermeasures describe the proposed application and implementation for different engineering solutions for pedestrian safety. Below are potential solutions that will be implemented as part of the WalkFirst CIP projects, listed by most frequently proposed to be implemented.

Quick / Cost-effective Improvements

6

Temporary Pedestrian refuge Islands

Speed humps

Signal Timing Changes

Turn Prohibitions

Advance Stop or yield lines / red visibility Curbs

Continental Crosswalks

leading Pedestrian Intervals

Pedestrian Scrambles

Protected left Turns

reduced lane widths

Temporary Corner bulbs & Chokers

Page 36: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

FISCAL YEAR* % OF WALkFIRST 5-YEAR CIP SPENT

Year 1: July 2014 – June 2015 12%Year 2: July 2015 – June 2016 30%Year 3: July 2016 – June 2017 24%Year 4: July 2017 – June 2018 19%Year 5: July 2018 – June 2019 15%

Comprehensive / longer-Term Improvements

road diets

The WalkFirst Capital Improvement Program will be implemented over five years, starting with the quickest and most inexpensive improvements and progressing to more permanent solutions.

*Annual costs are based on estimated project start years, but some projects will take multiple years to implement

7

Pedestrian refuge Islands

radar Speed display Signs / Portable Speed Trailers

YOUR SPEED

roadway Safety lighting

Speed Tables & raised Crosswalks

Corner bulbs & Chokers

new Midblock Crosswalks

Flashing beacons (rrFb’s & hAwks)

Marking unmarked Crosswalks

Pedestrian Countdown Signals

Pedestrian detection

Pedestrian warning Signs

Page 37: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

walkFirst ProgramsThe WalkFirst Pedestrian Safety CIP will complement targeted infrastructure projects with a set of citywide pedestrian safety programs.

8

COST:

$1.9M

TIMEFRAME:

years 1-5

Selected Corridor Planning & designStudy two corridors on the WalkFirst network for pedestrian safety improvements at a corridor level. In addition to intersection-specific treatments, recommendations may include corridor speed control measures, enhanced midblock crossings, and reallocation of street space to calm traffic and enhance pedestrian and bicycle access.

enforcementIncrease enforcement to improve pedestrian safety, including establishment of citation diversion program, use of LIDAR speed enforcement, and installation of automated speed enforcement at 10 locations per year for five years (pending state legislation).

COST:

$1.2M

TIMEFRAME:

years 1-5

education CampaignsRoll out citywide pedestrian and motorist education campaign to increase effectiveness of WalkFirst infrastructure improvements, including awareness efforts and multimedia behavioral change program.

COST:

$1.9M

TIMEFRAME:

years 1-5

Automated Speed enforcement legislationResearch and analysis to inform the discussion of legislative change to permit the implementation of automated speed enforcement in California.

COST:

$40k

TIMEFRAME:

years 1-2

Page 38: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

9

Flashing beacon ProgramInstall 15 flashing beacons (three per year for five years) at targeted locations throughout the city.

Signal retiming ProgramAdjust signal timing to accommodate slower walking speeds at 20 targeted locations per year for five years.

daylighting ProgramProhibit parking in advance of crosswalks to increase pedestrian visibility (daylighting) at 25 targeted locations per year for five years.

Pedestrian detection PilotImplement pedestrian detection to extend crossing times at six targeted locations.

radar Speed display SignsInstall 15 radar speed display signs that will be deployed in the first year of the program. This item provides for the purchase and installation of 10 radar speed display signs each year thereafter.

YOUR SPEED

COST:

$1.9M

TIMEFRAME:

years 1-5

COST:

$550k

TIMEFRAME:

years 1-5

COST:

$300k

TIMEFRAME:

years 1-5

COST:

$300k

TIMEFRAME:

years 1-5

COST:

$40k

TIMEFRAME:

year 1

Page 39: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

walkfirst.sfplanning.org

WalkFirst is a collaborative effort of the Office of the Controller, the San Francisco Municipal Transportation Agency, the San Francisco Planning Department, and the San Francisco Department of Public Health. The project was funded by Prop K Sales Tax administered by the San Francisco County Transportation Authority. The Director’s Working Group guided this effort and the team thanks them for their on-going support.

SAn FrAnCISCo MunICIPAl

TrAnSPorTATIon AgenCy

Oliver GajdaCharlie Ream

Seleta J. Reynolds Laura Stonehill

Lucas Woodward

SAn FrAnCISCo oFFICe oF The ConTroller

Chava KronenbergClaire Phillips

Peg Stevenson

SAn FrAnCISCo PlAnnIng

dePArTMenT

Lily Langlois Adam Varat

SAn FrAnCISCo dePArTMenT oF PublIC heAlTh

Devan MorrisMegan Wier

ConSulTAnTS

Barbary Coast Consulting

Fehr & Peerslowercase

productions

Page 40: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Category:

Subcategory:

Prop K EP Project/Program:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Name:

Project Location:

Project Supervisorial District(s):

Project Description:

Purpose and Need:

Community Engagement/Support:

Implementing Agency:

Project Manager:

Phone Number:

Email:

Type:

Status:

Completion Date (Actual or Anticipated):

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - Both

Quarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering (30%)

Environmental Studies (PA&ED)

Design Engineering (PS&E)

R/W Activities/Acquisition

Advertise Construction

Start Construction (i.e. Award Contract)

End Construction (i.e. Open for Use)

Start Procurement (e.g. rolling stock)

Project Close-out

Prop K Expenditure Plan Information

C. Street & Traffic Safety

40

2014/15

TBD

Project Information

iv. Bicycle and Pedestrian Improvements

Neighborhood Transportation Improvement Program Placeholder

c. Pedestrian Circulation/Safety

TBD

NTIP projects are intended to funds projects that have been identified through community-based transportation planning efforts.

