pfm command element systems · ids-mc inc 2 rfp efec inc 2 rfp operations and support aats ias...
TRANSCRIPT
1“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 1
PfM COMMAND ELEMENT SYSTEMS
Mission: Provide and Sustain Command & Control, Communications and Intelligence
Capabilities to the MAGTF.
2“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 2
Command Element Systems (CES)
Program ManagerIntelligence Systems
Col Dave Burton
Electronic Warfare SystemsLtCol Thomas Dono
Deputy Program ManagerMr. Michael Stanford
Deputy Program ManagerMr. Michael Stanford
Distributed Common Ground/Surface Systems
Mr. William Rysanek
Terrestrial/HumanIntelligence
Mr. Dan Scarber
Signals IntelligenceLtCol Patrick Collins
Identity OperationsMs. Sarah Swift
Program ManagerCommand & Control Systems
LtCol Devin Licklider
Command & ControlInfrastructure & Services
Mr. Joseph Murgo
Deputy Program ManagerMs. Deborah Fountain-Yates
Deputy Program ManagerMs. Deborah Fountain-Yates
Joint Battle Command –Platform
Mr. Brian Havener
Extensible MAGTF Command & ControlMr. Basil Moncrief
Info Related CapabilitiesMaj Bret Hohmann
Tactical NetworkingMr. John Norris
Program ManagerCommunications Systems
LtCol Bert Rakdham
Expeditionary CommunicationsMr. Terry Ritchie
Deputy Program ManagerMr. Harry Downey
Deputy Program ManagerMr. Harry Downey
Ground RadiosLtCol Jeffrey Decker
Satellite CommunicationsMaj Andrew Konicki
Terrestrial High CapacityCommunicationsMr. Steven Batts
RadarsMaj Raymond Feltham
Deputy Portfolio ManagerMr. James Westerholm
Command Element Systems (CES)Portfolio Manager (PfM),Col Donald B. McDaniel
3“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 3
“C2 is a function of a commander’s ability to sense, make sense of, and act upon information. As a modern force, we must continue to put ourselves into position to gain all the possible advantages of networking.”
“We will seek to exploit all the advantages conferred by richly networked communications and attempt to deny those same advantages to the enemy.”
“The MAGTF must draw on the full portfolio of U.S. intelligence systems, including space-based assets, to build and maintain an accurate, current, and actionable operational knowledge base. ” - MOC
PM COMMAND ANDCONTROL SYSTEMS
PM COMMUNICATIONSSYSTEMS
PM INTELLIGENCESYSTEMS
PfM CES MAGTF Integration
Future “Five Drivers of Change”
“No single activity in war is more important than command and control.” - MCDP 6
4“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 4
PfM CES
PM CSCommunications Systems
PM C2SCommand and Control
Systems
PM ISIntelligence Systems
DCGS-MC-DCGS-MC-IAS FoS-IAS FoS FY16-21-TEG RWS-TPC FoS Refresh-VIP-MC
Identity Operations-BAT-BESD-EFEC-IDS-MC-IDS-MC Inc2
SIGINT-CESASII-EMSOR-IBR-MCSM/DC-RREP SS3 Mods-RREP FY14-TCAC 4.6/4.7-TPCS MPC Refresh-TPCS MPC Mods-TSCS (F)
T/HUMINT-CIHEP FY14/15-CIHEP Mods-GBOSS-MSIDS-MSIDS TR-MSWS-PGSS (F)-TRSS V6.0-TRSS V6.1-TRSS MAGID- TSCM
EWS-CAP-CVRJ (V)2 (2.1 Band C)-CREW MEU Ph2-NG-CREW (F)-THOR III-VSI (E)
EXCOMM -COMSEC (E)-DAGR-MGUE (F)-SPEED/NPM
GR-HFR-IISR-MBR-MBR II-MCR FoS-NGHFR-SINCGARS (E)-THHR -THHR (V) 3-THHR-SVASATCOM
-GBS-SCI-COMMS HBSI-PT-LMST-Phoenix-SMART-T -SMART-T AEHF UG-SWAN/VSAT FoS L/M/S-VSAT-E
Radars-AN/TPS-59 Sust.-AN/TPS-59 ADATR
- AN/TPS-59 DREX-AN/TPS-59 MLA-AN/TPS-59 Mode 5 IFF-AN/TPS-59 NFU-AN/TPS-59 TSTR-AN/TPS-63B Sust.-FMS (18 cases)
THC2-AN/TRC-170-AN/MRC-142B-AN/MRC-142B-R (F)-AN/MRC-142C-AN/MRC-142C Mod
EOIP-NGT-TEAMS-TSSR (E)-WPPL-D
CAE-CCS FoS-MARCIMS-MISO (F)-PAS
EMC2-NOTM GCV-NOTM-A Inc1-NOTM-A Inc2-NOTM-ITV
JBC-P-JBC-P FoS-MCH-MCH-RFES-MCH-ECR
C2IS-COC (V) 1-4 FoS -JTCW-C2PC-TCO-GCCS-TSOA
TACNET-DTC-R-JCSE-TSM-TVSS VOIP-TDN DDS-M
Last Reviewed: Aug 2017. (E) indicates effort (not a program); (F) indicates future program
S&TScience & Technology
S&TScience & Technology
- Advanced Biometrics (IS)- Antenna Electrocution (CS)- BLoS Communications (CS) - CEWL (MCH*)- Data & Transit Algorithms (CS)- Data Interoperability Testing (1-time)- EAITE (C2IS)- GHub (C2IS)- IA Resiliency & Multi-Level Security (C2S)- JUNO (TBD)- Low Probability of Intercept Communications (PM AFSS/PfM GCES)- RAP (MCH)- SCC (C2IS)
PfM CES Portfolio Overview
Total Efforts: 129
5“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.”
