STUDIO OF ARCHITECTURAL DESIGN VIPOCKET OF CREATIVITY IN THE OLD CITY AREA OF JAKARTA
CO-LECTURE:IR. INDIRA LAKSMI , M Arch
CREATED BY :ANNISA DIANDARI PUTRI 052.06.008
ARDHANA RESWARI 052.06.010ARIO WITONO 052.06.012
LECTURES:PROF. DR. IR. GUNAWAN TJAHJONO
IR. HARY WAHJONO MSA
DEPARTEMENT OF ARCHITECTUREFACULTY OF CIVIL ENGINEERING &
PLANNINGTRISAKTI UNIVERSITY-JAKARTA
2009
Introduction of Assignment
Introduction
In accordance with the effort to provide object of Jakarta City-Tour,
the Local Government of DKI Jakarta need develop the area of “Kota
Lama Jakarta” as a central of creativity and cultural tourism by
creating an activity pocket for Living, creating, performing, and
shopping recreation.
In surrounding the route of tourism within the area of “Kota Lama
Jakarta”, there are many colonial buildings became object of
cultural recreation. So the area should be develop as conservation
district based on the concept of revitalization by promoting new
activity, maintaining or increasing the former activities, and
appreciating the historical buildings.
Purpose :
Make a center of creativity and cultural tourism by creating and activity
pocket for Living, Creating, Performance and shopping
recreation.
Make a concept of revitalization area in Kota Lama Jakarta by
promoting, new activity, maintaining the former activities and
appreciating the historical buildings.
Plan and design the Mixed-Use facilities up to all user’s need could be
achieved and pleasurable for various users with diverse interests.
Design the center by considering the climate tropical sustainable
city.
PROPOSED SOLUTIONS
GUEST ROOMSFOR ARTIST
LIVING PERFORMINGRECREATION
CAFÉ & ART SHOP
ART GALLERY
CULTURE CENTER of ART
Proposed Solution
Building that designed with attention to the tropical climate as a function of the cultural center of art were created to accommodate all the activities such as living, performing and recreation and with attention to the culture of Indonesia itself with the historical value of the area that have. The building design with the Indonesia culture and atmosphere
LIVING Artist GuestroomCrewArtist
Sequens
CREATING Artist Workshop
PERFORMING Artist Facilitate a place for performing
Visitors
Dance / Theater Function HallMusic Music Hall
Backstage for mucisianBackstage for musical instrument
Give place for visitors to watch the show
SHOPPING
RECREATION
Vendors Facilitate a place for sell
Visitors
Jakarta typical food
(Gado-gado, laksa, pancong, kerak telor, fruits)
Provide a place for recreation with the typical atmosphere of Jakarta
Manager Sell souvenirs typical Jakarta
(Kebaya encim, golok, rebana, sclupture)
Mixed-Use Definition :
Mixed-Use Building :
Merger three or more building function which significant, inwrought, andcomprehensive in one tread to increase site efficiency, related/relevant at theprice of high site and resident requirement which progressively complex [1]. The characteristic mixed-use building is have three or deeper function which is supporting each other, enlarging to span the activity time, reaching immeasurable consumer[3].
Marking Mixed-Use[2]:Three or more commercial function which is significant
( Resident, Shopping, Office, Recreation, etc.)Integration of Function and physical. ( each other being connected by pedestrian way) Plan which coherence. ( physical, economic, management)
The function for example : Office :easy to joined, competitive, commercial. Shopping : wide market, lengthening time Hotel : most beneficial, activity 24 hour. Supporter Facility : restaurant, sport, entertainment amusement, etc.
[1] Robert E. Witherspoon, Jon P. Abbett, and Robert M. Gladstone, Mixed-Use Developments, New Ways of Land Use, page 6.[2] Ibid. page 7.[3] Ibid. page 47-48.
Mixed-Use Development :
Development that combines and integrates two or more principal land uses, such
as commercial, office, civic, commercial, industries in a vertical and
separate build-trial, or residential uses as those use types are defined in.
All mixed-use developments exhibit a strong orientation toward accommodating
pedestrians. The mix of uses may be combined mixed-use building or combined in
located on one property and/or under unified control. All “activity centers,” as this
Section defines that term, contain mixed-use development.
Vertical Mixed-Use Building :
A multi-story building containing a vertical mix of two or more principal
uses. For
example, a vertical mixed-use building would include a building with retail or office
uses
on the first (ground) floor and residential uses on upper floors.
Tropical City :Tropical is area on the surface of earth, what geographically residing in about equator, that is limited by two latitude, that is 23.50 LS and 23.5 LU. Tropic of north and tropic of south. This Area located in between 23.5° LU and 23.5° LS, and inclusion all part of earth where the sun reach a dot above head, at least once during the year. Said is tropic come from Greek meaning "rotate", because position of the sun changing between two are tropic in one periods, which we mentioning year.
