8/2/2019 Performance Based Nav 6390a
1/24
PERFORMANCE BASEDNAVIGATION (PBN)
Bod 21.januar 2009
1
-
8/2/2019 Performance Based Nav 6390a
2/24
-
8/2/2019 Performance Based Nav 6390a
3/24
What is the intent of the PBNImplementation Plan
The PBN Implementation Plan should bedeveloped by the State together with the
stakeholders concerned and is intended toassist the main stakeholders of the aviationcommunity plan a gradual transition to the
RNAV and RNP concepts.
3
-
8/2/2019 Performance Based Nav 6390a
4/24
What is the intent of the PBNImplementation Plan
The main stakeholders of the aviation community thatbenefit from this roadmap and should therefore be
included in the development process are: Airspace operators and users
Air navigation service providers
Regulating agencies National and international organizations
4
-
8/2/2019 Performance Based Nav 6390a
5/24
What is the intent of the PBNImplementation Plan
The PBN Implementation Plan is intended to assistthe main stakeholders of the aviation communityplan the future transition and their investment
strategies. For example, airlines and operators canuse this roadmap to plan future equipage andadditional navigation capability investments;
air navigation service providers can plan a gradual
transition for the evolving ground infrastructure. Regulating agencies will be able to anticipate and
plan for the criteria that will be needed in the future
as well as the future regulatory workload andassociated training requirements for their work force.5
-
8/2/2019 Performance Based Nav 6390a
6/24
What are the objectives ofthe PBN Implementation Plan
Provide a high-level strategy for the evolution ofthe navigation applications to be implemented inthe State in the short term (2010-2012) and
medium term (2013-2017). This strategy is basedon the concepts of PBN, Area Navigation (RNAV)and Required Navigation Performance (RNP),which will be applied to aircraft operations
involving instrument approaches, standarddeparture (SID) routes, standard arrival (STAR)routes, and ATS routes in oceanic and continentalareas in accordance with the implementation
goals in the Assembly resolution;6
-
8/2/2019 Performance Based Nav 6390a
7/24
What principles should be applied indevelopment of the PBN Impl. Plan
The implementation of PBN in the State should be based onthe following principles:
Continued application of conventional air navigationprocedures during the transition period, to guaranteeavailability by users that are not RNAV- and/or RNP-equipped;
Development of airspace concepts, applying airspacemodelling tools as well as real-time and acceleratedsimulations, which identify the navigation applications that arecompatible with the aforementioned concept;
Conduct of cost-benefit analyses to justify the implementationof the RNAV and/or RNP concepts in each particular airspace;
Conduct of pre- and post-implementation safety assessmentsto ensure the application and maintenance of the establishedtarget levels of safety.
Must not conflict with the regional PBN implementation plan.7
-
8/2/2019 Performance Based Nav 6390a
8/24
A36-23: Performance basednavigation global goals
Primary objective of ICAO is ensuring the safeand efficient performance of the global AirNavigation System;
Improvement of the performance of the AirNavigation System on a harmonized, worldwidebasis requires the active collaboration of all
stakeholders;8
-
8/2/2019 Performance Based Nav 6390a
9/24
A36-23: Performance basednavigation global goals
The Eleventh Air Navigation Conference recommended that ICAO:
as a matter of urgency, address and progress the issues associatedwith the introduction of area navigation (RNAV) and required
navigation performance (RNP);
develop RNAV procedures supported by global GNSS for fixed wingaircraft, providing high track and velocity-keeping accuracy tomaintain separation through curves and enable flexible approachline-ups;
develop RNAV procedures supported by GNSS for both fixed androtary wing aircraft, enabling lower operating minima in obstacle rich
or otherwise constrained environments;9
-
8/2/2019 Performance Based Nav 6390a