San Francisco Municipal Transportation Agency (SFMTA) or other eligible sponsor

TBD

The NTIP program came out of the San Francisco Transportation Plan's needs assessment that identified significant unmet demand for pedestrian and bicycle circulation projects and transit reliability initiatives. (See Purpose and Need below.) The NTIP has two components: a planning component to fund community-based planning efforts in each Supervisorial district; and a capital component to provide local matching funds for two neighborhood-scale projects in each district in the next five years. Examples of project types include pedestrian signals, bulbouts, and other measures to improve pedestrian and bicyclist safety. Capital placeholders like this project are included in various 5YPPs.

Start Date End Date

Environmental Clearance

Comments/Concerns

The San Francisco Transportation Plan's needs assessment identified significant unmet demand for pedestrian and bicycle circulation projects and transit reliability initiatives, and concluded that meeting these transportation needs is an important way to improve mobility in neighborhoods and to address socioeconomic and geographic disparities in San Francisco. As a result of this finding and in response to public and Board input, the Transportation Authority developed the NTIP.

This is a placeholder. Schedule will be determined when projects are identified.

Page 1 of 2

Page 41: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

San

Fra

nci

sco

Cou

nty

Tra

nsp

orta

tion

Au

thor

ity

Pro

pos

itio

n K

Sal

es T

ax P

rogr

am P

roje

ct I

nfo

rmat

ion

For

m

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Ph

ase

Cos

tP

rop

KO

ther

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

-$

-

$

-$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

-$

Des

ign

Eng

inee

ring

(PS&

E)

-$

-

$

-$

R/W

-$

-

$

-$

Con

stru

ctio

n1,

600,

000

$

1,60

0,00

0$

-

$

Pro

cure

men

t (e.

g. r

ollin

g st

ock)

-$

-

$

-$

Tot

al P

roje

ct C

ost

1,60

0,00

0$

1,

600,

000

$

-$

Per

cen

t of

Tot

al10

0%0%

Ph

ase

Fu

nd

Sou

rce

Fu

nd

Sou

rce

Stat

us

Fis

cal Y

ear

Fu

nd

s A

vaila

ble

Pre

viou

s14

/15

15/

1616

/17

17/

1818

/19

Tot

al

Con

stru

ctio

nP

rop

KP

lann

ed14

/15

400,

000

$

40

0,00

0$

800,

000

$

Con

stru

ctio

nP

rop

KP

lann

ed15

/16

400,

000

$

40

0,00

0$

800,

000

$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

Tot

al B

y F

isca

l Yea

r-

$

400,

000

$

80

0,00

0$

400,

000

$

-$

-

$

1,60

0,00

0$

Com

men

ts/

Con

cern

s

Nei

ghbo

rhoo

d T

rans

port

atio

n Im

prov

emen

t Pro

gram

Pla

ceho

lder

Fu

nd

ing

Sou

rce

Pro

ject

Exp

end

itu

res

(Cas

h F

low

) B

y F

isca

l Yea

r E

nte

r C

ash

Flo

w H

ere

Whe

n pr

ojec

ts a

re id

entif

ied,

pro

ject

s ar

e ex

pect

ed to

incl

ude

appr

opria

te le

vera

ging

.

Page

2 o

f 2

Page 42: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

MT

AC

ityw

ide

Safe

ty a

nd C

ircul

atio

n Im

prov

emen

tsT

BD

Pro

gram

med

$75,

000

$75,

000

MT

AC

ityw

ide

Safe

ty a

nd C

ircul

atio

n Im

prov

emen

tsT

BD

Pro

gram

med

$200

,000

$200

,000

MT

AC

ityw

ide

Safe

ty a

nd C

ircul

atio

n Im

prov

emen

tsT

BD

Pro

gram

med

$200

,000

$200

,000

MT

AC

ityw

ide

Safe

ty a

nd C

ircul

atio

n Im

prov

emen

tsT

BD

Pro

gram

med

$200

,000

$200

,000

MT

AC

onve

rtin

g St

anda

rd C

ross

wal

ks to

C

ontin

enta

l Cro

ssw

alks

PL

AN

/CE

R,

PS&

E,

CO

NA

lloca

ted

$80,

000

$80,

000

MT

AC

onve

rtin

g St

anda

rd C

ross

wal

ks to

C

ontin

enta

l Cro

ssw

alks

CO

NP

rogr

amm

ed$5

5,00

0$5

5,00

0

MT

AP

edes

tria

n C

ount

ing

Pro

ject

PL

AN

/

CE

R,

PR

OC

Allo

cate

d$5

5,00

0$5

5,00

0M

TA

Ped

estr

ian

Cou

ntin

g P

roje

ctP

RO

CP

rogr

amm

ed$2

5,00

0$2

5,00

0

MT

AR

ed V

isib

ility

Cur

bs

PL

AN

/CE

R,

PS&

E,

CO

NA

lloca

ted

$30,

000

$30,

000

MT

AR

ed V

isib

ility

Cur

bs

CE

R,

PS&

E,

CO

NP

rogr

amm

ed$3

0,00

0$3

0,00

0

MT

AR

e-O

pen

Clo

sed

Cro

ssw

alks

PL

AN

/CE

R,

PS&

E,

CO

NA

lloca

ted

$230

,000

$230

,000

MT

AR

e-op

enin

g C

lose

d C

ross

wal

ks

CE

R,

PS&

E,

CO

NP

rogr

amm

ed$1

00,0

00$1

00,0

00

Pro

gram

min

g an

d A

lloca

tion

s T

o-d

ate

2009

Pro

p K

5Y

PP

- P

rogr

am o

f P

roje

cts

Ped

estr

ian

Cir

cula

tion

/Sa

fety

(E

P 4

0)

Las

t Upd

ate:

Mar

ch 3

0, 2

010

Fis

cal Y

ear

Tot

alA

genc

yP

roje

ct N

ame

Pha

seSt

atus

City

wid

e P

edes

tria

n Sa

fety

& C

ircul

atio

n

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 4

0 T

ab: E

P 40

5YP

P SP

am

d1Pa

ge 1

of 3

Page 43: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

Pro

gram

min

g an

d A

lloca

tion

s T

o-d

ate

2009

Pro

p K

5Y

PP

- P

rogr

am o

f P

roje

cts

Ped

estr

ian

Cir

cula

tion

/Sa

fety

(E

P 4

0)

Las

t Upd

ate:

Mar

ch 3

0, 2

010

Fis

cal Y

ear

Tot

alA

genc

yP

roje

ct N

ame

Pha

seSt

atus

BA

RT

BA

RT

Tra

nsit

Con

nect

ivity

at

Reg

iona

l Hub

s (E

mba

rcad

ero

BA

RT

St

atio

n)C

ON

Pro

gram

med

$50,

000

$50,

000

MT

AB

ette

r St

reet

s P

roje

cts

CO

NP

rogr

amm

ed$2

00,0

00$2

00,0

00M

TA

Bet

ter

Stre

ets

Pro

ject

s C

ON

Pro

gram

med

$166

,000

$166

,000

MT

AB

ette

r St

reet

s P

roje

cts

CO

NP

rogr

amm

ed$2

34,0

00$2

34,0

00M

TA

Bet

ter

Stre

ets

Pro

ject

s C

ON

Pro

gram

med

$200

,000

$200

,000

MT

A

Gol

den

Gat

e P

ark

and

Dub

oce

Ave

nue

Ped

estr

ian

Impr

ovem

ents

: G

olde

n G

ate

Par

k P

edes

tria

n Im

prov

emen

tsC

ON

Allo

cate

d$9

3,00

0$9

3,00

0

MT

AP

lan

Impl

emen

tatio

nP

S&E

, C

ON

Pro

gram

med

$100

,000

$100

,000

MT

AP

lan

Impl

emen

tatio

nP

S&E

, C

ON

Pro

gram

med

$100

,000

$100

,000

MT

AP

lan

Impl

emen

tatio

nP

S&E

, C

ON

Pro

gram

med

$100

,000

$100

,000

MT

AP

lan

Impl

emen

tatio

nP

S&E

, C

ON

Pro

gram

med

$100

,000

$100

,000

MT

ASt

ockt

on S

tree

t Ped

estr

ian

Enh

ance

men

ts

PL

AN

/CE

R,

PA

&E

D,

PS&

EP

rogr

amm

ed$8

0,00

0$8

0,00

0

MT

AC

ross

wal

k M

aint

enan

ceC

ON

Pro

gram

med

$75,

000

$75,

000

MT

AC

ross

wal

k M

aint

enan

ceC

ON

Pro

gram

med

$75,

000

$75,

000

MT

AC

ross

wal

k M

aint

enan

ceC

ON

Pro

gram

med

$75,

000

$75,

000

MT

AC

ross

wal

k M

aint

enan

ceC

ON

Pro

gram

med

$75,

000

$75,

000

MT

AC

ross

wal

k M

aint

enan

ce (S

choo

l)C

ON

Allo

cate

d$7

5,00

0$7

5,00

0

MT

A14

th/M

arke

t Cur

b B

ulb

CO

NP

rogr

amm

ed$5

3,00

0$5

3,00

0

MT

AD

uboc

e A

venu

e P

edes

tria

n Im

prov

emen

tsC

ON

Allo

cate

d$1

73,0

00$1

73,0

00

Cro

ssw

alks

Med

ians

, Bul

b-O

uts

& S

idew

alk

Wid

enin

g

Cor

ridor

and

Are

a-Sp

ecifi

c P

roje

cts

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 4

0 T

ab: E

P 40

5YP

P SP

am

d1Pa

ge 2

of 3

Page 44: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

Pro

gram

min

g an

d A

lloca

tion

s T

o-d

ate

2009

Pro

p K

5Y

PP

- P

rogr

am o

f P

roje

cts

Ped

estr

ian

Cir

cula

tion

/Sa

fety

(E

P 4

0)

Las

t Upd

ate:

Mar

ch 3

0, 2

010

Fis

cal Y

ear

Tot

alA

genc

yP

roje

ct N

ame

Pha

seSt

atus

MT

A

Gol

den

Gat

e P

ark

and

Dub

oce

Ave

nue

Ped

estr

ian

Impr

ovem

ents

: D

uboc

e A

venu

e C

urb

Ext

ensi

ons

PS&

EA

lloca

ted

$47,

000

$47,

000

MT

AM

edia

ns, B

ulb-

Out

s &

Sid

ewal

k W

iden

ing

PS&

E,

CO

NP

rogr

amm

ed$1

25,0

00$1

25,0

00

MT

AM

edia

ns, B

ulb-

Out

s &

Sid

ewal

k W

iden

ing

PS&

E,

CO

NP

rogr

amm

ed$1

75,0

00$1

75,0

00

MT

AM

edia

ns, B

ulb-

Out

s &

Sid

ewal

k W

iden

ing

PS&

E,

CO

NP

rogr

amm

ed$2

00,0

00$2

00,0

00

MT

AM

edia

ns, B

ulb-

Out

s &

Sid

ewal

k W

iden

ing

PS&

E,

CO

NP

rogr

amm

ed$2

00,0

00$2

00,0

00

MT

AP

edes

tria

n Si

gnal

s (in

clud

ing

coun

tdow

ns a

nd A

PS)

PS&

E,

CO

N,

PR

OC

Pro

gram

med

$250

,000

$250

,000

MT

AP

edes

tria

n Si

gnal

s (in

clud

ing

coun

tdow

ns a

nd A

PS)