In classical tropical climate divided two: tropical wet and tropical run dry. De Wall divide tropical climate become 10 classification based on daily temperature average and difference between nights and afternons temperatures. Jakarta is mentioned as admission in first category, with temperature of average of 28C and also deviation about 7.
CONCEPT SCHEME OF TROPICAL CITY :
1.Protection to weather ( rain and the sun radiation)2.Reforestation of town: Minimization abssorbtion of heat surface of outdoor space. For anticipating relative air temperature3.Settlement of building mass by optimal of air current around building4.Dissociation of vehicular circulation motorize, vehicle don‘t motorize, and Pedestrian
Urban Context :
One of the most crucial problem that an urban city has to deal with is the lack of city planning and the crosswires of needs that often causes urban chaos (the price to pay for the chaos are; unnecessary accidents). The arrangement of the city could have been done, unfortunately the implementation is not good enough because the human organization is not supporting.
Oftenly found, life systems and life supporters or the environment around the dwellings are not capable enough to facilitate a healthy dwelling, which can be caused by;Infrastructure of the urban area are not well planned (many systems like transportation, electrical cables, water, land use, irrigation, etc)
The environmental social life around the dwellings are not giving positive impact to the dwellingsThe unexistense of healthy dwelling assets like clean air, clean waterUrban cities, whether it has became urban or new urban cities need specific dwelling designs that gives efficiency and the comfort of life (this is subjective). If in an urban city there is none or rare anymore to be found the possibility to create proper dwelling, it might be needed to think about the possibility to create better urban cities.
From the small harbor and dirty impressed town to a Megapolitan city in Indonesia which is has been four and three times changed name and divided by Kalibesar.
Local Regulation & Classification
Local Regulation According to Per-Da no. 9 tahun 1999: Revitalization is effort to empower the situation and environment and heritage buildings
for various functions that support their preservation Maintain and restore the environment and the origin of a building that contains the value
of history, science, and culture Building heritage Group C, is building that meets the criteria:
a. Age b. Architecture
Age criteria is associated with the lack of minimum age limit of 50 (fifty) years While architecture criteria is associated with aesthetic and design that depicts a certain
era and styleRestoration of heritage Group C is the adaptation and reconstruction of the building with
the following:a. Changes can be done w ith the build ing sti ll retains the patt ern appear to advance, the m ain architecture and form of roof constructionb. D etail and ornam ent m ateria ls ad justed to the arch itecture around the build ing environm ent in harm onyc. A dditional build ings in som e site can only be done on the back of the build ing herritage, w hich m ust be in accordance w ith the architectural heritage of harm ony in the environm entd. Function of the build ing can be changed in accordance w ith the p lan of the city
Revitalization is effort to empower the situation and environment and heritage buildings for various functions that support their preservation
Maintain and restore the environment and the origin of a building that contains the value of history, science, and culture
Building heritage Group C, is building that meets the criteria: a. Age b. Architecture
Age criteria is associated with the lack of minimum age limit of 50 (fifty) years
While architecture criteria is associated with aesthetic and design that depicts a certain era and style
Restoration of heritage Group C is the adaptation and reconstruction of the building with the following:a. Changes can be done with the building still retains the pattern appear to advance, the main architecture and form of roof constructionb. Detail and ornament materials adjusted to the architecture around the building environment in harmonyc. Additional buildings in some site can only be done on the back of the building herritage, which must be in accordance with the architectural heritage of harmony in the environmentd. Function of the building can be changed in accordance with the plan of the city
History of Jakarta
Batavia was ruled by Jan Pieterzoon Coen since 30 May 1619 and became international town. Worry with enemy attack, this town was protected by ditch and circumference wall. In the year of 1619 Jayakarta town was conquered and fallen into the Dutch. Name of Jayakarta even also finally changed into Batavia.
History of Jakarta Old City
The settlement in the form of block which dissociated with canal and road. This kota divided into two sides dissociated by Ciliwung river (now recognized as Kalibesar). At part of east side estuary there were Castille of Batavia which surroundings there are big warehouses.
The interesting from this town structure is existence of Plazas as the downtown (is now Taman Fatahillah) with luxurious and big building beside the plaza. The building function as Balaikota (Stadhuis).
Comparison Study
Salihara - The New Cultural Oasis: Jakarta, West Java
Residents and visitors of the capital will soon to have a new modern cultural enclave with the establishment of the Salihara community and its building complex in South Jakarta.
The 3,060-square-meter cultural complex on Jl. Salihara in the Pasar Minggu area will add to the city’s very few “alternative” art centers.
The Salihara complex is to have the country’s first black box theater, a flat arena on which players and spectators can interact with each other.
