perfect future conveyance routes - h+e logistik › fileadmin › user_upload › he... · 04 i 05...

9
CLEVER CONVEYING Perfect future conveyance routes

Upload: others

Post on 04-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Perfect future conveyance routes - H+E Logistik › fileadmin › user_upload › HE... · 04 I 05 Tunnelling: Road Metro Railway Water Utility OUR SERVICES Planning and development

CLEVER CONVEYING

Perfect future conveyance routes

Page 2: Perfect future conveyance routes - H+E Logistik › fileadmin › user_upload › HE... · 04 I 05 Tunnelling: Road Metro Railway Water Utility OUR SERVICES Planning and development

02 I 03

H+E mining

H+E industrial

H+E tunnelling

© ka

lafo

to –

fot

olia

.com

RELIABLE, INTELLIGENT AND EFFICIENTWe design, manufacture, supply and install turn-key systems of a few metres up to thirty kilometres in length and, if necessary, even longer than that. We set up the system and ensure trouble-free operation.

With our fl exible conveyor belt systems, there is always a way for intelligent logistics at construction sites and in other fi elds. Tasks with obstructions are not a problem, but rather a challenge for us.

If we focus on our core competencies and procure manufacturing capacities as needed, H+E Logistik is lean, fast and just as fl exible as our system technology. Our customers are pleased to see this because they only get the best – including savings in time and advantages in cost.

It goes without saying that H+E Logistik GmbH also develops customised special designs, so for any distance and required conveyor capacity, the optimal solution is found in next to no time.

Move more with know-how

H+E Logistik offers conveyor systems for any company that would like to move a lot. Extensive experience and the most modern engineering know-how are integrated into our conveyor belt systems that stand the test for transport and distribution of raw and construction materials as well as goods of any kind. We have divided our worldwide activities into three core segments: tunnelling, mining and industrial. H+E competence multiplied by 3.

Page 3: Perfect future conveyance routes - H+E Logistik › fileadmin › user_upload › HE... · 04 I 05 Tunnelling: Road Metro Railway Water Utility OUR SERVICES Planning and development

04 I 05

Tunnelling : Road Metro Railway Water Utilit yTunnelling : Road Metro Railway Water Utilit y

OUR SERVICES■ Planning and development■ Construction and production■ Supply, installation and commissioning■ Field Services and maintenance

OUR PRODUCTS■ Curving, continuously extendable belt conveyor systems for tunnel boring maschines and drill and blast application■ Machine and backup belt conveyors for tunnel boring machines■ Horizontal and vertical belt storage■ Space-saving vertical conveyors■ Spreading and swivelling stockpile conveyors■ Stationary belt conveyors for mining, tunnelling and bulk goods■ Special belt conveyor systems and customer specifi c solutions

Be it under water, in a mega city or high up in the mountains – H+E conveyor systems ensure that the most diverse projects, even under quite extreme conditions, are ex-ecuted in time. Thanks to our booster stations, they can overcome the typically narrow curves to construct metro tunnels. In metropolitan cities, we make sure that waste material is on its way in situations where space is restricted without unfavourably affecting the surrounding infrastructure.

However, we also accompany our customers there where civilisation has not yet ar-rived. Even in remote regions that have not been developed, our systems and elaborate logistics have proven their worth, for example in the construction of railway tunnels. Incidentally, the same holds true for projects with particularly large quantities of waste material, such as boring tunnels for multi-lane high-speed motorways.

The right solution for every situation

H+E conveyor belts are hi-tech systems with the greatest pre-cision. Our sidefl exing and extendible systems transport large quantities of waste material quickly and seamlessly – often over several kilometres.

Page 4: Perfect future conveyance routes - H+E Logistik › fileadmin › user_upload › HE... · 04 I 05 Tunnelling: Road Metro Railway Water Utility OUR SERVICES Planning and development

tunnelling

06 I 07

TEAM PLAYER FOR OPTIMAL PROCESSES FLOWS■ Seamless connection to mechanical

tunnel boring or for conventional

blasting■ Environmentally sound logistics■ Minimal labour input, maximal operational safety■ Belt extension is possible during

normal operation■ Booster stations enable narrow curve

radii of less than 200 metres ■ Economical and effi cient by belt force

reduction on long, straight stretches■ Horizontal or vertical belt storage

saves time and space■ Feeding of material into the tunnel is

possible by means of conveyance on the bottom run

TIME IS MONEY – WE ARE AWARE OF THISBelt extension during normal operation is indispensable for mechanical tunnel boring. H+E has hereto developed a clever system which is child‘s play to handle. Not only is the quantity of waste material increased, but the propulsion power is also accelerated. Belt storage for supplying extra belt material helps save time and space – as horizontal storage or as vertical belt storage in storage towers developed in-house by H+E. By the way: Our belt systems also demonstrate their strength with an effi cient supply of material into the tunnel.