PS&

E,

CO

N,

PR

OC

Pro

gram

med

$1,0

00,0

00$1

,000

,000

MT

AP

edes

tria

n Si

gnal

s (in

clud

ing

coun

tdow

ns a

nd A

PS)

PS&

E,

CO

N,

PR

OC

Pro

gram

med

$250

,000

$250

,000

$833

,000

$1,0

88,0

00$1

,716

,000

$8

09,0

00

$1,1

05,0

00

$ 5,5

51,0

00

$783

,000

$0$0

$0$0

$7

83,0

00$5

0,00

0$1

,088

,000

$1,7

16,0

00

$809

,000

$1

,105

,000

$ 4

,768

,000

$833

,000

$1,0

88,0

00$1

,716

,000

$8

09,0

00

$1,1

05,0

00

$5,5

51,0

00$0

$0$0

$0$0

$0

*T

he 2

009

Stra

tegi

c P

lan

was

am

ende

d on

Mar

ch 3

0, 2

010

thro

ugh

Res

. 10-

52.

Tot

al P

rogr

amm

ed in

5Y

PP

Pro

gram

med

Ped

estr

ian

Sign

als

(Cou

ntdo

wn

& A

PS)

Tot

al A

lloca

ted

Cu

mu

lati

ve R

emai

nin

g P

rogr

amm

ing

Cap

acit

y

Boa

rd A

ppro

ved

Allo

catio

n/A

ppro

pria

tion

Tot

al P

rogr

amm

ed in

Am

end

ed 2

009

Stra

tegi

c P

lan

*

Tot

al U

nal

loca

ted

Pen

ding

Allo

catio

n/A

ppro

pria

tion

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 4

0 T

ab: E

P 40

5YP

P SP

am

d1Pa

ge 3

of 3

Page 45: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

SFM

TA

City

wid

e Sa

fety

and

Cir

cula

tion

Impr

ovem

ents

1T

BD

Prog

ram

med

$0$0

SFM

TA

City

wid

e Sa

fety

and

Cir

cula

tion

Impr

ovem

ents

5, 6

, 10

TB

DPr

ogra

mm

ed$0

$0

SFM

TA

City

wid

e Sa

fety

and

Cir

cula

tion

Impr

ovem

ents

10, 1

1, 1

9T

BD

Prog

ram

med

$79,

773

$79,

773

SFM

TA

City

wid

e Sa

fety

and

Cir

cula

tion

Impr

ovem

ents

TB

DPr

ogra

mm

ed$2

00,0

00$2

00,0

00

SFM

TA

Con

vert

ing

Stan

dard

Cro

ssw

alks

to

Con

tinen

tal C

ross

wal

ksPL

AN

/CE

R,

PS&

E, C

ON

Allo

cate

d$8

0,00

0$8

0,00

0

SFM

TA

Con

vert

ing

Stan

dard

Cro

ssw

alks

to

Con

tinen

tal C

ross

wal

ksPL

AN

/CE

R,

PS&

E, C

ON

Deo

blig

ated

($11

)($

11)

SFM

TA

Con

vert

ing

Stan

dard

Cro

ssw

alks

to

Con

tinen

tal C

ross

wal

ks 1

CO

NA

lloca

ted

$130

,000

$130

,000

SFM

TA

Con

vert

ing

Stan

dard

Cro

ssw

alks

to

Con

tinen

tal C

ross

wal

ks 1

CO

ND

eobl

igat

ed($

40,4

71)

($40

,471

)

SFM

TA

Con

tinen

tal C

ross

wal

ks a

nd R

ed V

isib

ility

Cur

bs 5

CO

NA

lloca

ted

$35,

727

$35,

727

SFM

TA

Con

tinen

tal C

ross

wal

ks 10

PS&

EA

lloca

ted

$115

,000

$115

,000

SFM

TA

2013

5Y

PP D

evel

opm

ent 11

Plan

Allo

cate

d$1

9,00

0$1

9,00

0

SFM

TA

Pede

stri

an C

ount

ing

/,

PRO

CA

lloca

ted

$55,

000

$55,

000

SFM

TA

Pede

stri

an C

ount

ing

PRO

CD

eobl

igat

ed($

147)

($14

7)SF

MT

APe

dest

rian

Cou

ntin

gPR

OC

Allo

cate

d$2

5,00

0$2

5,00

0SF

MT

AR

ed V

isib

ility

Cur

bsPS

&E

, CO

NA

lloca

ted

$30,

000

$30,

000

SFM

TA

Red

Vis

ibili

ty C

urbs

PLA

N/C

ER

, PS

&E

, CO

ND

eobl

igat

ed($

865)

($86

5)

SFM

TA

Red

Vis

ibili

ty C

urbs

CE

R, P

S&E

, C

ON

Allo

cate

d$3

0,00

0$3

0,00

0

SFM

TA

Re-

Ope

n C

lose

d C

ross

wal

ksPL

AN

/CE

R,

PS&

E, C

ON

Allo

cate

d$2

30,0

00$2

30,0

00

SFM

TA

Re-

open

ing

Clo

sed

Cro

ssw

alks

at M

arin

a /

Buc

hann

anC

ON

Allo

cate

d$9

7,00

0$9

7,00

0

SFM

TA

Re-

open

ing

Clo

sed

Cro

ssw

alks

at M

arin

a /

Buc

hann

anC

ON

Deo

blig

ated

($97

,000

)($

97,0

00)

SFM

TA

O'S

haug

hnes

sy /

Del

Val

e N

ew C

ross

wal

k 6

PS&

E, C

ON

Allo

cate

d$1

36,0

00$1

36,0

00

SFM

TA

Bic

ycle

& P

edes

tria

n Pr

ojec

ts -

Spee

d &

Vol

ume

Surv

eys

19PL

AN

Allo

cate

d$2

1,50

0$2

1,50

0

SFM

TA

Re-

open

ing

Clo

sed

Cro

ssw

alks

CE

R, P

S&E

, C

ON

Prog

ram

med

$3,0

00$3

,000

2009

Pro

p K

5Y

PP

- P

rogr

am o

f P

roje

cts

Ped

estr

ian

Cir

cula

tion

/Sa

fety

(E

P 4

0)

City

wid

e Pe

dest

rian

Saf

ety

& C

ircu

latio

n Im

prov

emen

ts

Stat

usFi

scal

Yea

rT

otal

Las

t Upd

ate:

05.