A unique four-story building that will accommodate a library, offices, guest house and a bookshop, food court will also be part of the Salihara complex.
The Salihara complex will be an architectural experiment combining the talents of three architects: Adi Purnomo, who is to design the theater, Marco Kusumawijaya the art gallery and Isandra Matin Ahmad, the administrative building. They work for build a new cultural home that is environmentally friendly and spends less energy.
The theater, which can accommodate up to 300 people, will have sound-proof walls, a green room and modern sound and lighting equipment and the unique wall with the brick rotate almost 5 degrees. The rooftop of the theater is also designed to be an open-air theater.
A cozy foodcourt with an open view situated below the ovate gallery will provide food and beverages, recalling the similar setup of the Utan Kayu cafe. Cultural discussions and book readings are some of the activities that could be conducted in the food court.
There is also have a gallery housed in an ovate-cylindrical building without any corner, to provide a wider perspective for the viewers.“In the gallery, for instance, we use glass in the roof to maximize the use of sunlight. I put the glass in such a way that we will get a soft light,” Marco said.
The open space such as pedestrian to combining the all function and nature and spends many energy and lighting.
Selasar Sunaryo
• Located in the the green hills of Dago, Selasar Sunaryo is an art space that exhibits various kind of art objects, like sculpture, installation, and painting.
• Lower level spaces present artworks by emerging and established Contemporary Indonesian Artists and Contemporary Visual Art exhibitions from the Asia Pacific region.
• Upper Level indoor and outdoor exhibition spaces present selected works by Sunaryo including painting, sculpture, prints and installation
• Selasar Sunaryo constructed over four years (1993-1997) by Sunaryo and BaskoroTedjo.
• This building stand on the land area of 4000 m² and the measurement of the building is 1000 m²
• 'Ruang A' (Gallery A)
Gallery A (about 177 m²), is used to houseand exhibit works of Sunaryo selected by the Board of Curators based on timeline and periods of creation. The room is also used for large scale exhibitions promoting Indonesian and foreign artists.
• Stone Garden
Stone Garden (about 190 m²), an open space used for exhibiting Sunaryo's artworks made of stones
• 'Ruang B' (Gallery B)
Gallery B (about 210 m²), is used to present exhibitions of young artists from Indonesia as well as overseas. The space is also used to present the permanent collection of the artspace and works of artists from Indonesia and overseas
• 'Kopi Selasar' (Selasar Cafe)
Kopi Selasar (about 157 m²), a large outdoor cafe is the perfect place to unwind and enjoy excellent coffee, snacks and lunch, use wireless, or just enjoy the beautiful scenery of the Dago hill.
• 'Cinderamata Selasar' (Selasar Shop)
Cinderamata Selasar, a shop where people can purchase and array of arts and cultural books and journals as well as gifts and souvenirs.
• 'Amphitheater'
Amphitheater (about 198 m²), an open circular space with large screen, has a maximum capacity of 300 people and was specially built and structured for staging performingarts events, poetry readings, screenings and other cultural events.
• Bamboo House
Bamboo House (about 76 m²), a modest house made of bamboo. Visiting artists often spend the night whilst involved in a program and is also used by artists in residence, and special guests.
• 'Bale Handap'
Bale handap is a multi purpose space used for discussions, performances, events, theatre, workshops/ seminars, discussions, presentations and video screenings. The building is inspired by traditional Javenese architecture with an open terrace. Bale Handap is separated from the major building, located betweenthe Bamboo House on the lowest level of Selasar.
• 'Bale Tonggoh' (Upper Hall)
Bale Tonggoh (about 190 m²), is a semi-permanent building functioning as a project room and temporary exhibition space.
American Folk Art Museum by Tod William and Billie Tsien (2001)
Part of New York’s famous Museum of Modern Art (MOMA) family.
As an infill building, the verticality of the form was generated in response to the context and site plan constraints.
Where the site is only 12 x 30 metres and accommodates a 2800 m2 program.
Façade of the building is designed to make a strong but
quiet statement of independence
American Folk Art Museum Plan
Ground Level Plan
1. Main entrance
2. Main stair
3. Museum store
4. Entrance to the museum store
5. A small coffee bar
6. Main hallway
7. Stair
8. Single elevator
Level 4/5 Plan
1. Lobby
2. Corridor
3. Corridor
4. Hall
5. Elevators
6. Main Stairs
• At the mezzanine level, a small cafe overlooking 53rd Street provides a dramatic view of the two-story atrium.
• The galleries on the four top floors of the building vary in scale from intimate spaces to allow for a personalized art experience to open areas for the display of larger works. The gallery floors are made of wood set into concrete.
• Seven of the eight levels of the new building are entirely dedicated to public space.
• At the street level is a new museum store accessible during non- museum hours via a separate entrance.