EVEN WITH A MACHINE CONNECTIONAs an affi liated company of Herrenknecht AG, we provide backup conveyors for leading providers of mechanical tunnel boring. Hence, tunnel construction companies benefi t from our technical know-how over the entire conveyance route as well as from the fact that at interface points, everything goes hand in hand.

H+E.tunnelling – We clear the way

For tunnel construction, even the fastest drilling machine does not go far without a working backup. H+E conveyor belt systems create a perfect interface to mechanical tunnel boring or for conventional blasting. As a clean logistics solution to transport waste material without lorries or railway transport. Instead, it is done with minimal labour input and minimised accident risk.

Page 5: Perfect future conveyance routes - H+E Logistik › fileadmin › user_upload › HE... · 04 I 05 Tunnelling: Road Metro Railway Water Utility OUR SERVICES Planning and development

08 I 09

miningWE BRING RAW MATERIALS TO DAYLIGHT Be it coal or copper ore, H+E systems transport and distribute raw materials reliably and effi ciently – even under extreme conditions. Our specially designed swivelling spreaders can also achieve impressive conveying capacities for piling.

In CIS countries, both old mines are modernised and new ones are opened. H+E con-veyor belt systems are deployed for these projects. The belt systems transport the mined material through inclined shaft belts from below the ground to above.

The productivity of each mine particularly depends on the conveyor belts, which must run just as smoothly and seamlessly at +40 °C in summer as at -40 °C in winter. This requires materials and production technologies of a very special quality: made in Germany, made by H+E.

PRACTICAL SOLUTIONS – EVEN IN DIFFICULT CASES■ Durable and robust systems■ Maximum reliability, e. g. in cases of

extreme temperatures and depths■ Can be deployed in potentially explosive atmospheres■ High disposability■ Large conveying capacity

The fi elds of application of our conveyor systems are not limited to tunnel construction projects throughout the world. On the contrary, H+E systems are also suitable for transport and distribution of raw materials – a tried-and-true solution in the mining industry.

H+E.mining – We go into the depth

Page 6: Perfect future conveyance routes - H+E Logistik › fileadmin › user_upload › HE... · 04 I 05 Tunnelling: Road Metro Railway Water Utility OUR SERVICES Planning and development

10 I 11

industrialSpecially for the area of bulk goods, H+E has developed a modular conveyor system which is suitable for almost all bulk goods. The modules can be combined individually and con-siderably reduce the planning cost, and they can be perfectly adapted to the most diverse requirements on-site.

H+E.industrial – We deliver fl exibility

H+E.industrial conveyor belt systems are characterised by a particularly high level of fl exibility and ensure precise system installation. In this manner, we ensure both trouble-free and high-performance operation for our customers. Our clever modular system can even be deployed in constrained spaces. Simple construction permits the transport of bulk goods over the most varied distances.

THREE COMPONENTS – ENDLESS OPTIONSThe drive, bridge and reverse modules are available in several designs and versions, and they can be combined as required. H+E offers various motor capacities and belt widths, so the optimal system can be assembled for any situation.

The system‘s high reliability and large volume fl ows signifi cantly contribute to cost- effectiveness of separation and processing facilities as well as gravel and cement factories, for example.

Lengths of 1 m, 2 m, 6 m

Drive module Bridge module Reverse module

MULTI-TALENTED BULK GOOD SYSTEMS■ Quick planning and installation ■ Various motor capacities and belt

widths are available■ Easy adaptation and extension to meet

different requirements on-site■ Large quantities of material up to

2,000 tonnes/hour for high cost- effectiveness■ They can even be deployed in diffi cult

situations or those with restricted space

+ +

Page 7: Perfect future conveyance routes - H+E Logistik › fileadmin › user_upload › HE... · 04 I 05 Tunnelling: Road Metro Railway Water Utility OUR SERVICES Planning and development

12 I 13

The Herrenknecht Group is behind us

The tunnel conveyor belt transports the material from the boring operation right up to in front of the tunnel portal. If a shaft is present, vertical conveyors or in-clined conveyor belts bring the excavated material to the surface. This is wherethe interim repository with deposit belt conveyor and the stacker are located.