20.1

4

Age

ncy

Proj

ect N

ame

Phas

e

Pro

gram

min

g an

d A

lloca

tion

s T

o-d

ate

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 4

0 T

ab: E

P 40

5YP

P 05

.20.

14Pa

ge 1

of 4

Page 46: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

Stat

usFi

scal

Yea

rT

otal

Age

ncy

Proj

ect N

ame

Phas

e

BA

RT

BA

RT

Tra

nsit

Con

nect

ivity

at R

egio

nal H

ubs

(Em

barc

ader

o B

AR

T S

tatio

n)C

ON

Prog

ram

med

$50,

000

$50,

000

SFM

TA

Bet

ter

Stre

ets

Proj

ects

4C

ON

Prog

ram

med

$0$0

SFM

TA

Bet

ter

Stre

ets

Proj

ects

4,14

CO

NPr

ogra

mm

ed$0

$0

DPW

Uni

on S

quar

e Pu

blic

Rig

ht-o

f-W

ay

Acc

essi

bilit

y Im

prov

emen

ts -

Phas

e I4

CO

NA

lloca

ted

$339

,900

$339

,900

DPW

Uni

on S

quar

e Pu

blic

Rig

ht-o

f-W

ay

Acc

essi

bilit

y Im

prov

emen

ts -

Phas

e I

CO

ND

eobl

igat

ed($

293)

($29

3)

SFM

TA

Bet

ter

Stre

ets

Proj

ects

14C

ON

Prog

ram

med

$79,

271

$79,

271

SFM

TA

Bet

ter

Stre

ets

Proj

ects

C

ON

Prog

ram

med

$200

,000

$200

,000

SFM

TA

6th

Stre

et I

mpr

ovem

ents

14PL

AN

, PA

&E

DA

lloca

ted

$180

,829

$180

,829

SFM

TA

Gol

den

Gat

e Pa

rk a

nd D

uboc

e A

venu

e Pe

dest

rian

Im

prov

emen

ts: G

olde

n G

ate

Park

Pe

dest

rian

Im

prov

emen

tsC

ON

Allo

cate

d$9

3,00

0$9

3,00

0

SFM

TA

Plan

Im

plem

enta

tion3

PS&

E, C

ON

Prog

ram

med

$0$0

SFM

TA

Plan

Im

plem

enta

tion3,

18

PS&

E, C

ON

Prog

ram

med

$0$0

SFM

TA

Mis

sion

-Gen

eva

Tra

nsit

and

Pede

stri

an

Impr

ovem

ents

3C

ON

Allo

cate

d$1

68,0

00$1

68,0

00

SFM

TA

Mis

sion

-Gen

eva

Tra

nsit

and

Pede

stri

an

Impr

ovem

ents

3C

ON

Deo

blig

ated

($71

,508

)($

71,5

08)

SFM

TA

Plan

Im

plem

enta

tion 1

8PS

&E

, CO

NPr

ogra

mm

ed$0

$0

SFM

TA

Plan

Im

plem

enta

tion

18PS

&E

, CO

NPr

ogra

mm

ed$8

1,18

3$8

1,18

3SF

MT

A7t

h an

d 8t

h St

reet

scap

e 18

EN

V, P

A&

ED

Allo

cate

d$1

80,0

00$1

80,0

00

SFM

TA

Stoc

kton

Str

eet P

edes

tria

n E

nhan

cem

ents

PL

AN

/CE

R,

PA&

ED

, PS&

EPr

ogra

mm

ed$8

0,00

0$8

0,00

0

SFM

TA

Scho

ol C

ross

wal

k M

aint

enan

ceC

ON

Allo

cate

d$7

5,00

0$7

5,00

0SF

MT

ASc

hool

Cro

ssw

alk

Mai

nten

ance

CO

ND

eobl

igat

ed($

440)

($44

0)SF

MT

ASc

hool

Cro

ssw

alk

Mai

nten

ance

CO

NA

lloca

ted

$75,

000

$75,

000

SFM

TA

Scho

ol C

ross

wal

k M

aint

enan

ceC

ON

Deo

blig

ated

($5,

758)

($5,

758)

SFM

TA

Cro

ssw

alk

Mai

nten

ance

CO

NA

lloca

ted

$75,

000

$75,

000

SFM

TA

Cro

ssw

alk

Mai

nten

ance

CO

ND

eobl

igat

ed($

3,92

3)($

3,92

3)SF

MT

AC

ross

wal

k M

aint

enan

ceC

ON

Prog

ram

med

$75,

000

$75,

000

SFM

TA

Cro

ssw

alk

Mai

nten

ance

CO

NPr

ogra

mm

ed$7

5,00

0$7

5,00

0

SFM

TA

Dub

oce

Ave

nue

Pede

stri

an I

mpr

ovem

ents

CO

NA

lloca

ted

$173

,000

$173

,000

SFM

TA

Gol

den

Gat

e Pa

rk a

nd D

uboc

e A

venu

e Pe

dest

rian

Im

prov

emen

ts: D

uboc

e A

venu

e C

urb

Ext

ensi

ons

PS&

EA

lloca

ted

$47,

000

$47,

000

SFM

TA

Gol

den

Gat

e Pa

rk a

nd D

uboc

e A

venu

e Pe

dest

rian

Im

prov

emen

ts: D

uboc

e A

venu

e C

urb

Ext

ensi

ons

PS&

ED

eobl

igat

ed($

2,66

7)($

2,66

7)

Cro

ssw

alks

Med

ians

, Bul

b-O

uts

& S

idew

alk

Wid

enin

g

Cor

rido

r an

d A

rea-

Spec

ific

Proj

ects

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 4

0 T

ab: E

P 40

5YP

P 05

.20.