• The museum offices, reference library, rare book room, and educational areas, including the auditorium and classrooms, are located on two levels below ground. The building extends two levels underground; one floor holds the new auditorium and classroom facilities, while the lowest level holds houses administrative offices and the library
ABOUT THE BUILDING
Switch Building
The white building is the Switch Building
• The architects attempts to facilitate chance interactions on a project by attempting to redefine typologies.
• The Architect designed the Switch Building, a seven storey apartment and art gallery building in New York.
• The building consist of four floor apartment, a duplex penthouse and a double height art gallery on the ground and cellar levels.
• The project’s design emerges from a creative interpretation of some of narrow constraints imposed by zoning and the developer’s need.
The different angled bay windows in nArchitect Switch Building,
• The “switching” concept opportunistically maximizes difference while maintaining the efficiencies of repetition.
• In a reinterpretation of a traditional New York bay window, an angled front façade switches back and fourth, allowing each floor-through apartment unique views up and down Norfolk street and creating subtle variations in shadow and reflections.
Switch Building
Plan of the Building
Section of the Building
The kitchen, and the stairs to the apartment
The entrance of the lobby
Switch gallery has a black hot-rolled steel and glass storefront and canopy that open completely, allowing for openings to extend onto the sidewalk
Lobby of the building
corridor to the lift with the interior material using wood or natural materials throughout the gallery space and lighting factors that are supporting
cover the building with a transparent box that can save energy by using solar lighting to natural lighting from the building itself
The conclusion of the Comparison Study
Salihara’s Building and Selasar Soenaryo• In the example in the case of building Salihara’s and
Selasar Soenaryo, we use the example in the interior using natural materials for the building in accordance that include a function for Performing art, creativity, studying, and recreation.
• The both building use the natural material according to the tropical climate
Museum of Modern Art • One of the example the case of infill building by adjusting the footprint of the
building and use the interior is quite luxurious and modern. that there is room in the building functions as a reading room, cafe, museum
Switch Building• Building consist of 4floor with a case example infill building
• The building has two appear to face a different direction and look almost the same.• Interior using natural materials (wood) and natural lighting in the dwelling
• This building function as a gallery and apartment
Plan for living
Plan for art gallery
Case Study Applied to Design
Plan of Design
The plan that we take is from Switch Building. We
take from the space program and the same case
which is use the limited site for building.
There are the art gallery in ground floor and
basement (section) and for living in the 2nd to 6th
floor. These room like our project room.
This plan also showed us the stretch plan and
storey building to accommodate many function in
the limited site.
Section and Interior of Design
The plan that we take is from Switch Building. We
take from the space program and the same case
which is use the limited site for building.
In this plan also showed us they use of
openings to provide the natural light
can enter so can it can save the
natural light and the good air
circulation.
Section of the building
Art gallery
Art gallery
Living area
Living area
Living area
Living area
Living area
Kitchen
In this section also showed us the basement for
art gallery is to accommodate the needs of the
building and another room in up stairs for living
area.
on the roof top in the design using the transparency box to take advantage of the natural lighting that we will also apply to the building which will be designed
The using of the stair case to reach to every floor in the building and using the natural material which is we can also apply on our project
Case Study Applied to Design
Interior and Another Room of
Design
The Interior design is also to support our building.
And the right material and zoning also support it
too. Because there are many problem and one of
them is interior. There are a few examples that we
will apply in our project for references.
In our project, there is also
room for creativity. In this case,
we use the workshop room for
share our creativity.
The good material which is also support it like natural
material. And good lighting. In this room we can also share
our creativity to public so it must have Indonesian
atmosphere and familiar.
We also take one of
our comparison for our performance art room, we took from
this case is the good acoustic created from the processing of
material
The use of open space in one of the
cases we can also take advantage of us and apply on our projects. open space
is also space for air circulation and can also solve our site problems which is
be less vegetation.
One of the rooms are on one of our cases that
we take examples of stand space and eat food that we will make reference
which is in that rooms we can feel Jakarta’s atmosphere.
The wooden material and good lighting which is
can we apply to in our project for performing art
and creating art.
Existing Data
Site Data
3rd alternative“Roa Malaka Utara Street”
1st alternative“Pintu Besar Utara Street”
2nd alternative“Pinangsia Timur Street”
This site is located around the historical building of old city.This site should be developed as conservation district based on
the concept of revitalization by promoting new activity.
Site Analysis
1st alternativeLocation
This site is located in Pintu Besar Selatan street.The location of this site is between the commercial area.This site is accessible.This site located in crowded area.
