performance of ten mile canal filter marsh project anura karuna-muni, p.e., lee county roland...

24
Performance of Ten Performance of Ten Mile Canal Filter Mile Canal Filter Marsh Project Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering, Inc. Lee County Division of Natural Resources

Upload: summer-milton

Post on 14-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Performance of Ten Mile Canal Filter Marsh Mile Canal Filter Marsh ProjectProject

Anura Karuna-Muni, P.E., Lee County

Roland Ottolini, P.E., Lee County

Tim Denison, Johnson Engineering, Inc.

Lee County Division of Natural Resources

Page 2: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Presentation Outline:•Layout of the filter marsh

•Monitoring of water quality and flow

•Data analysis and trends, assuming the filter marsh as a blackbox

•Maintenance of the marsh

•Summary

Page 3: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Page 4: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Ten Mile and Six Mile Ten Mile and Six Mile WatershedsWatersheds(approximate area = 43,000 acres)(approximate area = 43,000 acres)

Ten Mile Canal WatershedTen Mile Canal Watershed

(Approx. 13 square miles)(Approx. 13 square miles)

Page 5: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Filter Marsh Cell Orientation and Operation

North Settling Cell/ Filter Marsh

North Filter Marsh

South Settling Cell/Filter Marsh

South Filter Marsh

Lee County Division of Natural Resources

Page 6: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Page 7: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Page 8: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Water Quality Monitoring Locations

Lee County Division of Natural Resources

Page 9: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Water Level Monitoring Locations

Lee County Division of Natural Resources

Page 10: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Filter Marsh Inflow and Outflow (acre-ft)

0

100

200

300

400

Jan

Feb

Mar

Apr

May Jun

Jul

Aug Sep Oct

Nov

Dec

ac-f

t Inflow

Outflow

Page 11: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Filter Marsh Inflow and Outflow Trendlines(established using 5th order polynomials)

0

100

200

300

400

Jan

Feb

Mar

Apr

May Jun

Jul

Aug Sep Oct

Nov

Dec

ac-f

t

Inflow

Outflow

Trendline(inflow )Trendline(outf low )

Page 12: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Effect of Rainfall on Flow

0

100

200

300

400

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Flo

w V

olu

me

(a

c-f

t)

0

2

4

6

8

10

12

14

Ra

infa

ll (i

n)

InflowOutflowRainfall

Page 13: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Water Quality and Level Monitoring Equipments

Avalanche® Multi-bottle, Multi-function Sampler

Page 14: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Total Nitrogen Concentrations

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

Jan

Feb

Mar

Apr

May Jun

Jul

Aug Sep Oct

Nov

Dec

mg

/l

Total Nitrogen(in)

Total Nitrogen (out)

Page 15: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Total Phosphorus Concentrations

0.00

0.01

0.02

0.03

0.04

0.05

0.06

0.07

Jan

Feb

Mar

Apr

May Jun

Jul

Aug Sep Oct

Nov

Dec

mg

/l

Total Phosphorus (in)

Total Phosphorus (out)

Page 16: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Total Nitrogen Load Removal

71%71%

55%38%

80%49%

58%78%

99%

91%

99%

100%

0

100

200

300

400

500

Jan

Feb

Mar

Apr

May Ju

n

Jul

Aug Sep Oct

Nov

Dec

Mo

nth

ly L

oad

(kg

)

Load InLoad OutPercentages

2008 Total Load Reduction = 68% (1920 kg)

Page 17: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Total Phosphorus Load Removal

99% 89%100%

89%

100%

66%

79%

91%

56%74% 88%

87%

0

5

10

15

20

25

Jan

Fe

b

Ma

r

Ap

r

Ma

y

Jun

Jul

Au

g

Se

p

Oct

No

v

De

c

Mo

nth

ly L

oa

d (

kg

)

Load InLoad OutPercentages2008 Total Load

Reduction = 82% (78.9 kg)

Page 18: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Maintenance Activities

4/15/2008 Aquatic Plant Removal 7 cy mixed

4/15/2008 Aquatic Plant Removal 1 cy chara

5/15/2008 Harvest Cell No. 4 8 cy native

8/6/2008 Aquatic Plant Removal 45 cy mixed

11/17/2008 Aquatic Plant Removal 40 cy mixed

Page 19: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Canal Performance of Ten Mile Canal Filter Marsh ProjectFilter Marsh Project

Lee County Division of Natural Resources

Nitrogen Load Entering the Filter Marsh

during dry season (706 kg)

during wet season (2115 kg)

Nitrogen Load Leaving the Filter Marsh

during dry season (62 kg)

during wet season (839 kg)

Page 20: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Phosphorus Load Entering the Filter Marsh

during dry season (17.2 kg) during wet

season (79.5 kg)

Phosphorus Load Leaving the Filter Marsh

during dry season (1.1 kg)

during wet season (16.7 kg)

Page 21: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

2008 Filter Marsh Performance Summary:Upper limitUpper limit (considering the filter (considering the filter marsh as a blackbox)marsh as a blackbox)

Total Nitrogen Total Nitrogen RemovedRemoved

1920 kg1920 kg

Nitrogen Removal Nitrogen Removal EfficiencyEfficiency

68%68%

Total Phosphorus Total Phosphorus RemovedRemoved

78.9 kg78.9 kg

Phosphorus Phosphorus Removal Removal EfficiencyEfficiency

82%82%

Page 22: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

2008 Filter Marsh Performance Summary:Upper limitUpper limit (considering the filter (considering the filter marsh as a blackbox)marsh as a blackbox)

Lower limitLower limit (considering the inflow (considering the inflow to be equal to to be equal to discharge – no losses)discharge – no losses)

Total Nitrogen Total Nitrogen RemovedRemoved

1920 kg1920 kg 506 kg506 kg

Nitrogen Removal Nitrogen Removal EfficiencyEfficiency

68%68% 36%36%

Total Phosphorus Total Phosphorus RemovedRemoved

78.9 kg78.9 kg 33 kg33 kg

Phosphorus Phosphorus Removal Removal EfficiencyEfficiency

82%82% 65%65%

Page 23: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project

Lee County Division of Natural Resources

Observations and Recommendations:• The efficiency can be determined in different ways. This study focuses on efficiency based on load in the water column.

• Efficiency and load reduction depends on a number of factors such as loading rate, amount of discharge, residence time, maintenance, volume loss due to seepage, ET, leaks, etc.

• Focus on removing nutrient loads during the wet season

• Coordinate monitoring of water quality and flow

• Stay on top of maintenance schedule

• Develop a simple design that is easy to operate and maintain

• Make aware of factors influencing the efficiency

Page 24: Performance of Ten Mile Canal Filter Marsh Project Anura Karuna-Muni, P.E., Lee County Roland Ottolini, P.E., Lee County Tim Denison, Johnson Engineering,

Web Site:www.lee-county.com/naturalresources

Contact Information•[email protected]

[email protected]

[email protected]

Questions & Comments