14Pa

ge 2

of 4

Page 47: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

Stat

usFi

scal

Yea

rT

otal

Age

ncy

Proj

ect N

ame

Phas

e

SFM

TA

14th

/Mar

ket C

urb

Bul

bC

ON

Prog

ram

med

$53,

000

$53,

000

SFM

TA

Med

ians

, Bul

b-O

uts

& S

idew

alk

Wid

enin

g 9, 1

1PS

&E

, CO

NPr

ogra

mm

ed$0

$0

DPW

Sloa

t Bou

leva

rd P

edes

tria

n Im

prov

emen

ts 9

PS&

EA

lloca

ted

$33,

552

$33,

552

DPW

Sloa

t Bou

leva

rd P

edes

tria

n Im

prov

emen

ts 16

CO

NA

lloca

ted

$96,

825

$96,

825

SFM

TA

Pede

stri

an R

efug

e Is

land

s 2PS

&E

Allo

cate

d$2

5,00

0$2

5,00

0

SFM

TA

Pede

stri

an R

efug

e Is

land

s 2PS

&E

Deo

blig

ated

($2,

851)

($2,

851)

SFM

TA

Med

ians

, Bul

b-O

uts

& S

idew

alk

Wid

enin

g2,

11, 1

6PS

&E

, CO

NPr

ogra

mm

ed$0

$0

SFM

TA

Silv

er a

nd A

ugus

ta I

slan

d an

d B

ulb-

out 1

2C

ON

Allo

cate

d$1

53,7

47$1

53,7

47

SFM

TA

Med

ians

, Bul

b-O

uts

& S

idew

alk

Wid

enin

g 16

,

17PS

&E

, CO

NPr

ogra

mm

ed$1

36,8

76$1

36,8

76

SFM

TA

Pede

stri

an R

efug

e Is

land

s17C

ON

Allo

cate

d$5

4,00

0$5

4,00

0

SFM

TA

Med

ians

, Bul

b-O

uts

& S

idew

alk

Wid

enin

g PS

&E

, CO

NPr

ogra

mm

ed$2

00,0

00$2

00,0

00

SFM

TA

Pede

stri

an S

igna

ls (i

nclu

ding

cou

ntdo

wns

and

A

P S)

PS&

E, C

ON

Allo

cate

d$2

14,0

00$2

14,0

00

SFM

TA

Pede

stri

an S

igna

ls (i

nclu

ding

cou

ntdo

wns

and

A

PS)

PS&

E, C

ON

Deo

blig

ated

($34

2)($

342)

SFM

TA

Pede

stri

an S

igna

ls (i

nclu

ding

cou

ntdo

wns

and

A

PS)

PS&

E, C

ON

Deo

blig

ated

($15

,216

)($

15,2

16)

SFM

TA

Pede

stri

an S

igna

ls (i

nclu

ding

cou

ntdo

wns

and

APS

) 7PS

&E

, CO

N,

PRO

CPr

ogra

mm

ed$0

$0

SFM

TA

Pede

stri

an S

igna

ls (i

nclu

ding

cou

ntdo

wns

and

APS

) 7, 1

2PS

&E

, CO

N,

PRO

CPr

ogra

mm

ed$0

$0

SFM

TA

New

Ped

estr

ian

Sign

als

13C

ON

Allo

cate

d$9

23,9

05$9

23,9

05SF

MT

AFr

ankl

in S

tree

t Sig

nal U

pgra

des

- Con

duit

7PS

&E

Allo

cate

d$1

12,0

95$1

12,0

95SF

MT

AFr

ankl

in S

tree

t Sig

nal U

pgra

des

- Con

duit

7PS

&E

Deo

blig

ated

($44

,072

)($

44,0

72)

SFM

TA

Pede

stri

an S

igna

ls (i

nclu

ding

cou

ntdo

wns

and

A

PS)

PS&

E, C

ON

, PR

OC

Prog

ram

med

$250

,000

$250

,000

SFM

TA

Man

sell

Cor

rido

r Im

prov

emen

ts 8

PLA

NA

lloca

ted

$119

,112

$119

,112

SFM

TA

Man

sell

Cor

rido

r Im

prov

emen

ts 15

EN

VA

lloca

ted

$44,

130

$44,

130

$828

,870

$4

68,2

13

$529

,325

$1

,974

,986

$1

,663

,467

$5

,464

,862

$783

,000

$5

71,0

00

$607

,900

$1

,648

,138

$5

77,2

84

$4,1

87,3

22

($4,

130)

($15

8,78

7)($

78,5

75)

($44

,072

)$0

($

285,

563)

$50,

000

$56,

000

$0

$370

,920

$1

,086

,183

$1

,563

,103

$833

,000

$1

,088

,000

$1

,716

,000

$8

09,0

00

$1,1

05,0

00

$5,5

51,0

00

$ 240

,764

$240

,764

$244

,894

$8

64,6

81

$2,0

51,3

55

$885

,369

$3

26,9

02

$326

,902

Tot

al P

rogr

amm

ed in

5Y

PP

Deo

blig

ated

fro

m P

rior

5Y

PP

Cyc

les

**C

um

ula

tive

Rem

ain

ing

Pro

gram

min

g C

apac

ity

Tot

al U

nal

loca

ted

in 5

YP

P

Tot

al P

rogr

amm

ed in

Am

end

ed 2

009

Stra

tegi

c P

lan

*

Tot

al A

lloca

ted

an

d P

end

ing

in 5

YP

PT

otal

Deo

blig

ated

in 5

YP

P

Pede

stri

an S

igna

ls (C

ount

dow

n &

APS

)

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 4

0 T

ab: E

P 40

5YP

P 05

.20.