U
1st alternativeExisting Data
B.C : 75%F.A.R : 3Located between commercial
area and housing area.Located near the Station KotaThe total of this size is about ±
2000 m² Borders :
• North : Station Kota• East :commercial area• South : commercial area• West : housing area
1st alternativeExisting Data
Façade of the site
Façade of the narrow building
The situation of the main street in the site
Façade of the building in front of the site
This site is have a traffic jam in a busy hourThe façade of every building have a modern image (art-deco)The vegetation just a small trees
1st alternativeS.W.O.T Analysis
S
W
O
T
trength
This total area of the site is about ± 2000 m²The site has FAR 3, so it can containing a vertical mix of two or more principal uses and places our many function.
eakness
The site is between 4th storey building, so the wind is difficult to make into the building
The site is to west-east, and it makes the sun go directly to the site and make the sun uncomfortable.
No pedestrian ways arond the site.
Facade of the site and the position between the another building
The position of the site in front of the main road with yellow line is the main road
The rules of the site is with FAR 3 and BC 75%
S
W
O
T
The site is accessible from the main roadSite is located close to the colonial buildings that made the footprint
thick with the value historyThe site is near a sation Kota for activity support pportunity
Because the site is near with the traffic light, it makes the main road of site fully traffic jam in bussy hour
There is no vegetation in this area, so it makes area so dirty because many vehicle through this site it brings more pollution hreat
Museum Fatahillah is the one of the colonial building near the site
Station Kota is one of the activity support near the site
Situation of the main road in a bussy hour
Site Analysis
2nd alternativeLocation
This site is located in Pinangsia Timur street.The location of this site is between the residential and commercial areaThis site located in crowded area.
U
B.C : 75%F.A.R : 3Located between commercial
area and housing area.Located near the Station KotaThe wide of this size is about ±
1.800 m² Borders :
• North : commercial area• East : Klenteng• South : school• West : commercial
2nd alternativeExisting Data
Description:
The Site
House for gathering of Marga Tan
Vihara
Commercial Area
Existing Data
2nd alternative
House for gathering for Marga Tan
Easily accessible from main road Many activity near the siteThere is no vegetation in this site.
Façade of the building in front of the site
Façade of the site
The backside of House for gathering is Vihara
The backside of the site
Description:
Main Road
Side Road
Circulation
2nd alternative
The road in front of the site
The backside of the site
The situation of the road around the site
Facade of the site
Road entrance from the main road
2nd alternativeS.W.O.T Analysis
S
W
O
T
trength
weakness
The site has FAR 3, so it can containing a vertical mix of two or more principal uses and places our many function.The site is between low rise building, so it makes the air circulation so smoothThere is the pedestrian ways in front of the site
The site facing north-south, in the west-east there is a building which is hindered the natural lighting.
The road in front of the site is just for 2 ways
The location of the site between low rise building and facing north-south
The situation of in front of the site fully of the parking for the people who lived in there.
S
W
O
T
pportunity
threat
Many activities around the site and many activity support in there such as commercial area and house for Gathering of Marga Tan and it makes the site is has many activity and makes site so alive.
The location of the site quite far from main road.Site location was quite far from hustle and make a bit difficult to
reach the site by community
House for gathering is the right side of the site
The backside of house for gathering
The location of the site between low rise building
Site Analysis
3rd alternativeLocation
This site is located in Roa Malaka Utara street.The location of this site is between the residential and commercial areaThis site located in crowded area.
U
1st alternativeExisting Data
B.C : 75%F.A.R : 3Located between commercial
area and housing area.Located near the Fatahillah museumThe total of this size is about ±
2100 m² Borders :
• North : commercial area• East :commercial area• South : Bank Artha
Graha• West : housing area
3rd alternative
Existing Data
The back side of the site
The site is not easily visibleThe site between the commercial areaThere is a big trees around the site
The facade of the site
The situation in the intersection of the backside
The situation of the street in front of the site
1st alternativeS.W.O.T Analysis
S
W
O
T
trength
This total area of the site is about ± 2000 m²The site has FAR 3, so it can containing a vertical mix of two or more principal uses and places our many function.
eakness
The site is between 4th storey building, so the wind is difficult to make into the building
The site is to west-east, and it makes the sun go directly to the site and make the sun uncomfortable.
No pedestrian ways around the site.