Areas Where Industry Can Help► Cyber Security► Reduce Size, Weight, and Power► Signature Management► Converging Capabilities► Reducing Costs
Opportunities
6“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 6
Program Manager Command and Control Systems (PM C2S)
PM C2S Overview
7“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 7
Production &
Deployment
Engineering Manufacturing&
Development
Technology Maturation&
Risk Reduction
2019 2020 20212017 2018
Operations and Support
Phase Key
MCH MCHMCH
JBC-P HW Refresh
C2PC
TSOA
COC CDS
TSOA TSOATSOA TSOA
NOTM-A Inc 2 Systems
DDS-M Small Form Factor
DDS-M IP Accelerator
DDS-M Refresh (Routers, Servers, Switches)
PM C2S Business Opportunities
8“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 8
Title Planned RFPMCH Hardware Procurement (Prototypes) 1QFY18
*MCH Hardware Procurement (Production)
JBC-P Hardware Refresh Procurement (US Army) 3QFY18
Command and Control Personal Computer (C2PC)(SW development/support) 4QFY21
Combat Operations Center (COC) Cross Domain Solution (CDS) 2QFY20
Tactical Services Oriented Architecture (TSOA) (SW development/support) 4QFY21
TSOA Science & Technology (S&T)/Office of Naval Research supported(TSOA connector development/Tactical Cloud/Compliance)
3QFY183QFY193QFY203QFY21
NOTM-A Inc 2 Systems 1QFY18
DDS-M Small Form Factor 2QFY18
DDS-M IP Accelerator 2QFY21
DDS-M Refresh (Routers, Servers, Switches) 2QFY21 – 1QFY22
*MCH HW Procurement will not be a separate RFP, included in 1QFY18 RFP
PM C2S Business Opportunities
9“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 9
Program Manager Communications Systems (PM CS)
PM CS Overview
10“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 10
Production &
Deployment
Engineering Manufacturing&
Development
Technology Maturation&
Risk Reduction
2019 2020 20212017 2018
NGT – LRIP/FRP/IOC
Operations and Support
Phase Key
AN/MRC-142B Replacement
AN/MRC-142C and WPPL-D Replacement
VSAT-M(R)
VSAT Signal Entry Panel Mod
Next-Generation SATCOM
MCHH- Procurement
AN/TPS-59 Radar System Row TransmitterTechnical Refresh
AN/TPS-59 Radar SystemMode 5 Level II / Mode S Integration
PM CS Business Opportunities
11“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 11
Title Planned RFPNGT (LRIP) 4QFY18
NGT (FRP) 4QFY19
AN/MRC-142B Replacement (LRIP) 1QFY20
AN/MRC-142B Replacement (FOC) 4QFY20
AN/MRC-142C/ WPPL Replacement (RFP) 2QFY20
Signal Entry Panel Modification 1QFY18
VSAT-M(R) 2QFY19
Next Generation SATCOM 3QFY20
MCHH 3QFY18
AN/TPS-59 Radar System Row Transmitter Technical Refresh 2QFY19
AN/TPS-59 Radar System Mode 5 Level II / Mode S Integration 2QFY19
PM CS Business Opportunities
12“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 12
Program Manager Intelligence Systems (PM IS)
PM IS Overview
13“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 13
Production &
Deployment
Engineering Manufacturing&
Development
Technology Maturation&
Risk Reduction
2019 2020 20212017 2018IDS-MC Inc 2 RFP
EFEC Inc 2 RFP
Operations and Support
AATS
IAS Refresh
DCGS-R
CESAS II
TPCS
RREP
MFEW Development
TRSS
G-BOSS
G-BOSS
Phase Key
PM IS Business Opportunities
TRSS: ETU-IITRSS: Imager-IIATRSS: HHPMTRSS: CSR & SDR-II
TRSS: HHPM SDR-II UPGRADES TRSS: ETU-II TRSS: Imager-IIA
14“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 14
Title Planned RFPIDS-MC Increment II RFP 2QFY18
EFEC Increment II RFP FY19
IAS Advanced Analytics (AA) 2QFY17
IAS Refresh 2QFY17 – 2QFY20
DCGS Marine Corps GEOINT-Refresh (DCGS-R) 2QFY19
CESAS II Production 4QFY18
TPCS Components 4QFY18
RREP Components 4QFY18
Multi-Function Electronic Warfare 2QFY20
G-BOSS Tech Refresh FY18 – FY19
G-BOSS Tech Refresh FY18 – FY20
TRSS-Common Sensor Radio FY18 – FY23
TRSS-Hand Held Program Monitor (HHPM) FY18
TRSS-HHPM FY19 – FY20
TRSS-SDR Upgrades FY19
TRSS-IMAGER IIA FY20
TRSS-ETU FY20
TRSS-ETU FY21 – FY22
PM IS Business Opportunities
15“DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.” 15
PfM SES: [email protected] CES: [email protected] LCES: [email protected]
PfM GCES: [email protected] TRASYS: [email protected]