14Pa

ge 3

of 4

Page 48: PEDESTRIAN CIRCULATION AND SAFETY...Pedestrian Safety - Innovative Device Testing/Adjustments Construction 130,776 $ 100% SFMTA 2005/06 Pedestrian Signals - 16th and Folsom Streets

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

Stat

usFi

scal

Yea

rT

otal

Age

ncy

Proj

ect N

ame

Phas

e

*T

he 2

009

Stra

tegi

c Pl

an w

as a

men

ded

on M

arch

30,

201

0 th

roug

h R

es. 1

0-52

.

.F

OO

TN

OT

ES:

City

wid

e Sa

fety

and

Cir

cula

tion

Impr

ovem

ents

: Red

uced

by

$21,

500

in F

isca

l Yea

r 20

12/1

3.

Bic

ycle

& P

edes

tria

n Pr

ojec

ts -

Spee

d &

Vol

ume

Surv

eys:

Add

ed p

roje

ct w

ith $

21,5

00 in

Fis

cal Y

ear

2013

/14

fund

s fo

r th

e pl

anni

ng p

hase

.

19 5Y

PP

am

endm

ent t

o ad

d B

icyc

le &

Ped

estr

ian

Proj

ects

- Sp

eed

& V

olum

e Su

rvey

s (R

esol

utio

n 14

-79,

05.

20.2

014)

16 5

YPP

am

endm

ent t

o ad

d Sl

oat B

oule

vard

Ped

estr

ian

Impr

ovem

ents

(Res

olut

ion

14-4

8, 0

1.28

.201

4)M

edia

ns, B

ulb-

outs

& S

idew

alk

Wid

enin

g: R

educ

ed b

y $8

7,70

1 in

Fis

cal Y

ear

2011

/12

and

$9,1

24 in

Fis

cal Y

ear

2012

/13.

Sloa

t Bou

leva

rd P

edes

tria

n Im

prov

emen

ts: A

dded

pro

ject

with

$96

,825

in F

isca

l Yea

r 20

13/1

4 co

nstr

uctio

n fu

nds.

17 $

54,0

00 f

rom

$19

0,87

6 pr

ogra

mm

ed in

Fis

cal Y

ear

2012

/13

Med

ians

, Bul

b-ou

ts &

Sid

ewal

k W

iden

ing

fund

s w

ere

allo

cate

d in

FY

201

3/14

for

Ped

estr

ian

Ref

uge

Isla

nds

in F

Y 2

013/

14.

Bet

ter

Stre

ets

Proj

ects

: Red

uced

by

$26,

100

in F

isca

l Yea

r 20

11/1

2.

Bet

ter

Stre

ets

Proj

ects

: Red

uced

by

$154

,729

in F

isca

l Yea

r 20

12/1

3.

6th

Stre

et I

mpr

ovem

ents

: Add

ed p

roje

ct w

ith $

180,

829

in F

isca

l Yea

r 20

13/1

4 fu

nds

for

plan

ning

/con

cept

ual e

ngin

eeri

ng a

nd e

nvir

onm

enta

l rev

iew

.15

5Y

PP

am

endm

ent t

o ad

d M

anse

ll C

orri

dor

Impr

ovem

ents

(Res

olut

ion

14-2

0, 0

9.24

.201

3)C

umul

ativ

e R

emai

ning

Pro

gram

min

g C

apac

ity: R

educ

ed b

y $4

4,13

0 in

Fis

cal Y

ear

2013

/14.

M

anse

ll C

orri

dor

Impr

ovem

ents

: Add

ed p

roje

ct w

ith $

44,1

30 in

Fis

cal Y

ear

2013

/14

fund

s fo

r th

e en

viro

nmen

tal p

hase

.

11 5

YPP

am

endm

ent t

o ad

d 20

13 5

YPP

Dev

elop

men

t (R

esol

utio

n 13

-49,

04.

23.2

013)

.C

ityw

ide

Safe

ty a

nd C

ircu

latio

n Im

prov

emen

ts: R

educ

ed p

rogr

amm

ing

by $

12,0

00 in

Fis

cal Y

ear

2012

/13.

2013

5Y

PP D

evel

opm

ent:

Add

ed p

roje

ct w

ith $

12,0

00 in

Fis

cal Y

ear

2012

/13

plan

ning

fun

ds.

12 M

edia

ns, B

ulb-

outs

& S

idew

alk

Wid

enin

g fu

nds

from

Fis

cal Y

ear

2010

/11

($91

,448

) and

Fis

cal Y

ear

2011

/12

($62

,299

) wer

e al

loca

ted

to S

ilver

and

Aug

usta

Isl

and

and

Bul

b-ou

t.13

Ped

estr

ian

Sign

als

(incl

udin

g co

untd

owns

and

APS

) fun

ds f

rom

Fis

cal Y

ear

2011

/12

($92

3,90

5) w

ere

allo

cate

d to

New

Ped

estr

ian

Sign

als.

14 5

YPP

am

endm

ent t

o ad

d 6t

h St

reet

Im

prov

emen

ts (R

esol

utio

n 14

-05,

07.

23.2

013)

.

Cum

ulat

ive

Rem

aini

ng P

rogr

amm

ing

Cap

acity

: Red

uced

by

$119

,112

in F

isca

l Yea

r 20

12/1

3.