Facade of the site and the position between the another building
The position of the site in front of the main road with yellow line is the main road
The rules of the site is with FAR 3 and BC 75%
S
W
O
T
The site is accessible from the main roadSite is located close to the colonial buildings that made the site thick
with the value historyThe site is near a sation Kota for activity support pportunity
Because the site is near with the traffic light, it makes the main road of site fully traffic jam in bussy hour
There is no vegetation in this area, so it makes area so dirty because many vehicle through this site it brings more pollution hreat
Museum Fatahillah is the one of the colonial building near the site
Station Kota is one of the activity support near the site
Situation of the main road in a bussy hour
S.W.O.T Analysis
S.W.O.T
W-T Strategy• Create a green area to prevent
pollution
• Create openings in some places so that the wind can enter the building
and take advantage of natural sunlight
S-T strategi•Move the location of entrance for
private vehicles, while the pedestrian ways still in front of the
main road
• Create a green area on the building as a buffer and create
good air circulation in the building
S-O StrategyMake a vertical mix-use building because of the
limitations of the existing land
W-O strategyBeing a vocal point of the area
around the site
Opportunity Treat
Strength
Weakness
1st
Alternative2nd
Alternative3rd
Alternative
Access + + +The street around the
site
+ +Accessible from the
main road
+ +Accessible from the
main road
Pedestrian +Small pedestrian
+ +Enough for 2 people
+ + +Pedestrian is about
5 – 6 m
CharacteristicArea
+ + +Between commercial
and housing area, and with art deco fasade at
all the building
+ Between commercial
area, House for gathering of Marga
Tan, and Vihara
+ Around the site is
the commercial area
Vegetation + +There is just small tree
for vegetation
- No vegetation
+ +There is just small tree for vegetation
Measurement + + ± 1.900 m²
+ ± 1.800 m²
+ + +± 2.100 m²
Conclusion
Problem Statement
Problem Makro Problem Makro
• There are a lot of vendors in the back of the site
• Because of local regulations which state that must be harmonious with the environment remains good shape, altitude, and the value of architecture, so we can’t make recklessly form of the building we will make
• On this site there is no vegetation, while the local regulations require that the government develop the greenery area on old town.
Small tree in front of the site for vegetation
Problem Mikro Problem Mikro
• This site is located between two high buildings, so the air circulation difficult
• Because we take the topic of tropical city, so we should reduce the use of air conditioner
• A narrow site and number of activities according to the function of the building, then the building can’t be made large horizontally
Two high building between the site
Solution Statement
Problem Makro Problem Makro
• Vendors where located behind this site is given a place to trade, where they sell goods made in indonesia, for example they sell art craft, kerak telor, etc
• Makes this site more green with planting many trees around the building
• We try to design this building with follow the local regulation, but is not glued to the rules are.
The design may have the same level with the surrounding buildings or have the same style of architecture with the environment
Problem Mikro Problem Mikro
• On this building we create many openings so that air can enter the building
• We make a lot of open space and green space to reduce the use of air conditioner
• The building made of vertical mix-used, so all activities can be facilitated in it and on the existing site
Spatial Room and Room Program
Spatial Room
HUMAN ACTIVITIES PLACES CHARACTER
COME / GO MAIN ENTRANCE/EXIT PUBLIC
GET INFORMATION RECEPTIONIST SEMI PUBLIC
WATCH THE ART SHOW AUDIENCE ROOM SEMI PUBLIC
VISITORS LISTENING & LEARNING THE WORKSHOP HALL SEMI PUBLIC
EAT & CHAT FOOD AREA SEMI PUBLIC
BUY SOUVENIR SOUVENIR STAND SEMI PUBLIC
CLEAN AND WASTE TOILET PRIVATE
COME / GO SIDE ENTRANCE SEMI PUBLIC
STAY AND REST GUEST ROOM SEMI PRIVATE