With the numerous branches of Herrenknecht, we use the infrastructure of a global player in order to be represented in the neighbourhood all over the world. Our Field Service is part of the “Tunnelling Teamwork“ and contributes towards developing new paths in the mobility of tomorrow.

Herrenknecht AG holds a majority share in

H+E Logistik. So our customers can rely on

the security of an international leader in

mechanical tunnelling – with over 3,000

employees worldwide, more than 30 years

of experience and hundreds of successfully

completed projects around the world.

Dr.-Ing. Martin Herrenknecht, Company Founder and Management Board Chairman of Herrenknecht AG

The large complex of 32,000 square metres

houses an offi ce complex, a cold hall of 1,500

square metres for temporary storage of

materials, a 2,500 square metre production

hall which comprises two crane bridges with

a 16 tonne load lifting capacity as well as a

sand and paint shop.

Progress as a matter of principle

In 2010, we set up a new H+E location for production of belt systems in Aschers-leben near Magdeburg for this purpose. Equipped with highly modern machinery, this production location is optimally equipped to meet the individual requirements of our customers.

Apart from a permanent workforce of experienced employees, also new colleagues fi nd themselves a job here. In addition, H+E in Aschersleben is also a training facility, which gives the fi rst insights into our exciting segment and provides professional advanced development.

Innovation, reliability and competitiveness form the basis of the trust reposed in us by our customers. We live up to these claims by continually adapting our production to the latest technical requirements.

Our products are integrated as backup conveyors in tunnel boring machines of Herrenknecht and merge seamlessly with tunnel belt conveyor systems of any length. In this way, H+E ensures streamlined process, even at this im-portant interface of tunnel boring machines.

Page 8: Perfect future conveyance routes - H+E Logistik › fileadmin › user_upload › HE... · 04 I 05 Tunnelling: Road Metro Railway Water Utility OUR SERVICES Planning and development

14 I 15

Dipl.-Ing. Gregor Enneking, Managing Director, H+E Logistik GmbH

Our core competence lies in providing extremely reliable, fl ex-ible, cost-effective conveyor belt systems. Projects all over the world underscore the international orientation of our activities.

Since its establishment in 1999, the company H+E Logistik, based in Bochum, has been on a consistent and continuous expansion path. In May 2011, the hundred per cent subsidiary, H+E Logistik USA Inc. was established in Seattle, which is promoting our sales activities locally. Moreover, we are also represented by contact partners in Brisbane (Australia), Novokuznetsk (Russia), Auckland (New Zealand) as well as Hong Kong. The strength of H+E lies in the combination of know-how and entrepreneurship, from which our customers and employees benefi t.

WE PROMOTE SKILLSTeamwork characterises the work at all H+E locations. We place great importance on the selection of our employees, since their performance determines the quality of our products. Starting from engineers to technical draughtsmen or technicians and right up to the commercial colleagues: we have a pool of excellently trained experts, and with the help of supplementary qualifi cations we ensure that each and every one of us can introduce the latest knowledge into the development of our products. Even pro-moting the younger generation is accorded high priority.

Our motivated team lives up to our business philosophy day after day in order to supply the optimal product and the best service to the customer. Please speak to our team if you would like to move mountains. You can expect a pragmatic and down-to-earth solution that works. Guaranteed to be clever.

Expanding pathways – Creating pathways

Page 9: Perfect future conveyance routes - H+E Logistik › fileadmin › user_upload › HE... · 04 I 05 Tunnelling: Road Metro Railway Water Utility OUR SERVICES Planning and development

CLEVER CONVEYING

H+E Logistik GmbHJosef-Baumann-Str. 1844805 BochumGermanyTel. +49 (0)234 I 950 23 60Fax +49 (0)234 I 950 23 [email protected]

Perfect future conveyance routesH+E competence – In use worldwide