Page 1: PHENIX rotator commissioning @ RUN9

PHENIX rotator commissioning@ RUN9

1

Page 2: PHENIX rotator commissioning @ RUN9

First rotator ON : Fill#10382

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.072±0.004 0.079±0.005

@ Rotator ON 0.011±0.002 0.005±0.002

Transverse component 15±3 % 6±3 %

From phi fit (only amplitude)

From the scaler

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0015 0.0004

@ Rotator ON : UD 0.0039 (11.5%) -0.0020

Transverse component 12.4 % 5.4 %

2

Page 3: PHENIX rotator commissioning @ RUN9

Fill#10383• Use CNI pol. values

– Blue pol = 15%

– Yell pol = 43%

• Blue looks zero, but residual transverse appears in yellow UD…

From the scaler

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0015 0.0001

@ Rotator ON : UD 0.0005 -0.0062

Transverse component 4.6 % 16.3 %

3

Page 4: PHENIX rotator commissioning @ RUN9

Fill#10398• Use CNI pol. values

– Blue pol = 38%

– Yell pol = 47%

From the scaler

4

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0009 0.0024

@ Rotator ON : UD 0.0044 (13.0%) -0.0025

Transverse component 13.3 % 9.1 %

Page 5: PHENIX rotator commissioning @ RUN9

Fill#10399• Use CNI pol. values

– Blue pol = 38%

– Yell pol = 40%

From the scaler

5

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0012 0.0019

@ Rotator ON : UD 0.0055 (16.3%) -0.0015

Transverse component 16.7 % 6.4 %

Page 6: PHENIX rotator commissioning @ RUN9

Fill#10402• Use CNI pol. values

– Blue pol = 36%

– Yell pol = 35%

From the scaler

6

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0002 0.0027

@ Rotator ON : UD 0.0017 -0.0020

Transverse component 5.0 % 8.9 %

Page 7: PHENIX rotator commissioning @ RUN9

Fill#10403• Use CNI pol. values

– Blue pol = 37%

– Yell pol = 37%

From the scaler

7

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0005 0.0023

@ Rotator ON : UD 0.0021 -0.0015

Transverse component 6.4 % 7.2 %

Page 8: PHENIX rotator commissioning @ RUN9

After changing rotator currentFill#10399

8

Go to zero!

Page 9: PHENIX rotator commissioning @ RUN9

Fill#10404• Use CNI pol. values (using first measurements)

– Blue pol = 26.4%

– Yell pol = 31.6%

From the scaler

9

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0002 0.0029

@ Rotator ON : UD 0.0021 -0.0012

Transverse component 6.2 % 8.3 %

Page 10: PHENIX rotator commissioning @ RUN9

Fill#10407• Use CNI pol. values (using first measurements)

– Blue pol = 28.8%

– Yell pol = 23.2%

From the scaler

10

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0005 0.0033

@ Rotator ON : UD 0.0021 -0.0022

Transverse component 6.4 % 10.5 %

Page 11: PHENIX rotator commissioning @ RUN9

Fill#10408• Use CNI pol. values (using first measurements)

– Blue pol = 35.9%

– Yell pol = 34.2%

From the scaler

11

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0001 0.0020

@ Rotator ON : UD 0.0021 -0.0008

Transverse component 6.2 % 5.7 %

Page 12: PHENIX rotator commissioning @ RUN9

Fill#10412• Use CNI pol. values (using first measurements)

– Blue pol = 43.3%

– Yell pol = 36.7%

From the scaler

12

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0003 0.0030

@ Rotator ON : UD 0.0022 -0.0015

Transverse component 6.6 % 8.8 %

Page 13: PHENIX rotator commissioning @ RUN9

Fill#10426• Use CNI pol. values (using first measurements)

– Blue pol = 40.1%

– Yell pol = 39.7%

• Scaler is perfect (non zero) from this fill

From the scaler

13

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0002 0.0019

@ Rotator ON : UD 0.0013 -0.0007

Transverse component 3.9 % 5.4 %

Page 14: PHENIX rotator commissioning @ RUN9

Fill#10434• Use CNI pol. values (using first measurements)

– Blue pol = 32.0%

– Yell pol = 42.7%

• Scaler is perfect (non zero) from this fill

From the scaler

14

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0002 0.0018

@ Rotator ON : UD 0.0015 -0.0023

Transverse component 4.5 % 7.7 %

Page 15: PHENIX rotator commissioning @ RUN9

Fill#10439• Use CNI pol. values (using first measurements)