PERFORMANCE PERFORMANCE ROOM/STAGE SEMI PUBLIC
ARTIST WORKSHOP HALL SEMI PUBLIC
CHANGE OUTRAGEOUS OUTFITS COSTUM ROOM PRIVATE
CLEAN AND WASTE TOILET PRIVATE
EAT & CHAT FOOD STAND SEMI PUBLIC
COME / GO MAIN ENTRANCE PUBLIC
CLEAN THE ROOM AND SAVE THE CLEAN EQUIPMENT
JANITOR ROOM & STORAGE SERVICE
ADMINISTRATOR KEEPING SECURITY SECURITY ROOM/CCTV ROOM PRIVATE
MANAGE THE BUILDING MANAGER ROOM PRIVATE
GIVE INFORMATION TO VISITOR, ETC RECEPTIONIST ROOM SEMI PUBLIC
EAT , CHAT & BREAK FOOD STAND SEMI PUBLIC
CHANGE CLOTHES LOCKER ROOM PRIVATE
COME / GO SIDE ENTRANCE SEMI PUBLIC
TRADER COOKING KITCHEN SERVICE
SALE THE FOOD & SOUVENIR FOOD STAND & SOUVENIR STAND SEMI PUBLIC
PUBLIC SEMI PUBLIC PRIVATE SERVICE
Space Program
ROOM ACTIVITIES ROOM NEEDS STANDARD FURNITURE REFERENCES MEASUREMENT
Food Stand (5 unit)
Cooking Cooker Neufert
Wash dishes Sinker Neufert
Service the customer Display food Neufert
Keep the equipment Storage Neufert
Subtotal 1,8 m² x 1,85 m² = 3,33 m² x 5 unit = 16,65 m² Circulation 20% 16,65 m² x 20% = 3,33 m² Total food stand 16,65 m² + 3,33 m² = 19,98 m²
Dinning Room Eat Round table/square Neufret 22,5 m² + 13,32 m² = 35,82 m²
Wash Wash basin Neufert 0,36 m² x 1 unit = 0,36 m²
Souvenir area Sale the stuff Display stuff 0,40 m² x 1,80 m² = 0,72 m² x 2 unit = 1,44 m²
Neufert 1,5 m² x 2 m² = 3 m²
Toilet (4 unit) Wash & Waste Toilet Neufert 1,575 m² x 4 unit = 6,3 m²
Janitor Keep the equipment clean Janitor room - Neufert 1 x 2m² = 2 m²
Subtotal 67,49 m²
Circulation 20% 13,498m²
Total 80,988m²
Food stand and Souvenir stand
}}
1,75 m² x 0,90 m² = 1,575 m²
0,40 m² x 0,90 m² = 0,36 m²
3 m² x 0,60 m² = 1,8 m²
1,10 m² + 0,75 m² = 1,85 m²
1,50 m² x 5 m² = 7,5 m²7,5 m² x 3 unit = 22,5 m²
3,70 m² x 1,80 m² = 6,66 m²6,66 m² x 2 unit = 13,32 m²
P.S = The food stand is just for traditional food of Jakarta
Performing and Creating Space
0,50 m² x 16 seats = 8 m²0,50 m² x 12 row = 6 m²
ROOM ACTIVITIES ROOM NEEDS STANDARD FURNITURE REFERENCES MEASUREMENTAudience Watch the show Audience room Neufert 10 m² x 6 m² = 60 m²
Stage Performance Stage Neufert 10 m² x 3 m² = 30 m²
Custom Room Change the Custom artist Changing room Neufert 6 m² x 4 m² = 24 m²
Workshop Gallery & painting,Crafting
Gallery Neufert 6 m² x 2,5 m² = 15 m²
Toilet Clean & Waste Ladies Room Neufert 2 m² x 3 m² = 6 m²
Gentle Room Neufert 2,55 m² x 4 m² = 10,2 m²
Janitor Keep the Equipment clean Janitor Room - Neufert 1 X 2 m² = 2 m²
Subtotal 147,2 m²
Circulation 20% 29,44 m²
Total 176,64 m²
PaintingSculptureHall
Living Area for Artist
ROOM ACTIVITIES ROOM NEEDS STANDARD FURNITURE REFERENCES MEASUREMENT
Living Sleep, take a bath, chat, meeting
Bed Room Neufert 26 m² x 5 unit = 130 m²
Security Maintain Security Security Room -
Toilet Wash & Waste Toilet Room Neufert 1,575 m² x 2 unit = 3,15 m²
Janitor Keep the equipment clean Janitor Room - Neufert 1 x 2m² = 2 m²
Subtotal 144,15 m²
Circulation 20% 28,283m²
Total 172,98 m²
1,75 m² x 0,90 m² = 1,575 m²
PHD 7,5 m² - 9 m² /unit 9 m²
4 m² x 6,5 m² = 26 m²
Staff and Manager Area
ROOM ACTIVITIES ROOM NEEDS STANDARD FURNITURE REFERENCES MEASUREMENTAdministration Manage & Rental Administration Room 4,5 - 5 m² /unit Neufert 5 m² /unit x 3 person =15 m²
Staff Room Change the Custom & keep the stuff for the staff. Chat &
Break for the staff
Locker Room Neufert 0,8 m² /unit x 20 person =16 m²
Manager Room Manage and Lead the Building Manager Room 14 - 18 m² /person Neufert 14 m² /person x 1 unit = 4,5 m²
Information Give information Front Desk 4,5 m² /unit PHD 4,5 m² /person x 1 unit = 4,5 m²
Toilet Wash & Clean Toilet Neufert 1,575 m² x 4 unit = 6,3 m²
CCTV Room Attention and keep the building from danger
CCTV room - PHD 7,5 m² - 9 m² /unit 9 m²
Janitor Keep the equipment clean Janitor Room - Neufert 1 x 2m² = 2 m²
Subtotal 57,3 m²
Circulation 20% 11,46 m²
Total 68,76m²
1,75 m² x 0,90 m² = 1,575 m²
0,8 m²/unit
Urban Design (Hamid Shirvani)
Land Use :
THIS THING HAPPENED BECAUSE THE STREET IS STRATEGIC AND CROWDED MAIN ROAD CAUSING ASSESSING THE ECONOMICAL VERY HIGH
AREA OF AROUND PINTU BESAR SELATAN STREET HAVE DOMINATED BY COMMERCIAL AREA.
BEHIND IN THIS COMMERCIAL AREA FOUND SHOP MATTERS AND HOUSING.
