pelindo iii indonesia presentation on 36th asean ports association meeting cambodia, 8 - 11 december...

15
PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

Upload: corbin-presnell

Post on 31-Mar-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

PELINDO III

INDONESIA PRESENTATIONON

36th ASEAN PORTS ASSOCIATION MEETING

CAMBODIA, 8 - 11 DECEMBER 2010

Page 2: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

Indonesia Port Corporation I

Indonesia Port Corporation II

Indonesia Port Corporation III

Indonesia Port Corporation IV

Jakarta

Medan

SurabayaMakassar

INDONESIA PORT CORPORATIONS

IPC I

IPC II

IPC III

IPC IV

Indonesia’s state-owned port companies:

Page 3: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

PROFILE OF INDONESIA PORT CORPORATION III

43 Ports2 Business Units

Operations area : 7 provinces out of 33

provinces in Indonesia

Total area : 248.524 KM2 (13% of total

area in Indonesia)

Serve 88.641.069 people (40.50% of total population)

IPC III

5 Subsidiary Companies

1. PT. TPS (Container Terminal)2. PT. BJTI (Logistics)3. PT. RSPS (Hospital)4. PT. Portek Indonesia (Equipment)5. PT. Ambapers (Channel Operator)

Page 4: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

IPC III IN TRANFORMATION

IPC III

Port Operating Company

Port Operating Company

Terminal Operating Company

Terminal Operating Company

Page 5: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

IPC III MAJOR PROJECTS

Surabaya Western Access Channel (SWAC)

Teluk Lamong Multipurpose Terminal

Benoa Cruise Terminal

* Notes : Usulan Rute Tol Baru Land or Mangrove Edge

New Island (marina &Fishery)

Cruise Ships

Rute Tol Awal

ANGKASA

PURA

PELINDO III

NUSA DUA TOURIST RESORTINTERNATIONAL

CONVENTION HALL

DENPASAR

SELATAN

SANUR

Page 6: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

PORT OF TANJUNG PERAK

APBS IMPROVEMENT THREATS

SHIPPING LANES • Length : 25 mil laut• Width : 100 Meter • Depth : 9,50 M LWS• Total SBN : 18 buoys + 7 (NEW)

SHIPPING LANES • Length : 25 mil laut• Width : 100 Meter • Depth : 9,50 M LWS• Total SBN : 18 buoys + 7 (NEW)

LOCATION COORDINATE IN TANJUNG PERAK :

112° 43’ 22” BT7° 11’ 54” LS

LOCATION COORDINATE IN TANJUNG PERAK :

112° 43’ 22” BT7° 11’ 54” LS

Water area : 1.547,3 HaLand area : 574,7 Ha

Water area : 1.547,3 HaLand area : 574,7 Ha

6

SURABAYA WESTERN ACCESS CHANNEL

Page 7: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

DEVELOPMENT PLAN OF SWAC

MADURA

JAVA

Pipa Gas Lama

No.1 3

5

2

7

9 4

11

Buoy MAFIA

6

13

15

8

PILOT STATION Kr. Jamuang

SWEBERCONQUEST

CHANNELWIDTH 100 mDEPTH -9,5 m

Lebar 100 mLWS 9,5 m

Lebar 150 mLWS 10 m - 11 m

Area Anchorage

Area Anchorage

Area Anchorage

Alpha DMB 88

Maspion

Smelthing

10 Rede Tg. Perak Surabaya

PORT OF TANJUNG PERAK SURABAYA

Petro Kimia

Dermaga Gresik

PLTU

Current Width : 100 Meter Depth : - 9,50 M LWS Capacities: 27.000 Moves/Years

Future Width : 200 Meter Depth : - 14 M LWS Capacities : 58.000 Moves/Years

Page 8: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

TELUK LAMONG MULTIPURPOSE TERMINAL (1)

1. Accommodate overflow of Tanjung Perak Port.

2. Increase Capacity.3. Built on an artificial island in area of 50

hectare.

4. Structures Causeway : 1.280 M Berth : 51.200 m2 (1.280 x 40m)Container Yard : 364.800 m2

(9.600 ground slots)

5. CY Capacity :1.708.200 Teus/Years

6. Support Facility :Causeway, Bridge, Gate in/out, office, road

and workshop, parking area, CFS.

Page 9: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

TELUK LAMONG MULTIPURPOSE TERMINAL (2)

9

Activities that have been done :- Feasibility study- Detailed Engineering Design- Bidding process for civil construction- Earth breaking to commence

construction

Page 10: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

BENOA AS CENTER OF CRUISE DESTINATION

CRUISE SHIP TO INDONESIA (2010)

236 CALLS

CRUISE SHIP TO INDONESIA (2010)

236 CALLS

Page 11: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

PROPOSED DEVELOPMENT OF BENOA

*

Notes : Usulan Rute Tol Baru Land or Mangrove Edge

New Island (marina &Fishery)

Cruise Ships

Rute Tol Awal

ANGKASA PURA

PELINDO III

NUSA DUA TOURIST RESORTINTERNATIONAL CONVENTION HALL

DENPASAR SELATAN

SANUR

Page 12: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

BENOA DEVELOPMENT PLAN (1)

SHORT TERM PROGRAMSHORT TERM PROGRAMSHORT TERM PROGRAMSHORT TERM PROGRAM

Page 13: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

BENOA DEVELOPMENT PLAN (2)

I

- Deepening and widening port basin- Straightening acces channel

- Deepening and widening port basin- Straightening acces channel

SHORT TERM PROGRAMSHORT TERM PROGRAMSHORT TERM PROGRAMSHORT TERM PROGRAM

Page 14: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

BENOA DEVELOPMENT PLAN (3)

MASTERPLANMASTERPLANMASTERPLANMASTERPLAN

Page 15: PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010