– Blue pol = 38.4%

– Yell pol = 40.1%

From the scaler

15

Raw asym./CNI pol. BLUE YELLOW

@ Transverse 0.0338 0.0379

@ Rotator ON : LR 0.0010 0.0016

@ Rotator ON : UD 0.0084 -0.0025

Transverse component 25.0 % 7.8 %

Page 16: PHENIX rotator commissioning @ RUN9

Fill#10382

16

Page 17: PHENIX rotator commissioning @ RUN9

phi asymmetry

Value@transversefor BLUE: 0.072±0.004

BLUE forward

BLUE backward

Yellow forward

Yellow backward

Value@transversefor YELLOW : 0.079±0.005

17

Page 18: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

18

Page 19: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

19

Page 20: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

20

Page 21: PHENIX rotator commissioning @ RUN9

Fill#10383

21

Page 22: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

22

Page 23: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

23

Page 24: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

24

Page 25: PHENIX rotator commissioning @ RUN9

Fill#10398

25

Page 26: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

26

Page 27: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

27

Page 28: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

28

Page 29: PHENIX rotator commissioning @ RUN9

Fill#10399

29

Page 30: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

30

Page 31: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

31

Page 32: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

32

Page 33: PHENIX rotator commissioning @ RUN9

Fill#10402

33

Page 34: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

34

Page 35: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

35

Page 36: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

36

Page 37: PHENIX rotator commissioning @ RUN9

Fill#10403

37

Page 38: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

38

Page 39: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

39

Page 40: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

40

Page 41: PHENIX rotator commissioning @ RUN9

Fill#10404

41

Page 42: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

42

Page 43: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

43

Page 44: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

44

Page 45: PHENIX rotator commissioning @ RUN9

Fill#10407

45

Page 46: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

46

Goes down?...

Page 47: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

47

Page 48: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

48

Page 49: PHENIX rotator commissioning @ RUN9

Fill#10408

49

Page 50: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

50

Page 51: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

51

Page 52: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

52

Page 53: PHENIX rotator commissioning @ RUN9

Fill#10412

53

Page 54: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

54

Page 55: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

55

Page 56: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

56

Page 57: PHENIX rotator commissioning @ RUN9

Fill#10415

• Scaler is missed.

57

Page 58: PHENIX rotator commissioning @ RUN9

Fill#10426

58

Page 59: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

59

Page 60: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

60

Page 61: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

61

Page 62: PHENIX rotator commissioning @ RUN9

Fill#10434

62

Page 63: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

63

Page 64: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

64

Page 65: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

65

Page 66: PHENIX rotator commissioning @ RUN9

Fill#10439

66

Page 67: PHENIX rotator commissioning @ RUN9

LP scaler : forward asymmetry

67Increase BG after CNI measurement

Page 68: PHENIX rotator commissioning @ RUN9

LP scaler : backward asymmetry

68

Page 69: PHENIX rotator commissioning @ RUN9

LP scaler : detector asymmetry

69Increase BG after CNI measurement

Page 70: PHENIX rotator commissioning @ RUN9

CNI measurements

70

Fill# Time Pol.

10382 3/17 8:45 46.1±2.8

10382 3/17 11:24 31.0±2.3

10383 3/17 17:39 16.7±2.7

10383 3/17 20:32 12.1±3.3

10398 3/19 20:32 41.5±2.4

10398 3/19 22:43 32.4±2.7

10398 3/20 0:43 21.7±2.7

10399 3/20 4:46 37.6±2.4

10399 3/20 6:51 19.9±2.2

10399 3/20 10:39 20.4±2.2

10402 3/20 20:32 35.9±2.4

10402 3/20 22:33 31.6±2.5

10402 3/21 0:35 29.2±2.6

10403 3/21 4:04 36.7±2.5

10403 3/21 6:21 37.8±2.3

Fill# Time Pol.

10382 3/17 8:43 31.2±3.5

10382 3/17 11:24 34.5±2.8

10383 3/17 17:48 33.1±3.0

10383 3/17 21:43 41.2±1.5

10398 3/19 20.32 49.7±2.7

10398 3/19 22:43 52.5±2.4

10398 3/20 0:43 45.0±2.7

10399 3/20 4:46 39.8±2.2

10399 3/20 6:51 36.2±3.4

10399 3/20 10:39 31.6±3.2

10402 3/20 20:32 35.3±3.7

10402 3/20 22:33 38.8±3.7

10402 3/21 0:38 36.6±3.7

10403 3/21 4:05 37.2±3.7

10403 3/21 6:21 28.4±3.3

BLUE YELLOW

Black : Original rotator currentRed : New rotator current

Page 71: PHENIX rotator commissioning @ RUN9

BLUE UD for Fill#10398, 10399

71

Fill#10398

Fill#10399Rotator ON

??