10/24
A36-23: Performance basednavigation global goals
Resolution A33-16 requested the Council to develop a programme toencourage States to implement approach procedures with verticalguidance (APV) utilizing such inputs as GNSS or distance measuringequipment (DME)/DME, in accordance with ICAO provisions;
Recognizingthat implementation of approach with vertical guidance(APV) is still not widespread;
Recognizingthat the Global Aviation Safety Plan has identifiedGlobal Safety Initiatives (GSIs) to concentrate on developing a safetystrategy for the future that includes the effective use of technology toenhance safety, consistent adoption of industry best practices,alignment of global industry safety strategies and consistent
regulatory oversight;10
-
8/2/2019 Performance Based Nav 6390a
11/24
-
8/2/2019 Performance Based Nav 6390a
12/24
A36-23: Performance basednavigation global goals
The Assembly:
1. Urgesall States to implement RNAV and RNPair traffic services (ATS) routes and approachprocedures in accordance with the ICAO PBN
concept laid down in the Performance BasedNavigation Manual(Doc 9613);
12
-
8/2/2019 Performance Based Nav 6390a
13/24
A36-23: Performance basednavigation global goals
2. Resolvesthat:
a) States and planning and implementationregional groups (PIRGs) complete a PBN
implementation plan by 2009 to achieve:
13
-
8/2/2019 Performance Based Nav 6390a
14/24
-
8/2/2019 Performance Based Nav 6390a
15/24
A36-23: Performance basednavigation global goals
b) ICAO develop a coordinated action plan to
assist States in the implementation of PBN andto ensure development and/or maintenance ofglobally harmonized SARPs, Procedures for AirNavigation Services (PANS) and guidancematerial including a global harmonized safetyassessment methodology to keep pace withoperational demands;
15
-
8/2/2019 Performance Based Nav 6390a
16/24
A36-23: Performance basednavigation global goals
3. Urgesthat States include in their PBNimplementation plan provisions for
implementation of approach procedures withvertical guidance (APV) to all runway endsserving aircraft with a maximum certificated take-off mass of 5700 kg or more, according toestablished timelines and intermediatemilestones.
16
-
8/2/2019 Performance Based Nav 6390a
17/24
ICAO Doc 9613, Performance-based Navigation (PBN) Manual
The manual consists of two volumes:
Volume I Concept and ImplementationGuidance
Volume II Implementing RNAV and RNP
Third edition 2008
17
-
8/2/2019 Performance Based Nav 6390a
18/24
VOL 1 Part A THEPERFORMANCE-BASED
NAVIGATION CONCEPT Chapter 1. Description of performance-based
navigation
Chapter 2. Airspace concepts
Chapter 3. Stakeholder uses of performance-based navigation
18
-
8/2/2019 Performance Based Nav 6390a
19/24
VOL 1 PART B IMPLEMENTATION GUIDANCE
Chapter 1. Introduction to implementationprocesses
Chapter 2. Process 1: Determine requirements Chapter 3. Process 2: Identifying ICAO
navigation specification for implementation Chapter 4. Process 3: Planning and
implementation Chapter 5. Guidelines for development of a new
navigation specification
19
-
8/2/2019 Performance Based Nav 6390a
20/24
VOL 1 PART B IMPLEMENTATION GUIDANCEChapter 4. Process 3: Planning andImplementation
Step 1 Formulate safety plan Step 2 Validate airspace concept for safety Step 3 Procedure design
Step 4 Procedure ground validation Step 5 Implementation decision Step 6 Flight inspection and flight validation Step 7 ATC system integration considerations Step 8 Awareness and training material Step 9 Establishing operational
implementation date
Step 10 Post-implementation review20
-
8/2/2019 Performance Based Nav 6390a
21/24
-
8/2/2019 Performance Based Nav 6390a
22/24
VOLUME IIPART A GENERAL
Chapter 1. Introduction
Chapter 2. On-board performancemonitoring and alerting
Chapter 3. Safety assessmentconsiderations
22
-
8/2/2019 Performance Based Nav 6390a
23/24
VOLUME IIPART B IMPLEMENTING RNAV
Chapter 1. Implementing RNAV 10
(designated and authorized as RNP 10)
Chapter 2. Implementing RNAV 5
Chapter 3. Implementing RNAV 1 and RNAV 2
23
-
8/2/2019 Performance Based Nav 6390a
24/24