COMMERCIAL AREAHOUSING
Building Form and Massing :
PROBLEM STATEMENT : SEEN INEXISTENCE RITME AS SKYLINE LESS THE EXISTENCE OF COMPATIBILITY OF BETWEEN BUILDING WHICH IS ONE WITH VINICITY LESS AS WELL-BALANCED AS BETWEEN OPEN SPACE WITH THE SPACE CLOSED.
MOST OF THE BUILDING IN PINTU BESAR SELATAN ST. AREA HAS SAME STYLE. MOST OF THE BUILDING HAVE A MONUMENTAL SCALE. AND THE BUILDING ALSO HAVE A SQUARE AND ARCH OR CURVE FORM IN THEIR FACADE.
THE FAÇADE FROM THE PICTURE, CAN’T REFLECT TO MODERN ARCHITECTURE.
FROM THE SET BACK THIS BUILDING HAVEN’T ALREADY OBEY THE GOVERNMENT ROLE. THE BULKINESS IN THIS BUILDING BLOCKED WIND CIRCULATION
Circulation and Parking :
FROM PINTU BESAR SELATAN STREET TO THE HAYAM WURUK STREET NOT CROWDED.
SOLUTION :• EVERY BUILDING SHOULD PROVIDE A PARKING AREA• AREA PARK ARRANGED NATTY ROADSIDE.
PROBLEM :• THE PINTU BESAR SELATAN THERE ARE A TRAFFIC LIGHT, SO IN
THE THIS STREET FULLY OF TRAFFIC JAM IN BUSSY HOUR.
PARKING TAKES NARROW SPACE THAT CAN BE USEFUL FOR ANOTHER PUBLIC ACTIVITIES
TRAFFIC SIGN
COMMERCIAL SIGN
PROBLEM STATEMENT : THE SIGNAGE ARE MONOTONE, NOT
COLORFUL, NOT INVITING, IT’S MAKE THE SITUATION IN KEMAYORAN MORE BORING
Signage :
Activity Support
• Activity Support is open space or public building, that connect two or more centers of public activity in the city
• Public buildings that are used as activity support on this site is Stasium Kota, Commercial area and Museum Fatahillah
• While Activity Support in the form of open space is Fatahillah Square
Open Space
• The open space is divided into public open space and special open space
• Open space on this site, including public open space.
Main street in the site
Fatahillah square
PROBLEM STATEMENT :THERE IS A MISUSE OF PEDESTRIAN WAYS FOR PARKING AREA AND STREET VENDORS SO THAT ELIMINATE THE PEOPLE CONVINIENCE.THIS AREA ISN’T SUPPORTED BY PEOPLE TO CROSS THE STREET.RESIDENTIAL AREA DOESN’T HAVE ANY PEDESTRIAN WAYS AS A BORDER BETWEEN HOUSE AND STREET.ALONG AS THE STREET CORRIDOR AREN’T SUPPORTED BY A WELL-BALANCED PEDESTRIAN WAYS AREA THAT BALANCE WIDELY WITH THE STREET.
PIMARY STREET (PINTU BESAR SELATAN STREET)
-THERE ARE NO SPECIFIC PARKING AREA SO THAT PEDESTRIAN WAYS IS USED AS PARKING AREA
-THERE ARE SOME STREET VENDORS THAT USE SIDE OF STREET. THIS CONDITION IS DECREASE THE VISUAL VALUE OF STREET ITSELF
-THE SIZE OF THE PEDESTRIAN WAYS IN THIS SIDE IS MORE SMALLER, IT’S ABOUT 2 METERS
Pedestrian Ways :
EXISTING :SOME BUILDINGS ARE IN BAD CONDITION AND DESTROYED AMONG THE OTHERS.
PRESERVATION
BUSWAY LINE IT WAS REPAIRING.
PROBLEM STATEMENT :THEIR EXISTENCE AFFECTS :•DECREASE THE VISUAL AND COMMERCIAL VALUE IN THIS AREA.•THE CHARACTER OF CITY IS UNCLEAR, OR MAYBE LOST.
Preservation :
Zoning Site
Public
Public
Semi Public
Semi Public
Private
Zoning Floor
Souvenir Shop
Foods Corner
Workshop
Performing Room
Guest Room
SHOPING and
RECREATION
PERFORMINGAnd
CREATING
LIVING
Public Semi Public Private
Situation of the Site at 12.30 am in the Sunday
Situation of the Site at 06.00 pm in the Monday
Reference
[1] Robert E. Witherspoon, Jon P. Abbett, and Robert M. Gladstone, Mixed-Use Developments, New Ways of Land Use, page 6.[2] Ibid. page 7.[3] Ibid. page 47-48.
Go-girl Magazine
Personal Data Team
www.google.co.id
Reference :