Man

sell

Cor

rido

r Im

prov

emen

ts: A

dded

pro

ject

with

$11

9,11

2 in

Fis

cal Y

ear

2012

/13

fund

s fo

r pl

anni

ng/c

once

ptua

l eng

inee

ring

.9 5

YPP

am

endm

ent t

o ad

d Sl

oat B

oule

vard

Ped

estr

ian

Impr

ovem

ents

(Res

olut

ion

13-4

3, 0

3.26

.201

3)M

edia

ns, B

ulb-

outs

& S

idew

alk

Wid

enin

g: R

educ

ed b

y $3

3,55

2 in

Fis

cal Y

ear

2010

/11.

Sloa

t Bou

leva

rd P

edes

tria

n Im

prov

emen

ts: A

dded

pro

ject

with

$33

,552

in F

isca

l Yea

r 20

12/1

3.10

City

wid

e Sa

fety

and

Cir

cula

tion

Impr

ovem

ents

fun

ds f

rom

Fis

cal Y

ear

2011

/12

($28

,273

) and

Fis

cal Y

ear

2012

/13

($86

,727

) wer

e al

loca

ted

to C

ontin

enta

l Cro

ssw

alks

.

4 5Y

PP a

men

dmen

t to

add

DPW

's U

nion

Squ

are

Publ

ic R

ight

-of-

Way

Acc

essi

bilit

y Im

prov

emen

ts p

roje

ct u

sing

Pro

p K

fun

ds r

epro

gram

med

fro

m F

isca

l Yea

rs 2

010/

11 a

nd 2

011/

12

SFM

TA

Bet

ter

Stre

ets

Proj

ects

pla

ceho

lder

s (R

esol

utio

n 12

-06,

07.

19.1

1).

5 $35

,747

in u

ndes

igna

ted

FY 2

011/

12 C

ityw

ide

Safe

ty a

nd C

ircu

latio

n Im

prov

emen

ts f

unds

wer

e al

loca

ted

in F

Y 2

012/

13 f

or C

ontin

enta

l Cro

ssw

alks

and

Red

Vis

ibili

ty C

urbs

.6 $

134,

000

in u

ndes

igna

ted

FY 2

011/

12 C

ityw

ide

Safe

ty a

nd C

ircu

latio

n Im

prov

emen

ts f

unds

wer

e al

loca

ted

in F

Y 2

012/

13 f

or O

'Sha

ughn

essy

/ D

el V

ale

New

Cro

ssw

alk.

7

FY 2

010/

11 P

edes

tria

n Si

gnal

s fu

nds

decr

ease

d fr

om $

36,0

00 to

$0,

and

FY

201

1/12

Ped

estr

ian

Sign

als

fund

s de

crea

sed

from

$1,

000,

000

to $

923,

905,

and

$11

2,09

5 w

as r

edir

ecte

d to

FY

12

/13

for

the

Fran

klin

Str

eet S

igna

l Upg

rade

s - C

ondu

it pr

ojec

t.8 5

YP

P a

men

dmen

t to

add

Man

sell

Cor

rido

r Im

prov

emen

ts (R

esol

utio

n 13

-30,

01.

29.2

013)

1 $75

,000

in u

ndes

igna

ted

FY 2

010/

11 C

ityw

ide

Safe

ty a

nd C

ircu

latio

n Im

prov

emen

ts f

unds

wer

e ad

ded

to $

55,0

00 in

FY

201

0/11

fun

ds f

or th

e C

onve

rtin

g St

anda

rd C

ross

wal

ks to

C

ontin

enta

l Cro

ssw

alks

pro

ject

for

the

tota

l FY

201

0/11

allo

catio

n of

$13

0,00

0 to

the

proj

ect.

2 $25

,000

fro

m $

175,

000

prog

ram

med

in F

Y 2

011/

12 M

edia

ns, B

ulb-

outs

& S

idew

alk

Wid

enin

g fu

nds

wer

e al

loca

ted

in F

Y 2

011/

12 f

or P

edes

tria

n R

efug

e Is

land

s.3 5

YPP

am

endm

ent t

o ad

d th

e M

issi

on-G

enev

a T

rans

it an

d Pe

dest

rian

Im

prov

emen

ts p

roje

ct a

nd r

epro

gram

$29

,183

in F

Y 2

005/

06 P

rop

K f

unds

deo

blig

ated

fro

m th

e Pe

dest

rian

Sig

nals

: 16

th S

tree

t and

Fol

som

Str

eet p

roje

ct (R

es. 0

6-34

, 140

.907

011)

(Res

. 11-

63, 0

6.28

.11)

. The

deo

blig

atio

n is

incl

uded

in th

e "D

eobl

igat

ed f

rom

pri

or 5

YPP

cyc

les.

" M

issi

on-G

enev

a fu

ndin

g al

so in

clud

es $

100,

000

and

$38,

813

in F

Ys

2010

/11

and

2011

/12

Prop

K f

unds

, res

pect

ivel

y fr

om th

e Pl

an I

mpl

emen

tatio

n pl

aceh

olde

r.

Pend

ing

Allo

catio

n/A

ppro

pria

tion

Boa

rd A

ppro

ved

Allo

catio

n/A

ppro

pria

tion

** "

Deo

blig

ated

fro

m p

rior

5Y

PP c

ycle

s" in

clud

es d

eobl

igat

ions

fro

m a

lloca

tions

app

rove

d pr

ior

to th

e cu

rren

t 5Y

PP p

erio

d, a

s of

Aug

ust 2

2, 2

013.

Prog

ram

med

18 P

lan

Impl

emen

tatio

n fu

nds

from

Fis

cal Y

ear

2011

/12

($61

,183

), 20

12/1

3 ($

100,

000)

, and

201

3/14

($18

,817

) wer

e al

loca

ted

to 7

th a

nd 8

th S

tree

tsca

pe.

P:\P

rop

K\SP

-5YP

P\20

09 L

ivin

g\5Y

PP A

men

ded\

EP 4

0 T

ab: E

P 40

5YP

P 05

.20.

14Pa

ge 4

of 4